GE

Oil
&
Gas

Liquefied Natural Gas


Reliable innovation for the entire LNG value chain

Pushing technological boundaries

When GE Oil & Gas introduced its Frame 5 gas turbine driver Our compression technologies cover virtually all the major LNG
to LNG liquefaction in 1989, it enabled a step out in terms of processes including APCI C3 Pre-cooled MR™ or AP-X™, Shell’s
production capacity and propelled the industry into a new era. Double Mixed Refrigerant DMR™, Phillips Optimized Cascade™ and
Linde Mixed Fluid Cascade MFC™ process.
Since that first 2.6-MTPY train, we have continually evolved our
LNG technologies to deliver ever-higher power densities and plant
capacities around the world. In 2009, our Frame 9 enabled the
7.8-MTPY megatrains at Qatargas 2 – and we are now installing
even more powerful trains for the latest developments.

Adriatic LNG Oman LNG Malaysia LNG, Bintulu


Gas turbines for power generation Turbocompression and Propane and mixed refrigerant
power-generation units turbocompression trains

Proven Atlantic Basin


56 MTPY

technology

Source: IHS CERA, September 14, 2010


Providing comprehensive support

We
provide
products
and
services
that
increase
performance
All our technologies are rigorously tested to the highest
through
the
entire
LNG
value
chain

production,
liquefaction,
re- international standards and proven in the most extreme operating
gasification
and
storage.
And
we
customize
all
our
equipment
conditions worldwide. Our extensive Global Services network also
for
the
best
fit
with
each
project’s
specific
requirements.
ensures that the right resources and expert support personnel are
always close to our customers – ready and able to help keep the
natural gas flowing.

Woodside Trinidad & Tobago Qatargas 1-4


Main refrigerant compressor drivers Turbocompression units Turbocompression including latest
megatrain technologies

Middle East
67 MTPY

Higher
Asia Pacific
58 MTPY

capacity
Since our Frame 5 gas turbine driver first surpassed
2 MTPY in 1989, GE solutions have been adopted at all the
major LNG plants around the world – contributing much
needed power, efficiency and reliability to help produce
over 181 MTPY (70% of existing capacity) of natural gas.
Safety
Thermal efficiency

Environmental health and safety (EHS) is an integral aspect of our The overall success of an LNG plant is dependent on many
business and the foundation of all our work in this challenging features, the most significant of which is turbomachinery
sector. Our superior EHS metrics and strong performance give efficiency. GE Oil & Gas is well known for its industry-leading
customers the confidence they need regarding the protection contributions to these technologies – continually evolving machine
of their employees and surrounding communities as a whole. designs for safe and superior efficiency increases.

We have an exceptional record with international regulatory bodies Our liquefaction portfolio includes axial compressors with over
and an unwavering commitment to compliance. We recognize 90% efficiency and gas-turbine drivers (e.g., LM2500, LM6000 and
and support it as a crucial part of successful public-private LMS100) with simple-cycle thermal efficiency of more than 40%.
partnerships for clean energy solutions, global infrastructure
development, and various other long-term shared goals.

Designed for
unique demands
Economies of scale Availability & reliability

The viability and competitiveness of an LNG project are very High-quality, reliable equipment is critical to our customers’ success,
sensitive to the investment cost of the liquefaction facility. so we make rigorous testing a critical part of our procedures –
Consequently, the specific cost per ton of LNG produced is of critical both for product development and specific project configurations.
importance. Working closely with our customers, GE Oil & Gas has developed a
wide range of services to improve the performance of all our plant
Our experience includes design and installation of the megatrain equipment – ranging from specific maintenance methodologies that
technologies that enabled Trains 4 and 5 at the Qatargas facility in shorten planned maintenance site activities, through to taking full
Ras Laffan. These trains, driven by our Frame 9E gas turbines, set responsibility for the ongoing performance and availability of the
a new industry milestone for economies of scale. The next step in equipment under Contractual Service Agreements.
large LNG drivers is represented by our LMS100 – with a nominal ISO
power output of about 100 MW and a thermal efficiency of 45%, By injecting our latest technologies into existing installations, we
it is the best available option to reduce the total cost of an LNG are able to extend maintenance intervals and component life. We
operation. also provide advanced machine monitoring and diagnostics – with
a variety of on-site and remote system options – ensuring that
each piece of equipment is running to its potential, and making the
necessary contribution to plant performance.

LNG is the industry’s most volume-intensive process, with success hinging on a balance
of critical aspects – both technological and organizational. With over 25 years of proven
experience in this field, GE Oil & Gas continues developing innovative solutions that help
customers achieve their objectives at many of the largest processing facilities in the world.

Compression solutions

CO2 Barrel Pumps


Vertically Split HP
Discharge Pressure

Pipeline

Vertically Split LP/MP Integrally Geared


Vertically
Split LNG

Integrated Line
Horizontally Split
Overhung

Axial Split Pumps

Screw
Axial

Inlet Volume
Liquefaction trains
Power generation

GE Oil & Gas has supplied turbocompression trains for all the main GE Oil & Gas can supply the complete power station for any
LNG processes. Our technological versatility, breadth of experience liquefaction or regasification facility. Our solutions vary from
and single-source approach gives our customers the advantage packaged simple-cycle turbo-generators to complete power-
of maximized efficiency, reliability and availability in every aspect generation islands and waste-heat recovery systems – all available
of plant operation. In addition to extensive design experience, on a turnkey basis. Thanks to our full line of steam and gas turbine-
we also provide comprehensive in-house capabilities for testing, based configurations, we offer true single-source solutions with the
installation, start-up and commissioning support, maintenance, most efficient power supply tailored to every need.
plant integration and upgrading.
Floating LNG
Other compression services
GE’s aeroderivative gas turbines offer high power-to-weight ratios
We also provide compression solutions for all the other services that are ideal for floating LNG installations. To meet even the most
generally found in an LNG plant. Of particular interest is our demanding requirements, we can offer proven and integrated
innovative design for the boil-off gas compressor that draws on solutions that maximize flexibility and simplify on-site maintenance
extensive in-field experience and has been validated through a and operation. Our technological leadership in all LNG processes
dedicated experimental campaign of detailed analysis and testing. and breadth of experience with offshore installations result in a
This robust and reliable solution now enables our LNG customers single-source approach that decreases installation time and cost
to get their complete line of compressors – including associated while enabling higher operating efficiency and safety in harsh
maintenance and support – from a single, trusted source. marine environments.

Our planning, design and engineering experience spans the entire LNG value chain
– and so does our portfolio of equipment and support capabilities. Since every LNG
facility has unique characteristics and operational objectives, we are committed to
solutions that are customized and configured to each customer’s specific needs.

Gas-turbine drivers for LNG applications Aeroderivative Heavy duty

LMS100
98 MW, 45%

LM6000
PGT25+/G4 44-52 MW, 42%
31.4-34 MW, 41%

LM2500/PGT25
Efficiency

23.2 MW, 37.7%

MS5002E
32 MW, 36%
MS9001EA
130 MW, 34.6%
MS6001B MS7001EA
42 MW, 33% 87 MW, 33%

MS5001, MS5002C-D
26.8-32.6 MW, 29.4%

Power
Modules
Control systems

Modularization of the plant is the best solution to meet overcome We have the unique ability to offer an integrated control platform
limited site resources and space availability. GE Oil & Gas has all the for compressors with a variety of drivers including gas turbines,
necessary engineering, manufacturing and procurement resources steam turbines and electric motors. Our Integrated Compressor
available in-house to produce turnkey modules. Our fabrication Train Control (ICTC) system, previously known as Integrated Turbine-
yard is equipped with full-load testing capabilities that replicate Compressor Control (ITCC), is a well-established product with over
on-site conditions to considerably reduce risk. Our teams support 500 installations on different applications including refrigerant
customers throughout the entire project lifecycle, from design and compressors. This integrated product offers a simplified, reliable and
installation to ongoing maintenance and upgrades. efficient control architecture and software for compressors for anti-
surge control, process control and load sharing.
Auxiliary equipment The ICTC generally uses our Mark VIe system which ensures high
We offer a complete portfolio of auxiliary equipment including reliability and availability through triple modular redundancy
reciprocating compressors, steam turbines, turbo-expanders, (TMR) or dual redundancy for critical systems. Key advantages of
air coolers, pumps, valves and more. Design and manufacturing an integrated system include cost savings in terms of hardware,
is tailored to each plant’s specific process requirements. All simplified installation and commissioning, enhanced maintainability
engineering, manufacturing and testing is carried out at our and system availability – without impacting performance or safety
facilities for optimum quality control. of the anti-surge system.

Delivering
unique results
GE Oil & Gas ge.com/oilandgas
Global Headquarters
Via Felice Matteucci, 2 The information contained herein is general in nature
50127 Florence, Italy and is not intended for specific construction, installation
T +39 055 423 211 or application purposes. GE reserves the right to make
F +39 055 423 2800 changes in specifications or add improvements at any
customer.service.center@ge.com time without notice or obligation.
Nuovo Pignone S.p.A.

Americas Regional Headquarters ©2011 General Electric Company


4424 West Sam Houston Parkway North All Rights Reserved
Houston, Texas 77041
P.O. Box 2291
Houston, Texas 77252-2291
T +1 713 683 2400
F +1 713 683 2421

For complete contact information,


please refer to our website.

GE imagination at work
LNG_012611