PROJET DE RECASEMENT AIN AOUDA-29ha ASSAINISSEMENT DES EAUX USEES

LOTISSEMENT ASSAFA
EVALUATION DES DEBITS DES EAUX USEES
BUREAU D'ETUDES : EXCEL INGÉNIERIE
Adresse : 44, Avenue Al Mélia, Hay Riad, RABAT
DATE : AVRIL 2015
Téléphone : 05 37 57 09 01/02 – Fax : 05 37 57 09 03

NOMBRE
NOMBRE POPULATIO Q. moy Q. moy Q. pointe Q. pointe
SURFACE PERSONNE DOTATION CONSOM.
DESIGNATION D'UNITE N journalier + 10% journalier horaire
PAR HABITAT
U m² hab. hab. L/j/hab m3/j/ha m3/j l/s l/s l/s l/s
0.8 1.3
LOGEMENTS
R+2 907 68,025 10 9070 70 634.90 5.88 6.47 8.41 19.86
R+3 555 62,160 15 8325 70 582.75 5.40 5.94 7.72 18.52
SOUS TOTAL 1,462 130,185 17395 1,217.65 11.27 12.40 16.12 34.22

EQUIPEMENTS
FOUR-HAMAM - Equipement 1 1 423 - 17.00 0.16 0.17 0.23 0.68
SANTE - Equipement 2 1 575 - 5.00 0.05 0.05 0.07 0.20
SOCIO-CULTUREL - Equipement 3 1 616 20 1.23 0.01 0.01 0.02 0.05
ECOLE - Equipement 4 1 1,815 20 3.63 0.03 0.04 0.05 0.14
MOSQUEE - Equipement 5 1 753 - 5.00 0.05 0.05 0.07 0.20
ESPLANADE 1 1,351
Terrains Sportifs 2 1,324
Espace Vert 1,562 15 2.34
Voirie 135,016
Zone Tampon Boisée 15,976
SOUS TOTAL 159,411 31.86 0.30 0.32 0.42 1.27

TOTAL GENERAL 289,596 1,249.51 11.57 12.73 16.54 34.99


RESEAU D'EAU POTABLE

PROJET DE RECASEMENT AIN AOUDA-29ha


Lotissement Assafa

Données de base

Besoin pointe
horaire Côte
N°Nœud N° Conduite Nœud 1 Nœud 2
(l/s) (m)

P1 247.60 1 P1 N1
P2 244.00 2 P2 N2
N1 #REF! 248.20 3 N1 N1"
N1" #REF! 244.80 4 N1 N3
N2 #REF! 241.20 5 N1" N2
N3 #REF! 247.90 6 N1" N5
N4 #REF! 247.00 7 N2 N6
N5 #REF! 244.90 8 N3 N4
N6 #REF! 241.70 9 N3 N7
N7 #REF! 245.60 10 N4 N5
N8 #REF! 244.70 11 N4 N7
N9 #REF! 242.70 12 N5 N6
N10 #REF! 244.60 13 N5 N8
N11 #REF! 243.40 14 N6 N9
N12 #REF! 245.30 15 N7 N8
N13 #REF! 244.10 16 N8 N9
N14 #REF! 243.80 17 N8 N10
N15 #REF! 242.80 18 N9 N11
N16 #REF! 242.00 19 N10 N11
20 N10 N12
Total #REF! 21 N11 N13
22 N11 N15
23 N12 N13
24 N12 N16
25 N13 N14
26 N14 N15
27 N14 N16
28 N15 N16

Total
Réseau Tertiare

N° Conduite Nœud 1 Nœud 2

1 N17 N25
2 N18 N26
3 N19 N34
4 N27 N204
5 N24' N27'
6 N31 N206
7 N29 N32
8 N30 N33
9 N35 N38
10 N36 N39
11 N37 N40
12 N41 N48
13 N42 N51
14 N43 N52
15 N44 N53
16 N45 N54
17 N46 N55
18 N47 N56
19 N49 N90
20 N50 N57
21 N58 N62
22 N59 N65
23 N60 N63
24 N61 N64
25 N66 N71
26 N67 N70
27 N68 N69
28 N72 N107
29 N73 N78
30 N74 N82
31 N75 N83
32 N76 N84
33 N77 N85
34 N79 N87
35 N80 N88
36 N81 N86
37 N89 N92
38 N90 N10
39 N91 N119
40 N93 N7
41 N94 N101
42 N94' N99
43 N95 N98
44 N96 N100
45 N101 N106
46 N102 N105
47 N103 N104
48 N107 N116
49 N109 N120
50 N110 N121
51 N111 N122
52 N112 N123
53 N113 N124
54 N114 N125
55 N115 N126
56 N116 N130
57 N117 N127
58 N118 N131
59 N127 N130
60 N129 N137
61 N132 N154
62 N133 N135
63 N134 N149
64 N136 N143
65 N138 N145
66 N139 N140
67 N141 N142
68 N144 N146
69 N147 N148
70 N150 N151
71 N152 N153
72 N155 N172
73 N156 N171
74 N157 N170
75 N158 N159
76 NN160 N161
77 N162 N163
78 N164 N168
79 N165 N166
80 N167 N169
81 N173 N175
82 N174 N182
83 N176 N181
84 N177 N178
85 N179 N180
86 N183 N185
87 N184 N186
88 N187 N188
89 N189 N190
90 N191 N192
91 N193 N199
92 N200 N208
93 N201 N209
94 N202 N4
95 N210 N214

Total
SEAU D'EAU POTABLE

RECASEMENT AIN AOUDA-29ha


Lotissement Assafa

Données de base

Longueur
(m)

96
86
259
84
184
84
83
79
196
180
127
184
127
127
180
184
150
140
187
172
179
256
137
209
21
139
109
294

4,253
Longueur
(m)
201
201
444
110
63
110
136
136
128
127
127
111
85
85
85
85
85
85
127
111
134
127
133
118
134
134
119
127
89
85
85
85
85
127
127
89
111
210
253
150
176
134
119
128
166
135
120
141
89
89
89
89
89
89
89
136
129
413
266
93
144
115
101
60
104
94
74
74
74
25
26
271
220
192
47
76
26
53
76
44
25
202
181
178
180
208
191
171
175
180
85
464
458
131
445

13,113
RESEAU D'EAU POTABLE

PROJET DE RECASEMENT AIN AOUDA-29ha


Lotissement Assafa

Résultats aux nœuds

Côte Besoin pointe horaire Charge Pression


N°Nœud
(NGM) (l/s) (m) (m)
N1 248.20 2.73 275.00 26.80
N1" 244.80 1.87 274.21 29.41
N2 241.20 1.87 274.62 33.42
N3 247.90 1.5 274.31 26.41
N4 247.00 2.44 273.83 26.83
N5 244.90 3.99 273.77 28.87
N6 241.70 2.31 273.93 32.23
N7 245.60 3.05 273.73 28.13
N8 244.70 3.91 273.32 28.62
N9 241.70 2.98 273.32 31.62
N10 244.60 2.74 271.08 26.48
N11 243.40 4.44 270.93 27.53
N12 245.30 2.31 270.46 25.16
N13 244.10 1.62 270.44 26.34
N14 243.80 0.94 270.41 26.61
N15 242.80 3.42 270.39 27.59
N16 242.00 2.42 270.38 28.38
TOTAL 44.54
RESEAU D'EAU POTABLE

PROJET DE RECASEMENT AIN AOUDA29ha


Lotissement Assafa

Résultats aux conduites

Longueur Diamètre Rugosité Débit Vitesse


N° Conduite (ml) (mm) (mm) (l/s) (m/s)

1 96 160.0 0.1 22.91 1.47


2 86 160.0 0.1 21.63 1.39
3 259 110.0 0.1 3.71 0.49
4 84 160.0 0.1 16.47 1.05
5 184 110.0 0.1 3.16 0.42
6 84 110.0 0.1 5.01 0.66
7 83 160.0 0.1 16.60 1.06
8 79 110.0 0.1 5.38 0.71
9 196 160.0 0.1 9.59 0.61
10 180 110.0 0.1 1.14 0.15
11 127 110.0 0.1 1.79 0.24
12 184 110.0 0.1 1.89 0.25
13 127 110.0 0.1 4.05 0.53
14 127 160.0 0.1 12.40 0.79
15 180 160.0 0.1 8.33 0.53
16 184 160.0 0.1 0.16 0.01
17 150 110.0 0.1 8.63 1.14
18 140 110.0 0.1 9.26 1.22
19 187 110.0 0.1 1.79 0.24
20 172 110.0 0.1 4.10 0.54
21 179 110.0 0.1 3.54 0.47
22 256 110.0 0.1 3.07 0.40
23 137 110.0 0.1 0.63 0.08
24 209 110.0 0.1 1.16 0.15
25 21 110.0 0.1 2.56 0.34
26 139 110.0 0.1 0.65 0.09
27 109 110.0 0.1 0.96 0.13
28 294 110.0 0.1 0.30 0.04
Total 4253.00
A29ha

Pertes de charge
(m/km)

15.51
13.89
3.04
8.23
2.24
5.29
8.36
6.05
2.96
0.34
0.80
0.88
3.54
4.80
2.27
0.00
14.90
17.03
0.79
3.65
2.77
2.13
0.13
0.36
1.52
0.13
0.23
0.03
RESEAU D'EAU POTABLE

PROJET DE RECASEMENT AIN AOUDA-29ha


Lotissement Assafa
Protection Contre Incendie-N3

Données de base

Besoin pointe
horaire Côte
N°Nœud N° Conduite Nœud 1
(l/s) (m)

P1 247.60 1 P1
P2 244.00 2 P2
N1 #REF! 248.20 3 N1
N1" #REF! 244.80 4 N1
N2 #REF! 241.20 5 N1"
N3 17.50 247.90 6 N1"
N4 #REF! 247.00 7 N2
N5 #REF! 244.90 8 N3
N6 #REF! 241.70 9 N3
N7 #REF! 245.60 10 N4
N8 #REF! 244.70 11 N4
N9 #REF! 242.70 12 N5
N10 #REF! 244.60 13 N5
N11 #REF! 243.40 14 N6
N12 #REF! 245.30 15 N7
N13 #REF! 244.10 16 N8
N14 #REF! 243.80 17 N8
N15 #REF! 242.80 18 N9
N16 #REF! 242.00 19 N10
20 N10
Total #REF! 21 N11
22 N11
23 N12
24 N12
25 N13
26 N14
27 N14
28 N15

Total

Réseau Tertiare

N° Conduite Nœud 1

1 N17
2 N18
3 N19
4 N27
5 N24'
6 N31
7 N29
8 N30
9 N35
10 N36
11 N37
12 N41
13 N42
14 N43
15 N44
16 N45
17 N46
18 N47
19 N49
20 N50
21 N58
22 N59
23 N60
24 N61
25 N66
26 N67
27 N68
28 N72
29 N73
30 N74
31 N75
32 N76
33 N77
34 N79
35 N80
36 N81
37 N89
38 N90
39 N91
40 N93
41 N94
42 N94'
43 N95
44 N96
45 N101
46 N102
47 N103
48 N107
49 N109
50 N110
51 N111
52 N112
53 N113
54 N114
55 N115
56 N116
57 N117
58 N118
59 N127
60 N129
61 N132
62 N133
63 N134
64 N136
65 N138
66 N139
67 N141
68 N144
69 N147
70 N150
71 N152
72 N155
73 N156
74 N157
75 N158
76 NN160
77 N162
78 N164
79 N165
80 N167
81 N173
82 N174
83 N176
84 N177
85 N179
86 N183
87 N184
88 N187
89 N189
90 N191
91 N193
92 N200
93 N201
94 N202
95 N210

Total
-29ha

Longueur
Nœud 2
(m)

N1 96
N2 86
N1" 259
N3 84
N2 184
N5 84
N6 83
N4 79
N7 196
N5 180
N7 127
N6 184
N8 127
N9 127
N8 180
N9 184
N10 150
N11 140
N11 187
N12 172
N13 179
N15 256
N13 137
N16 209
N14 21
N15 139
N16 109
N16 294

4,253

Nœud 2 Longueur
(m)
N25 201
N26 201
N34 444
N204 110
N27' 63
N206 110
N32 136
N33 136
N38 128
N39 127
N40 127
N48 111
N51 85
N52 85
N53 85
N54 85
N55 85
N56 85
N90 127
N57 111
N62 134
N65 127
N63 133
N64 118
N71 134
N70 134
N69 119
N107 127
N78 89
N82 85
N83 85
N84 85
N85 85
N87 127
N88 127
N86 89
N92 111
N10 210
N119 253
N7 150
N101 176
N99 134
N98 119
N100 128
N106 166
N105 135
N104 120
N116 141
N120 89
N121 89
N122 89
N123 89
N124 89
N125 89
N126 89
N130 136
N127 129
N131 413
N130 266
N137 93
N154 144
N135 115
N149 101
N143 60
N145 104
N140 94
N142 74
N146 74
N148 74
N151 25
N153 26
N172 271
N171 220
N170 192
N159 47
N161 76
N163 26
N168 53
N166 76
N169 44
N175 25
N182 202
N181 181
N178 178
N180 180
N185 208
N186 191
N188 171
N190 175
N192 180
N199 85
N208 464
N209 458
N4 131
N214 445

13,113
RESEAU D'EAU POTABLE

PROJET DE RECASEMENT AIN AOUDA-29ha


Lotissement Assafa
Protection Contre Incendie-N3

Résultats aux nœuds

Côte Besoin pointe horaire Charge Pression


N°Nœud
(NGM) (l/s) (m) (m)
N1 248.20 2.73 272.13 23.93
N1" 244.80 1.87 271.26 26.46
N2 241.20 1.87 272.14 30.94
N3 247.90 18.5 270.37 22.47
N4 247.00 2.44 270.27 23.27
N5 244.90 3.99 270.47 25.57
N6 241.70 2.31 271.00 29.30
N7 245.60 3.05 270.13 24.53
N8 244.70 3.91 269.98 25.28
N9 241.70 2.98 270.05 28.35
N10 244.60 2.74 267.78 23.18
N11 243.40 4.44 267.64 24.24
N12 245.30 2.31 267.15 21.85
N13 244.10 1.62 267.14 23.04
N14 243.80 0.94 267.11 23.31
N15 242.80 3.42 267.09 24.29
N16 242.00 2.42 267.08 25.08
TOTAL 61.54
RESEAU D'EAU POTABLE

PROJET DE RECASEMENT AIN AOUDA29ha


Lotissement Assafa
Protection Contre IncendieN3

Résultats aux conduites

Pertes de
N° Conduite Longueur Diamètre Rugosité Débit Vitesse charge
(ml) (mm) (mm) (l/s) (m/s) (m/km)
1 96 141.0 0.1 33.41 2.14 32.19
2 86 141.0 0.1 28.13 1.80 23.05
3 259 98.3 0.1 3.92 0.52 3.35
4 84 141.0 0.1 26.77 1.71 20.94
5 184 98.3 0.1 4.74 0.62 4.78
6 84 98.3 0.1 6.78 0.89 9.41
7 83 141.0 0.1 21.52 1.38 13.75
8 79 98.3 0.1 2.35 0.31 1.30
9 196 141.0 0.1 5.91 0.38 1.20
10 180 98.3 0.1 2.17 0.29 1.13
11 127 98.3 0.1 2.08 0.27 1.04
12 184 98.3 0.1 3.61 0.48 2.87
13 127 98.3 0.1 4.23 0.56 3.86
14 127 141.0 0.1 15.60 1.00 7.43
15 180 141.0 0.1 4.95 0.32 0.86
16 184 141.0 0.1 3.30 0.21 0.41
17 150 98.3 0.1 8.56 1.13 14.68
18 140 98.3 0.1 9.33 1.23 17.27
19 187 98.3 0.1 1.74 0.23 0.75
20 172 98.3 0.1 4.08 0.54 3.62
21 179 98.3 0.1 3.55 0.47 2.78
22 256 98.3 0.1 3.08 0.41 2.14
23 137 98.3 0.1 0.62 0.08 0.12
24 209 98.3 0.1 1.16 0.15 0.36
25 21 98.3 0.1 2.54 0.34 1.50
26 139 98.3 0.1 0.65 0.09 0.13
27 109 98.3 0.1 0.96 0.13 0.26
28 294 98.3 0.1 0.30 0.04 0.03
Total 4253
RESEAU D'EAU POTABLE

PROJET DE RECASEMENT AIN AOUDA-29ha


Lotissement Assafa
Protection Contre Incendie-N12
Données de base

Besoin pointe
horaire Côte
N°Nœud N° Conduite Nœud 1
l/s m

P1 247.60 1 P1
P2 244.00 2 P2
N1 2.73 248.20 3 N1
N1" 1.87 244.80 4 N1
N2 1.87 241.20 5 N1"
N3 1.50 247.90 6 N1"
N4 2.44 247.00 7 N2
N5 3.99 244.90 8 N3
N6 2.31 241.70 9 N3
N7 3.05 245.60 10 N4
N8 3.91 244.70 11 N4
N9 2.98 242.70 12 N5
N10 2.74 244.60 13 N5
N11 4.44 243.40 14 N6
N12 19.31 245.30 15 N7
N13 1.62 244.10 16 N8
N14 0.94 243.80 17 N8
N15 3.42 242.80 18 N9
N16 2.42 242.00 19 N10
20 N10
Total 61.54 21 N11
22 N11
23 N12
24 N12
25 N13
26 N14
27 N14
28 N15

Total

Réseau Tertiare

N° Conduite Nœud 1

1 N17
2 N18
3 N19
4 N27
5 N24'
6 N31
7 N29
8 N30
9 N35
10 N36
11 N37
12 N41
13 N42
14 N43
15 N44
16 N45
17 N46
18 N47
19 N49
20 N50
21 N58
22 N59
23 N60
24 N61
25 N66
26 N67
27 N68
28 N72
29 N73
30 N74
31 N75
32 N76
33 N77
34 N79
35 N80
36 N81
37 N89
38 N90
39 N91
40 N93
41 N94
42 N94'
43 N95
44 N96
45 N101
46 N102
47 N103
48 N107
49 N109
50 N110
51 N111
52 N112
53 N113
54 N114
55 N115
56 N116
57 N117
58 N118
59 N127
60 N129
61 N132
62 N133
63 N134
64 N136
65 N138
66 N139
67 N141
68 N144
69 N147
70 N150
71 N152
72 N155
73 N156
74 N157
75 N158
76 NN160
77 N162
78 N164
79 N165
80 N167
81 N173
82 N174
83 N176
84 N177
85 N179
86 N183
87 N184
88 N187
89 N189
90 N191
91 N193
92 N200
93 N201
94 N202
95 N210

Total
-29ha

Longueur
Nœud 2
(m)

N1 96
N2 86
N1" 259
N3 84
N2 184
N5 84
N6 83
N4 79
N7 196
N5 180
N7 127
N6 184
N8 127
N9 127
N8 180
N9 184
N10 150
N11 140
N11 187
N12 172
N13 179
N15 256
N13 137
N16 209
N14 21
N15 139
N16 109
N16 294

4,253

Nœud 2 Longueur
(m)
N25 201
N26 201
N34 444
N204 110
N27' 63
N206 110
N32 136
N33 136
N38 128
N39 127
N40 127
N48 111
N51 85
N52 85
N53 85
N54 85
N55 85
N56 85
N90 127
N57 111
N62 134
N65 127
N63 133
N64 118
N71 134
N70 134
N69 119
N107 127
N78 89
N82 85
N83 85
N84 85
N85 85
N87 127
N88 127
N86 89
N92 111
N10 210
N119 253
N7 150
N101 176
N99 134
N98 119
N100 128
N106 166
N105 135
N104 120
N116 141
N120 89
N121 89
N122 89
N123 89
N124 89
N125 89
N126 89
N130 136
N127 129
N131 413
N130 266
N137 93
N154 144
N135 115
N149 101
N143 60
N145 104
N140 94
N142 74
N146 74
N148 74
N151 25
N153 26
N172 271
N171 220
N170 192
N159 47
N161 76
N163 26
N168 53
N166 76
N169 44
N175 25
N182 202
N181 181
N178 178
N180 180
N185 208
N186 191
N188 171
N190 175
N192 180
N199 85
N208 464
N209 458
N4 131
N214 445

13,113
RESEAU D'EAU POTABLE

PROJET DE RECASEMENT AIN AOUDA-29ha


Lotissement Assafa
Protection Contre Incendie-N12

Résultats aux nœuds

Besoin
Côte pointe Charge Pression
N°Nœud
(NGM) horaire (m) (m)
(l/s)
N1 248.20 2.73 272.49 24.29
N1" 244.80 1.87 271.01 26.21
N2 241.20 1.87 271.68 30.48
N3 247.90 1.5 271.14 23.24
N4 247.00 2.44 270.22 23.22
N5 244.90 3.99 270.07 25.17
N6 241.70 2.31 270.24 28.54
N7 245.60 3.05 269.91 24.31
N8 244.70 3.91 268.73 24.03
N9 241.70 2.98 268.73 27.03
N10 244.60 2.74 260.55 15.95
N11 243.40 4.44 260.15 16.75
N12 245.30 19.31 256.41 11.11
N13 244.10 1.62 257.17 13.07
N14 243.80 0.94 257.15 13.35
N15 242.80 3.42 257.24 14.44
N16 242.00 2.42 256.85 14.85
TOTAL 61.54
RESEAU D'EAU POTABLE

PROJET DE RECASEMENT AIN AOUDA29ha


Lotissement Assafa
Protection Contre IncendieN12

Résultats aux conduites

Pertes de
N° Conduite Longueur Diamètre Rugosité Débit Vitesse charge
(ml) (mm) (mm) (l/s) (m/s) (m/km)
1 96 141.0 0.1 31.31 2.01 28.38
2 86 141.0 0.1 30.23 1.94 26.50
3 259 98.3 0.1 5.20 0.69 5.71
4 84 141.0 0.1 23.38 1.50 16.13
5 184 98.3 0.1 4.11 0.54 3.62
6 84 98.3 0.1 7.44 0.98 11.19
7 83 141.0 0.1 24.25 1.55 17.31
8 79 98.3 0.1 7.59 1.00 11.63
9 196 141.0 0.1 14.29 0.92 6.29
10 180 98.3 0.1 1.83 0.24 0.81
11 127 98.3 0.1 3.32 0.44 2.47
12 184 98.3 0.1 1.94 0.26 0.92
13 127 98.3 0.1 7.21 0.95 10.55
14 127 141.0 0.1 20.00 1.28 11.95
15 180 141.0 0.1 14.56 0.93 6.52
16 184 141.0 0.1 0.94 0.06 0.04
17 150 98.3 0.1 16.93 2.23 54.57
18 140 98.3 0.1 17.96 2.37 61.28
19 187 98.3 0.1 3.11 0.41 2.15
20 172 98.3 0.1 11.08 1.46 24.06
21 179 98.3 0.1 9.13 1.20 16.61
22 256 98.3 0.1 7.50 0.99 11.35
23 137 98.3 0.1 5.13 0.68 5.58
24 209 98.3 0.1 3.10 0.41 2.11
25 21 98.3 0.1 2.38 0.31 1.32
26 139 98.3 0.1 1.63 0.22 0.68
27 109 93.8 0.1 3.07 0.44 2.70
28 294 98.3 0.1 2.44 0.32 1.32
Total 4253
ONEE.
Direction Régionale Rabat
Service Etudes et Travaux

Electrification HTA/BT de l'Ilot 6a de la Phase 1 (Tranches 3&4) du projet FIRDAOUS à Ain Aouda

BILAN DE PUISSANCE

Puissance
Nombre Surface Nbre de Puissance totale
Nbre unités totale
d'unité moyenne niveau foisonnée
DESIGNATION foisonnée
Nbre lot de Nbre lot de Cce
U m² U Log KW KVA
Cce sur voie de 20m²

Zone lots de terrain en R+2, R+3, R+4 et R+5


R+2-Habitation S ≤ 100m² 146 100.00 3 438 0 0 438 547.5
R+2-Habitation 100m²≤ S ≤ 150m² 7 120.00 3 21 0 0 32 39.375
R+2-Rdc Commercial S ≤ 100m² 55 100.00 3 110 28 27 301 376.25
R+2-Rdc Commercial 100m²≤ S ≤ 150m² 20 120.00 3 40 7 13 152 190
SOUS TOTAL LOGEMENT 228 110 3 609 35 40 923 1,153

Zone Equipements
Hammam + Fitness 1 640 1 28.00 35
Terrain Multisport 1 1 400 1 8.00 10
Eclairage Public 8.00 10
SOUS TOTAL EQUIPEMENT 1,040.00 3 44.00 55.00

TOTAL GENERAL 1,150.00 967 1,208

Soit une alimentation à partir de :


-4 dparts BT de 100 KVA chacun (400 KVA) issu du PT n 11 de 500 KVA (le reste de puissance à reserver pour la zone villa 6a)
- 2 dparts BT de 100 KVA chcun (200 KVA) issu du PT n 16 de 500 KVA de la Sous tranche 7 (départ dédié initialement pour une GH de la zone
immeuble modifiée)
- Le reste de puissance à satisfaire à partir d'un nouveau PT de 2x400 KVA
4 départs à partir du PT existant N 11 (420 KVA)

Nombre Surface Nbre de Nbre unités


d'unité moyenne niveau
DESIGNATION
Nbre lot de
U m² U Log Cce

Zone lots de terrain en R+2, R+3, R+4 et R+5


R+2-Habitation S ≤ 100m² 66 100.00 3 198 0
R+2-Habitation 100m²≤ S ≤ 150m² 2 120.00 3 6 0
R+2-Rdc Commercial S ≤ 100m² 14 100.00 3 28 14
R+2-Rdc Commercial 100m²≤ S ≤ 150m² 10 120.00 3 20 4
SOUS TOTAL LOGEMENT 92 110 3 252 18

2 départs à partir du PT existant N 16 (200 KVA)

Nombre Surface Nbre de Nbre unités


d'unité moyenne niveau
DESIGNATION
Nbre lot de
U m² U Log Cce

Zone lots de terrain en R+2, R+3, R+4 et R+5


R+2-Habitation S ≤ 100m² 8 100.00 3 24 0
R+2-Habitation 100m²≤ S ≤ 150m² 2 120.00 3 6 0
R+2-Rdc Commercial S ≤ 100m² 12 100.00 3 24 0
R+2-Rdc Commercial 100m²≤ S ≤ 150m² 6 120.00 3 12 3
SOUS TOTAL LOGEMENT 28 110 3 66 3

Nouveau PT de 2x400 KVA à construire

Nombre Surface Nbre de Nbre unités


d'unité moyenne niveau

DESIGNATION
Nbre lot de
U m² U Log Cce

Zone lots de terrain en R+2, R+3, R+4 et R+5


R+2-Habitation S ≤ 100m² 68 100.00 3 204 0
R+2-Habitation 100m²≤ S ≤ 150m² 3 120.00 3 9 0
R+2-Rdc Commercial S ≤ 100m² 33 100.00 3 66 20
R+2-Rdc Commercial 100m²≤ S ≤ 150m² 4 120.00 3 8 0
SOUS TOTAL LOGEMENT 108 110 3 287 20

Zone Equipements
Hammam + Fitness 1 640 1
Terrain Multisport 1 1 400 1
Eclairage Public
SOUS TOTAL EQUIPEMENT 1,040.00 3

TOTAL GENERAL 1,150.00


Puissance Puissance
Nbre unités totale totale
foisonnée foisonnée
Nbre lot de
Cce sur voie KW KVA
de 20m²

0 198 247.5
0 9 11.25
0 56 70
6 74 92.5
6 337 421

Puissance Puissance
Nbre unités totale totale
foisonnée foisonnée
Nbre lot de
Cce sur voie KW KVA
de 20m²

0 24 30
0 9 11.25
12 84 105
3 42 52.5
15 159 199

Puissance Puissance
Nbre unités totale totale
foisonnée foisonnée

Nbre lot de
Cce sur voie KW KVA
de 20m²

Habi Voie 15 Voie 20


0 204 255
0 14 16.875 3
13 171 213.75 4.5
4 36 45 4 7
17 425 531 5 9

28.00 35 13
8.00 10 17
8.00 0
44.00 45.00 4
1
469 576 71
91
68
0
36
4.5
213

412.5
448.5
560.625
Electrification HTA/BT de l'Ilot 6b de la Phase 1 (Tranches 3&4) du projet FIRDAOUS à Ain Aouda
BILAN DE PUISSANCE

Zone Lots de terrain pour Villas de R+1


Puissance
Puis Puissance
Nombre Nbre de totale
Désignation fois.par totale en
lots Total niveau foisonnée
villa en Kw Kva
en Kw
Lots Villas en R+1 (S<250 m3) 12.00 2.00 24 30
Lots Villas en R+1 (250<S<600 m3) 10 3.0 30 38
Total Zone Lots Villas 10.00 54.00 67.50
Tr 1
Nombre Surface Nbre de Nbre unités
d'unité moyenne niveau

DESIGNATION
Nbre lot de
U m² U Log Cce

Zone lots de terrain en R+2, R+3, R+4 et R+5


R+2-Habitation S ≤ 100m² 39 100.00 3 117
R+2-Habitation 100m²≤ S ≤ 150m² 1 120.00 3 3
R+2-Rdc Commercial S ≤ 100m² 7 100.00 3 14 6
R+2-Rdc Commercial 100m²≤ S ≤ 150m² 1 120.00 3 2 0
SOUS TOTAL LOGEMENT 48 110 3 136 6

Zone Equipements
Hammam + Fitness 640 1
Terrain Multisport 1 1 400 1
Eclairage Public
SOUS TOTAL EQUIPEMENT 1,040.00 3

TOTAL GENERAL 1,150.00

Tr 2
Nombre Surface Nbre de Nbre unités
d'unité moyenne niveau

DESIGNATION
Nbre lot de
U m² U Log Cce

Zone lots de terrain en R+2, R+3, R+4 et R+5


R+2-Habitation S ≤ 100m² 29 100.00 3 87
R+2-Habitation 100m²≤ S ≤ 150m² 0 120.00 3 0
R+2-Rdc Commercial S ≤ 100m² 26 100.00 3 52 14
R+2-Rdc Commercial 100m²≤ S ≤ 150m² 3 120.00 3 6 0
SOUS TOTAL LOGEMENT 58 110 3 145 14

Zone Equipements
Hammam + Fitness 1 640 1
Terrain Multisport 1 400 1
Eclairage Public
SOUS TOTAL EQUIPEMENT 1,040.00 3

TOTAL GENERAL 1,150.00


Puissance Puissance
Nbre unités totale totale
foisonnée foisonnée

Nbre lot de
Cce sur voie KW KVA
de 20m²

117 146.25
5 5.625
1 31 38.75
1 9 11.25
2 162 202

0
8.00 10

8.00 10.00

170 212

106
68
1
Puissance Puissance 33 20
Nbre unités totale totale
foisonnée foisonnée 4 0

Nbre lot de
Cce sur voie KW KVA
de 20m²

87 108.75
0 0
12 140 175
3 27 33.75
15 254 318

28.00 35
8.00
36.00 35.00

290 353
13
4
110
110
118.00
113
133
109
134
114
129
111
111
112
103
123
107
133
113
107
113
107
119
118
108
122
108
131
125

S-ar putea să vă placă și