P.O.

BOX 23439
DOHA, QATAR
TEL. NO. +974 44500628
FAX NO. +974 44500608

STATIC CALCULATION FOR


PIER HEAD FORMWORK
SPECIAL STEEL MOULDS
+
SUPPORTING CONSTRUCTION FRAMES
“UNIVERSAL”

DOCUMENT NO : 345
345-000926-CR-004 REV. 1

PROJECT : Green Line Elevated & At-Grade

CLIENT : SBG
SBG-PORR-HBK

SUBMITTED BY : JOERY T. VILLEGAS


Sr. Project Technician ______________________
signature

CHECKED BY : OLEGS SOKOLOVS


SOKOLOV ______________________
Deputy Head of Engineering signature

APPROVED BY : WOLFGANG BERGER ______________________


Head of Engineering signature

SUBMITTED DATE : 15 June 2015


PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 1 of 63

CONTENTS
PAGE

1.0 GENERAL INFORMATION................................................................................................................................... 2


1.1 REGULATIONS AND STANDARDS ..................................................................................................................... 2
1.2 DESIGN DATA: ..................................................................................................................................................... 2
1.3 CALCULATOR FOR FRESH CONCRETE PRESSURE: ...................................................................................... 3

2.0 FORMWORKS OVERVIEW .................................................................................................................................. 4


2.1 ELEVATION .......................................................................................................................................................... 4

3.0 IMPORTANT INFORMATION ............................................................................................................................... 5

4.0 STRUCTURAL ANALYSIS FOR FORMWORK ................................................................................................... 8


4.1 CHECK 5MM THICK STEEL PLATE .................................................................................................................... 8
4.2 CHECK HORIZONTAL RIBS ................................................................................................................................ 9
4.2.1 panels type 2 & 3 ............................................................................................................................................. 9
4.2.2 panel type 1 ................................................................................................................................................... 16
4.3 CHECK VERTICAL RIBS ...................................................................................................................................... 22
4.3.1 panels type 2 & 3 ........................................................................................................................................... 22
4.3.2 panel type 1 ................................................................................................................................................... 25
4.4 CHECK BOTTOM ANCHOR WALER ................................................................................................................... 29
4.4.1 panel type 2 ................................................................................................................................................... 29
4.4.2 panel type 1 ................................................................................................................................................... 30
4.5 CHECK LIFTING BRACKETS ............................................................................................................................... 32
4.5.1 LOAD ASSUMPTION .................................................................................................................................... 32
4.5.2 STRUCTURAL ANALYSIS FOR LIFTING LOOP .......................................................................................... 33

5.0 STRUCTURAL ANALYSIS FOR SUPPORTING PLATFORM ............................................................................. 35


5.1 LOAD ASSUMPTION ............................................................................................................................................ 35
5.2 SUPPORTING REACTIONS ON PLATFORM MEMBERS ................................................................................... 36
5.3 CHECK SUPPORTING CONSTRUCTION FRAME TYPE 2................................................................................. 52
5.3.1 PIER HEAD SUPPORT ANCHORING / SUPPORTING LOADS .................................................................. 54
5.4 CHECK SUPPORTING CONSTRUCTION FRAME TYPE 1................................................................................. 55
5.4.1 PIER HEAD SUPPORT ANCHORING / SUPPORTING LOADS .................................................................. 56

6.0 ATTACHMENT 1 .................................................................................................................................................. 58


COMPARISON OF SUPPORTING REACTION VALUES ................................................................................................... 58

1
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 2 of 63

1.0 GENERAL INFORMATION


1.1 REGULATIONS AND STANDARDS
• All calculations, calculation table, design and permissible loading as well as approved loading
capacities for DOKA Formwork System parts are based on German Standards DIN; QCS 2010 or
EN.
• Calculation for Doka Formwork System Parts shown in this Structural Analysis are based on the
worst loadings (max. spacing and max. loading of formwork items).
• All deflections in the middle field of Formwork System parts are restricted to maximum 1/500 or
1/350 of span.
• For Form Ties System Max. permissible load ability with 1.6 safety factor against breaking load
• For further details and DOKA Product Information please refer to Work method statement
“Large-area Top 50 system”, “Doka Supporting construction frame” & shop drawings
• Concrete Pressure Pmax. = 75kN/m² for Pier Head.
• Normal Concrete will be used, with consistency D , very soft concrete as per DIN 18218
• Concrete Pressure Pmax. = 75kN/m² is hydrostatic, therefore concrete placing speed is not relevant
(check with “calculator for fresh concrete pressure “for actual concrete temperature” ).
http://www.doka.com/web/tools/calculator/index.en.html

1.2 DESIGN DATA:


Pouring Ht. = 3.00m
Formwork Ht. = 3.15m
Reinforced Concrete Weight = 25 kN/m³
Pouring Concrete Pressure = 75 kN/m² (Max.)

2
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 3 of 63

1.3 CALCULATOR FOR FRESH CONCRETE PRESSURE:

http://www.doka.com/web/tools/calculator/index.en.html
Where:
Tc, ref: Temperature in ºc of fresh concrete, which was the basis for the calculation of the setting on final set
tE.

tE: Time in hours from the first input of water until the fresh concrete reaches the end of setting / final set.

Tc, placing: Temperature in ºc of the fresh concrete directly after placing it into the formwork.

3
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 4 of 63

2.0 FORMWORKS OVERVIEW


2.1 ELEVATION
Front view:

Side view:

4
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 5 of 63

Concrete volume

3.0 IMPORTANT INFORMATION


 Additional to the drawings information it should be taken in consideration also the user information
“LARGE-AREA FORMWORK TOP 50 System” & “Doka Supporting construction frame”
 Live load is calculated as per the EN 12812 min. 1.5KN/m2
 Working wind is 64.4 km/h
 Max. wind is 129 km/h at 8 to 20m above ground as per DIN 1055, Part 4
 In the situation of assembling and storm wind, the supporting structure has to be saved against
overturning and slippage by site (load combination 1 = LC1).
 The concreting has to be done in equal layers.
 The calculation is done for the max utilized components only.
 The structural calculation is based on the EN12812. In the calculation are following safety
parameter included:

 Partial safety factor for loads γF


for variable actions γF = 1.5
(this factor is incorporated on the material side for each DOKA product / design
diagram or table)

 Partial safety factor for material γM

Steel: γM = 1.1

wood (according to EN 1995-1-1)


γM = 1.3 , kmod = 0.9
5
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 6 of 63

 Design explanation to the Software TIP BEAM used by DOKA

 The software TIP BEAM STATICS is an own product of DOKA


 The partial safety factor for loads γF is incorporated on the material side
 Following verifications are incorporated in the TIP BEAM STATIC software:

 Shear stress
 Bending moment
 Deflection

Additional documentation / software used for the calculation:

 User information Large-Area Top 50 Formworks


 User information Doka Supporting construction frame
 DOKA calculation guide (internal documentation)
 RStab 7

6
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 7 of 63

Product information according to EN 1993


Steel plates in use:
-) Steel sheet (form face): 5 mm
-) Horizontal steel ribs: 8 mm x 100 mm (h)
-) Vertical steel ribs: 10 mm x 120 mm (h)

Steel quality:

7
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 8 of 63

4.0 STRUCTURAL ANALYSIS FOR FORMWORK


4.1 CHECK 5MM THICK STEEL PLATE
Design Parameters:

a. steel plate = 5mm thk.


b. Design max. concrete pressure = 75 KN/m2
c. Maximum support spacing = 250mm

Permissible Moment (elastic) of 5mm steel plate:


100  0,5 27,5
 =  = 0.69 /
6 1.1  1.50

Figure 01: 5mm steel plate support spacing

MEd = 0.46 kNm/m

ಶ೏ .
= = 0.67 < 1.00
ೃ೏ .

Utilization = 67%

8
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 9 of 63

4.2 CHECK HORIZONTAL RIBS


Design Parameters:

steel ribs: 8 mm x 100 mm (h)


 ,
27,5
 = = = 16.7 / 2
   1.1  1.50
 ,
27,5
 = = = 9.6 / 2
   √3 1.1  1.50√3

 = 100.8 = 8.0 2


0.8103
, = = 66.7 4
12
66,7
, = = 13.34 3
5
 =
  , = 16,713,34 = 222,8   = 2,23 
2  
 = = 51,2 
3

4.2.1 PANELS TYPE 2 & 3

Figure 02: support spacing of horizontal rib (Panel 2 & 3)

9
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 10 of 63

Check MEd & deflection for all areas with different concrete pressure and rib spacing (referring to Figure 02):

Area 1 (A1):
Q = P x e = 75 x 0,25 = 19 kN/m
 = ,  ;

Permissible deflections as per DOKA standard:


In field / span = L/500 = 885 mm / 500 = 1.77 mm

Deflection perm > │Deflection actual


1.77 > 0.10 mm OK!

10
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 11 of 63

Area 2 (A2):
Q = P x e = 62,5 x 0,27 = 16,9 kN/m
 = ,  

Permissible deflections as per DOKA standard:


In field / span = L/500 = 1024 mm / 500 = 2.05 mm

Deflection perm > │Deflection actual


2.05 > 0.20 mm OK!

11
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 12 of 63

Area 3 (A3):
Q = P x e = 50 x 0,3 = 15 kN/m
 = ,  

Permissible deflections as per DOKA standard:


In field / span = L/500 = 1150 mm / 500 = 2.30 mm

Deflection perm > │Deflection actual


2.30 > 0.20 mm OK!

12
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 13 of 63

Area 4 (A4):
Q = P x e = 37,5 x 0,4 = 15 kN/m
 = ,  

Permissible deflections as per DOKA standard:


In field / span = L/500 = 1150 mm / 500 = 2.30 mm

Deflection perm > │Deflection actual


2.30 > 0.20 mm OK!

13
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 14 of 63

Area 5 (A5):
Q = P x e = 25 x 0,4 = 10 kN/m
 = ,  

Permissible deflections as per DOKA standard:


In field / span = L/500 = 1215 mm / 500 = 2.43 mm

Deflection perm > │Deflection actual


2.43 > 0.30 mm OK!

14
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 15 of 63

Area 6 (A6):
Q = P x e = 12,5 x 0,4 = 5 kN/m
 = ,  

Permissible deflections as per DOKA standard:


In field / span = L/500 = 1660 mm / 500 = 3.32 mm

Deflection perm > │Deflection actual


3.32 > 0.60 mm OK!

MEd, Max = 2.22 kNm/m

ಶ೏ ,
= = 1.00
ೃ೏ ,

Utilization = 100%

15
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 16 of 63

4.2.2 PANEL TYPE 1


Design Parameters:

steel ribs: 8 mm x 100 mm (h)

Figure 03: support spacing of horizontal rib (Panel 1)

16
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 17 of 63

Check MEd & deflection for all areas with different concrete pressure and rib spacing (referring to Figure 03):

Area 1 (A1):
Q = P x e = 75 x 0,25 = 19 kN/m
 = ,  

Permissible deflections as per DOKA standard:


In field / span = L/500 = 933 mm / 500 = 1.87 mm

Deflection perm > │Deflection actual


1.87 > 0.20 mm OK!

17
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 18 of 63

Area 2 (A2):
Q = P x e = 62,5 x 0,27 = 16,9 kN/m
 = ,  

Permissible deflections as per DOKA standard:


In field / span = L/500 = 1050 mm / 500 = 2.10 mm

Deflection perm > │Deflection actual


2.10 > 0.10 mm OK!

18
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 19 of 63

Area 3 (A3):
Q = P x e = 50 x 0,3 = 15 kN/m
 = ,  

Permissible deflections as per DOKA standard:


In field / span = L/500 = 1050 mm / 500 = 2.10 mm

Deflection perm > │Deflection actual


2.10 > 0.10 mm OK!

19
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 20 of 63

Area 4 (A4):
Q = P x e = 37,5 x 0,4 = 15 kN/m
 = ,  

Permissible deflections as per DOKA standard:


In field / span = L/500 = 1150 mm / 500 = 2.30 mm

Deflection perm > │Deflection actual


2.30 > 0.20 mm OK!

20
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 21 of 63

Area 5 (A5):
Q = P x e = 25 x 0,4 = 10 kN/m
 = ,  

Permissible deflections as per DOKA standard:


In field / span = L/500 = 1250 mm / 500 = 2.50 mm

Deflection perm > │Deflection actual


2.50 > 0.20 mm OK!

MEd, Max = 2.07 kNm/m

ಶ೏ ,
= = 0,93
ೃ೏ ,

Utilization = 93%

21
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 22 of 63

4.3 CHECK VERTICAL RIBS


Design Parameters:

2 steel ribs: 10 mm x 120 mm (h)


 ,
27,5
 = = = 16.7 / 2
   1.1  1.50
 ,
27,5
 = = = 9.6 / 2
   √3 1.1  1.50√3

 = 121.02 = 24.0 2


1.0123
, = 2 = 288,0 4
12
288,0
, = = 48.0 3
6
 =
  , = 16,748,0 = 801,6   = 8,02 
2  
 = = 153,6 
3

4.3.1 PANELS TYPE 2 & 3

Figure 04: Concrete Pressure influence on MIDDLE vertical rib (Panel 2 & 3) & Support spacing

22
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 23 of 63

Figure 05: Concrete Pressure influence on EDGE vertical rib (Panel 2 & 3) & Support spacing

Check MEd (referring to Figure 04):

Permissible deflections as per DOKA standard:


A. In field / span = L/500 = 1010 mm / 500 = 2.02 mm
B. Cantilever = L/250 = 960 mm / 250 = 3.84 mm

Deflection perm > │Deflection actual


A. 2.02 > 0.70 mm OK!
B. 3.84 > 3.5 mm (6 mm deflection is at the end part of the member) OK!

23
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 24 of 63

Check MEd (referring to Figure 05):

Permissible deflections as per DOKA standard:


A. In field / span = L/500 = 1330 mm / 500 = 2.66 mm
B. Cantilever = L/250 = 410 mm / 250 = 1.64 mm

Deflection perm > │Deflection actual


A. 2.66 > 0.80 mm OK!
B. 1.64 > 0.1 mm OK!

MEd, Max = 7.11 kNm/m

ಶ೏ ,
= = 0,89
ೃ೏ ,

Utilization = 89%

24
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 25 of 63

4.3.2 PANEL TYPE 1

1 2 3 4

4
3
2
1

Figure 06: Vertical Rib Support spacing (Panel 1)

Check MEd (referring to Figure 06):


Rib 1:

Permissible deflections as per DOKA standard:


A. In field / span = L/500 = 1525 mm / 500 = 3.05 mm
B. Cantilever = L/250 = 990 mm / 250 = 3.96 mm

Deflection perm > │Deflection actual


A. 3.05 > 1.00 mm OK!
B. 3.96 > 3.50 mm (5 mm deflection is at the end part of the member) OK!

25
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 26 of 63

Rib 2:

Permissible deflections as per DOKA standard:


A. In field / span = L/500 = 1525 mm / 500 = 3.05 mm
B. Cantilever = L/250 = 843 mm / 250 = 3.37 mm

Deflection perm > │Deflection actual


A. 3.05 > 1.10 mm OK!
B. 3.37 > 2.90 mm (4 mm deflection is at the end part of the member) OK!

26
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 27 of 63

Rib 3:

Permissible deflections as per DOKA standard:


A. In field / span = L/500 = 1180 mm / 500 = 2.36 mm
B. Cantilever = L/250 = 865 mm / 250 = 3.46 mm

Deflection perm > │Deflection actual


A. 2.36 > 0.90 mm OK!
B. 3.46 > 0.10 mm OK!

27
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 28 of 63

Rib 4:

Permissible deflections as per DOKA standard:


A. In field / span = L/500 = 681 mm / 500 = 1.36 mm
B. Cantilever = L/250 = 636 mm / 250 = 2.54 mm

Deflection perm > │Deflection actual


A. 1.36 > 0.10 mm OK!
B. 2.54 > 1.20 mm OK!

MEd, Max = 7.52 kNm/m

ಶ೏ ,
= = 0,94
ೃ೏ ,

Utilization = 94%

28
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 29 of 63

4.4 CHECK BOTTOM ANCHOR WALER


4.4.1 PANEL TYPE 2
Waler influence:
e=250+1025 / 2=763mm

Result Concrete pressure:


PRez = 63 kN/m2

Figure 07: Reactions from Vertical Ribs (Panel 2) at anchor waling level

29
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 30 of 63

Verification Anchor Waler WU16

Mperm > │max. MEk│ 31.90 > 31.10 KN-m OK!


Qperm > │max. QEk │ 161.00 > 42.50 KN OK!

Permissible deflections as per DOKA standard:


A. In field / span = L/500 = 2100 mm / 500 = 4.20 mm

Deflection perm > │Deflection actual


A. 4.20 > 3.10 mm OK!

4.4.2 PANEL TYPE 1


Waler influence:
e=50+1065 / 2=583mm

Result Concrete pressure:


PRez = 69 kN/m2

30
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 31 of 63

Figure 08: Reactions from Vertical Ribs (Panel 1) at anchor waling level

Verification Anchor Waler WU16

Mperm > │max. MEk│ 31.90 > 29.45 KN-m OK!


Qperm > │max. QEk │ 161.00 > 37.60 KN OK!

Permissible deflections as per DOKA standard:


A. In field / span = L/500 = 2200 mm / 500 = 4.40 mm

Deflection perm > │Deflection actual


A. 4.20 > 3.20 mm OK!

31
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 32 of 63

4.5 CHECK LIFTING BRACKETS


4.5.1 LOAD ASSUMPTION
Lifting Pier head mould as one unit:
- During transportation
Panels:
2 x Type 1 = 2775 kgs x 2 = 5550 kgs
2 x Type 2 = 1500 kgs x 2 = 3000 kgs
2 x Type 3 = 400 kgs x 2 = 800 kgs
______________________________
Total weight for 8 lifting loops: 9350 kgs

Lifting mould panel with supporting structure attached:


- During stripping / erection
Panels:
1 x Type 2 = 1500 kgs
1 x Type 3 = 400 kgs
Supporting structure:
1690 kgs
______________________________
Total weight: 3590 kgs

Considering lifting point arrangement,


total weight will be distributed between the
lifting loops and WU200 Lifting profile in the
following ratio:
1/3 – to WU200 Lifting profile
2/3 – to lifting hooks
Take worst case scenario, when all the weight
is taken by loops:
Total weight for 2 lifting loops: 3590 kgs

Maximum expected load on 1 lifting loop:


 = 

32
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 33 of 63

4.5.2 STRUCTURAL ANALYSIS FOR LIFTING LOOP

Product information according to EN 1993


Steel plates in use:
-) Steel sheet (form face): 5 mm
-) Horizontal steel ribs: 8 mm x 100 mm (h)
-) Vertical steel ribs: 10 mm x 120 mm (h)

Steel quality:

Cross-section data of the welds:


A= 3 x 10 x 0,3 + 9 x 0,3 = 11,7cm2
FEd = 1800 x 1,5 = 2700 kgs = 27 kN
ಶ೏ 

= = = 2,31 / 
 ,
‫ݕ  ݓ‬,݇ 0,9527,5
 = !‫ ܯ‬
=
1.1
= 23.8 / 2


2,31
= = 0,1

 23,8

Utilization = 10%

33
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 34 of 63

steel plate: 15 mm
27,5
 =
‫ݕ‬,݇
= = 16.7 / 2
!‫ܨ!  ܯ‬ 1.1  1.50
c
27,5
 =
‫ݕ‬,݇
= = 9.6 / 2
!‫√ ܨ!  ܯ‬3 1.1  1.50√3
a
, = 2,51,52 = 7,5 2
,
= 4,01,5 = 6,0 2

",# =   ,# = 16,77,5 = 125,3 


",$ =    , = 9,66,0 = 57,6 

ಶ೏ ,
= = 0,47
ೃ೏ ,

Utilization = 47%

34
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 35 of 63

5.0 STRUCTURAL ANALYSIS FOR SUPPORTING PLATFORM


5.1 LOAD ASSUMPTION
The following loads are considered in below calculation:
- Steel mould self weight (as per actual production drawings) 1,2 kN/m²
- Standard Doka elements self weight (as per Doka weight list)
- Reinforced Concrete Weight 25 kN/m³
- Pouring Concrete Pressure (Max.) 75 kN/m²
- LL on top of concrete during pouring 2,0 kN/m²
- LL on top perimeter working platform 1,5 kN/m²

Load transfer is calculated with RStab software and result supporting reactions are applied to the
supporting platform members.
*Supporting reaction summarized value from software is compared against geometrical value
(see attachment)

Figure 09: Rstab model for Platform Type 2

35
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 36 of 63

Figure 10: Rstab model for Platform Type 1

5.2 SUPPORTING REACTIONS ON PLATFORM MEMBERS

Figure 11: Supporting reactions for Panel 2 Central rib (LC1: full load)

36
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 37 of 63

Figure 12: Supporting reactions for Panel 2 Central rib (LC2: without concrete pressure)

Figure 13: Supporting reactions for Panel 2 Edge rib (LC1: full load)

37
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 38 of 63

Figure 14: Supporting reactions for Panel 2 Edge rib (LC2: without concrete pressure)

38
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 39 of 63

Check load on Panel 2 supporting spindles - Universal spindle foot T8


Maximum vertical loads are from LC 2:

Max load on Universal spindle foot T8: 59.8 kN < 80 kN (allowable)

39
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 40 of 63

Check distribution profile WU12 under supporting spindles

Verification distribution profile WU12

Mperm > │max. MEk│ 18.30 > 13.54 KN-m OK!


Qperm > │max. QEk │ 117.00 > 63.00 KN OK!

Permissible deflections as per DOKA standard:


A. In field / span = L/500 = 1050 mm / 500 = 2.10 mm

Deflection perm > │Deflection actual


A. 2.10 > 0.40 mm OK!

40
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 41 of 63

Check distribution profile under T7 spindle struts and distribution profile WU12

- distribution profile under Central Rib (LC1: full load)

41
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 42 of 63

- distribution profile under Central Rib (LC2: without concrete pressure)

- distribution profile under Edge Rib (LC1: full load)

42
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 43 of 63

- distribution profile under Edge Rib (LC2: without concrete pressure)

Support reaction Vertical components are transferred to the Supporting Construction frame trough
IPB180 / IPE180 distribution profiles (see attachment for these profiles structural prove).

43
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 44 of 63

It is not allowed to transfer horizontal loads to the horizontal Supporting Construction frame, therefore
horizontal components of Support reactions are terminated by interconnecting distribution profiles with a
help of tie rods.

44
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 45 of 63

Check distribution profile WU12 for horizontal load transfer


From RStab:

Max Horizontal load at Central Rib (LC1: full load):


H = 88,1 kN

Max Horizontal load at Edge Rib (LC1: full load):


H = 55,0 kN

45
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 46 of 63

Verification distribution profile WU12

Mperm > │max. MEk│ 18.30 > 13.48 KN-m OK!


Qperm > │max. QEk │ 117.00 > 55.00 KN OK!

Permissible deflections as per DOKA standard:


A. In field / span = L/500 = 1820 mm / 500 = 3.64 mm
B. Cantilever = L/250 = 590 mm / 250 = 2.36 mm

Deflection perm > │Deflection actual


A. 3.64 > 1.80 mm OK!
B. 2.36 > 0.40 mm (2 mm deflection is at the end part of the member) OK!

Verification Tie rod 20.0

As shown in Beam static, maximum load on tie = 99.10 kN


Max Tie rod Load = 99.10 kN < 220kN OK!

46
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 47 of 63

Check load on Panel 1 supporting spindles - Universal spindle foot T8


Maximum vertical loads are from LC 2:

- Steel mould self weight (as per actual production drawings) 1,2 kN/m²
- Reinforced Concrete Weight 25 kN/m³
3
3,47 m of concrete
- LL on top of concrete during pouring 2,0 kN/m²
- LL on top perimeter working platform 1,5 kN/m²

________________________________________________________________________
Total vertical load from Panel 1: 175,1 kN
(see attachment for
Comparison of Supporting reaction summarized value from software against geometrical value)

Load distribution from Panel 1 on supporting spindles - Universal spindle foot T8

47
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 48 of 63

Max load on Universal spindle foot T8: 60.1 kN < 80 kN (allowable)

Check distribution profile WU12 under supporting spindles

48
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 49 of 63

Verification distribution profile WU12

Mperm > │max. MEk│ 18.30 > 18.03 KN-m OK!


Qperm > │max. QEk │ 117.00 > 60.10 KN OK!

Permissible deflections as per DOKA standard:


A. In field / span = L/500 = 1000 mm / 500 = 2.00 mm

Deflection perm > │Deflection actual


A. 2.00 > 0.70 mm (3 mm deflection is at the end part of the member) OK!

49
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 50 of 63

Check distribution profile WS10 under Panel struts

Panel struts are used for panel alignment only and will not take load from concrete weight / concrete
pressure. Due to a complex mould shape, it is not possible to verify the exact load distribution to these
panel struts, therefore maximum allowable load is considered for below calculation.

50
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 51 of 63

Verification distribution profile WS10

Mperm > │max. MEk│ 12.30 > 2.33 KN-m OK!


Qperm > │max. QEk │ 82.00 > 15.00 KN OK!

Permissible deflections as per DOKA standard:


A. In field / span = L/500 = 1000 mm / 500 = 2.00 mm

Deflection perm > │Deflection actual


A. 2.00 > 0.30 mm OK!

51
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 52 of 63

5.3 CHECK SUPPORTING CONSTRUCTION FRAME TYPE 2.

- Vertical loads from IPB180 / IPE180 distribution profiles (LC1: full load)

- Vertical loads from IPB180 / IPE180 distribution profiles (LC2: without concrete pressure)

52
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 53 of 63

Verification Supporting construction frame


- Utilization (LC1: full load)

- Utilization (LC2: without concrete pressure)

Utilization = 95%

53
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 54 of 63

5.3.1 PIER HEAD SUPPORT ANCHORING / SUPPORTING LOADS

LC1: full load LC2: without concrete pressure

54
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 55 of 63

5.4 CHECK SUPPORTING CONSTRUCTION FRAME TYPE 1.

- Vertical loads from WU12 / WS10 distribution profiles

Verification Supporting construction frame


- Utilization

Utilization = 17%

55
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 56 of 63

5.4.1 PIER HEAD SUPPORT ANCHORING / SUPPORTING LOADS

56
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 57 of 63

Anchoring loads are UNFACTORED / CHARACTERISTIC

57
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 58 of 63

6.0 ATTACHMENT 1
COMPARISON OF SUPPORTING REACTION VALUES

Vertical load summary (from geometry); considering distribution on panels:

Area 1
3,07 m3

15,08 m3

3,07 m3

Area 2

Considered as additional load for Panel 2 Edge rib *

Considered as load for Panel 1

* Except Panel self weight and LL on platform

Load distribution at Panel 1

58
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 59 of 63

Panel 2 _ Central Rib:


- Steel mould self weight (as per actual production drawings):
2
Panel 2 + Panel 3 = 5,9 m x 1,15m = 6,8 m
6,8 x 94 = 639,2 kg = 6,4 kN
- Reinforced Concrete Weight:
2 3
5,75 m x 1,15m = 6,62 m
6,62 x 25 = 165,5 kN
- LL on top of concrete during pouring:
4 x 1,15 x 2,0 = 9,2 kN
- LL on top perimeter working platforms:
1 x 1,15 x 1,5 = 1,73 kN
∑ Vertical load _Central Rib: 182,8 kN

Supporting reactions for Panel 2 Central rib (LC1: full load)

Supporting reactions for Panel 2 Central rib (LC2: without concrete pressure)

∑ Vertical load _Central Rib: 183,0 kN

59
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 60 of 63

Panel 2 _ Edge Rib:


- Steel mould self weight (as per actual production drawings):
(1900kg - 639,2 kg) / 2 = 630,4 kg = 6,3 kN
- Reinforced Concrete Weight:
3
(15,08 - 6,62 m ) / 2 x 25 = 105,8 kN
- LL on top of concrete during pouring:
3,74 x 2,0 = 7,5 kN
- LL on top perimeter working platforms:
2,25 x 1,5 = 3,38 kN
Additional load from Panel 1 cantilevered part
- Reinforced Concrete Weight:
3
3,07 m x 25 = 76,8 kN
- LL on top of concrete during pouring:
4,03 x 2,0 = 8,1 kN
84,9 / 5,9 = 14,4 kN / m
14,4 x 3,25 = 46,7 kN – additional for Panel 2 Edge rib

∑ Vertical load Edge Rib: 123,0 + 46,7 = 169,7 kN (1 side only)


169,7 x 2 = 339,4 (total from 2 Edge ribs)

60
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 61 of 63

Supporting reactions for Panel 2 Edge rib (LC1: full load)

Supporting reactions for Panel 2 Edge rib (LC2: without concrete pressure)

∑ Vertical load _Middle Rib: 168,5 kN

61
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 62 of 63

Panel 1:
- Steel mould self weight (as per actual production drawings):
Panel 1 = 2775 kg = 27,8 kN
- Reinforced Concrete Weight:
3,47 x 25 = 86,8 kN
- LL on top of concrete during pouring:
1,96 x 1,7 x 2,0 = 6,67 kN
- LL on top perimeter working platforms:
5,0 x 1,5 = 7,5 kN

14,4 x 2,66 = 38,3 kN – for Panel 1

∑ Vertical load_Panel 1: 128,8 + 38,3 = 167,1 kN


167,1 / 2 = 83,6 (1 side only)

Supporting reactions for Panel 1

∑ Vertical load _Central Rib: 118,2 kN

62
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004

VIADUCT PIER HEAD FORMWORK REV. 1

STATIC CALCULATION REPORT


GREEN LINE ELEVATED DATE 15-06-15
& AT-GRADE PAGE 63 of 63

Vertical load summary (from geometry); total:


- Steel mould self weight (as per actual production drawings):
(Panel 1 + Panel 2 + Panel 3) x 2 = (2775 +1500 + 400) x 2 = 9350 kg = 93,5 kN
- Reinforced Concrete Weight:
3 3
(58,1 m – 8,67 m ) x 25 = 1235,8 kN
- LL on top of concrete during pouring:
51,7 x 2,0 = 103,4 kN
- LL on top perimeter working platforms:
34,7 x 1,5 = 52,1 kN

∑ Vertical load  : 1484,8 kN


∑ Vertical load 
 : 1512,8 kN

∑ Vertical load  ,


∑ Vertical load
 
=
,
= 0,98 < 1,0 OK!

63