BOX 23439
DOHA, QATAR
TEL. NO. +974 44500628
FAX NO. +974 44500608
DOCUMENT NO : 345
345-000926-CR-004 REV. 1
CLIENT : SBG
SBG-PORR-HBK
CONTENTS
PAGE
1
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
2
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
http://www.doka.com/web/tools/calculator/index.en.html
Where:
Tc, ref: Temperature in ºc of fresh concrete, which was the basis for the calculation of the setting on final set
tE.
tE: Time in hours from the first input of water until the fresh concrete reaches the end of setting / final set.
Tc, placing: Temperature in ºc of the fresh concrete directly after placing it into the formwork.
3
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Side view:
4
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Concrete volume
Steel: γM = 1.1
Shear stress
Bending moment
Deflection
6
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Steel quality:
7
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
ಶ .
= = 0.67 < 1.00
ೃ .
Utilization = 67%
8
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
9
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Check MEd & deflection for all areas with different concrete pressure and rib spacing (referring to Figure 02):
Area 1 (A1):
Q = P x e = 75 x 0,25 = 19 kN/m
= , ;
10
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Area 2 (A2):
Q = P x e = 62,5 x 0,27 = 16,9 kN/m
= ,
11
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Area 3 (A3):
Q = P x e = 50 x 0,3 = 15 kN/m
= ,
12
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Area 4 (A4):
Q = P x e = 37,5 x 0,4 = 15 kN/m
= ,
13
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Area 5 (A5):
Q = P x e = 25 x 0,4 = 10 kN/m
= ,
14
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Area 6 (A6):
Q = P x e = 12,5 x 0,4 = 5 kN/m
= ,
ಶ ,
= = 1.00
ೃ ,
Utilization = 100%
15
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
16
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Check MEd & deflection for all areas with different concrete pressure and rib spacing (referring to Figure 03):
Area 1 (A1):
Q = P x e = 75 x 0,25 = 19 kN/m
= ,
17
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Area 2 (A2):
Q = P x e = 62,5 x 0,27 = 16,9 kN/m
= ,
18
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Area 3 (A3):
Q = P x e = 50 x 0,3 = 15 kN/m
= ,
19
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Area 4 (A4):
Q = P x e = 37,5 x 0,4 = 15 kN/m
= ,
20
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Area 5 (A5):
Q = P x e = 25 x 0,4 = 10 kN/m
= ,
ಶ ,
= = 0,93
ೃ ,
Utilization = 93%
21
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Figure 04: Concrete Pressure influence on MIDDLE vertical rib (Panel 2 & 3) & Support spacing
22
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Figure 05: Concrete Pressure influence on EDGE vertical rib (Panel 2 & 3) & Support spacing
23
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
ಶ ,
= = 0,89
ೃ ,
Utilization = 89%
24
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
1 2 3 4
4
3
2
1
25
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Rib 2:
26
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Rib 3:
27
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Rib 4:
ಶ ,
= = 0,94
ೃ ,
Utilization = 94%
28
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Figure 07: Reactions from Vertical Ribs (Panel 2) at anchor waling level
29
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
30
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Figure 08: Reactions from Vertical Ribs (Panel 1) at anchor waling level
31
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
32
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Steel quality:
2,31
= = 0,1
23,8
Utilization = 10%
33
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
steel plate: 15 mm
27,5
=
ݕ,݇
= = 16.7 / 2
!ܨ! ܯ 1.1 1.50
c
27,5
=
ݕ,݇
= = 9.6 / 2
!√ ܨ! ܯ3 1.1 1.50√3
a
, = 2,51,52 = 7,5 2
,
= 4,01,5 = 6,0 2
ಶ ,
= = 0,47
ೃ ,
Utilization = 47%
34
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Load transfer is calculated with RStab software and result supporting reactions are applied to the
supporting platform members.
*Supporting reaction summarized value from software is compared against geometrical value
(see attachment)
35
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Figure 11: Supporting reactions for Panel 2 Central rib (LC1: full load)
36
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Figure 12: Supporting reactions for Panel 2 Central rib (LC2: without concrete pressure)
Figure 13: Supporting reactions for Panel 2 Edge rib (LC1: full load)
37
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Figure 14: Supporting reactions for Panel 2 Edge rib (LC2: without concrete pressure)
38
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
39
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
40
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Check distribution profile under T7 spindle struts and distribution profile WU12
41
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
42
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Support reaction Vertical components are transferred to the Supporting Construction frame trough
IPB180 / IPE180 distribution profiles (see attachment for these profiles structural prove).
43
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
It is not allowed to transfer horizontal loads to the horizontal Supporting Construction frame, therefore
horizontal components of Support reactions are terminated by interconnecting distribution profiles with a
help of tie rods.
44
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
45
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
46
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
- Steel mould self weight (as per actual production drawings) 1,2 kN/m²
- Reinforced Concrete Weight 25 kN/m³
3
3,47 m of concrete
- LL on top of concrete during pouring 2,0 kN/m²
- LL on top perimeter working platform 1,5 kN/m²
________________________________________________________________________
Total vertical load from Panel 1: 175,1 kN
(see attachment for
Comparison of Supporting reaction summarized value from software against geometrical value)
47
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
48
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
49
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Panel struts are used for panel alignment only and will not take load from concrete weight / concrete
pressure. Due to a complex mould shape, it is not possible to verify the exact load distribution to these
panel struts, therefore maximum allowable load is considered for below calculation.
50
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
51
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
- Vertical loads from IPB180 / IPE180 distribution profiles (LC1: full load)
- Vertical loads from IPB180 / IPE180 distribution profiles (LC2: without concrete pressure)
52
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Utilization = 95%
53
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
54
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Utilization = 17%
55
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
56
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
57
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
6.0 ATTACHMENT 1
COMPARISON OF SUPPORTING REACTION VALUES
Area 1
3,07 m3
15,08 m3
3,07 m3
Area 2
58
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Supporting reactions for Panel 2 Central rib (LC2: without concrete pressure)
59
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
60
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Supporting reactions for Panel 2 Edge rib (LC2: without concrete pressure)
61
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
Panel 1:
- Steel mould self weight (as per actual production drawings):
Panel 1 = 2775 kg = 27,8 kN
- Reinforced Concrete Weight:
3,47 x 25 = 86,8 kN
- LL on top of concrete during pouring:
1,96 x 1,7 x 2,0 = 6,67 kN
- LL on top perimeter working platforms:
5,0 x 1,5 = 7,5 kN
62
PARTICULAR MANAGEMENT PROCEDURE REF: 345-000926-CR-004
63