Steel Limited, Vijayanagar Works No

TITLE: Header flue & Branch flue damper greasing & freeness

Purpose: Safe synchronization of CDQ power plant with the Grid.

Scope: Generator & control panel

Responsibility: Operation Incharge / Shift Incharge / Electrical Maintenance.


Tools and Tackles:
Key
Sl.No Work Sequence point

1 Running the STG set at rated speed (3000 RPM)

2 Ensure there are no faults present in the system.


3 Clearing the alarms in the system if any present.

4 Excitation of the generator field.

5 Excitation of the generator field.


6
Maintain the required terminal voltage by varying
the excitation.

7
Selection of the generator transformer which will be
synchronized with grid.

8 Match the bus and generator voltage.


9 Match the frequency of the Bus & generator.

10 Ensure the synchronization conditions.

11
Synchronization of the generator with grid by closing
the generator transformer breaker.

Quality Check points: 1.Maintain proper excitation & required frequency, 2. Ensure no faults are present in
FIRST AID :If any injuries, report to shift incharge Legend: Safety Quality: Q

PPE: Personnel protective equipments


Sathishkumar.P Apparao Kulkarni Puneet Narayan
Prepared By Section Head HOD TQ
No.VJNR/CDQPP-EM/VSOP/01

eeness

h the Grid.

ectrical Maintenance.

Work Note

Ensure the STG set running at 3000 RPM. Check


any alarms presnt in the GCP panel.

Reset all the faults in GRP1&2 and GT1&2 and


reset alarms in GCP panel
Reset the AVR by using AVR RESET push button.

Close the generator fireld breaker

Switch On the excitation from GCP.


Observe the generator terminal voltage at
voltmeter in the GCP-1Terminal voltage should
be 10.5 to 11KV if it is low raise the terminal
voltage by giving pulse by EXCIATATION RISE
push button. For lower use EXCITATION LOWER
push button.

Put the GT breaker (Which is to be closed) sync


selector switch (A/M/D) to Manual position by
unlocking the switch and turn it to manual
position

Observe the running voltage and incoming


voltage and match the voltages by raise or
lower the excitation.
Observe the running frequency and incoming
frequency and matches the frequencies by
raise or lower the speed. Difference in
frequencies should be less than 0.1Hz.

Switch on the SYNCHRONOSCOPE ON switch


and observes the synchronoscope. And close
the breaker while the needle comes to sync
limit position & SYNC LIMIT lamp glows.

Closing the breaker.


Speed (Load control) should be increased only
after closing the breaker.

ncy, 2. Ensure no faults are present in the system..

Quality: Q
yan
TQM Representative
P-EM/VSOP/01

Dept: CDQ Power Plant - Electrical Maintenance

Visual Explanation of the work

S-ar putea să vă placă și