Clie : SEC-C
COA Riyadh Po
R ower plantt # 10
Connsultant : “1062
21166/00”
Conntractor : BEMCO O
Date:13
D Revision
n:
Doc
c. No.: PP1
10-BS-SU--001 STARTU
UP MANUA
AL F
Feb,09 0
TES
STING PROCCEDUR
RE FO
OR ME
EDIUM
V
VOLTAAGE BU
US DU
UCT
Page 70
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc No: TP-BD01,
Page 1 of 7
Equipment : Medium Voltage bus duct
Date:13 Feb,09 Revision: 0
TABLE OF CONTENT
1. Task
a. Work Status------------------------------------------------------------------------------------------------2
b. Documentation--------------------------------------------------------------------------------------------2
c. Personnel---------------------------------------------------------------------------------------------------2
d. Measuring Instrumentation-----------------------------------------------------------------------------2
2. Preconditions---------------------------------------------------------------------------------------------------2
3. Precautions------------------------------------------------------------------------------------------------------2
4. Scope--------------------------------------------------------------------------------------------------------------3
5. Execution---------------------------------------------------------------------------------------------------------3
a. Visual Checks---------------------------------------------------------------------------------------------3
b. Testing of MV Bus duct
1. Bus continuity and phasing test----------------------------------------------------------------3
2. Torque test-------------------------------------------------------------------------------------------4
3. Contact Resistance test--------------------------------------------------------------------------4
4. Main Circuit Contact Resistance test---------------------------------------------------------4
5. Insulation resistance test before hipot--------------------------------------------------------5
6. High Voltage test-----------------------------------------------------------------------------------5
7. Insulation resistance test after hipot-----------------------------------------------------------6
8. Commissioning of Heater Circuit --------------------------------------------------------------6
9. Protective earthing check------------------------------------------------------------------------7
6. Documents-------------------------------------------------------------------------------------------------------7
7. Reference---------------------------------------------------------------------------------------------------------7
8. Attachment-------------------------------------------------------------------------------------------------------7
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by : MAH Page 71
the originator
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc No: TP-BD01,
Page 2 of 7
Equipment : Medium Voltage bus duct
Date:13 Feb,09 Revision: 0
1.0 Task
The purpose of this procedure is to test and document the integrity of metal enclosed
medium voltage bus duct assemblies of 13.8 kV and 4.16kv level using an ac/dc source.
2.0 Preconditions
2.2 Documentation
• The bus duct diagram is available
• Commissioning checklists TS-BD01
2.3 Personnel
• 1 Commissioning engineer: Engineer or technician with experience in
commissioning of all types of electrical equipments.
• 1 Helper: skilled worker with adequate on-the-job training.
3.0 Precautions
The work will only proceed when a Permit to Work (PTW) in work permit area has been
obtained. The PTW will be kept on site for consultation during the testing works.
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by : MAH Page 72
the originator
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc No: TP-BD01,
Page 3 of 7
Equipment : Medium Voltage bus duct
Date:13 Feb,09 Revision: 0
• Closing of the work permit after completion of the work (if the test area is to be
considered in work permit area) is necessary.
4.0 Scope
• Testing of bus bar
• High voltage test on complete Bus duct assembly
• Circuit resistance for complete Bus duct assembly
• Checking that the bus bar mounting position is correct,
• Checking of the phase and continuity
• Checking of correct earthing,
5.0 Execution
5.1 Visual Checks
• Check that the bus bar is not damage and that they are bolted correctly,
• Check that insulator does not have any cracks or damage.
• Inspect for cleanliness, connections etc.
• Check for water tight seals at all joints including expanding interface
points
• Check for quality of paint work both inside and out side
• Check that ventilation openings are not blocked and that they are
screened against ingress of insects and rain
• Check that moisture drain holes are available at the bottom of enclosure
• Check anti-condensation heaters are mounted at bottom
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by : MAH Page 73
the originator
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc No: TP-BD01,
Page 4 of 7
Equipment : Medium Voltage bus duct
Date:13 Feb,09 Revision: 0
Bolt Maximum
Size value
M6 8 Nm
M8 20 Nm
M 10 40 Nm
M 12 70 Nm
M 16 140 Nm
Tolerance : ± 20 %
M IC R O O H M
M ETER
C O N T A C T R E S IS T A N C E T E S T A R R A N G E M E N T F O R
P R IM A R Y C IR C U IT S
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by : MAH Page 74
the originator
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc No: TP-BD01,
Page 5 of 7
Equipment : Medium Voltage bus duct
Date:13 Feb,09 Revision: 0
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by : MAH Page 75
the originator
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc No: TP-BD01,
Page 6 of 7
Equipment : Medium Voltage bus duct
Date:13 Feb,09 Revision: 0
Table-1
AC Testing
High-potential DC Testing
Rated Partial Discharge Test
Equipment Voltage, Test
kV Test Pulse Test
Time, Extinction Time, Time,
Level, Magnitude, level,
Min Level, kV Min Min
kV pC kV
Bus Duct :
Isolated phase
25 45(60) 1 19 100 2 64 1
Bus (IPB)
Metal-Enclosed
13.8 27(36) 1 10.5(10.5) 100(100) 2 37(50) 1
Rigid Bus
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by : MAH Page 76
the originator
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc No: TP-BD01,
Page 7 of 7
Equipment : Medium Voltage bus duct
Date:13 Feb,09 Revision: 0
6.0 Documents
Check list TS-BD01 shall be completed.
7.0 References
8.0 Attachment
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by : MAH Page 77
the originator
ent
Clie : SEC-C
COA Riyadh Po
R ower plantt # 10
Connsultant : “1062
21166/00”
Conntractor : BEMCO O
Date:13
D Revision
n:
Doc
c. No.: PP1
10-BS-SU--001 STARTU
UP MANUA
AL F
Feb,09 0
TES
ST SHEETS
Page 78
Customer : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Form No: TS-BD01,
Testing of Medium Voltage bus duct Page 1 of 4
Date:13/02/09 Revision: 0
1. Technical data
Bus duct:
Manufacturer:...............................................................................................
Type designation:.........................................................................................
Rated voltage:..............................................................................................
2. Visual check
i. Check the bus bar for any damage and they are bolted correctly,
ii. Check the insulator for any cracks or damage
iii. Check insulation damage, cleanliness, connections etc.
iv. Check for water tight seals at all joints including expanding interface points
v. Check for quality of paint work both inside and out side
vi. Check that ventilation openings are not blocked and that they are screened
against ingress of insects and rain
vii. Check that moisture drain holes are available at the bottom of enclosure
viii. Check anti-condensation heaters are mounted at bottom
3. Mechanical check
Torque Check
Perform and Check the torque for all the interconnection joints of the bus bar which are
made at site. Torque should be checked as per following values. Or as per Manuf Rec.
For SS A270 Bolt Maximum
Size value
M6 8 Nm
M8 17 Nm
M 10 40 Nm
M 12 60 Nm
M 16 91 Nm
Name:
Signature:
Date:
Page 79
Customer : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Form No: TS-BD01,
Testing of Medium Voltage bus duct Page 2 of 4
Date:13/02/09 Revision: 0
Test Voltage
Name:
Signature:
Date:
Page 80
Customer : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Form No: TS-BD01,
Testing of Medium Voltage bus duct Page 3 of 4
Date:13/02/09 Revision: 0
30 Sec
45 Sec
60 Sec
Test Voltage
Name:
Signature:
Date:
Page 81
Customer : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Form No: TS-BD01,
Testing of Medium Voltage bus duct Page 4 of 4
Date:13/02/09 Revision: 0
Electrical Test:
Functional Check
Thermostat:
o o o
Ambient Temp in C Cut in Temp in C Cut out Temp in C
Test Equipment Model Cal due date Test Equipment Model Cal due date
Name:
Signature:
Date:
Page 82
ent
Clie : SEC-C
COA Riyadh Po
R ower plantt # 10
Connsultant : “1062
21166/00”
Conntractor : BEMCO O
Date:13
D Revision
n:
Doc
c. No.: PP1
10-BS-SU--001 STARTU
UP MANUA
AL F
Feb,09 0
TE
ESTIN
NG PROOCED
DURE FOR
F L
LOW
V
VOLTAAGE BU
US DU
UCT
Page 83
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc No: TP-BD02,
TABLE OF CONTENT
1. Task
a. Work Status-------------------------------------------------------------------------------------------------------2
b. Documentation---------------------------------------------------------------------------------------------------2
c. Personnel----------------------------------------------------------------------------------------------------------2
d. Measuring Instrumentation-----------------------------------------------------------------------------------2
2. Preconditions---------------------------------------------------------------------------------------------------------2
3. Precautions------------------------------------------------------------------------------------------------------------2
4. Scope--------------------------------------------------------------------------------------------------------------------3
5. Execution---------------------------------------------------------------------------------------------------------------3
a. Visual Checks----------------------------------------------------------------------------------------------------3
b. Testing of LV Bus Duct
1. Bus continuity and phasing test---------------------------------------------------------------------3
2. Torque test------------------------------------------------------------------------------------------------4
3. Contact Resistance test-------------------------------------------------------------------------------4
4. Main Circuit Contact Resistance test--------------------------------------------------------------4
5. Insulation resistance test before hipot-------------------------------------------------------------5
6. High Voltage test----------------------------------------------------------------------------------------5
7. Insulation resistance test after hipot----------------------------------------------------------------5
8. Commissioning of Heater Circuit -------------------------------------------------------------------5
9. Protective earthing check-----------------------------------------------------------------------------6
6. Documents------------------------------------------------------------------------------------------------------------6
7. Reference--------------------------------------------------------------------------------------------------------------6
8. Attachment------------------------------------------------------------------------------------------------------------6
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by :M AH Page 84
the originator
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc No: TP-BD02,
1.0 Task
The purpose of this procedure is to test and document the integrity of bus bar of metal enclosed
assemblies of non segregated bus duct of 380V and 480V, levels using an ac/dc source.
2.0 Preconditions
2.2 Documentation
• The bus duct diagram and single line diagram are available
• Commissioning checklists TS-BD02
2.3 Personnel
• 1 Commissioning engineer: Engineer or technician with experience in
commissioning of all types of electrical equipments.
• 1 Helper: skilled worker with adequate on-the-job training.
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by :M AH Page 85
the originator
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc No: TP-BD02,
4.0 Scope
• Testing of bus bar
• High voltage test on complete bus duct assembly
• Circuit resistance for complete bus duct assembly
• Checking that the bus bar mounting position is correct,
• Checking of the phase and continuity
• Checking of correct earthing,
5.0 Execution
Connect the extreme end of the single phase of the bus with ground and
check the resistance between phases and ground. All the phases should
read Infinity except the grounded phase. Thus the phase is identified and
continuity is checked. Repeat the test on remaining two phases.
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by :M AH Page 86
the originator
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc No: TP-BD02,
Bolt Maximum
Size value
M6 8 Nm
M8 20 Nm
M 10 40 Nm
M 12 70 Nm
M 16 140 Nm
Tolerance : ± 20 %
Contact resistance can also be measured using micro ohm meter as shown
in figure below.
• Check the resistance for all the bus bar joints using micro-ohm meter
at 100 Amps.
• Check the over all resistance of the bus bar for each phase using
micro-ohm meter 100Amps.
M IC R O O H M
M ETER
C O N T A C T R E S IS T A N C E T E S T A R R A N G E M E N T F O R
P R IM A R Y C IR C U IT S
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by :M AH Page 87
the originator
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc No: TP-BD02,
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by :M AH Page 88
the originator
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc No: TP-BD02,
6.0 Documents
Check list TS-BD02 shall be completed.
7.0 References
8.0 Attachment
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by :M AH Page 89
the originator
ent
Clie : SEC-C
COA Riyadh Po
R ower plantt # 10
Connsultant : “1062
21166/00”
Conntractor : BEMCO O
Date:13
D Revision
n:
Doc
c. No.: PP1
10-BS-SU--001 STARTU
UP MANUA
AL F
Feb,09 0
TES
ST SHEETS
Page 90
Customer : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Form No: TS-BD02,
Testing of Low Voltage bus duct Page 1 of 4
Date: 13/02/09 Revision: 0
1. Technical data
Bus duct:
Manufacturer:...............................................................................................
Type designation:.........................................................................................
Rated voltage:..............................................................................................
2. Visual check
i. Check the bus bar for any damage and they are bolted correctly,
ii. Check the insulator for any cracks or damage
iii. Check insulation damage, cleanliness, connections etc.
iv. Check for water tight seals at all joints including expanding interface points
v. Check for quality of paint work both inside and out side
vi. Check that ventilation openings are not blocked and that they are screened
against ingress of insects and rain
vii. Check that moisture drain holes are available at the bottom of enclosure
viii. Check anti-condensation heaters are mounted at bottom
3. Mechanical check
Torque Check
Perform and Check the torque for all the interconnection joints of the bus bar which are
made at site. Torque should be checked as per following values. Or as per Manuf Rec.
For SS A270 Bolt Maximum
Size value
M6 8 Nm
M8 17 Nm
M 10 40 Nm
M 12 60 Nm
M 16 91 Nm
Name:
Signature:
Date:
Page 91
Customer : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Form No: TS-BD02,
Testing of Low Voltage bus duct Page 2 of 4
Date: 13/02/09 Revision: 0
Test Voltage
Name:
Signature:
Date:
Page 92
Customer : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Form No: TS-BD02,
Testing of Low Voltage bus duct Page 3 of 4
Date: 13/02/09 Revision: 0
30 Sec
45 Sec
60 Sec
Test Voltage
Name:
Signature:
Date:
Page 93
Customer : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Form No: TS-BD02,
Testing of Low Voltage bus duct Page 4 of 4
Date: 13/02/09 Revision: 0
Electrical Test:
Functional Check
Thermostat:
o o o
Ambient Temp in C Cut in Temp in C Cut out Temp in C
Test Equipment Model Cal due date Test Equipment Model Cal due date
Name:
Signature:
Date: