Time(min) Unit condition Operation Duration Oil(kL) 0 Boiler pressure 1 ata,Boiler temp. 25°C. Start 4 burners in the lower row with light oil. 0 20 55 90 1:30 3.9 Start another 4 burners in the lower row with light 100 1:40 4.8 oil. 120 130 180 Boiler pressure 75 ata,RH pressure 14 ata,SH Start first mill and related auxiliaries (End of 220 3:40 19.1 outlet temp. approx.350°C. deaerator preheating) Boiler pressure 75 ata,Boiler load 130 t/lh,RH 250 Start second mill and related aux. 4:10 21.7 pressure 14 ata 280 Boiler pressure 75 ata ,HP turbine metal Start turbine rolling setting speed at 2500 rpm. 330 5:30 28.6 temp.150°C with low acceleration (1 00 rprnlmin). 355 360 Boiler pressure at 75 ata,Reheater pressure at 14 Synchronize generator - Add approx. 2% of load 390 6:30 33.8 ata,Boiler load 30%,Turbine at 3000 rpm Start 3rd mill and related auxiliaries. 410 Turbine load 40% Start 4th mill and related auxiliaries. 6.50 35.5 470 Unit load 60% Start 5th mill and related auxiliaries. 7:50 40.7
Stop light oil firing
Total Oil cons. 188.1 Stage-1 Warm Start up Time Unit condition Operation 0 Blr. pr.40 ata,Drum temp.250°C. Start two burners in the lower row with light oil. 0 5 Start four burners with heavy oil. 0:05 0.2 35 Blr. pr.90 ata,Aux.steam at 16 ata 0:35 2.3 50 Blr. pr.125 ata,Cond.Pr.0.3 ata 0:50 3.2 65 Blr. pr.125 ata,Cond.Pr.0.1 ata Start first mill and related auxiliaries 1:05 4.2 Increase coal f~ringra te Decrease oil firing rate. Blr. pr.125 ata,Blr.load 20%,RH Pr.14 ata,D/A 75 Start second mill and related auxiliaries 1:15 4.9 Pr.1.5 ata 95 Blr. pr.125 ata,Blr.load 35% Start third mill and related auxiliaries 1:35 6.2 Start turbine rolling setting speed at 2500 rpm 110 Blr.load 40%,SH outlet temp.approx. 470°C. 1:50 7.1 with acceleration of 150 rprnlmin. 130 Turbine at 3000 rpm 2:10 8.5 Synchronise generator add approx. 2% of load. Start 4th mill & related auxiliaries. 172 Stop heavy oil firing 2:52 11.2 195 Start fifth mill and related auxiliaries. 3:15 12.7 Total Oil cons. 60.5 Stage-1 Hot Start up Time Unit condition Operation Blr. pr.11 0 ata,Turbine Temp. 380°C.,Drum 0 Start two burners in the lower row with light oil. 0 temp.31 5°C. 5 Start four burners with heavy oil. 0:05 0.234 Start first mill and related auxiliaries (End of 35 Drum pressure 150 ata 0:35 2.262 deaerator preheating)Increase firing rate 45 Boiler load 20%,SH outlet temp.approx. 430°C. Start second mill and related auxiliaries 0:45 2.9 Increase coal f~ringra te 65 Turbine inlet Pr. 1 50 ata,Boiler load approx. 35% 1:05 4.2 Decrease oil firing rate. Boiler load 40%,SH outlet temp.approx. Start turbine rolling in "IP FLOW mode setting the 70 1:10 4.6 490°C.,RH Pr.14 ata,D/A Pe.3.5 ata speed at 3000 rpm, Start third mill and related auxiliaries & Stop heavy oil firing 90 Boiler load 50%,SH outlet temp.approx. 510°C. Turbine at 3000 rpm 1:30 5.9 Synchronize generator, add approx. 1 % of load 95 Start fourth mill and related auxiliaries