Refence Codes :
1.) DPWH - DGCS Volume 5 2015
2.) DPWH - LRFD BSDS 1st Editon 2013
Since the site specific coefficient is under review, General Procedure from BSDS was used.
B. On progress Calculations
1.0. Design of Pile Cap to be done initial calculation, need to update for recent code
2.0 Design of Wingwall to be done initial calculation, need to update for recent code
3.0 Design of Approach Railing to be done initial calculation, need to update for recent code
4.0 Revetment to be done