A strategic planning model for natural gas transmission networks


Alireza Kabiriana,, Mohammad Reza Hemmatib
a
Department of Industrial and Manufacturing Systems Engineering, Iowa State University, 2019 Black Engineering, Ames, IA 50011, USA
b
Department of Chemical Engineering, Sharif University of Technology, Tehran, Iran
Received 3 March 2007; accepted 18 May 2007
Available online 1 August 2007

Abstract

The design and development of natural gas transmission pipeline networks are multidisciplinary problems that require various
engineering knowledge. In this problem, the type, location, and installation schedule of major physical components of a network
including pipelines and compressor stations are decided upon over a planning horizon with least cost goal and subject to network
constraints. Practically, this problem has been viewed as a conceptual design case and not as an optimization problem that tries to select
the best design option among a set of possible solutions. Consequently, conceptual design approaches are usually suboptimal and work
only for short-run development planning. We propose an integrated nonlinear optimization model for this problem. This model provides
the best development plans for an existing network over a long-run planning horizon with least discounted operating and capital costs. A
heuristic random search optimization method is also developed to solve the model. We show the application of the model through a
simple case study and discuss how non-economic objectives may also be incorporated into model.
r 2007 Elsevier Ltd. All rights reserved.

Keywords: Natural gas pipeline network; Strategic planning; Nonlinear optimization

1. Introduction pipes, regulators, valves, and compressors. We further


narrow down our focus in this study to transmission
Development and planning of natural gas transmission networks. The problem addressed in this paper involves
networks as multidisciplinary projects have crucial impact decisions upon the development plans of an existing
on the economy of gas-rich countries like Iran. The natural gas transmission network for a study area in a
investment costs and operation expenses of pipeline long-run horizon in order to satisfy the demand of some
networks are so large that even small improvements in consumers.
system utilization and planning can involve substantial Over the years, various aspects of the problem have been
amounts of money. addressed (Larson and Wong, 1968; Graham et al., 1971;
The natural gas industry services include producing, Martch and McCall, 1972; Flanigan, 1972; Mah and
moving, and selling gas. Our main interest in this study is Schacham, 1978; Cheesman, 1971a, b; Edgar et al., 1978).
focused on the transportation of gas through a pipeline Larson and Wong (1968) determined the steady-state
network. Moving gas is divided into two classes: transmis- optimal operating conditions of a straight natural pipeline
sion and distribution. Transmission of gas means moving a with compressors in series using dynamic programming to
large volume of gas at high pressures over long distances find the optimal suction and discharge pressures. The
from a gas source to distribution centers. In contrast, gas length and diameter of the pipeline segment were assumed
distribution is the process of routing gas to individual to be constant because of limitations of dynamic program-
customers. For both transmission and distribution net- ming. Martch and McCall (1972) modified the problem by
works, the gas flows through various devices including adding branches to the pipeline segments. However, the
transmission network was predetermined because of the
Corresponding author. Tel.: +1 515 294 1682; fax: +1 515 294 3524. limitations of the optimization technique used. Cheesman
E-mail address: a_kabirian@yahoo.com (A. Kabirian). (1971) introduced a computer optimizing code in addition

0301-4215/$ - see front matter r 2007 Elsevier Ltd. All rights reserved.
doi:10.1016/j.enpol.2007.05.022
ARTICLE IN PRESS
A. Kabirian, M.R. Hemmati / Energy Policy 35 (2007) 5656–5670 5657

to Martch and McCall (1972) problem. They considered could solve the proposed strategic planning model and
the length and diameters of the pipeline segments to be provide (near) optimal development plans over the long-
variables. But their problem formulation did not allow run planning horizon.
unbranched network, so complicated network systems The remainder of this paper is organized as follows.
could not be handled. Olorunniwo (1981) and Olorunniwo Section 2 discusses about the model. After introducing the
and Jensen (1982) provided further breakthrough by notation and main parameters of the model in Sections 2.2
optimizing a gas transmission network including the type and 2.3, we talk about the integrated model of this paper
and location of pipelines and compressor stations. Edgar by introducing decision variables, constraints, and objec-
and Himmelblau (1988) simplified the problem addressed tive function. There is a submodel within the integrated
by Olorunniwo (1981) and Olorunniwo and Jensen (1982) model that finds best operating condition of the network
to make sure that the various factors involved in the design over time. This submodel is discussed in Section 2.5. The
are clear. They assumed the gas quantity to be transferred optimization algorithm of the model is discussed in Section
along with the suction and discharge pressures to be given 3 and we use a case study in Section 4 to demonstrate the
in the problem statement. They optimized the variables applicability of the model and the proposed solver method.
such as the number of compressor stations, the length of Section 5 discusses about the flexibility of the model in
pipeline segments between the compressors stations, the incorporating various decision criteria and constraints in
diameters of the pipeline segments and the suction, and the planning model. Finally, Section 6 concludes the paper.
discharge pressures at each station. They considered the
minimization of the total cost of operation per year
including the capital cost in their objective function against 2. Proposed model
which the above parameters are to be optimized. Edgar and
Himmelblau (1988) also considered two possible scenarios: We discuss about the model of this paper in this section.
(1) the capital cost of the compressor stations is linear Before going through the details, we briefly introduce all
function of the horse power and (2) the capital cost of the notations in Table 1.
compressor stations is linear function of the horsepower
with a fixed capital outlay for zero horsepower. 2.1. Problem definition
The development planning of natural gas network
requires various engineering, economics, and management The problem addressed in this paper focuses on
knowledge. But what practically is done in developing transmission of high-pressure processed natural gas from
countries like Iran, which holds the second largest natural production facilities to distribution centers or major
gas resources in the world, is based on conceptual designs consumption sites. The development and extension projects
of engineers to satisfy short-run demand of consumers. of a natural gas transmission network have different
Pursuing this policy over years has led to a complex and phases, which differ from country to country based on
inefficient pipeline network that is growing annually. On the rules and economic policies imposed by the govern-
the other hand in theory, the literature also lacks an ments. The major phases of a typical development project
integrated strategic planning method to consider different in the US are provided in Table 2 (Transportation
aspects of the problem over a long-run horizon. Specifi-
cally, these issues include: Table 1
Parameters of the model
1. The short-run development planning in the heart of a Notation Parameter, sets, and variables
long-run strategic plan,
2. The best type and location of the new compressor o Length of long-run planning horizon
stations, u Length of short-run planning horizon
l Number of short horizons in a long horizon
3. The best type and routing of the pipelines, Cjk Set of supply nodes in kth year of jth short horizon
4. The scheduling of implementing new pipelines and Djk Set of demand nodes in kth year of jth short horizon
compressor stations in the network, ijk Lower bound of gas supply of ith node in kth year of jth
5. The best combination of natural gas procurement from short horizon
available sources, and dijk Upper bound of gas supply of ith node in kth year of jth
short horizon
6. The best operating conditions of compressor stations in
t The number of periods of a year
different periods of each year of the long-run horizon. yijkl The demand of ith node in lth period of kth year of jth short
horizon
In this paper, we provide an optimization model to Zijkl Upper bound of the pressure demanded/supplied in ith node
address these issues. This strategic planning model is a at lth period of kth year of jth short horizon
gijkl Lower bound of the pressure demanded/supplied in ith node
complement to the available studies in the literature and
at lth period of kth year of jth short horizon
could bridge the gap between the theoretical researches and Ij Available compressor station entrance nodes at short
practical needs. In addition to the model, a specific horizon j
heuristic random search algorithm is also developed which Oj Available compressor station exit nodes at short horizon j
ARTICLE IN PRESS
5658 A. Kabirian, M.R. Hemmati / Energy Policy 35 (2007) 5656–5670

Table 1 (continued ) Table 2


Phases of a typical natural gas development project in the Unites States
Notation Parameter, sets, and variables
Phase Description
Hj The union of sets Ij and Oj
Tj The set of potential transshipment nodes for short horizon j 1. Feasibility study Working on economic studies and construction
Aj The set of active transshipment nodes for short horizon j plans
r Number of different types of pipe Analyzing environmental impacts of the pipeline ‘s
s Number of different types of compressor stations construction and operation
Gii0 j Set of pipe types between nodes i and i0 in the available
network of short horizon j 2. Certificates from Submitting feasibility study reports to Federal
mii0 j Compressor station type between nodes i and i0 in available FERC Energy Regularity Commission (FERC)
network of short horizon j Obtaining certificate of public convenience and
Pj Set of pipe edges in the available network of short horizon j necessity
Kj Set of compressor station edges in the available network of 3. Right of way Purchasing the right of way and leasing the surface
short horizon j property along the path of the proposed
X ii0 jm Type code of nth new pipe between nodes i and i0 in construction
development plan for jth short horizon
x Maximum number of new pipes between two nodes in a 4. Ordering Ordering the pipes, and fittings and delivering them
development plan equipments
w Discount rate
5. Installation and Installing physical components of the network
NPW Objective function of the model (net present worth)
utilization Inspection
ajk Capital cost paid at kth year of jth short horizon
Utililization
bjk Optimum operating cost paid at kth year of jth short
horizon
acaa0 j Capital cost of replacing compressor station type a with
compressor station type a0 at jth short horizon
Research Board of the National Academies, 2004). The
apbii0 j Capital cost of installing pipeline type b between nodes i and procedures for other countries, though officially different,
l0 at jth short horizon have similarities to the major steps described in the table.
nck Percent of the capital cost of compressor stations in a We will focus our attention in this paper on the first phase
development plan for each short horizon which occurs in kth in Table 2.
year
We assume that there exists a study area with an existing
npk Percent of the capital cost of pipelines in a development plan
for each short horizon which occurs in kth year natural gas pipeline network. There is also a long-run
Bjk Financial budget available for kth year of jth short horizon planning horizon for this study area. The study area has a
W ijkl The pressure in ith node at lth period of kth year of jth number of consumption centers/sources of gas supply with
planning horizon known demand/supply range over the long-run horizon.
V hii0 jkl The mass flow rate in hth pipe between nodes i and l0 at lth
period of kth year of jth short horizon
The problem addressed here is finding the ‘‘best feasible’’
Wii0 j Number of pipelines between nodes i,l0 in the available development plans for the gas transmission network over
network of short horizon j the long-run horizon based on the existing network. ‘‘Best’’
tl The time point in each year when lth period ends here means least discounted operating and capital costs
bjk Operating cost paid at kth year of jth short horizon paid over the long horizon and by ‘‘feasible’’ we mean
$jkl Operating cost paid at lth period of kth year of jth short satisfying all structural, technical, and planning con-
horizon
$jkl Optimum operating cost paid at lth period of kth year of jth
straints.
short horizon
$cjkl Operating cost of compressor stations at lth period of kth 2.2. Planning horizons
year of jth short horizon
$sjkl Operating cost of gas supply at lth period of kth year of jth
short horizon The model assumes a long-run planning horizon
psijkl ðM; PÞ The price function of one mass unit natural gas in ith supply consisting of a number short-run planning horizons with
node at lth period of kth year of jth short horizon if equal length. We assume that the lengths of long and short
requested mass flow rate out of the node and pressure are M horizons are o and u years respectively, and the long
and P, respectively horizon has l short horizons. Simply, we have
pcjkl The price of one mass unit natural gas consumed in a
compressor station at lth period of kth year of jth short o ¼ lu.
horizon
pfjk ðTÞ Annual fixed operating cost function of a compressor The key assumption here is that the structure of the
station of type T at kth year of jth short horizon network at the end of short horizon j must be capable of
kðM; I; O; TÞ Mass flow rate function consumed by a compressor station satisfying the total demand of all consumers during all
of type T where the incoming mass flow rate of M with
years of short horizon j þ 1. Hence, the available useable
pressure I is delivered with an outgoing pressure of O.
z Pipe resistance which is a function of type and length of pipe
structure of the network for a short horizon is fixed during
O(T) The set of feasible vectors of (incoming mass flow rate (M), all years of the short horizon. But the structure of the
inlet pressure (I), outlet pressure(O)) for a compressor network could be changed during short horizons; these
station of type T changes are either in the combination of pipelines or in
compressor stations.
ARTICLE IN PRESS
A. Kabirian, M.R. Hemmati / Energy Policy 35 (2007) 5656–5670 5659

The model plans some changes in the network structure 2.3.1. Demand and supply parameters
for each short horizon. These changes could be considered The combination of locations of demand and
as ‘‘development plans’’. We assume that the development supply nodes must be forecasted by the modeler.
plan for short horizon j þ 1 are implemented during We assume that these combinations are fixed during
previous short horizons and finished no later than the each year of long horizon, but can be modified at the
end of short horizon j. So the changes in the structure are end of each year; for instance, a new gas supplier may
available to be utilized in short horizon j þ 1. The planned- be added at the end of year j to the combination of
ahead changes for the first short horizon are implemented supply nodes for this year so that the new supplier may
before the start of the long horizon. The model considers a start to feed gas into network from the beginning of year
short horizon called ‘‘short horizon zero’’ before the first j þ 1. We denote the sets of supply and demand nodes in
short horizon, so that the required changes for the first kth year of jth short horizon by Cjk and Djk , respectively,
short horizon are implemented until the end of the short where
horizon zero. The hidden assumption here is that the
j ¼ 1; 2; . . . ; l; k ¼ 1; 2; . . . ; u.
demand of all consumers before the start of the long
horizon is met by the available network before long We also need to define the sets of supply and demand
horizon. nodes for the last year of planning horizon zero; these two
sets are denoted by C0;u and D0;u , respectively.
In this paper, the demand and supply are measured by
2.3. Network structure their mass flow rate (kg/year). We assume that the amount
of potential gas supply in each supply node is limited to a
The model assumes a study area that has some natural range. These ranges must be forecasted in order to
gas consumers and suppliers during long horizon. construct and run the model. The parameters ijk and dijk
The major physical components of a real gas transmis- represent upper and lower bounds of gas supply of ith node
sion network are pipelines and compressor stations. These in kth year of jth short horizon where
two components are represented by some edges in the
network of the model; one edge for each pipe and one edge i 2 Cjk ; j ¼ 1; 2; . . . ; l; k ¼ 1; 2; . . . ; u.
for each compressor station. The model also requires the forecasts of the demand for
Along with the mentioned edges, the network has five each demand node over the long horizon. The actual
types of nodes: demands follow specific time series and are continuous
functions of time. But for simplicity, each year is split into
 Demand nodes. a number of periods, say t periods, and the model tries to
 Supply nodes. satisfy the forecasted average demand of each period. The
 Compressor station entrance nodes. lth period of each year starts at time tl1 and ends at tl,
 Compressor station exit nodes. where we set t0 ¼ 0 and tt ¼ 1. We denote the forecasted
 Transshipment nodes. average demand of ith node in lth period of kth year of jth
short horizon by yijkl , where
The demand nodes are major locations of consuming
i 2 Djk ; j ¼ 1; 2; . . . ; l; j ¼ 1; 2; . . . ; l; l ¼ 1; 2; . . . ; t.
natural gas in the study area. The demand nodes are either
the central point of major consumption regions in the study
The demand nodes not only consume a specific mass
area or export terminals of natural gas from the study area
flow rate in each period, but also need the pressure of the
to outside. In contrast, supply nodes are locations of
gas to be within a range. Also, the supply nodes release the
resources of processed natural gas in the study area. These
gas with a pressure that is bounded to a range. We denote
nodes are either refineries or plants producing natural gas
the user-defined upper and lower bounds of the pressure
or the import terminals of natural gas from outside of the
demanded/supplied in ith node at lth period of kth year of
study area.
jth short horizon by Zijkl and gijkl, respectively, where
Entrance nodes of compressor stations are points where
gas enters a compressor station edge to be compressed. i 2 Djk [ Cjk ; j ¼ 1; 2; . . . ; l; k ¼ 1; 2; . . . ; u;
Another set of nodes, exit nodes, are considered at the end
of compressor station edges, where compressed gas flows l ¼ 1; 2; . . . ; t.
through the network by compressor stations.
Transshipment nodes are the places where more than 2 2.3.2. Parameters of network components
pipe edges are joined. In each transshipment node, the gas The sets of available compressor station entrance and
flows into the node via some pipe(s) and flows out through exit nodes at short horizon j are denoted by Ij and Oj,
some other(s). respectively. We also define the set H j as the union of I j
Each node in the network is assigned a unique code in and Oj where
the model. The edges are recognized by the codes of their
corresponding end nodes. j ¼ 0; 1; . . . ; l.
ARTICLE IN PRESS
5660 A. Kabirian, M.R. Hemmati / Energy Policy 35 (2007) 5656–5670

Transshipment nodes as the potential locations of joint ematically presented in this section after defining decision
of a number of pipes help the model find optimal pipeline variables of the planning problem.
routes with the goal of least total net present cost. The
modeler selects a set of points inside the study area for each 2.4.1. Decision variables
short horizon where by the new pipes in the development Development plans are nothing but the type and location
plans may join at these points. But these potential points of new pipes and compressor stations in the network. So we
are not necessarily the joint place of pipes because the define one set of decision variables for pipes and another
optimal routes obtained by the model may pass through set for compressor stations.
specific transshipment nodes and ignore the others due to Any two nodes that are not adjacent with a compressor
cost issues. A transshipment node is called ‘‘active’’ if it is station edge may be planned to be linked with one or more
the joint location of pipes; otherwise, it is named pipes in a development plan for a short horizon. Let us
‘‘inactive’’. We denote the set of potential transshipment denote the type code of nth new pipe between nodes i; i0 in
nodes for short horizon j with Tj which is a combination of development plan for jth short horizon by X ii0 jn (note that
active and inactive transshipment nodes. The set of active more than 1 pipe may be installed between 2 points) where
transshipment nodes in the available pipeline network at
jth short horizon is also denoted by Aj where ioi0 ; i; i0 2 Cj;u [ Dj;u [ T j [ H j1
0
ði; i ÞeK j1 ; j ¼ 1; 2; . . . ; l; n ¼ 1; 2; . . . ; x,
j ¼ 0; 1; . . . ; l.
where x is the maximum number of new pipes between any
Two types of edges were defined for the network of the 2 nodes in a development plan; this user-defined parameter
model. We suppose that the number of different pipe edges limits the set of pipe decision variable. If no pipe is planned
is limited. Specifically, there are r different types of pipeline between 2 nodes in a development plan, the corresponding
that could be used in the network. These pipes which have
decision variable takes zero. We have
unique type codes may differ in technical specifications
such as diameter, thickness, etc. Similarly, we suppose that X ii0 jn 2 f0; 1; 2; . . . ; rg.
there are s different types of compressor stations. Again, We assume that the new compressor stations are located
these compressor stations may differ in technical specifica- in the middle of some pipe edges. This means that the
tions like the number of compressors, fuel, etc. and have optimization algorithm of the model selects some pipe
unique type codes. edges and split each in to 3 edges; 2 pipe edges and one
The set of pipe edges in the available network of short compressor station edge between them. In order to define
horizon j is denoted by Pj. The members of this set are the new decision variable, we need to define the updated
vectors (i,i0 ) where ioi0 and i,i0 are 2 adjacent nodes pipe set Pj1 as
through a pipe. If more than 1 pipe link i,i0 (parallel pipe 
edges in the network), the set of pipe edges includes vector Pj1 ¼ Pj1 [ fði; i0 Þioi0 ; i; i0 2 Cj;u [ Dj;u [ T j [ H j1 ;
(i,i0 ) as many as the number of parallel pipes between the X
x
corresponding nodes. Similarly, we define Kj as the set of ði; i0 ÞeK j1 ; ð X ii0 jn Þa0g ð1Þ
compressor station edges containing vectors (i,i0 ) where n¼1
ioi0 and i,i0 are 2 adjacent nodes through a compressor The set Pj1 contains the pipe edges in available network
station. Again we have of short horizon j  1 and new pipes that are planned in the
j ¼ 0; 1; . . . ; l. development plan of short horizon j.
We define decision variable Y ii0 j as the compressor
We also define Gii0 j as the set of pipe types between i, and station type that is planned to be installed in the middle of
i0 in available network of short horizon j. Clearly, if only pipe edge ði; i0 Þ in the development plan of jth short horizon
one pipe links i,i0 for short horizon j, Gii0 j has just one where
member which is the type code of the pipe. We have
ioi0 ; ði; i0 Þ 2 Pj1 ; j ¼ 1; 2; . . . ; l.
0
ði; i Þ 2 Pj ; j ¼ 0; 1; . . . ; l.
Another possibility for compressor station decision
Similarly, the compressor station type between i; and i0 variable is the case that a previously installed compressor
in available network of short horizon j is denoted by mii0 j station is upgraded in a development plan. Therefore, we
where extend the definition of the decision variable Y ii0 j to the
ði; i0 Þ 2 K j ; j ¼ 0; 1; . . . ; l. type code of upgraded compressor station that replaces
with existent compressor station ði; i0 Þ in the development
plan of jth short horizon where
2.4. Integrated model
ioi0 ; ði; i0 Þ 2 K j1 ; j ¼ 1; 2; . . . ; l.
The integrated strategic planning model is an optimiza- Like decision variable X ii0 jn , we set Y ii0 j ¼ 0 if no new
tion framework, which involves an objective function and a compressor station is planned to be installed between
number of constraints. This optimization model is math- nodes i and i0 in development plan of jth short horizon.
ARTICLE IN PRESS
A. Kabirian, M.R. Hemmati / Energy Policy 35 (2007) 5656–5670 5661

Any way, we have 2.4.2.1. Capital costs. We assume that the capital cost of
installing a compressor station varies for different short
Y ii0 j 2 f0; 1; 2; . . . ; sg.
horizons and is a function of the compressor station type.
Let us denote this capital cost of replacing compressor
2.4.2. Objective function station type a with compressor station type a0 at jth short
Various goals may be pursued in gas transmission horizon with acaa0 j . If a0 ¼ 0, no compressor station already
pipelines network design and planning. Among these, cost, exists in the installation location to be upgraded and acaa0 j is
reliability, and responsiveness are probably the most just the capital cost of a new compressor station type a at
important and evident. But in addition to these objectives, jth short horizon. We assume that the capital cost of a
environmental and social criteria must also be considered pipeline is a function of pipe type and locations of end
in the planning model to ensure a sustainable development. nodes; this cost varies for different short horizons as well.
Our objective function here nominally includes cost-related Let us denote the capital cost of installing pipeline type b
objectives. Specifically, we use the net present worth between nodes i and i0 at jth short horizon with apbii0 j . For
(NPW) of operating and capital costs in long-run horizons. these parameters,
In Section 5, we discuss how various other objectives may a ¼ 1; 2; . . . ; s; a0 ¼ 0; 1; . . . ; s; a ¼ a0 ;
be incorporated into the cost-based objective function of
b ¼ 1; 2; . . . ; r; j ¼ 0; 1; . . . ; l  1.
the model.
Considering a cash flow of costs and possibly revenues Now we calculate the total capital cost ajk as
related to installation and operation of the network, we X
ajk ¼ nc  acmi;i0 ;jþ1 ;0;j
calculate the NPW at the beginning of long horizon as the    k
ði;i0 Þði;i0 Þ2ðK jþ1 K j Þ
objective function to be minimized: X
þ nc  acmi;i0 ;jþ1 ;mi;i0 ;j ;j
X
l X
n ajk þ bjk    k
ði;i0 Þði;i0 Þ2ðK jþ1 \K j Þ; mi;i0 ;jþ1 ami;i0 ;j
min NPW ¼ ,
j¼0 k¼1 ð1 þ wÞðj1Þuþk1 X X
z
þ npk  apX 0
where w is the effective annual interest rate and ajk and bjk n  o m¼1 i;i0 ;jþ1;m ;i;i j

ði;i0 Þði;i0 Þ2ðPj Pj Þ
are, respectively, capital and optimal operating costs at kth
year of jth short horizon, so that j ¼ 0; 1; . . . ; l  1; k ¼ 1; 2; . . . ; u,
j ¼ 0; 1; :::; l  1; k ¼ 1; 2; :::; u, nck npk
where and are, respectively, the percent of capital cost of
installing compressor stations and pipelines for each short
We assume that the capital and operation costs are horizon which occur in kth year. Of course, we must have
occurred at the beginning of the year. X
u X
u
The capital costs occurred in each short horizon are nck ¼ 1; npk ¼ 1.
functions of the variables of development plan for the k¼1 k¼1
subsequent short horizon (remember that the development
plan for a short horizon is implemented in its previous 2.4.2.2. Operating costs. Generally, operating cost for the
short horizon). Specifically, the two decision variables sets pipeline network are those costs that are not classified as
defined earlier, pipeline and compressor station variables, capital costs. We only consider two major operating costs
are the only variables that affect the capital cost function. in the model:
In contrast, this is not the case for operating costs because
there are 2 other sets of variables along with pipeline and  The operating cost of compressor stations.
compressor station variables that could alter the values of  The supply cost of natural gas to the network.
operating cost. These new variables as the decision
variables of the so-called ‘‘Submodel’’ are pressure of the Compressor stations as the hearts of the network
gas in nodes and the mass flow rate in pipes. Given a consume energy to increase gas pressure in the network.
network structure for satisfying the demand of consumers These stations have some other operating costs such as
for a period, different combinations of pressure and mass maintenance, labor, and overhead.
flow rate may be found that could be technically feasible; The gas is supplied to the network by different sources
hence, we define bjk as the total minimum (optimum) including refineries and importation from outside of the study
operating cost of all periods of kth year of jth short horizon area. Given the forecast of the consumption in demand nodes
if the combination of pressure and mass flow rate variables for a period, one may find different combination of gas
for all periods of the corresponding year take their optimal supply from supply nodes to satisfy the demands. But, the
values that lead to least operating costs. sales cost of gas from the supply nodes to the network could
We also set be different for different supply nodes. So the combination of
gas supply could affect the costs of model. Therefore, we also
al;k ¼ 0; b0;k ¼ 0; k ¼ 1; 2; . . . ; u. define the operating cost of gas supply.
ARTICLE IN PRESS
5662 A. Kabirian, M.R. Hemmati / Energy Policy 35 (2007) 5656–5670

Given a fixed network structure for a period, both logically acceptable options. Three types of this class of
operating cost defined above are functions of steady-state constraints are as follows:
mass flow rate in the pipes and gas pressure in the nodes. In
fact, whenever we have a fixed structure for the network to 1. There must be at least one path between any demand
satisfy the demand of some consumers, we may find node (with a positive demand) and at least one of the
different combination of mass flow rate and pressure supply nodes; otherwise there is no way that the given
variables for different parts of the network that can satisfy network structure could satisfy the consumption of the
demands. These different combinations of mass flow rates demand nodes. Many algorithms exist in graph theory
and pressures could have different operating costs. Hence, to check the existence of these paths (see Ore, 1963;
there must be an optimization model within our integrated Harary, 1969).
model to find the best combination of mass flow rates and 2. The structure of the network must not have transship-
pressures in the network for a given network structure. We ment nodes that are adjacent to exactly one edge. In
call this new optimization model as ‘‘submodel’’. The other words, the number of pipes or compressor stations
objective function of this submodel is minimization of the connected by a transshipment node must be zero or
operating cost. This submodel is subject to many technical more than 2.
constraints. 3. The transshipment nodes cannot be the joints place of
The procedure that is used in our model is that whenever any combination of pipes. Technically, it may be
we have a fixed network structure for a period, we run the infeasible to join specific types of pipes together. These
submodel to find least possible operating cost for the given constraints must be defined with more details based on
network, then this cost is plugged into the objective the type of available pipelines and engineering designs.
function of our integrated model.
As we will see in Section 2.4.3, some constraints of the In the 3rd class of constraints, the total financial budget
integrated model are also affected by the best feasible available in each year of the long horizon is assumed to be
values of mass flow rates and pressure variables of the limited. If this budget for the kth year of jth short horizon
network. So, we postpone discussing about more details of is denoted by Bjk ,
the submodel problem until Section 2.5.
ajk þ bjk pBjk ,
2.4.3. Constraints j ¼ 0; 1; 2; . . . ; l; k ¼ 1; 2; . . . ; u.
There are 4 classes of constraints for the integrated
The 4th class of constraints is basically the constraints of
model as follows (in Section 5, we discuss how various
the submodel introduced in Section 2.4.2.2. In the perspective
other constraints including some environmental and social
of integrated model, these constraints are generally defined to
limitations may be incorporated into model):
make sure that the network structures under study can meet
the demand of consumers. We discuss about the details of
Class 1: domain of variables. submodel constraints in Section 2.5.3.
Class 2: network structure constraints.
Class 3: financial budget constraints.
Class 4: submodel constraints. 2.5. Control optimization submodel

In Section 2.4, we discussed about the necessity of having


We informally provided the first-class constraints when
a submodel in the heart of the integrated model to find the
we defined the decision variables of integrated model. The
least possible operating cost and check some of the
first set of decision variables ðX ii0 jn Þ could only take these
constraints of integrated model. The submodel which is
values:
called steady-state simulation of pipeline network in the
X ii0 jn 2 f0; 1; 2; :::; rg, literature is essentially the optimization model of mass flow
rates and pressure in the network subject to some technical
constraints and with operating costs as objective function.
ioi0 ; i; i0 2 Cj;u [ Dj;u [ T j [ H j1 ;
0
The submodel problem differs from traditional network
ði; i ÞeK j1 ; j ¼ 1; 2; . . . ; l; n ¼ 1; 2; . . . ; x. flow problems in some fundamental aspects (Rı́os Mercado
Similarly, for the second set of decision variables ðY ii0 j Þ, et al., 2006). First, in addition to the flow variables for each
edge, which in this case represent mass flow rates, a pressure
Y ii0 j 2 f0; 1; 2; . . . ; sg, variable is defined at every node. Second, besides the mass
balance constraints, there exist two other types of major
ioi0 ; ði; i0 Þ 2 Pj1 ; j ¼ 1; 2; . . . ; l. constraints: (i) a nonlinear equality constraint on each pipe,
which represents the relationship between the pressure drop
The second class of constraints refers to the feasible and the flow and (ii) a nonlinear nonconvex set, which
structures of the network. Applying these constraints, the represents the feasible operating limits for pressure and flow
model searches best structures of the network among within each compressor station. The objective function is
ARTICLE IN PRESS
A. Kabirian, M.R. Hemmati / Energy Policy 35 (2007) 5656–5670 5663

given by a nonlinear function of flow rates and pressures. In horizon if requested mass flow rate out of the node and
the real world, these types of instances are very large both in pressure are M and P, respectively, by psijkl ðM; PÞ. There-
terms of the number of decision variables and the number of fore, the total operating cost of gas supply is
constraints, and very complex due to the presence of 00 1
Wii0 j
nonlinearity and nonconvexity in both the set of feasible X X X
$sjkl ¼ @@ V hii0 jkl Aðtl  tl1 Þ
solutions and the objective function.
i2Cjk i0 2YðiÞ h¼1
The submodel must be run for each period of each year 0 0 111
of any given network structure of a short horizon. So, we Wii0 j
X X
develop the submodel concepts for an arbitrary period, say  @psijkl @ V hii0 jkl ; W ijkl AAA,
lth period of kth year of jth short horizon. i0 2YðiÞ h¼1

YðiÞ ¼ fi0 jði; i0 Þ or ði0 ; iÞ 2 Pj g.


2.5.1. Decision variables of submodel
The submodel has 2 sets of decision variables. The first We assume that the compressor stations use the natural
set is the gas pressure in all nodes of the network. Let us gas as energy. The operating cost of a compressor station is
denote the pressure in ith node of lth period of kth year of classified into some fixed costs and variable costs. Let us
jth planning horizon by W ijkl where denote Annual fixed operating cost of a compressor station
i 2 Cjk [ Djk [ T j [ H j . of type T at kth year of jth short horizon by pfjk ðTÞ and the
We also denote the mass flow rate in hth pipe between price of one mass unit natural gas consumed in a
nodes i and i0 at lth period of kth year of jth short horizon compressor station at lth period of kth year of jth short
by V hii0 jkl where horizon by pcjkl . Now, the operating cost of compressor
stations could be defined as
h ¼ 1; 2; . . . ; Wii0 j ; ði; i0 Þ or ði0 ; iÞ 2 Pj , X
where Wii0 j is the number of pipes between nodes i and i0 at jth $cjkl ¼ fðpfjk ðmii0 j ÞÞðtl  tl1 Þ
ði;i0 Þ2K j
short horizon. If the flow of gas in the pipes between i and i0 at
lth period of kth year of jth short horizon is from node i to Wii0 j Wii0 j
X X X X
node i0 , V hii0 jkl is positive; otherwise, it takes a negative value þ ðpcjkl Þð V hi00 ijkl  V hi0 i000 jkl Þg,
to indicate that the gas flow direction is from node i0 to node i. i00 2Y1 ðiÞ h¼1 i000 2Y2 ði0 Þ h¼1

Y1 ðiÞ ¼ fi00 ði; i00 Þ or ði00 ; iÞ 2 Pj g,
2.5.2. Objective function of submodel 
Y2 ði0 Þ ¼ fi000 ði0 ; i000 Þ or ði000 ; i0 Þ 2 Pj g.
The objective function of submodel is the operating costs
of the network. It includes the operating cost of all periods 2.5.3. Constraints of submodel
within a year: There are many classes of constraints which limit the
X
t values of the two decision variable sets defined for
bjk ¼ $jkl , submodel. This section mathematically discusses about
l¼1 these constraints.
where $jkl is the operating cost paid at lth period of kth Class 1 (Domain of variables):
year of jth short horizon. Since we model each period W ijkl X0 & real
independently, the annual least operating cost is the sum of
i 2 Cjk [ Djk [ T j [ H j
least periodic operating costs:
X
t
V hii0 jkl is real
bjk ¼ $jkl ,
l¼1 ði; i0 Þ or ði0 ; iÞ 2 Pj ; h ¼ 1; 2; . . . ; Wii0 j .
where $jkl is the optimum (least) operating cost paid at lth Class 2 (Pressure limits in demand and supply nodes):
period of kth year of jth short horizon.
gijkl pW ijkl pZijkl
As discussed in Section 2.4.2.2, we consider only the
operating costs of compressor stations and gas supply to i 2 Cjk [ Djk .
the network. If we denote the total operating costs of gas Class 3 (Gas flow direction in the pipes):
supply and compressor stations at lth period of kth year of
jth short horizon by $cjkl and $sjkl , respectively, we have If W ijkl 4W i0 jkl 3V hii0 jkl 40 for h ¼ 1; 2; . . . ; Wii0 j
$jkl ¼ $cjkl þ $sjkl . otherwise if W ijkl oW i0 jkl 3V hii0 jkl o0 for h ¼ 1; 2; :::; Wii0 j
ði; i0 Þ or ði0 ; iÞ 2 K j
The price of natural gas for each supplier could be a
function of mass flow rate and pressure required. These and also
price functions should be known in order to run the model.
V hii0 jkl ¼ V hi0 ijkl
Let us denote the price function of one mass unit natural
gas in ith supply node at lth period of kth year of jth short ði; i0 Þ or ði0 ; iÞ 2 Pj ; h ¼ 1; 2; . . . ; Wii0 j .
ARTICLE IN PRESS
5664 A. Kabirian, M.R. Hemmati / Energy Policy 35 (2007) 5656–5670

Class 4 (Entrance and exit nodes of compressor stations): Y1 ðiÞ ¼ fi00 jði; i00 Þ or ði00 ; iÞ 2 Pj g,
Y2 ði0 Þ ¼ fi000 jði0 ; i000 Þ or ði000 ; i0 Þ 2 Pj g,
If W ijkl oW i0 jkl 3i 2 I j and i 0 2 Oj ,
ði; i0 Þ 2 K j ; i0 2 I j
otherwise if W ijkl XW i0 jkl 3i 2 Oj and i0 2 I j ,
ði; i0 Þ or ði0 ; iÞ 2 K j . Class 6. Pressure drop
Class 5 (Mass conservation in nodes): jW 2ijkl  W 2i0 jkl j ¼ zhii0 V 2hii0 jkl ,
 Demand nodes ði; i0 Þ 2 Pj ; h ¼ 1; 2; . . . ; Wii0 j ,
Wii0 j where zhii0 is the pipe resistant of hth pipe between nodes i
X X
V hi0 ijkl ¼ yijkl ; i 2 Djk , and i0 .
i0 2YðiÞ h¼1
Class 7. Operational constraints of compressor stations.
YðiÞ ¼ fi0 jði; i0 Þ or ði0 ; iÞ 2 Pj g.
Compressor stations cannot increase any pressure to any
 Supply nodes pressure. These components may not be able to work with
any incoming mass flow rate. Let us denote the set of
Wii0 j feasible vectors of (incoming mass flow rate, inlet pressure,
X X
ijk p V hii0 jkl pdijk ; i 2 Cjk , and outlet pressure) for a compressor station of type T by
i0 2YðiÞ h¼1 OðTÞ. Then,
YðiÞ ¼ fi0 jði; i0 Þ or ði0 ; iÞ 2 Pj g. 0 1
Wii0 j
X X
@ V hi00 ijkl ; W ijkl ; W i0 jkl A 2 Oðmii0 j Þ,
 Transshipment nodes i00 2YðiÞ h¼1

Wii0 j YðiÞ ¼ fi00 jði; i00 Þ or ði00 ; iÞ 2 Pj g,


XX
V hii0 jkl ¼ 0; i 2 Aj ði; i0 Þ 2 K j ; i 2 Ij
i2YðiÞ h¼1

YðiÞ ¼ fi0 jði; i0 Þ or ði0 ; iÞ 2 Pj g or equivalently,


0 1
Wii0 j
 Entrance and Exit nodes of compressor stations. X X
@ V hi00 i0 jkl ; W i0 jkl ; W ijkl A 2 Oðmii0 j Þ,
We assume that the natural gas consumption rate of a
i00 2Yði0 Þ h¼1
compressor station is a function of the incoming mass
flow rate, pressure at entrance node and pressure at the Yði0 Þ ¼ fi00 jði0 ; i00 Þ or ði00 ; i0 Þ 2 Pj g,
outgoing node and the type of station. This function ði; i0 Þ 2 K j ; i0 2 I j .
must be defined by the user of the model. Let us denote
by kðM; I; O; TÞ the mass flow rate function consumed
by a compressor station of type T where the incoming 3. Optimization algorithm
mass flow rate of M with pressure I is delivered with an
outgoing pressure of O. Then, 3.1. Limitations of choosing a solver
0 1
Wii0 j
X X Although there are various optimization algorithms
k@ V hi00 ijkl ; W ijkl ; W i0 jkl ; mii0 j A available in the literature of operations research, many of
i00 2Y1 ðiÞ h¼1 them are inapplicable to our model because the index range
Wii0 j
X X Wii0 j
X X of decision variables of the integrated model has inter-
¼ V hi00 ijkl  V hi0 i000 jkl , dependencies. To clarify these interdependencies, let us
i00 2Y1 ðiÞ h¼1 i000 2Y2 ði0 Þ h¼1 revisit the definition of the decision variables of the
Y1 ðiÞ ¼ fi00 jði; i00 Þ or ði00 ; iÞ 2 Pj g, integrated model. We denoted these variables by
Y2 ði0 Þ ¼ fi000 jði0 ; i000 Þ or ði000 ; i0 Þ 2 Pj g, (1)
0
X ii0 jn 2 f0; 1; 2; . . . ; rg;
ði; i Þ 2 K j ; i 2 Ij
and also ioi0 ; i; i0 2 Cj;u [ Dj;u [ T j [ H j1 ;
0 1 ði; i0 ÞeK j1 ; j ¼ 1; 2; . . . ; l; n ¼ 1; 2; . . . ; x,
Wii0 j
X X
k@ V hi000 i0 jkl ; W i0 jkl ; W ijkl ; mii0 j A
i000 2Y2 ði0 Þ h¼1 (2)
Wii0 j Wii0 j Y ii0 j 2 f0; 1; 2; . . . ; sg;
X X X X
¼ V hi00 ijkl  V hi0 i000 jkl ,
i00 2Y1 ðiÞ h¼1 i000 2Y2 ði0 Þ h¼1 ioi0 ; ði; i0 Þ 2 Pj1 [ K j1 ; j ¼ 1; 2; . . . ; l.
ARTICLE IN PRESS
A. Kabirian, M.R. Hemmati / Energy Policy 35 (2007) 5656–5670 5665

For j ¼ 2; 3; . . . ; l, the sets Cj;u ; Dj;u ; H j1 ; Pj1 ; K j1 are formed as follows. First a feasible solution is created for
known only if the values of decision variables for all previous the first short horizon (this solution is called the ‘‘trunk’’ of
short horizons are known; hence, since the index range of the the tree or the ‘‘first level branch’’; we explain later how a
decision variables of current short horizon depends on these feasible solution may be created). Knowing the values of
sets, it means that the index range of decision variables of jth the decision variables of the first short horizon (trunk
short horizon depends on the values of the decision variables solution in the tree), the algorithm creates b2 different
of all previous short horizons. solutions for the second short horizon (these solutions are
Also, another type of interdependency between the called ‘‘second-level branches’’). The trunk solution plus
decision variables exits. The set Pj1 depend on the values any one of the second-level branches determine develop-
of X ii0 jn (see Eq. (1)) as well as the values of decision ment plans of the first and second short horizons. In the
variables of all previous short horizons which means the next step, the algorithm creates b3 solutions for the third
values of decision variable X ii0 jn must be known in order to short horizon given the trunk solution plus each one of the
know the index range of the decision variable Y ii0 j . second level branches. In a general step j, the algorithm
These interdependencies and the fact that the constraints creates bj solution for short horizon j given any path from
and objective function of the model are highly nonlinear the trunk of the tree to the end of any of the (j–1) th-level
rule out the application of powerful mathematical pro- branches.
Ql Using this procedure, a solution tree would have
gramming approaches and direct use of the metaheuristic j¼2 b j complete solution where a complete solution is any
methods available in the optimization literature. path in the graph of the tree from the first-level branch
The key point here is that the optimization algorithm for (trunk) to any one of the lth-level branch. Here, bj :
the model; is not as important as using a robust and j ¼ 2,3y,l is a user-defined parameter.
complete model because when a model plans the develop- A feasible solution for a short horizon is created with a
ment of the network over a long horizon like 20 years, it random search method. The algorithm first assigns values
does not really matter for the top managers and policy from set f0; 1; 2; . . . ; rg to X ii0 jn at random (with a limited
makers if the model optimization run time is 1 minute or 10 maximum number of parallel pipes) and knowing the
days! Most of the effort in the literature has diverted to assigned values of X ii0 jn , the algorithm, then, randomly
finding fast solutions to the problem. Considering this fact assigns values from set f0; 1; 2; . . . ; sg to Y ii0 j . Knowing the
and the limitations in choosing an optimization method values of both decision variables, the constraints of the
due to interdependencies of the index range of the decision integrated model are checked to determine the feasibility of
variables, we propose a heuristic random search method in the solution comprised of the values of both decision
the next section which sequentially and randomly assigns variables. If all constraints are satisfied, a feasible solution
values to decision variables and evaluates the objective has been produced. Verification of constraints of integrated
function in search of the optimum development plans. model requires running the control optimization submodel
for each period of each year of the corresponding short
3.2. Steps of the algorithm horizon. We use a genetic algorithm approach for finding
(near) optimal solution of the submodel.
We define a complete solution as a feasible combination of When a tree is constructed in an iteration, the objective
development plans which satisfies all constraints of the function of each complete solution in the tree is evaluated
integrated model. In other words, a complete solution using the objective function of the integrated model which
consists of the values of all decision variables for all short consists of capital cost of the new physical components of
horizons. Also, a feasible development plan for a specific the network to be installed in development plans plus the
short horizon is simply called a ‘‘solution’’. Therefore, a optimum operating cost of utilizing the network during the
complete solution is a combination of solutions of all short long-run horizon obtained by running the submodel. The
horizons. best combination of development plans after a number of
The optimization algorithm of the model has an iterative iterations of the optimization algorithm would be the
procedure which produces a number of complete solutions created complete feasible solution with least objective
in each iteration and evaluates their objective functions. function.
This iterative algorithm continues until one or more of the
terminating conditions of the algorithm are satisfied. The 4. Case study
best found complete solution at the end of the algorithm
converges to global optimum if the number of iterations This section demonstrates the application of the model
goes to infinity. As examples of the terminating conditions, and designed heuristic optimization algorithm to a
one may use maximum number of iterations, maximum simplified case study.
number of stalled iterations (consecutive iterations without
any improvement in the objective function of the best 4.1. Definitions and parameters
found complete solution), etc.
The algorithm constructs a ‘‘solution tree’’ in each An arbitrary study area requires a strategic plan for
iteration which is a set of complete solutions. This tree is development of an existing natural gas transmission
ARTICLE IN PRESS
5666 A. Kabirian, M.R. Hemmati / Energy Policy 35 (2007) 5656–5670

pipeline network in order to satisfy the demand of a D 6


number of major consumers from January 1, 2010 to C C D S
T
December 31, 2020 (o ¼ 10). This 10-year long-run S 5 7 8 9 11 13
horizon is split into two 5-year short horizons (l ¼ 2,
u ¼ 5) and the goal is to find 2 development plans with least
discounted operating and capital costs. We assume there is
ample time before 2010 to implement the first development C 3 4 10 12
plan. Table 3 summarizes some parameters of the model of D T D
this case study. Fig. 1 shows the existing network before C 2
the development plans are implemented and Table 4
provides the location of the nodes in Fig. 1. Tables 5 and
6 show the type of pipelines and compressor stations in the S 1
available network, respectively.
Legend:
We consider a 25 km square grid in the map for the S: supply node
location of the transshipment nodes for both development D: demand node
plans. Also, another assumption is that no new demand or C: compressor station end node
T: active transshipment nodes
supply node would be added during the long-run horizon.
Table 7 shows the forecasted consumption rate of the Fig. 1. The graph of the available network before implementation of the
demand nodes in each short-run horizon (for simplicity, we first development plan.
assumed one period in each year and similar consumption
rate in each year). Table 8 shows the range of production at Table 4
supply nodes over the long-run horizon. The supply nodes Location of the nodes of the available network before implementation of
can provide natural gas with a pressure between 700 and the first development plan
1050 psi. The demand nodes require a gas pressure with the Node Location (km, km)
same range. Also, the pressure of gas entered to a
compressor station may not fall below 700 psi and the 1 (25,0)
maximum outlet pressure from a compressor station could 2 (25,100)
3 (25,100)
not be more than 1050 psi. 4 (50,100)
Table 9 shows the price of one unit of natural gas over 5 (0,150)
the long run horizon. For simplicity, we assume the 6 (50,175)
incoming and outgoing mass flow rates of compressor 7 (50,150)
stations are equal (this is a bit different from our 8 (75,150)
9 (75,150)
assumption in the model that compressor stations consume 10 (75,100)
a fraction of flowing natural gas). Consequently, we 11 (125,150)
assume the operating cost (dollar) of a compressor station 12 (125,100)
for a short horizon is calculated as follows: 13 (175,150)

 
Pout 0:4=1:4
operating cost ¼ 5  40; 000  V in , Table 5
Pin
Types of pipeline edges of the available network
where V in is the daily volumetric incoming flow rate, Pin
Edge Type
the inlet pressure and Pout the outlet pressure.
We also calculate the capital cost (dollar) of a (1,2) 8
compressor station throughout the long horizon using the (3,4) 8
(5,7) 10
(6,7) 9
(4,7) 8
Table 3 (7,8) 8
Parameters of the model (8,10) 8
(9,11) 8
Parameter Value (4,10) 8
o 10
u 5
following formula:
l 2
t 1 operating cost ¼ 485  877  V in .
r 14
s 1 Table 10 shows the capital cost of installing 100 km of
x 2
pipelines in the study area throughout the long horizon (we
w 0%
assume installation location doesn’t affect the cost).
ARTICLE IN PRESS
A. Kabirian, M.R. Hemmati / Energy Policy 35 (2007) 5656–5670 5667

Table 6  Optimum solution of the second short horizon (require-


Types compressor station edges of the available network ments of development plan 2):
J Do not change the network.
Edge Type

(8,9) 1 Fig. 2 shows the network after implementing the first


(2,3) 1
development plan (since the network does not change in
development plan 2, the figure represents the available
network during short horizon 2 as well).
Table 7 The total operating cost during the long horizon for the
Forecasted consumption rates of the demand nodes
optimal complete solution was $14,020,969 and the capital
Demand Consumption rate throughout Consumption rate throughout cost was $14,000,000. Since we set the discount rate equal
node the first short horizon the second short horizon to zero, the NPW (objective function) of the optimal
(million m3) (million m3) complete solution is simply the sum of the operating and
4 7 11
capital cost, $28,020,969.
6 20 22 One of the possible reasons that the optimization
11 12 13 algorithm recommended no change to be made in
12 9 18 development plan 2 is that the discount rate was zero,
which means paying capital cast late and saving cash at the
beginning of the long horizon has no advantage.

Table 8
Range of production rates of the supply nodes
5. Discussion

Supply node Supply rate throughout the Supply rate throughout the Development of natural gas transmission networks
first short horizon second short horizon could affect different sectors such as economy, society,
(million m3) (million m3)
environment, and politics. So far, we discussed about the
Min Max Min Max most evident issues in network development planning
including technical, structural and economics of the pipe-
1 5 10 10 15
line network. In this section, we discuss how other issues
5 25 40 35 50
13 0 30 0 40 such as environmental, social, safety, and political criteria
could be incorporated into a typical network development
project in general and our model in particular.
Some parts of these issues are beyond the scope of the
Table 9 model of this paper. The proposed model covers only the
Price of natural gas first phase of a typical network development project as
outlined in Table 2 and for instance, many of the
Supply Forecasted price throughout Forecasted price throughout the environmental concerns could be considered in the last
node the first short horizon ($/ second short horizon ($/
million m3) million m3)
phases of a network development project (installation and
inspection) and are unrelated to our strategic planning
1 30 33 model.
5 36 42
13 45 49
Table 10
Capital cost of installing 100 km pipeline

4.2. Results Pipeline type Installation cost (million$)

1 4
We used 1000 iterations of the optimization algorithm
2 6
with b2 ¼ 3; which means that the algorithm has created 3 8
3000 complete solutions. The optimum complete solution 4 10
found in the first 1000 iterations had very simple 5 12
development plans which suggest these solutions: 6 16
7 20
8 24
 Optimum solution of the first short horizon (require- 9 30
ments of development plan 1): 10 36
J Install a pipeline of type 7 between nodes 11 and 13 11 40
(X 11;13;1;1 ¼ 7). 12 42
J Install a pipeline of type 7 between nodes 11 and 12 13 48
14 56
(X 11;12;1;1 ¼ 7).
ARTICLE IN PRESS
5668 A. Kabirian, M.R. Hemmati / Energy Policy 35 (2007) 5656–5670

D 6 use the form of the objective function. Hence, this property


C C D S
along with the fact that the constraints of the model are not
T
S 5 7 8 9 11 13 changed with different objective functions enable the model
to have multiobjective functions if any of the above
multiobjective techniques are employed to transform the
multiobjective function to a single one.
C 3 4 10 12 In addition to the ability of the model to accept a
D T D completely new multiobjective function, we also believe
C 2 that current cost-based single-objective function of the
model has the potential to account for some other
conflicting criteria if an appropriate cost function method
S 1 briefly explained above is employed. For instance, one may
measure environmental or safety criteria with ‘‘money’’
Legend:
S: supply node and add these cost to the cash flow of the current NPW
D: demand node objective function or select appropriate locations for
C: compressor station end node transshipment nodes (we elaborate upon this approach in
T: active transshipment nodes
the subsequent sections).
Fig. 2. The graph of the network after implementing optimal development
plan 1. 5.1. Environmental concerns

Sustainable development requires protection of natural


Another key point is that some of the criteria whose environment; and expansion of a natural gas transmission
effects are important on network development planning are network could have significant impacts on environment.
satisfied when the network itself develops even if these Some environmental criteria of network planning have
criteria are not directly considered in the model clear conflicts with the economy of expansion in certain
(for example, see Sections 5.1). In multiobjective optimiza- geographical areas, but some others do not.
tion language, such criteria are not in conflict with the Natural gas is a green fossil fuel which pollutes the
objective function of the model and one need not worry environment less than the others. Because of its clean
about them. burning nature, the use of natural gas wherever possible,
Multiobjective optimization methods are useful only for either in conjunction with other fossil fuels or instead of
conflicting criteria of network development planning. There them can help reduce the emission of harmful pollutants.
are many types of multiobjective functions; two well-known In this view, development of the network in our model even
types of them are (1) minfmaxx2F f 1 ðxÞ; f 2 ðxÞ; . . . ; f k ðxÞg (or with its microeconomic goals improves environmental
similarly max min) and (2) minx2F f 1 ðxÞ; f 2 ðxÞ; . . . ; f k ðxÞ; indicators.
where x is the decision vector, F the set of feasible decision On the other hand, preservation of trees and natural
vectors, and f i is the ith objective function. For the first habitats is a concern that sometimes conflicts with
type, one may add some constraints to the problem and economic objectives of the network development plans
reduce the objective function to a single-objective function because an economically optimum plan may require
(see Hillier and Liberman, 1997). The most widely used cutting trees or trespassing protected habitats. The planner
technique for the second type consists of reducing the in this situation may be presented with two options:
multiobjective problem to a single objective one by means
of the so-called ‘‘scalarization’’ procedure. Various scalar- 1. Pay the cost of violating the environment (cutting trees,
ization procedures may be employed: trespassing habitats, or any harmful interference in
ecosystem): this cost may be paid to certain institutions
1. Cost function method: Each objective function is (for example to obtain the right of way) or spent for
assigned a cost coefficient and then the function compensating the impacts on environment by turning
obtained by summing up all the objective functions the environmental situation after implementing the plan
scaled by their cost coefficients is optimized. to the position before that.
2. Goal programming method: An ‘‘ideal optimal value’’ for 2. Money cannot do anything. Violation of the environ-
each objective function is chosen and then the Eu- ment in the area is absolutely prohibited.
clidean/absolute distance between the actual vector of
objective functions and the vector made up of the ideal The capital cost of installing a pipeline in the objective
values is optimized. function of the integrated model was a function of the
location of the installation. For the first option above
The optimization algorithm described in Section 3 is which let the planner pay the cost of installing pipes in an
basically a numerical optimization method, i.e. it only environmentally protected area, this cost could easily be
needs numerical values of objective function and does not considered in the capital cost of the pipeline passing the
ARTICLE IN PRESS
A. Kabirian, M.R. Hemmati / Energy Policy 35 (2007) 5656–5670 5669

protected area; and for the second option, no transship- down for any reason, the production and receiving facilities
ment node is considered inside the protected area and an and refineries often also have to be shut down because gas
infinite cost of installation is assumed in the model which cannot be readily stored, except perhaps by increasing the
recommends the optimization algorithm not to trespass the pipeline pressure by some percentage. All these damages
absolutely protected area or pay an infinite cost. and failures involve cost.
Reliability and safety criteria could be incorporated into
5.2. Social issues the cost-based objective function of the model if the
modeler could measure the level of reliability in cost. The
Social justice is based on the idea of a society which reliability cost has two parts. The first part is a fixed cost
gives individuals and groups fair treatment and a just which is paid at the time of installing a physical component
share of the benefits of society. Governments seek to of the network. This cost should be considered in the
provide a minimum level of income, service, or other capital cost of the component (pipeline or compressor
support for disadvantaged peoples to improve indicators of station). The second part is the cost of inspections and
social justice and welfare. Natural gas is one of these safety measures after the physical components of the
services that could be used as a tool to pursue certain social network are installed. Obviously, this part of the reliability
policies. cost is a part of the operating cost.
A common problem in developing countries is centrali- The development plans in the model are based on the
zation of the country resources, income and welfare in forecasts of the consumption in demand nodes and
limited metropolitan areas (such as Tehran, Khomei- production range in supply nodes. But, the actual
nishahr, Shahinshahr and Varnosfaderan State in Iran). production or consumption during the long horizon may
This geographically unbalanced development causes many deviate from forecasts. The network must be reliable in this
social and economical problems for people living far from situation to provide actual demanded natural gas of the
these developed areas. These problems include migration to consumers during the long-run horizon. The risk of poor
metropolitan areas, unemployment, and in general, poor reliability in this case is significant because inadequacy of
standards of living and quality of life outside major cities. supplied natural gas to certain consumers like large
In the perspective of natural gas development planning, the manufacturing industries or power plants could shut down
governments may indirectly subsidize the physical devel- these facilities for a longer period of time than a failure in
opment of the network in certain geographical areas to the network. Also, when inadequate natural gas is
supply cheaper gas to rural and undeveloped areas and supplied, consumers may use more polluting fuels and this
share the benefits of using this source of energy more fairly problem leads to environmental damages. However, this
and improve social justice. These subsidies could be problem could be addressed in the model by applying a
subtracted from the capital cost of installing pipelines margin of safety to the forecasts or accounting for the cost
and compressor stations for undeveloped areas in our of probable inadequate supply of natural gas in the
model. objective function.

5.3. Reliability and safety 5.4. Politics

The integrity of the pipeline network and its related Regional economic collaborations possess the power to
equipment is one of the industry’s top concerns. The threat engender as well as transform social and political discourse
of catastrophic pipeline rupture, though extremely unlikely between countries. Energy ties play a more important role
given the industry’s safety precautions, hangs over the in the economics and politics of energy rich countries. Such
head of every pipeline executive and employee. Pipe- regional and international energy relations sometimes serve
lines require regular patrol, inspection, and maintenance the political goals of the countries. For instance, since the
including internal cleaning and checking for signs of gas discovery of natural gas reserves in Iran’s South Pars fields
leaks. in Persian Gulf in 1988, the Iranian government began
Poor reliability and safety measures in a network could increasing efforts to promote higher gas exports abroad.
result in various failures and damages. Corrosion is a The export of this energy resource could end political
serious problem plaguing the industry. This is a sneaky isolation of the country. With this aim, Iran is negotiating
enemy and unless it has caused obvious damages, corrosion with India and China to export natural gas to these
is very difficult to detect and locate accurately. To large regional consumers in the near future. In our
minimize corrosion, pipeline companies install electrical model, each natural gas export terminal in the long-run
devices called catholic protection systems, which inhibit horizon is a demand node; therefore, the export quantities
electrochemical reactions between the pipe and the at these nodes should be forecasted. The governments
surrounding materials. Mechanical damages also occur may subsidize installing physical components of net-
when heavy construction equipments dent the pipe, scrape work structure and reduce associated capital costs to
off its coatings, gouge the metal or otherwise deform the encourage the export. Such policies could help political
pipe in some way. However, if the pipeline has to be shut interests.
ARTICLE IN PRESS
5670 A. Kabirian, M.R. Hemmati / Energy Policy 35 (2007) 5656–5670

6. Conclusion References

In this paper, we developed a new model for finding the Cheesman, A.P., 1971a. How to optimize gas pipeline design by computer.
Oil and Gas Journal 69 (51), 64.
optimal development plans over a long horizon. This
Cheesman, A.P., 1971b. Understanding origin of pressure is a key to
nonlinear model accounts for various engineering and better well planning. Oil and Gas Journal 69 (46), 146.
economic factors related to the problem. The objective Edgar, T.F., Himmelblau, D.M., 1988. Optimization of Chemical
function is essentially the NPW of all related operating and Processes. McGraw-Hill, New York.
investment costs paid during the long-run study horizon. Edgar, T.F., Himmelblau, D.M., Bickel, T.C., 1978. Optimal design of gas
We study the feasibility of the development plans through transmission network. Society of Petroleum Engineering Journal 30,
96.
different constraints. In addition to the planning model, a Flanigan, O., 1972. Constrained derivatives in natural gas pipeline system
heuristic random search optimization algorithm was optimization. Journal of Petroleum Technology May, 549.
developed which finds (near) optimal solutions of the Graham, G.E., Maxwell, D.A., Vallone, A., 1971. How to optimize gas
model. A case study was used to demonstrate the pipeline networks. Pipeline Industry, 41–43.
application of the model and optimization algorithm. Harary, F., 1969. Graphs Theory. Addison-Wesley, Reading, MA.
Hillier, F.S., Liberman, G.J., 1997. Introduction to Operations Research.
Although our model was originally designed to meet the McGraw-Hill, New York.
planning difficulties in Iran with a noncompetitive gas Larson, R.E., Wong, P.J., 1968. Optimization of natural gas system via
market and monopoly decision-making environment, but dynamic programming. Industrial and Engineering Chemistry AC 12
we believe it could be applied to other cases as well. The (5), 475–481.
Mah, R.S.H., Schacham, M., 1978. Pipeline network design and synthesis.
major step in implementing the model is collecting the
Advances in Chemical Engineering 10.
necessary information to feed into model. Accuracy of the Martch, H.B., McCall, N.J., 1972. Optimization of the design and
data and forecast could improve the optimality of operation of natural gas pipeline systems. Paper No. SPE 4006, Society
development plans suggested by running the model. We of Petroleum Engineers of AIME.
are working on implementing the model on Iran’s network. Olorunniwo, F.O., 1981. A methodology for optimal design and capacity
We also intend to extend the applicability of the model by expansion planning of natural gas transmission networks. Ph.D.
Dissertation, The University of Texas at Austin.
releasing some assumptions and introducing new cost Olorunniwo, F.O., Jensen, P.A., 1982. Optimal capacity expansion policy
elements in the objective function. for natural gas transmission networks—a decomposition approach.
Engineering Optimization 6, 95.
Acknowledgment Ore, O., 1963. Graphs and Their Uses. Random House, New York.
Rı́os Mercado, R.Z., Kim, S., Boyd, E.A., 2006. Efficient operation of
natural gas transmission systems: a network-based heuristic for cyclic
This work was supported in part by National Iranian structures. Computers & Operations Research 23 (8), 2323–2351.
Gas Company. The authors would like to thank Ms. Transportation Research Board of the National Academies, 2004.
Khaleye M. Hemmati for her considerate cooperation with Transmission pipeline and land use: a risk informed approach. Special
us during this research. Report 281 /www.tbr.orgS.