LIST OF RECOMMENDED MANUFACTURERS & STANDARDS FOR MAJOR MEP EQUIPMENTS

Spare Parts /  Maintenance / Training / 


Discipline Standards / Specification Recommended Manufacturers Warranty FAT / SAT Commissioning 
Extra materials Offer for AMC Demonstration
MECHANICAL
External Network:
Potable Water
Pumps Bronze/SS Impeller 1. Grundfoss SW MRSP N/A FAT  FASR FASR
SS shaft 2. KSB
Cast Iron Body 3. Armstrong
4. Ebara
WRAS approved 5. Lowara
Factory assembled 6. Holden Brooke Pullen
7. Wilo
BS 8558:2011 8. ITT Bell & Gosset
GRP water tanks ‐ above ground 40‐50 mm thick, 48 kg/m3, sandwich PUF insulated  1. Sekisui 10 years for panels N/A N/A N/A FASR Contractor
WRAS approved 2. Bridgestone
BS EN 13280:2001 3. Balmoral
4. Mitsubishi
Domestic Water Treatment DM guidelines 1. Culligan SW MRSP Annual maintenance offer  FAT  FASR FASR
WHO guidelines 2. Corodex (quotation only) up to 5 
3. Nalco years 
4. Metito
5. Waterbird
6. Veolia
Fire sprinkler system
Pumps Bronze Impeller 1. Ingersol Dresser SW MRSP N/A FAT  FASR FASR
SS shaft 2. Patterson
Cast Iron Body 3. ITT Bell & Gosett
NFPA 20 and UAE Fire Code 4. Aurora
5.  Peerless‐Grundfoss
FM/UL approved 6.  Reddy Buffallo
Fire Hydrant system
Hydrants NFPA 24 and UAE Fire Code 1. Kennedy Valve Co. SW N/A N/A N/A Contractor Contractor
2. Mueller
3. Tyco
4. Bristol
5. Naffco
6. Kidde
Chilled Water System
Pumps Bronze Impeller 1. Grundfoss SW MRSP N/A FAT  FASR FASR
SS shaft 2. Armstrong
Cast Iron Body 3. ITT Bell & Gosset
4. Holden Brooke Pullen
BS EN ISO 2858:2010 5. KSB
Factory assembled 6. Ebara
7. Lowara
Pressurisation units BS 7074 1. Grundfoss SW for unit MRSP N/A N/A FASR FASR
WRAS approved 2. Armstrong
3. ITT Bell & Gosset
4. Holden Brooke Pullen
5. Pneumatex
6. Lowara
Sewerage
Lifting station pumps Cast Iron Body 1. Flygt; ITT Industries. SW for unit MRSP N/A FAT  FASR FASR
SS Shaft 2. Goulds Pumps; ITT Industries.
SS Impeller 3. ABS
DM guidelines 4. SA Armstrong
BS EN 1671:1997 5. Grundfoss
Compressed Air
SW for unit & SW+4 years for  Annual maintenance offer 
Compressor BS EN 1012‐1:2010 1. Atlas Copco  compressors MRSP (quotation only) up to 5  FAT  FASR FASR
ASME B 19.1 2. Ingersoll‐Rand; Air Solutions Group. years 
3. Comp air
4. Kaeser Compressors, Inc.
Building Services:
Potable Water
Pumps Bronze/SS Impeller 1. Grundfoss SW MRSP N/A FAT  FASR FASR
SS shaft 2. KSB
Cast Iron Body 3. Armstrong
4. Ebara
5. Lowara
6. Holden Brooke Pullen
WRAS approved 7. Wilo
BS 8558:2011 8. ITT Bell & Gosset

Page : 1 of 5 Date: 01 May 2014
DUBAI PARKS
LIST OF RECOMMENDED MANUFACTURERS & STANDARDS FOR MAJOR MEP EQUIPMENTS

Spare Parts /  Maintenance / Training / 


Discipline Standards / Specification Recommended Manufacturers Warranty FAT / SAT Commissioning 
Extra materials Offer for AMC Demonstration
GRP Insulated Panel Tanks 40‐50 mm thick, 48 kg/m3, sandwich PUF insulated  1. Sekisui 10 years for panels N/A N/A N/A FASR Contractor
WRAS approved 2. Bridgestone
BS EN 13280:2001 3. Balmoral
4. Mitsubishi
Water heaters Steel Glass lined‐Small 1. A.O. Smith SW+4 years N/A N/A N/A Contractor Contractor
Stainless Steel‐Central 2. Bradford FAT for FASR (for central) FASR (for central)
3. Viesssmann  Central heater
DEWA and DM Guidelines 4. Ariston
BS 3456‐102.21:1998 5. Thermex
6. HRS
7. Ecotherm
8. Rycroft
Chilled Water
 Air Handling Equipment EUROVENT/AHRI 1. Flakt Woods SW MRSP N/A FAT FASR FASR
BS EN 1886:2007 2. York‐JCI SAT
3. Trane 
4. Carrier
5. McQuay
6. Euroclima
7. Klimak
8. Mekar
Close Control Air Conditioning Units EUROVENT/AHRI 1. Liebert SW for unit & SW+4 years MRSP Annual maintenance offer  FAT FASR FASR
2. Emerson for compressors (quotation only) up to 5 
3. Stulz years 
4. GEA
5. Johnson Controls
6. Compu‐Aire
7. Airedale
8. Climate worx
DX Split units EUROVENT/AHRI 1. York ‐JCI SW for unit & SW+4 years MRSP N/A N/A FASR FASR
BS ISO 15042:2011 2. Trane  for compressors
3. Carrier
4. McQuay
5. Mitsubishi
6. LG
7. O'General
 Fan Coil Units EUROVENT/AHRI 1. Flakt Woods SW MRSP N/A N/A FASR FASR
BS 4856‐4:1997 2. York‐JCI
3. Trane
4. Carrier
5. McQuay
6. Euroclima
7. Sinko
Fans AMCA 1. Nuaire SW MRSP N/A FAT FASR FASR
BS 848‐1:2007 2. Greenheck
3. PENN Ventilator Co.
4. Elta
5. Xpelair
6. Systemair
7. Dynair
 VAVs AHRI 1. Flakt Woods SW MRSP + N/A N/A Contractor Contractor
BS EN 12589:2001 2. Trox 5 actuators of each type
3.Waterloo
4. Barcol
5. Titus
6. KBE
7. EH Price
Differential Pressure Control Valves BS 7350:1990 1. Tour Anderson SW MRSP + N/A N/A FASR FASR
2. Danfoss 5 actuators of each type
3. Belimo
4. Honeywell
5. Hattersley
6. Crane
7. Flow Con
Plate Heat Exchangers SS plates 1. Alfa Laval, Inc. SW N/A N/A FAT Contractor N/A
EUROVENT/AHRI 2. Sondex
BS EN 1148:1999 3.  Bell & Gossett; ITT Industries.
4. APV
5. GEA
6. HRS
Sewerage

Page : 2 of 5 Date: 01 May 2014
DUBAI PARKS
LIST OF RECOMMENDED MANUFACTURERS & STANDARDS FOR MAJOR MEP EQUIPMENTS

Spare Parts /  Maintenance / Training / 


Discipline Standards / Specification Recommended Manufacturers Warranty FAT / SAT Commissioning 
Extra materials Offer for AMC Demonstration
Sanitary wares 1. Ideal Standard SW MRSP N/A N/A Contractor Contractor
2. Kohler
3. Toto
4. Twyford
5. RAK Ceramics
6. Roca
7. Villeroy & Boch

ELECTRICAL:
11 kV cables DEWA Will be supplied by DEWA N/A N/A N/A N/A N/A N/A

Ring Main Units  / 11 KV switchgear DEWA Will be supplied by DEWA N/A N/A N/A N/A N/A N/A

Transformers DEWA Will be supplied by DEWA N/A N/A N/A N/A N/A N/A

LV conductors & cables DEWA, BS 6007:2006, BS EN 50525:2011,  1.Ducab SW N/A N/A N/A Contractor Contractor


BS 6004:2012, BS 7889:2012, BS 6346:1997 2.AEI
3.Riyadh cables
4.Saudi cables
5. Delta cables
Bus bars BS EN 60439‐2:2000, IEC 60439‐2:2000 1.Schneider SW+1 year MSRP + N/A FAT FASR FASR
BS EN 61439‐6:2012 2.Siemens 1 pc / every size SAT
3.Eaton (Cutler  Hammer)
4. GE
5. ABB
Fire rated   cables (600V‐1000V)  DCD, DEWA, BS 7846:2009, BS EN 50267  1. Ducab SW N/A N/A N/A Contractor Contractor
(Armoured /Non armoured) 2.Draka 
3.AEI
4. Pirelli
5 Prysmian
Fire rated   cables (FA/EM/VA)  DCD,   BS 7629‐1:2008, BS 5839‐1:2002,  1.Draka SW N/A N/A N/A Contractor Contractor
(Non armoured) BS 5266‐1:2011,  BS 8519‐1:2010, BS EN 50267  2.AEI
3. Prysmian
4.BICC
5.Pirelli
Grounding, earthing & lightning protection DEWA, BS EN 62561:2012, BS 7430:2011 1.Furse SW N/A N/A N/A Contractor Contractor
BS EN 62305‐1:2011, BS EN 50310:2010 2.Erico
3.AN Wallis
4. Altec
5. Tenby
Non Metallic conduits & Accessories BS 4607‐1:1984+A2:2010, BS 4607‐3:1971 1.Marshall SW N/A N/A N/A N/A N/A
BS EN 61386‐21:2004+A11:2010 2.Decoduct
BS 4607‐5:1982+A3:2010 3.MK
4. Clipsal
5. Simplex
Metallic conduits & Accessories  BS EN 61386‐1:2008 1.Barton SW N/A N/A N/A N/A N/A
2.Simplex
3.Electrix
4. Transdelta
5. Wheatland
Flexible Metallic conduits & Accessories BS 4607‐1:1984+A2:2010 1.Adaptflex SW N/A N/A N/A N/A N/A
2.Barton
3.Kopex
4.Decoduct
5.Marshall Tuflex
Metal wire ways/mesh & accessories  BS EN 61537:2007,  IEC 61537:2001 1.Legrand SW N/A N/A N/A N/A N/A
2. B‐Line ‐ Cooper /Eton
3.Obo betterman
4.Novablue
5.Snaketray
6. MP huskey
Cable trays/ Ladder / trunking & accessories  BS EN 61537:2007,  IEC 61537:2001 1.Davis SW N/A N/A N/A N/A N/A
2.Swifts/Legrand
3. Obo betterman
4.B‐line ‐ cooper/Eton
5. Cablofill
Cable management system/ floor/wall trunking  BS EN 60423‐24:2007, BS EN 50085‐2‐2:2008 1. MK SW N/A N/A N/A N/A N/A
2.Legrand

Page : 3 of 5 Date: 01 May 2014
DUBAI PARKS
LIST OF RECOMMENDED MANUFACTURERS & STANDARDS FOR MAJOR MEP EQUIPMENTS

Spare Parts /  Maintenance / Training / 


Discipline Standards / Specification Recommended Manufacturers Warranty FAT / SAT Commissioning 
Extra materials Offer for AMC Demonstration
3.Obo betterman
4.Ackerman
5. Electrak
Under ground ducts and raceways BS EN 61386‐24:2010 1.Hepworth SW N/A N/A N/A N/A N/A
2.National plastic
3.Cosmoplast
4. Binbrook
5. Dubai Pipes
Isolators & Disconnecting switches DEWA,  BS EN 60204, BS EN 60947 1.Eton SW N/A N/A N/A Contractor N/A
2.ABB
3.Elektra
4. Schneider
5. Siemens
Wiring Devices DEWA, BS 1363 1. MK SW N/A N/A N/A Contractor Contractor
2. Clipsal
3. Legrand
4. Crabtree
5. Hubbel
LV switch gears DEWA, BS EN 60947, BS EN 61439:2012 1.Schneider SW+1 year MRSP N/A FAT FASR FASR
BS EN 60898‐1 , BS EN 608981:2003+A13:2012 2.ABB SAT
BS EN 60898‐1 , BS EN 608981:2003+A13:2012 3.Eton/ cutler hammer
BS EN 61008‐1:2012, BS EN 60529 : 1992 4.Siemens
6. Dorman smith
Capacitor Banks  DEWA, BS EN 60831, BS EN 60871, 1.Schneider SW+1 year MRSP N/A FAT FASR FASR
(Power factor correction equipments)  BS EN 60931,  2.ABB SAT
3. Power economy gulf
4. J & P capacitors
6. Lifasa
Standby Generator BS EN 60034,  NFPA 110 1.Caterpillar SW+1 year MRSP FAT FASR FASR
BS 5514, BS 7698 2. Mitsubishi Annual maintenance offer  SAT
3. FG wilson (quotation only) up to 5 
4. KHD/Duetz years 
5 .Cummins ONAN
UPS BS EN 62040:2013 1.Liebert SW+1 year MRSP FAT FASR FASR
2. Eton Annual maintenance offer  SAT
3. Schneider (quotation only) up to 5 
4. APC years 
5. Chloride
Automatic Transfer switches BS EN 62310, BS EN 60947,  1.ASCO SW+1 year MRSP N/A FAT FASR FASR
NFPA 110 2. Eton SAT
3. ABB
4. Schneider
5. Siemens
Variable frequency motor controllers BS EN 61800‐2:1998, IEC 61800‐2:1998 1. Danfoss SW+1 year MRSP N/A N/A FASR FASR
2. Allen Bradley
3. Siemens
4. Lenze AC tech
3. Schneider
Indoor & out door Light fittings DEWA, BS EN 60598‐1, BS EN 12665:2011, CIBSE (varies depends upon the project requirement) SW+1 year MRSP N/A N/A Contractor Contractor
BS EN 13032

Lighting control system BS EN 62386, CIBSE 1. Lutron SW+1 year MRSP N/A N/A FASR FASR


2. ABB
3. Philips
2. Tridonic
3.Legrand
Central Battery Emergency lighting BS EN 1838:2013, BS 5266‐1:2011, NFPA 101 1. Cooper lighting / CEAG SW+1 year MRSP N/A FASR FASR
CIBSE guide TM12, NFPA 110 2. ABB
Annual maintenance offer 
3. Chloride
(quotation only) up to 5 
4. Siemens
years 
5. Inotec
6. Thomas & Betts
Fire Alarm systems DCD, NFPA 72, NFPA 101, NFPA 92A, NFPA 101A 1. Honeywell SW+1 year MRSP N/A FASR FASR
UAE fire code, BS EN 54, BS 5839 2. Notifier
UL/FM Approved 3. Edwards
Annual maintenance offer 
4. Tyco
(quotation only) up to 5 
5. Simplex
years 
6. Bosch
7. Gent
8. Cooper
Security access control systems Dubai Police, Meraas Security requirements 1. Panasonic SW+1 year MRSP N/A N/A FASR FASR

Page : 4 of 5 Date: 01 May 2014
DUBAI PARKS
LIST OF RECOMMENDED MANUFACTURERS & STANDARDS FOR MAJOR MEP EQUIPMENTS

Spare Parts /  Maintenance / Training / 


Discipline Standards / Specification Recommended Manufacturers Warranty FAT / SAT Commissioning 
Extra materials Offer for AMC Demonstration
BS EN 50133 2.Honeywell
3. Johnson control
4. Siemens
5. Bosch
6. IES
Video surveillance equipment Dubai Police, Meraas Security requirements 1. Panasonic SW+1 year MRSP N/A N/A FASR FASR
BS EN 50133 2. Pelco
3. Baxall
4. Vicon
5. Axis
6. Bosch
7. Siemens
Public Address system / Voice Alarm system DCD, NFPA 72, NFPA 101, NFPA 92A, NFPA 101A 1. Aties SW+1 year MRSP N/A N/A FASR FASR
UAE fire code, BS 5839 2. Bosch
3. Merlaud
4. Bouyer
5. Panasonic
Building management system BS EN 14908, BS EN 15232:2012, 1. Honeywell SW+1 year MRSP N/A FASR + FASR
 Dubai Green building regulation 2. Siemens Annual maintenance offer  3rd party
3. Johnson Controls (quotation only) up to 5 
4. Invensys years 
5. Trend

ICT & COMMUNICATION
IT cabling Etisalat, TRA, Meraas ICT requirements 1. Belden 20 year MRSP N/A N/A FASR FASR
BS 6701:2010, TIA/EIA‐568‐C 2. 3M
BS EN 50173 ‐ 1 3. AMP
BS EN 50174 ‐ 1/2/3/4 4. Panduit
BS EN 50346 / 30310 5. Systimax
6. Corning
7. Commscope
8. Tyco
IP PBX Etisalat, TRA, Meraas ICT requirements 1. Cisco SW+1 year MRSP N/A N/A FASR FASR
2. Avaya
3. Alcatel

Networking Meraas ICT requirements 1. Cisco SW+1 year MRSP N/A FASR FASR


IEEE 802.x 2. HP
3. Dlink Annual maintenance offer 
4. Brocade (quotation only) up to 5 
years 
Servers & Desktops Meraas ICT requirements 1. HP SW+2 year MRSP N/A FASR FASR
2. IBM Annual maintenance offer 
3. Dell (quotation only) upto 5 
years 

Radio TRA, Meraas security  requirements 1. Motorola SW+1 year MRSP N/A N/A FASR FASR


2. Maxim

Legend:
SW: Standard Warranty 1 Year from Final Handing over date (Warranty shall be from the manufacturer and not from the supplier/local dealer)
FASR: Engage factory authorised service representative  to conduct testing & commissioning and Training to the employer representatives
MRSP: Manufacturer recommended spare parts for 6 months ( Contractor to provide the spare parts for 6 months and  a list of  Manufacturer's recommended spare parts for 6 months and 1 year)
FAT/SAT Factory aceeptance Test / Site Acceptance test  ‐ Shall be witnessed by client's representatives

Page : 5 of 5 Date: 01 May 2014

S-ar putea să vă placă și