377855594.xls Input
Stability Analysis
Dead load (15.0 x 17.5 x 1.5 + 1.5 x 17.5) x 2.4 1,008.00 (t)
Water weight (15.0 x 17.5 x 7.5) x 1.0 1,968.75 (t)
Uplift -(7.93 + 7.06) x 15.0 x 0.5 x 17.5 (1,967.44) (t)
Normal Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 0.00 0.00
Water Weight 1,968.75 0.00 0.00
Uplift (1,967.44) (0.15) 285.47
Σ 1,009 0 285 0
Seismic Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 96.77 0.00 0.75 0.00 72.58
Water Weight 1,968.75 0.00 0.00
Uplift (1,967.44) (0.15) 295.12
Construction Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 0.00 0.00
5-2
Upstream Apron Concrete (Center Portion) Longitudinal
5-3
Stability Analysis
Dead load (15.0 x 17.5 x 1.5 + 1.5 x 17.5) x 2.4 1,008.00 (t)
Water weight (15.0 x 17.5 x 7.5) x 1.0 1,968.75 (t)
Uplift -(7.93 + 7.06) x 15.0 x 0.5 x 17.5 (1,967.44) (t)
Normal Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 0.00 0.00
Water Weight 1,968.75 0.00 0.00
Uplift (1,967.44) 0.00 0.00
Σ 1,009 0 0 0
Seismic Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 96.77 0.00 0.75 0.00 72.58
Water Weight 1,968.75 0.00 0.00
Uplift (1,967.44) 0.00 0.00
Construction Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 0.00 0.00
5-4
Upstream Apron Concrete (Center Portion) Sectional
5-5
Stability Analysis
Dead load (15.0 x 16.35 x 1.5 + 1.5 x 16.35) x 2.4 941.76 (t)
Water weight (15.0 x 16.35 x 7.5) x 1.0 1,839.38 (t)
Uplift -(7.93 + 7.06) x 15.0 x 0.5 x 16.35 (1,838.15) (t)
Normal Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 941.76 0.00 0.00
Water Weight 1,839.38 0.00 0.00
Uplift (1,838.15) (0.15) 275.72
Σ 943 0 276 0
Seismic Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 941.76 90.41 0.00 0.75 0.00 67.81
Water Weight 1,839.38 0.00 0.00
Uplift (1,838.15) (0.15) 275.72
Construction Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 941.76 0.00 0.00
5-4
Upstream Apron Concrete (Side Portion) Longitudinal
5-5
Stability Analysis
Dead load (15.0 x 16.35 x 1.5 + 1.5 x 16.35) x 2.4 941.76 (t)
Water weight (15.0 x 16.35 x 7.5) x 1.0 1,839.38 (t)
Uplift -(7.93 + 7.06) x 0.5 x 16.35 x 15.0 (1,838.15) (t)
Normal Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 941.76 0.00 0.00
Water Weight 1,839.38 0.00 0.00
Uplift (1,838.15) 0.00 0.00
Σ 943 0 0 0
Seismic Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 941.76 90.41 0.00 0.75 0.00 67.81
Water Weight 1,839.38 0.00 0.00
Uplift (1,838.15) 0.00 0.00
Construction Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 941.76 0.00 0.00
5-6
Upstream Apron Concrete (Side Portion) Sectional
5-7
Stability Analysis
Dead load (15.0 x 17.5 x 2.0 + 1.5 x 17.5) x 2.4 1,323.00 (t)
Water weight (15.0 x 17.5 x 0.25) x 1.0 65.63 (t)
Uplift -(4.61 + 3.74) x 15.0 x 0.5 x 17.5 (1,095.94) (t)
Normal Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,323.00 0.00 0.00
Water Weight 65.63 0.00 0.00
Uplift (1,095.94) (0.26) 284.94
Σ 293 0 285 0
Seismic Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,323.00 127.01 0.00 1.00 0.00 127.01
Water Weight 65.63 0.00 0.00
Uplift (1,095.94) (0.26) 284.94
Construction Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,323.00 0.00 0.00
5-7
Downstream Apron Concrete (A) (Center Portion) Longitudinal
5-8
Stability Analysis
Dead load (15.0 x 17.5 x 2.0 + 1.5 x 17.5) x 2.4 1,323.00 (t)
Water weight (15.0 x 17.5 x 0.25) x 1.0 65.63 (t)
Uplift -(4.61 + 3.74) x 15.0 x 0.5 x 17.5 (1,095.94) (t)
Normal Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,323.00 0.00 0.00
Water Weight 65.63 0.00 0.00
Uplift (1,095.94) 0.00 0.00
Σ 293 0 0 0
Seismic Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,323.00 127.01 0.00 1.00 0.00 127.01
Water Weight 65.63 0.00 0.00
Uplift (1,095.94) 0.00 0.00
Construction Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,323.00 0.00 0.00
5-9
Downstream Apron Concrete (A) (Center Portion) Sectional
5 - 10
Stability Analysis
Dead load (15.0 x 15.9 x 2.0 + 1.5 x 15.9) x 2.4 1,202.04 (t)
Water weight (15.0 x 15.9 x 0.25) x 1.0 59.63 (t)
Uplift -(4.61 + 3.74) x 15.0 x 0.5 x 15.9 (995.74) (t)
Normal Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,202.04 0.00 0.00
Water Weight 59.63 0.00 0.00
Uplift (995.74) (0.26) 258.89
Σ 266 0 259 0
Seismic Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,202.04 115.40 0.00 1.00 0.00 115.40
Water Weight 59.63 0.00 0.00
Uplift (995.74) (0.26) 258.89
Construction Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,202.04 0.00 0.00
5 - 10
Downstream Apron Concrete (A) (Side Portion) Longitudinal
5 - 11
Stability Analysis
Dead load (15.0 x 15.9 x 2.0 + 1.5 x 15.9) x 2.4 1,202.04 (t)
Water weight (15.0 x 15.9 x 0.25) x 1.0 59.63 (t)
Uplift -(4.61 + 3.74) x 15.0 x 0.5 x 15.9 (995.74) (t)
Normal Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,202.04 0.00 0.00
Water Weight 59.63 0.00 0.00
Uplift (995.74) 0.00 0.00
Σ 266 0 0 0
Seismic Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,202.04 115.40 0.00 1.00 0.00 115.40
Water Weight 59.63 0.00 0.00
Uplift (995.74) 0.00 0.00
Construction Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,202.04 0.00 0.00
5 - 12
Downstream Apron Concrete (A) (Side Portion) Sectional
5 - 13
Stability Analysis
Dead load (15.0 x 17.5 x 1.5 + 1.5 x 17.5) x 2.4 1,008.00 (t)
Water weight (15.0 x 17.5 x 0.5) x 1.0 131.25 (t)
Uplift -(2.96 + 2.0) x 15.0 x 0.5 x 17.5 (651.00) (t)
Normal Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 0.00 0.00
Water Weight 131.25 0.00 0.00
Uplift (651.00) (0.48) 312.48
Σ 488 0 312 0
Seismic Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 96.77 0.00 0.75 0.00 72.58
Water Weight 131.25 0.00 0.00
Uplift (651.00) (0.48) 312.48
Construction Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 0.00 0.00
5 - 13
Downstream Apron Concrete (B) (Centger Portion) Longitudinal
5 - 14
Stability Analysis
Dead load (15.0 x 17.5 x 1.5 + 1.5 x 17.5) x 2.4 1,008.00 (t)
Water weight (15.0 x 17.5 x 0.5) x 1.0 131.25 (t)
Uplift -(2.96 + 2.0) x 15.0 x 0.5 x 17.5 (651.00) (t)
Normal Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 0.00 0.00
Water Weight 131.25 0.00 0.00
Uplift (651.00) 0.00 0.00
Σ 488 0 0 0
Seismic Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 96.77 0.00 0.75 0.00 72.58
Water Weight 131.25 0.00 0.00
Uplift (651.00) 0.00 0.00
Construction Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 0.00 0.00
5 - 15
Downstream Apron Concrete (B) (Centger Portion) Sectional
5 - 16
Stability Analysis
Dead load (15.0 x 15.9 x 1.5 + 1.5 x 15.9) x 2.4 915.84 (t)
Water weight (15.0 x 15.9 x 0.5) x 1.0 119.25 (t)
Uplift -(2.96 + 2.0) x 15.0 x 0.5 x 15.9 (591.48) (t)
Normal Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 915.84 0.00 0.00
Water Weight 119.25 0.00 0.00
Uplift (591.48) (0.48) 283.91
Seismic Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 915.84 87.92 0.00 0.75 0.00 65.94
Water Weight 119.25 0.00 0.00
Uplift (591.48) (0.48) 283.91
Construction Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 915.84 0.00 0.00
5 - 16
Downstream Apron Concrete (B) (Side Portion) Longitudinal
5 - 17
Stability Analysis
Dead load (15.0 x 15.9 x 1.5 + 1.5 x 15.9) x 2.4 915.84 (t)
Water weight (15.0 x 15.9 x 0.5) x 1.0 119.25 (t)
Uplift -(2.96 + 2.0) x 15.0 x 0.5 x 15.9 (591.48) (t)
Normal Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 915.84 0.00 0.00
Water Weight 119.25 0.00 0.00
Uplift (591.48) 0.00 0.00
Seismic Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 915.84 87.92 0.00 0.75 0.00 65.94
Water Weight 119.25 0.00 0.00
Uplift (591.48) 0.00 0.00
Construction Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 915.84 0.00 0.00
5 - 18
Downstream Apron Concrete (B) (Side Portion) Sectional
5 - 19
qa = ( α c N c +β γ B N r +γ Df N q ) /F s
Allowable bearing capacity qa = 17.5 (t/m2)
qae = 26.2 (t/m2)
安全率(基礎支持
Safety factor Fs = 3 力)
Fs = 2 常時 3
地震時 2
Cohesion c= 1.0 (t/m2)
Minimum width of loaded surface area B= 15 (m)
Unit weight of ground materials γ= 1.8 (t/m3)
Foundation depth from ground surface Df = 3.0 (m)
Internal friction angle φ= 20 (°)
Bearing capacity factor Nc = 7.9
Bearing capacity factor Nr = 2.0
Bearing capacity factor Nq = 3.9
Shape facor of foundation α= 1.350
Shape facor of foundation β= 0.383
Width of foundation B= 17.5 (m)
Length of foundation L= 15.0 (m)