Input for pile arrangement at bottom center of slab

Upstream Apron Concrete


(Side Portion)
Longitudinal (Y-direction) Sectional (X-direction)
Normal Seismic Flood Const Normal Seismic Flood Const
ΣV (kN) 9,300 9,300 #REF! 9,300 ΣV (kN) 9,300 9,300 #REF! 9,300
ΣH (kN) 0 900 #REF! 0 ΣH (kN) 0 900 #REF! 0
ΣM (kNm) 2,800 3,400 #REF! 0 ΣM (kNm) 0 700 #REF! 0
(Center Portion)
Longitudinal (Y-direction) Sectional (X-direction)
Normal Seismic Flood Const Normal Seismic Flood Const
ΣV (kN) 9,900 9,900 #REF! 9,900 ΣV (kN) 9,900 9,900 #REF! 9,900
ΣH (kN) 0 1,000 #REF! 0 ΣH (kN) 0 1,000 #REF! 0
ΣM (kNm) 2,800 3,700 #REF! 0 ΣM (kNm) 0 800 #REF! 0

Downstream Apron Concrete (Middle)


(Side Portion)
Longitudinal (Y-direction) Sectional (X-direction)
Normal Seismic Flood Const Normal Seismic Flood Const
ΣV (kN) 2,700 2,700 #REF! 11,800 ΣV (kN) 2,700 2,700 #REF! 11,800
ΣH (kN) 0 1,200 #REF! 0 ΣH (kN) 0 1,200 #REF! 0
ΣM (kNm) 2,600 3,700 #REF! 0 ΣM (kNm) 0 1,200 #REF! 0
(Center Portion)
Longitudinal (Y-direction) Sectional (X-direction)
Normal Seismic Flood Const Normal Seismic Flood Const
ΣV (kN) 2,900 2,900 #REF! 13,000 ΣV (kN) 2,900 2,900 #REF! 13,000
ΣH (kN) 0 1,300 #REF! 0 ΣH (kN) 0 1,300 #REF! 0
ΣM (kNm) 2,800 4,100 #REF! 0 ΣM (kNm) 0 1,300 #REF! 0

Downstream Apron Concrete (Lower)


(Side Portion)
Longitudinal (Y-direction) Sectional (X-direction)
Normal Seismic Flood Const Normal Seismic Flood Const
ΣV (kN) 4,400 4,400 #REF! 9,000 ΣV (kN) 4,400 4,400 #REF! 9,000
ΣH (kN) 0 900 #REF! 0 ΣH (kN) 0 900 #REF! 0
ΣM (kNm) 2,800 3,500 #REF! 0 ΣM (kNm) 0 700 #REF! 0
(Center Portion)
Longitudinal (Y-direction) Sectional (X-direction)
Normal Seismic Flood Const Normal Seismic Flood Const
ΣV (kN) 4,800 4,800 #REF! 9,900 ΣV (kN) 4,800 4,800 #REF! 9,900
ΣH (kN) 0 1,000 #REF! 0 ΣH (kN) 0 1,000 #REF! 0
ΣM (kNm) 3,100 3,800 #REF! 0 ΣM (kNm) 0 800 #REF! 0

377855594.xls Input
Stability Analysis

5.1 Upstream Apron Concrete Longitudinal


(Center Portion)

Length of apron Luc = 15.00 (m)


Width of apron Buc = 17.50 (m)
Thickness of apron tuc = 1.50 (m)
Unit weight of concrete γc = 2.40 (t/m3)
Height of storage water Hsw = 7.50 (m)
Unit weight of water γw = 1.0 (t/m3)
Unit weight of earth γsat = 1.8 (t/m3)
Earthquake coefficient kh = 0.096
Friction angle φ= 15 (°)

Dead load (15.0 x 17.5 x 1.5 + 1.5 x 17.5) x 2.4 1,008.00 (t)
Water weight (15.0 x 17.5 x 7.5) x 1.0 1,968.75 (t)
Uplift -(7.93 + 7.06) x 15.0 x 0.5 x 17.5 (1,967.44) (t)

Normal Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 0.00 0.00
Water Weight 1,968.75 0.00 0.00
Uplift (1,967.44) (0.15) 285.47

Σ 1,009 0 285 0

ΣVuc = 1,009 (t) |e| = 0.283 OK


ΣHuc = 0 (t) Fs = #DIV/0! #DIV/0!
ΣMuc = 285 (tm) qmax = 4.280 OK
qmin = 3.410 OK

Seismic Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 96.77 0.00 0.75 0.00 72.58
Water Weight 1,968.75 0.00 0.00
Uplift (1,967.44) (0.15) 295.12

Σ 1,009.31 96.77 295.12 72.58

ΣVuc = 1,009.31 (t) |e| = 0.364 OK


ΣHuc = 96.77 (t) Fs = 2.795 OK
ΣMuc = 367.70 (tm) qmax = 4.405 OK
qmin = 3.285 OK

Construction Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 0.00 0.00

Σ 1,008.00 0.00 0.00 0.00

ΣVuc = 1,008.00 (t) |e| = 0.000 OK


ΣHuc = 0.00 (t) Fs = #DIV/0! #DIV/0!
ΣMuc = 0.00 (tm) qmax = 3.840 OK
qmin = 3.840 OK

Loading Condition at the Pile Head

5-2
Upstream Apron Concrete (Center Portion) Longitudinal

Seismic Const Normal Normal


ΣV 1,009 (t) 9,900 (kN) 1,008 (t) 9,900 (kN) 1009 (t) 9,900 (kN)
ΣH 97 (t) 1,000 (kN) 0 (t) 0 (kN) 0 (t) 0 (kN)
ΣM 368 (tm) ### 0 (tm) 0 (kNm) 285 (tm) ###

5-3
Stability Analysis

Upstream Apron Concrete Sectional


(Center Portion)

Length of apron Luc = 17.50 (m)


Width of apron Buc = 15.00 (m)
Thickness of apron tuc = 1.50 (m)
Unit weight of concrete γc = 2.40 (t/m3)
Height of storage water Hsw = 7.50 (m)
Unit weight of water γw = 1.0 (t/m3)
Unit weight of earth γsat = 1.8 (t/m3)
Earthquake coefficient kh = 0.096
Friction angle φ= 15 (°)

Dead load (15.0 x 17.5 x 1.5 + 1.5 x 17.5) x 2.4 1,008.00 (t)
Water weight (15.0 x 17.5 x 7.5) x 1.0 1,968.75 (t)
Uplift -(7.93 + 7.06) x 15.0 x 0.5 x 17.5 (1,967.44) (t)

Normal Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 0.00 0.00
Water Weight 1,968.75 0.00 0.00
Uplift (1,967.44) 0.00 0.00

Σ 1,009 0 0 0

ΣVuc = 1,009 (t) |e| = 0.000 OK


ΣHuc = 0 (t) Fs = #DIV/0! #DIV/0!
ΣMuc = 0 (tm) qmax = 3.845 OK
qmin = 3.845 OK

Seismic Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 96.77 0.00 0.75 0.00 72.58
Water Weight 1,968.75 0.00 0.00
Uplift (1,967.44) 0.00 0.00

Σ 1,009.31 96.77 0.00 72.58

ΣVuc = 1,009.31 (t) |e| = 0.072 OK


ΣHuc = 96.77 (t) Fs = 2.795 OK
ΣMuc = 72.58 (tm) qmax = 3.940 OK
qmin = 3.750 OK

Construction Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 0.00 0.00

Σ 1,008.00 0.00 0.00 0.00

ΣVuc = 1,008.00 (t) |e| = 0.000 OK


ΣHuc = 0.00 (t) Fs = #DIV/0! #DIV/0!
ΣMuc = 0.00 (tm) qmax = 3.840 OK
qmin = 3.840 OK

Loading Condition at the Pile Head

5-4
Upstream Apron Concrete (Center Portion) Sectional

Seismic Const Normal Normal


ΣV 1,009 (t) 9,900 (kN) 1,008 (t) 9,900 (kN) 1009 (t) 9,900 (kN)
ΣH 97 (t) 1,000 (kN) 0 (t) 0 (kN) 0 (t) 0 (kN)
ΣM 73 (tm) 800(kNm) 0 (tm) 0 (kNm) 0 (tm) 0 (kNm)

5-5
Stability Analysis

5.2 Upstream Apron Concrete Longitudinal


(Side Portion)

Length of apron Luc = 15.00 (m)


Width of apron Buc = 16.35 (m)
Thickness of apron tuc = 1.50 (m)
Unit weight of concrete γc = 2.40 (t/m3)
Height of storage water Hsw = 7.50 (m)
Unit weight of water γw = 1.0 (t/m3)
Unit weight of earth γsat = 1.8 (t/m3)
Earthquake coefficient kh = 0.096
Friction angle φ= 15 (°)

Dead load (15.0 x 16.35 x 1.5 + 1.5 x 16.35) x 2.4 941.76 (t)
Water weight (15.0 x 16.35 x 7.5) x 1.0 1,839.38 (t)
Uplift -(7.93 + 7.06) x 15.0 x 0.5 x 16.35 (1,838.15) (t)

Normal Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 941.76 0.00 0.00
Water Weight 1,839.38 0.00 0.00
Uplift (1,838.15) (0.15) 275.72

Σ 943 0 276 0

ΣVuc = 943 (t) |e| = 0.292 OK


ΣHuc = 0 (t) Fs = #DIV/0! #DIV/0!
ΣMuc = 276 (tm) qmax = 4.295 OK
qmin = 3.395 OK

Seismic Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 941.76 90.41 0.00 0.75 0.00 67.81
Water Weight 1,839.38 0.00 0.00
Uplift (1,838.15) (0.15) 275.72

Σ 942.99 90.41 275.72 67.81

ΣVuc = 942.99 (t) e= 0.364 OK


ΣHuc = 90.41 (t) Fs = 2.795 OK
ΣMuc = 343.53 (tm) qmax = 4.405 OK
qmin = 3.285 OK

Construction Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 941.76 0.00 0.00

Σ 941.76 0.00 0.00 0.00

ΣVuc = 941.76 (t) e= 0.000 OK


ΣHuc = 0.00 (t) Fs = #DIV/0! #DIV/0!
ΣMuc = 0.00 (tm) qmax = 3.840 OK
qmin = 3.840 OK

Loading Condition at the Pile Head

5-4
Upstream Apron Concrete (Side Portion) Longitudinal

Seismic Const Normal


ΣV 943 (t) 9,300 (kN) 942 (t) 9,300 (kN) 943 (t) 9,300 (kN)
ΣH 90 (t) 900 (kN) 0 (t) 0 (kN) 0 (t) 0 (kN)
ΣM 344 (tm) ### 0 (tm) 0 (kNm) 276 (tm) ###

5-5
Stability Analysis

Upstream Apron Concrete Sectional


(Side Portion)

Length of apron Luc = 16.35 (m)


Width of apron Buc = 15.00 (m)
Thickness of apron tuc = 1.50 (m)
Unit weight of concrete γc = 2.40 (t/m3)
Height of storage water Hsw = 7.50 (m)
Unit weight of water γw = 1.0 (t/m3)
Unit weight of earth γsat = 1.8 (t/m3)
Earthquake coefficient kh = 0.096
Friction angle φ= 15 (°)

Dead load (15.0 x 16.35 x 1.5 + 1.5 x 16.35) x 2.4 941.76 (t)
Water weight (15.0 x 16.35 x 7.5) x 1.0 1,839.38 (t)
Uplift -(7.93 + 7.06) x 0.5 x 16.35 x 15.0 (1,838.15) (t)

Normal Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 941.76 0.00 0.00
Water Weight 1,839.38 0.00 0.00
Uplift (1,838.15) 0.00 0.00

Σ 943 0 0 0

ΣVuc = 943 (t) |e| = 0.000 OK


ΣHuc = 0 (t) Fs = #DIV/0! #DIV/0!
ΣMuc = 0 (tm) qmax = 3.845 OK
qmin = 3.845 OK

Seismic Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 941.76 90.41 0.00 0.75 0.00 67.81
Water Weight 1,839.38 0.00 0.00
Uplift (1,838.15) 0.00 0.00

Σ 942.99 90.41 0.00 67.81

ΣVuc = 942.99 (t) |e| = 0.072 OK


ΣHuc = 90.41 (t) Fs = 2.795 OK
ΣMuc = 67.81 (tm) qmax = 3.946 OK
qmin = 3.744 OK

Construction Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 941.76 0.00 0.00

Σ 941.76 0.00 0.00 0.00

ΣVuc = 941.76 (t) |e| = 0.000 OK


ΣHuc = 0.00 (t) Fs = #DIV/0! #DIV/0!
ΣMuc = 0.00 (tm) qmax = 3.840 OK
qmin = 3.840 OK

Loading Condition at the Pile Head

5-6
Upstream Apron Concrete (Side Portion) Sectional

Seismic Const Normal


ΣV 943 (t) 9,300 (kN) 942 (t) 9,300 (kN) 943 (t) 9,300 (kN)
ΣH 90 (t) 900 (kN) 0 (t) 0 (kN) 0 (t) 0 (kN)
ΣM 68 (tm) 700(kNm) 0 (tm) 0 (kNm) 0 (tm) 0 (kNm)

5-7
Stability Analysis

5.3 Downstream Apron Concrete (A) Longitudinal


(Center Portion)

Length of apron Ldcm = 15.00 (m)


Width of apron Bdcm = 17.50 (m)
Thickness of apron tdcm = 2.00 (m)
Unit weight of concrete γc = 2.40 (t/m3)
Height of storage water Hsw = 0.25 (m)
Unit weight of water γw = 1.0 (t/m3)
Unit weight of earth γsat = 1.8 (t/m3)
Earthquake coefficient kh = 0.096
Friction angle φ= 15 (°)

Dead load (15.0 x 17.5 x 2.0 + 1.5 x 17.5) x 2.4 1,323.00 (t)
Water weight (15.0 x 17.5 x 0.25) x 1.0 65.63 (t)
Uplift -(4.61 + 3.74) x 15.0 x 0.5 x 17.5 (1,095.94) (t)

Normal Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,323.00 0.00 0.00
Water Weight 65.63 0.00 0.00
Uplift (1,095.94) (0.26) 284.94

Σ 293 0 285 0

ΣVdcm = 293 (t) |e| = 0.974 OK


ΣHdcm = 0 (t) Fs = #DIV/0! #DIV/0!
ΣMdcm = 285 (tm) qmax = 1.549 OK
qmin = 0.681 OK

Seismic Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,323.00 127.01 0.00 1.00 0.00 127.01
Water Weight 65.63 0.00 0.00
Uplift (1,095.94) (0.26) 284.94

Σ 292.69 127.01 284.94 127.01

ΣVdcm = 292.69 (t) |e| = 1.407 OK


ΣHdcm = 127.01 (t) Fs = 0.617 NO
ΣMdcm = 411.95 (tm) qmax = 1.743 OK
qmin = 0.487 OK

Construction Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,323.00 0.00 0.00

Σ 1323.00 0.00 0.00 0.00

ΣVdcm = 1323.00 (t) |e| = 0.000 OK


ΣHdcm = 0.00 (t) Fs = #DIV/0! #DIV/0!
ΣMdcm = 0.00 (tm) qmax = 5.040 OK
qmin = 5.040 OK

Loading Condition at the Pile Head

5-7
Downstream Apron Concrete (A) (Center Portion) Longitudinal

Seismic Const Normal Normal


ΣV 293 (t) 2,900 (kN) 1,323 (t) ### 293 (t) 2,900 (kN)
ΣH 127 (t) 1,300 (kN) 0 (t) 0 (kN) 0 (t) 0 (kN)
ΣM 412 (tm) ### 0 (tm) 0 (kNm) 285 (tm) ###

5-8
Stability Analysis

Downstream Apron Concrete (A) Sectional


(Center Portion)

Length of apron Ldcm = 17.50 (m)


Width of apron Bdcm = 15.00 (m)
Thickness of apron tdcm = 2.00 (m)
Unit weight of concrete γc = 2.40 (t/m3)
Height of storage water Hsw = 0.25 (m)
Unit weight of water γw = 1.0 (t/m3)
Unit weight of earth γsat = 1.8 (t/m3)
Earthquake coefficient kh = 0.096
Friction angle φ= 15 (°)

Dead load (15.0 x 17.5 x 2.0 + 1.5 x 17.5) x 2.4 1,323.00 (t)
Water weight (15.0 x 17.5 x 0.25) x 1.0 65.63 (t)
Uplift -(4.61 + 3.74) x 15.0 x 0.5 x 17.5 (1,095.94) (t)

Normal Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,323.00 0.00 0.00
Water Weight 65.63 0.00 0.00
Uplift (1,095.94) 0.00 0.00

Σ 293 0 0 0

ΣVdcm = 293 (t) |e| = 0.000 OK


ΣHdcm = 0 (t) Fs = #DIV/0! #DIV/0!
ΣMdcm = 0 (tm) qmax = 1.115 OK
qmin = 1.115 OK

Seismic Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,323.00 127.01 0.00 1.00 0.00 127.01
Water Weight 65.63 0.00 0.00
Uplift (1,095.94) 0.00 0.00

Σ 292.69 127.01 0.00 127.01

ΣVdcm = 292.69 (t) |e| = 0.434 OK


ΣHdcm = 127.01 (t) Fs = 0.617 NO
ΣMdcm = 127.01 (tm) qmax = 1.281 OK
qmin = 0.949 OK

Construction Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,323.00 0.00 0.00

Σ 1323.00 0.00 0.00 0.00

ΣVdcm = 1323.00 (t) |e| = 0.000 OK


ΣHdcm = 0.00 (t) Fs = #DIV/0! #DIV/0!
ΣMdcm = 0.00 (tm) qmax = 5.040 OK
qmin = 5.040 OK

Loading Condition at the Pile Head

5-9
Downstream Apron Concrete (A) (Center Portion) Sectional

Seismic Const Normal Normal


ΣV 293 (t) 2,900 (kN) 1,323 (t) ### 293 (t) 2,900 (kN)
ΣH 127 (t) 1,300 (kN) 0 (t) 0 (kN) 0 (t) 0 (kN)
ΣM 127 (tm) ### 0 (tm) 0 (kNm) 0 (tm) 0 (kNm)

5 - 10
Stability Analysis

5.4 Downstream Apron Concrete (A) Longitudinal


(Side Portion)

Length of apron Ldcm = 15.00 (m)


Width of apron Bdcm = 15.90 (m)
Thickness of apron tdcm = 2.00 (m)
Unit weight of concrete γc = 2.40 (t/m3)
Height of storage water Hsw = 0.25 (m)
Unit weight of water γw = 1.0 (t/m3)
Unit weight of earth γsat = 1.8 (t/m3)
Earthquake coefficient kh = 0.096
Friction angle φ= 15 (°)

Dead load (15.0 x 15.9 x 2.0 + 1.5 x 15.9) x 2.4 1,202.04 (t)
Water weight (15.0 x 15.9 x 0.25) x 1.0 59.63 (t)
Uplift -(4.61 + 3.74) x 15.0 x 0.5 x 15.9 (995.74) (t)

Normal Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,202.04 0.00 0.00
Water Weight 59.63 0.00 0.00
Uplift (995.74) (0.26) 258.89

Σ 266 0 259 0

ΣVdcm = 266 (t) |e| = 0.974 OK


ΣHdcm = 0 (t) Fs = #DIV/0! #DIV/0!
ΣMdcm = 259 (tm) qmax = 1.549 OK
qmin = 0.681 OK

Seismic Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,202.04 115.40 0.00 1.00 0.00 115.40
Water Weight 59.63 0.00 0.00
Uplift (995.74) (0.26) 258.89

Σ 265.93 115.40 258.89 115.40

ΣVdcm = 265.93 (t) |e| = 1.407 OK


ΣHdcm = 115.40 (t) Fs = 0.617 NO
ΣMdcm = 374.29 (tm) qmax = 1.743 OK
qmin = 0.487 OK

Construction Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,202.04 0.00 0.00

Σ 1202.04 0.00 0.00 0.00

ΣVdcm = 1202.04 (t) |e| = 0.000 OK


ΣHdcm = 0.00 (t) Fs = #DIV/0! #DIV/0!
ΣMdcm = 0.00 (tm) qmax = 5.040 OK
qmin = 5.040 OK

Loading Condition at the Pile Head

5 - 10
Downstream Apron Concrete (A) (Side Portion) Longitudinal

Seismic Const Normal Normal


ΣV 266 (t) 2,700 (kN) 1,202 (t) ### 266 (t) 2,700 (kN)
ΣH 115 (t) 1,200 (kN) 0 (t) 0 (kN) 0 (t) 0 (kN)
ΣM 374 (tm) ### 0 (tm) 0 (kNm) 259 (tm) ###

5 - 11
Stability Analysis

Downstream Apron Concrete (A) Sectional


(Side Portion)

Length of apron Ldcm = 15.90 (m)


Width of apron Bdcm = 15.00 (m)
Thickness of apron tdcm = 2.00 (m)
Unit weight of concrete γc = 2.40 (t/m3)
Height of storage water Hsw = 0.25 (m)
Unit weight of water γw = 1.0 (t/m3)
Unit weight of earth γsat = 1.8 (t/m3)
Earthquake coefficient kh = 0.096
Friction angle φ= 15 (°)

Dead load (15.0 x 15.9 x 2.0 + 1.5 x 15.9) x 2.4 1,202.04 (t)
Water weight (15.0 x 15.9 x 0.25) x 1.0 59.63 (t)
Uplift -(4.61 + 3.74) x 15.0 x 0.5 x 15.9 (995.74) (t)

Normal Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,202.04 0.00 0.00
Water Weight 59.63 0.00 0.00
Uplift (995.74) 0.00 0.00

Σ 266 0 0 0

ΣVdcm = 266 (t) |e| = 0.000 OK


ΣHdcm = 0 (t) Fs = #DIV/0! #DIV/0!
ΣMdcm = 0 (tm) qmax = 1.115 OK
qmin = 1.115 OK

Seismic Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,202.04 115.40 0.00 1.00 0.00 115.40
Water Weight 59.63 0.00 0.00
Uplift (995.74) 0.00 0.00

Σ 265.93 115.40 0.00 115.40

ΣVdcm = 265.93 (t) |e| = 0.434 OK


ΣHdcm = 115.40 (t) Fs = 0.617 NO
ΣMdcm = 115.40 (tm) qmax = 1.298 OK
qmin = 0.932 OK

Construction Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,202.04 0.00 0.00

Σ 1202.04 0.00 0.00 0.00

ΣVdcm = 1202.04 (t) |e| = 0.000 OK


ΣHdcm = 0.00 (t) Fs = #DIV/0! #DIV/0!
ΣMdcm = 0.00 (tm) qmax = 5.040 OK
qmin = 5.040 OK

Loading Condition at the Pile Head

5 - 12
Downstream Apron Concrete (A) (Side Portion) Sectional

Seismic Const Normal Normal


ΣV 266 (t) 2,700 (kN) 1,202 (t) ### 266 (t) 2,700 (kN)
ΣH 115 (t) 1,200 (kN) 0 (t) 0 (kN) 0 (t) 0 (kN)
ΣM 115 (tm) ### 0 (tm) 0 (kNm) 0 (tm) 0 (kNm)

5 - 13
Stability Analysis

5.5 Downstream Apron Concrete (B) Longitudinal


(Centger Portion)

Length of apron Ldcl = 15.00 (m)


Width of apron Bdcl = 17.50 (m)
Thickness of apron tdcl = 1.50 (m)
Unit weight of concrete γc = 2.40 (t/m3)
Height of storage water Hsw = 0.50 (m)
Unit weight of water γw = 1.0 (t/m3)
Unit weight of earth γsat = 1.8 (t/m3)
Earthquake coefficient kh = 0.096
Friction angle φ= 15 (°)

Dead load (15.0 x 17.5 x 1.5 + 1.5 x 17.5) x 2.4 1,008.00 (t)
Water weight (15.0 x 17.5 x 0.5) x 1.0 131.25 (t)
Uplift -(2.96 + 2.0) x 15.0 x 0.5 x 17.5 (651.00) (t)

Normal Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 0.00 0.00
Water Weight 131.25 0.00 0.00
Uplift (651.00) (0.48) 312.48

Σ 488 0 312 0

ΣVdcl = 488 (t) |e| = 0.640 OK


ΣHdcl = 0 (t) Fs = #DIV/0! #DIV/0!
ΣMdcl = 312 (tm) qmax = 2.336 OK
qmin = 1.384 OK

Seismic Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 96.77 0.00 0.75 0.00 72.58
Water Weight 131.25 0.00 0.00
Uplift (651.00) (0.48) 312.48

Σ 488.25 96.77 312.48 72.58

ΣVdcl = 488.25 (t) |e| = 0.789 OK


ΣHdcl = 96.77 (t) Fs = 1.352 OK
ΣMdcl = 385.06 (tm) qmax = 2.447 OK
qmin = 1.273 OK

Construction Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 0.00 0.00

Σ 1008.00 0.00 0.00 0.00

ΣVdcl = 1008.00 (t) |e| = 0.000 OK


ΣHdcl = 0.00 (t) Fs = #DIV/0! #DIV/0!
ΣMdcl = 0.00 (tm) qmax = 3.840 OK
qmin = 3.840 OK

Loading Condition at the Pile Head

5 - 13
Downstream Apron Concrete (B) (Centger Portion) Longitudinal

Seismic Const Normal Normal


ΣV 488 (t) 4,800 (kN) 1,008 (t) 9,900 (kN) 488 (t) 4,800 (kN)
ΣH 97 (t) 1,000 (kN) 0 (t) 0 (kN) 0 (t) 0 (kN)
ΣM 385 (tm) ### 0 (tm) 0 (kNm) 312 (tm) ###

5 - 14
Stability Analysis

Downstream Apron Concrete (B) Sectional


(Centger Portion)

Length of apron Ldcl = 17.50 (m)


Width of apron Bdcl = 15.00 (m)
Thickness of apron tdcl = 1.50 (m)
Unit weight of concrete γc = 2.40 (t/m3)
Height of storage water Hsw = 0.50 (m)
Unit weight of water γw = 1.0 (t/m3)
Unit weight of earth γsat = 1.8 (t/m3)
Earthquake coefficient kh = 0.096
Friction angle φ= 15 (°)

Dead load (15.0 x 17.5 x 1.5 + 1.5 x 17.5) x 2.4 1,008.00 (t)
Water weight (15.0 x 17.5 x 0.5) x 1.0 131.25 (t)
Uplift -(2.96 + 2.0) x 15.0 x 0.5 x 17.5 (651.00) (t)

Normal Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 0.00 0.00
Water Weight 131.25 0.00 0.00
Uplift (651.00) 0.00 0.00

Σ 488 0 0 0

ΣVdcl = 488 (t) |e| = 0.000 OK


ΣHdcl = 0 (t) Fs = #DIV/0! #DIV/0!
ΣMdcl = 0 (tm) qmax = 1.860 OK
qmin = 1.860 OK

Seismic Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 96.77 0.00 0.75 0.00 72.58
Water Weight 131.25 0.00 0.00
Uplift (651.00) 0.00 0.00

Σ 488.25 96.77 0.00 72.58

ΣVdcl = 488.25 (t) |e| = 0.149 OK


ΣHdcl = 96.77 (t) Fs = 1.352 OK
ΣMdcl = 72.58 (tm) qmax = 1.955 OK
qmin = 1.765 OK

Construction Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 1,008.00 0.00 0.00

Σ 1008.00 0.00 0.00 0.00

ΣVdcl = 1008.00 (t) |e| = 0.000 OK


ΣHdcl = 0.00 (t) Fs = #DIV/0! #DIV/0!
ΣMdcl = 0.00 (tm) qmax = 3.840 OK
qmin = 3.840 OK

Loading Condition at the Pile Head

5 - 15
Downstream Apron Concrete (B) (Centger Portion) Sectional

Seismic Seismic Const Const Normal Normal


ΣV 488 (t) 4,800 (kN) 1,008 (t) 9,900 (kN) 488 (t) 4,800 (kN)
ΣH 97 (t) 1,000 (kN) 0 (t) 0 (kN) 0 (t) 0 (kN)
ΣM 73 (tm) 800(kNm) 0 (tm) 0 (kNm) 0 (tm) 0 (kNm)

5 - 16
Stability Analysis

5.6 Downstream Apron Concrete (B) Longitudinal


(Side Portion)

Length of apron Ldcl = 15.00 (m)


Width of apron Bdcl = 15.90 (m)
Thickness of apron tdcl = 1.50 (m)
Unit weight of concrete γc = 2.40 (t/m3)
Height of storage water Hsw = 0.50 (m)
Unit weight of water γw = 1.0 (t/m3)
Unit weight of earth γsat = 1.8 (t/m3)
Earthquake coefficient kh = 0.096
Friction angle φ= 15 (°)

Dead load (15.0 x 15.9 x 1.5 + 1.5 x 15.9) x 2.4 915.84 (t)
Water weight (15.0 x 15.9 x 0.5) x 1.0 119.25 (t)
Uplift -(2.96 + 2.0) x 15.0 x 0.5 x 15.9 (591.48) (t)

Normal Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 915.84 0.00 0.00
Water Weight 119.25 0.00 0.00
Uplift (591.48) (0.48) 283.91

Σ 443.61 0.00 283.91 0.00

ΣVdcl = 443.61 (t) |e| = 0.640 OK


ΣHdcl = 0.00 (t) Fs = #DIV/0! #DIV/0!
ΣMdcl = 283.91 (tm) qmax = 2.336 OK
qmin = 1.384 OK

Seismic Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 915.84 87.92 0.00 0.75 0.00 65.94
Water Weight 119.25 0.00 0.00
Uplift (591.48) (0.48) 283.91

Σ 443.61 87.92 283.91 65.94

ΣVdcl = 443.61 (t) |e| = 0.789 OK


ΣHdcl = 87.92 (t) Fs = 1.352 OK
ΣMdcl = 349.85 (tm) qmax = 2.447 OK
qmin = 1.273 OK

Construction Longitudinal
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 915.84 0.00 0.00

Σ 915.84 0.00 0.00 0.00

ΣVdcl = 915.84 (t) |e| = 0.000 OK


ΣHdcl = 0.00 (t) Fs = #DIV/0! #DIV/0!
ΣMdcl = 0.00 (tm) qmax = 3.840 OK
qmin = 3.840 OK

Loading Condition at the Pile Head

5 - 16
Downstream Apron Concrete (B) (Side Portion) Longitudinal

Seismic Const Normal Normal


ΣV 444 (t) 4,400 (kN) 916 (t) 9,000 (kN) 444 (t) 4,400 (kN)
ΣH 88 (t) 900 (kN) 0 (t) 0 (kN) 0 (t) 0 (kN)
ΣM 350 (tm) ### 0 (tm) 0 (kNm) 284 (tm) ###

5 - 17
Stability Analysis

Downstream Apron Concrete (B) Sectional


(Side Portion)

Length of apron Ldcl = 15.90 (m)


Width of apron Bdcl = 15.00 (m)
Thickness of apron tdcl = 1.50 (m)
Unit weight of concrete γc = 2.40 (t/m3)
Height of storage water Hsw = 0.50 (m)
Unit weight of water γw = 1.0 (t/m3)
Unit weight of earth γsat = 1.8 (t/m3)
Earthquake coefficient kh = 0.096
Friction angle φ= 15 (°)

Dead load (15.0 x 15.9 x 1.5 + 1.5 x 15.9) x 2.4 915.84 (t)
Water weight (15.0 x 15.9 x 0.5) x 1.0 119.25 (t)
Uplift -(2.96 + 2.0) x 15.0 x 0.5 x 15.9 (591.48) (t)

Normal Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 915.84 0.00 0.00
Water Weight 119.25 0.00 0.00
Uplift (591.48) 0.00 0.00

Σ 443.61 0.00 0.00 0.00

ΣVdcl = 443.61 (t) |e| = 0.000 OK


ΣHdcl = 0.00 (t) Fs = #DIV/0! #DIV/0!
ΣMdcl = 0.00 (tm) qmax = 1.860 OK
qmin = 1.860 OK

Seismic Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 915.84 87.92 0.00 0.75 0.00 65.94
Water Weight 119.25 0.00 0.00
Uplift (591.48) 0.00 0.00

Σ 443.61 87.92 0.00 65.94

ΣVdcl = 443.61 (t) |e| = 0.149 OK


ΣHdcl = 87.92 (t) Fs = 1.352 OK
ΣMdcl = 65.94 (tm) qmax = 1.964 OK
qmin = 1.756 OK

Construction Sectional
Load V(t) H(t) X(m) Y(m) MV (tm) MH (tm)
Dead Load
Concrete 915.84 0.00 0.00

Σ 915.84 0.00 0.00 0.00

ΣVdcl = 915.84 (t) |e| = 0.000 OK


ΣHdcl = 0.00 (t) Fs = #DIV/0! #DIV/0!
ΣMdcl = 0.00 (tm) qmax = 3.840 OK
qmin = 3.840 OK

Loading Condition at the Pile Head

5 - 18
Downstream Apron Concrete (B) (Side Portion) Sectional

Seismic Seismic Const Const Normal Normal


ΣV 444 (t) 4,400 (kN) 916 (t) 9,000 (kN) 444 (t) 4,400 (kN)
ΣH 88 (t) 900 (kN) 0 (t) 0 (kN) 0 (t) 0 (kN)
ΣM 66 (tm) 700(kNm) 0 (tm) 0 (kNm) 0 (tm) 0 (kNm)

5 - 19
qa = ( α c N c +β γ B N r +γ Df N q ) /F s
Allowable bearing capacity qa = 17.5 (t/m2)
qae = 26.2 (t/m2)
安全率(基礎支持
Safety factor Fs = 3 力)
Fs = 2 常時   3
地震時  2
Cohesion c= 1.0 (t/m2)
Minimum width of loaded surface area B= 15 (m)
Unit weight of ground materials γ= 1.8 (t/m3)
Foundation depth from ground surface Df = 3.0 (m)
Internal friction angle φ= 20 (°)
Bearing capacity factor Nc = 7.9
Bearing capacity factor Nr = 2.0
Bearing capacity factor Nq = 3.9
Shape facor of foundation α= 1.350
Shape facor of foundation β= 0.383
Width of foundation B= 17.5 (m)
Length of foundation L= 15.0 (m)

UAC(Side) UAC(Center) DAC-Mid(Side DAC-Mid(CentDAC-Low(SideDAC-Low(Center)


qa = 17.6 17.5 17.6 17.5 17.6 17.5
qae = 26.3 26.2 26.4 26.2 26.4 26.2