Sunteți pe pagina 1din 7

PRE-RECORDED SHEET

KEEP THIS DATA SHEET CURRENT AT ALL TIMES


(Highly Deviated and Horizontal Wells)
Well Name Roe 1 Field Hewitt Rig Paul1
Hole Data:
Size(avg) 12.4500 Hole MD. ft 11,345 Hole TVD 5,678 ft.
Hole Capacity:
no pipe in hole 0.1506 bbls/ft x 11,345 1708.3 bbls
(from BOP to MD) Minimu fluid Needed
*Use
PUMP DATA: Liners (in.) Stroke(in.) Rod(in. ) % Eff. bbl./stk For Kill?
No. 1 6 1/2 12 100 0.1232 X
No. 2 6 1/2 12 98 0.1201 0
CASING (LAST SET) DATA:
13.6250 by 12.2670 Shoe MD 3,400 Shoe TVD 3,400
(in. OD) (in. Avg ID) (feet) (feet)
WELLHEAD OR CASING PRESSURE LIMITATION:
Casing safety factor % 80.00%
The lessor of: 100% BOP Rating 10,000 psi.
100% Wellhead Rating 10,000 psi. Limitation = 10,000 psi.
Csg Burst pressure: 14,700 psi.
Csg rated w safety 11760 psi
LINER CASING DATA:
by Top @ ft. Shoe @
(in. OD) (in. Avg ID) (feet) (feet)
DRILL STRING DATA: DRILL COLLARS
Drill Pipe 1 5.00 in. (OD) 4.276 ID(inc.) Start at top OD(in.) ID(in.)
Drill Pipe 2 in. (OD) 0 ID(inc.) DC 2 8 3/4 3.000
HW Drill Pipe 5.00 in. (OD) 3 ID(inc.) DC1 9 1/2 3.000
INTERNAL CAPACITIES: Section 1 - Surface to Kickoff Point
Drill Pipe 1 3,500 ft. x 0.0178 ID(inc.) 62.2 bbls
Drill Pipe 2 ft. x 0.0000 ID(inc.) 0.0 bbls
HW Drill Pipe 0 ft. x 0.0087 ID(inc.) 0.0 bbls
Drill Collars 0 ft. x 0.0087 ID(inc.) 0.0 bbls
Drill Collars ft. x 0.0087 ID(inc.) 0.0 bbls
Section 1 Subtotal Internal Capacities =
Kickoff MD 3,500 62.2 bbls
Kickoff TVD 3,500 505 Strokes
INTERNAL CAPACITIES: Section 2 - Kickoff Point to Start of Hold
Drill Pipe 1 1,200 ft. x 0.0178 ID(inc.) 21.3 bbls
Drill Pipe 2 0 ft. x 0 ID(inc.) 0.0 bbls
HW Drill Pipe 0 ft. x 0.0087 ID(inc.) 0.0 bbls
Drill Collars 0 ft. x 0.0087 ID(inc.) 0.0 bbls
Drill Collars ft. x 0.0087 ID(inc.) 0.0 bbls
Section 2 Subtotal Internal Capacities =
Start of Hold 4,700 21.3 bbls
Start of Hold 4100 173 Strokes
INTERNAL CAPACITIES: Section 3 - Start of Hold to TD of Bit
Drill Pipe 1 6,060 ft. x 0.01777 ID(inc.) 107.7 bbls
Drill Pipe 2 ft. x 0.0000 ID(inc.) 0.0 bbls
HW Drill Pipe 315 ft. x 0.0087 ID(inc.) 2.8 bbls
Drill Collars 180 ft. x 0.0087 ID(inc.) 1.6 bbls
Drill Collars 90 ft. x 0.0087 ID(inc.) 0.8 bbls
Section 3 Subtotal Internal Capacities =
Total MD 11,345 112.8 bbls
Total TVD 4,120 916 Strokes
TOTAL INTERNAL CAPACITY
M Depth(Bit) 11,345 ft 196.3 bbls 1,594 Stks
ANNULUS CAPACITIES:
DP1 x Csg. 3,400 ft. x 0.1219 ID(inc.) 414.6 bbls
DP1 x Liner ft. x ID(inc.) bbls
DP1 x Hole 7,360 ft. x 0.1263 ID(inc.) 929.9 bbls
DP2 x Csg. ft. x 0.0000 ID(inc.) bbls
DP2 x Liner ft. x ID(inc.) bbls
DP2 x Hole ft. x 0.0000 ID(inc.) bbls
HW DP x Csg. ft. x 0.1219 ID(inc.) bbls
HW DP x Liner ft. x ID(inc.) bbls
HW DP x Hole 315 ft. x 0.1263 ID(inc.) 39.8 bbls
DC2 x Csg ft. x 0.0718 ID(inc.) bbls
DC2 x Liner ft. x ID(inc.) bbls
DC2 x Hole 180 ft. x 0.0762 ID(inc.) 13.7 bbls
DC1 x Csg ft. x 0.0585 ID(inc.) bbls
DC1x Liner ft. x ID(inc.) bbls
DC1 x Hole 90 ft. x 0.0629 ID(inc.) 5.7 bbls

Msrd Depth(bit 11,345 Total Annulus Volume 1403.6 bbls


Total Anular Srokes 11,395 Strokes
System Volume 1599.9 bbls
System Strokes 12,989 Strokes
(Internal + Annulus)
Active Pit Volume 150 bbl.

MAX INITIAL SICP TO FRACTURE FORMATION AT SHOE:


Max. SICP = (Shoe Test - Present Mud Wt.) x Shoe TVD x 0.052
test mud Present mud Shoe Depth
ppg wt ft psi
14.0 12.2 3,400 318.24
DRILLER'S METHOD WORKSHEET
PRERECORDED INFORMATION SPM psi bbl/stk bbl/min
A. Slow Pump Rate Data Pump #1 45 1300 0.1232 5.5
( Use SPR Pressure through Riser for Subsea ) Pump #2 0.1201 0.0

INFORMATION RECORDED WHEN WELL KICKS Date of kick 2/2/2018 16:49

B. Old Mud Weight B 12.2 lb/gal


C. Initial Shut-In Drill Pipe Pressure (SIDP) C 456 psi
D. Initial Shut-In Casing Pressure (SICP) D 520 psi
E. Initial Pit Volume Increase E 7 bbl
F. True Vertical Depth of Hole F 4,120 ft (TVD)
Measured Depth of Hole (for Capacity Calculations ONLY) 11,345 ft (MD)

FIRST CIRCULATION TO CLEAR WELL OF INFLUX


Bring Pumps up to Speed While Holding Casing Pressure Constant
{Account for Choke Line Friction if Subsea} 60 SPM

Read and Record Initial Circulating Pressure on Drill Pipe


[Should Approximately = Slow Pump Rate Pressure (A) + SIDP (C)] 1756 psi

Maintain Constant DP Pressure Until Influx is Circulated Out. Then Shut Down
Pumps While Holding Casing Pressure Constant. {Remember CLF for Subsea}. If Drill
Pipe and Casing Shut-In Pressures are not Equal, Continue to Circulate Out Influx.

G. Increase in Mud Weight required to Balance Kick


Initial SIDP C
G   G 2.2 lb/gal
0. 052  TVD 0. 052  F
H. New Mud Weight H=B+G= H 14.4 lb/gal

I. Total Volume to Weight up I = Active Pit Vol + System Vol = I 1,750 bbl

J. Barite Required
( 15 . 0× G )
J =I× = J 2,803 sacks
( 35 . 0− H )
SECOND CIRCULATION TO BALANCE WELL
Bring Pumps up to Speed While Holding
Casing Pressure Constant. {Account for  SIDP(C) Casing Pressure 456 psi
CLF if Subsea} Maintain Constant Casing
Pressure Until New Mud Reaches the Bit. Drill String Internal Capacity 1,594 strokes

Read and Record Drill Pipe Pressure


When New Mud Reaches the Bit KWM(H) Final Circulating Pressure 1534 psi
 SPRP (A) 
Maintain Constant Drill Pipe Pressure Old MW (B)
Until the System is Displaced. System Volume 12,989 strokes
RESERVOIR PRESSURE (Pr)
P. Pr=0.052*New Mw*tvd= 0.052*H*F K 3085 psi

HEIGHT OF GAS BUBBLE AROUND DRILL PIPE (KH)


L. Annulus Capacity Factor (DP x Casing) Right Below Wellhead L 0.1219 bbls/ft

Initial Pit Vol Increase ( E ) M 57 ft.


M. Height = 
Annulus Capacity Factor ( L )
MAXIMUM CASING PRESSURE (Pcmax) WHEN GAS GETS TO SURFACE
N.
Mud weight gradient
N 0.63 psi/ft.
= MW (B)  0.052 =

O. O 228
Pc max , = SIDP ÷ 2 = ( C )÷2 = psi

P. TZ= Compressibility and Temperature Effects (fig 11P.5) P 0.98


or Tz = 4.03 - (0.38  ln(Pr)) = 4.03 - (0.38  ln(K))

Q. Pcmax

= (O)2  (K )(M)(N)(P ) Q 402 psi

R. Maximum Casing Pressure,


Pc Max= O+Q R 630 psi

S. Does Pcmax Exceed the Wellhead or Casing Pressure Limitation?

YES NO X

VOLUME GAIN WHILE CIRCULATING OUT GAS BUBBLE


T. Volume of Gas at Surface (from Fig. 11P.4 or Formula below)
T 33 bbl
Pit Increase  Pr  TZ E  K  P
Vg , Volume of gas at surface , bbl   
Pcmax R
U. Volume Gain While Circulating Out Gas Kick U  T  E  U 26 bbl

STROKES TO MAXIMUM CASING PRESSURE AND VOLUME


Maximum casing Pressure and Excess Volume Occur When the Pumped Volume Equals
Total Annulus Capacity - Volume of Gas at Surface
1370.2 bbl
 Annulus Cap {prerecorded } - T  11123 strokes
ENGINEER'S METHOD WORKSHEET
(Highly Deviated and Horizontal Wells)

PRERECORDED INFORMATION SPM psi bbl/stk bbl/min


A. Slow Pump Rate Data Pump #1 80 1200 0.1232 9.9
( Use SPR Pressure thru Riser for Subsea ) Pump #2 0.1201 0.0
INFORMATION RECORDED WHEN WELL KICKS
B. Old Mud Weight B 12.2 lb/gal
C. Initial Shut-In Drill Pipe Pressure (SIDP) C 300 psi
D. Initial Shut-In Casing Pressure (SICP) D 370 psi
E. Initial Pit Volume Increase E 11 bbl
F. True Vertical Depth of Hole from data sheet F 4,120 ft (TVD)
Measured Depth of Hole (for Capacity Calculations ONLY) 11,345 ft (MD)
MUD WEIGHT TO BALANCE KICK
G. Increase in Mud Weight required to Balance Kick

Initial SIDP C
G   G 1.4 lb/gal
0.052  TVD 0.052  F
H. New Mud Weight H=B+G= H 13.6 lb/gal
I. Total Volume to Weight up I = Active tanks+ System Vol I 1,750 bbl
J. Barite Required ( 15 ´G )
J =I ´ = J 1,717 sx
( 35−H )
INITIAL CIRCULATING PRESSURE
K. Slow Pump Rate Pressure + SIDP K =A+C= K 1500 psi
FINAL CIRCULATING PRESSURE
L. Slow Pump Rate Pressure X (New Mud Wt / Old Mud Wt) H L 1338 psi
LA 
B
FINAL CIRCULATING PRESSURE AT KICKOFF POINT
M. Total Internal Capacity (from Prerecorded Well Data) M 1,594 strokes

Slow pump rate taken when coming on tour 1200 SPRP

N. Surface to Kickoff Point Strokes (from Prerecorded Data) N 505 strokes

O. Hydrostatic Pressure Increase Due to KWM at Kickoff Pt.


O 255 psi
O = ( H - B ) ´ 0 . 052´ TVD at Kickoff Point=
P. Friction Pressure Increase Due to KWM at Kickoff Pt.
(L - A) P 44 psi
P = ´N =
Q. Final Circulating Pressure at Kickoff Point M
Q=K-O+P Q 1289 psi
FINAL CIRCULATING PRESSURE AT START OF HOLD
R. Strokes from Kickoff Point to Start of Hold (from Prerecorded Well Data) R 173 strokes

S. Hydrostatic Pressure Increase Due to KWM at Start of Hold


S 298 psi
S =  H - B  0.052  TVD at Start of Hold =

T. Friction Pressure Increase Due to KWM at Start of Hold


(L - A) T 59 psi
T =  (N + R) =
M
U. Final Circulating Pressure at Start of Hold
U=K-S +T= U 1260 psi

V. Strokes from Hold Point to TD (from Prerecorded Well Data) V 916 strokes
DRILL PIPE PRESSURE PROFILE
W. Pressure Drop Per Stroke to Kickoff Point
( Initial Circ Press( K )−Final Circ Press(Q ))psi per stroke W 0.4183 psi
W= =
( Internal Capacity Strokes( N ))
X. Pressure Drop Per Stroke from Kickoff to Start of Hold

( Starting Pressure (Q) - Ending Pressure(Upsi) )per stroke X 0.1659 psi


X= =
( Internal
Y. Pressure Drop Per Capacity
Stroke from Strokes(
Hold Point to TD R) )
psi per stroke Y -0.0847 psi
(note: for a horizontal well this will be negative, meaning
the pressure will increase each stroke increment)

( Starting Pressure( U ) - FCP( L) )


Y= =
( Internal Capacity Strokes(
Strokes V ) ) Pressure (psi)
0 1500 = Initial Circ Press (K)
100 1458 increment 100
200 1416
300 1375
400 1333
500 1291
0 0
0 0
0 0
0 0
Kick Off Pt. (N) 505 1289 = Kickoff Pt. Circ Pres (Q)
530 1285 increment 20
540 1283
560 1280
580 1276
600 1273
620 1270
640 1266
660 1263
Start of Hold (R+N) 678 1260 = Circ Pres at Start of Hold(U)
800 1270 increment 100
880 1277
980 1286
1080 1294
1180 1303
1280 1311
1380 1320
1480 1328
1580 1337
Total Int. Cap. (M) 1594 1338 = Final Circ. Pres. (L)

RESERVOIR PRESSURE (Pr)


Z 2914 psi
Z . Pr = New MW x TVD x 0 . 052 = H x F x 0 .052 =
MAXIMUM CASING PRESSURE (Pcmax) WHEN GAS GETS TO SURFACE
AA. Drill String Capacity from Prerecorded Data AA 196 bbl
BB. Annulus Capacity Factor DP x Casing Right Below Wellhead BB 0.1219 bbl/ft

CC. Temperature and Compression Effects. (TZ from fig. 11P.5 or formula below)
CC 1.00
CC=4 . 03−(0 . 38´ ln(Z ))
DD . New MW Gradient, psi/ft DD 0.707 psi/ft
= H x 0. 052 =
EE. PcMAX , Part 1 (From Fig. 11P. 2 or From Formula Below )
G  AA x 0.052 EE 59 psi
= =
2  BB
FF. Pc MAX , Part 2 ( From Fig. 11P .3 or From Formula Below )

√( EE ) (
2
Z× E×CC×DD
= + BB = ) FF 435 psi

GG. Maximum Casing Pressure,


PCmax=(Part1) + (Part2) = EE + FF = GG 493 psi

Does Pcmax Exceed the Wellhead or Casing Pressure Limitation?

YES NO X

VOLUME GAIN WHILE CIRCULATING OUT GAS BUBBLE


HH. Volume of Gas at Surface (From Fig 11P.4 or From Formula Below)
HH 65 bbl
E  Z  CC
Vg , Vol gas at surf, bbl  
GG
II. Volume Gain While Circulating Out Gas Kick II = HH - E II 54 bbl

JJ. Volume Gain due to Barite Addition J JJ 114 bbl


JJ  
15 sacks / bbl

Total Volume Gain While Circulating Out Gas Kick = II + JJ 168 bbl

STROKES TO MAXIMUM CASING PRESSURE AND VOLUME


Maximum casing Pressure and Excess Volume Occur When the Pumped Volume Equals

Total Annulus Capacity - Volume of Gas at Surface


= Annulus Capacity (from Prerecorded) - HH 11147 strokes
1339 bbl
KK. Is volume built up enough to come out of hole
Total barrels after mixing 1,864.4 bbl
Total barrels No pipe in hole. Taken from avreage hole size 1,708.3 bbl
Total remaing in pits no pipe in hole 156.2 bbl

S-ar putea să vă placă și