Sunteți pe pagina 1din 1

City Plan for lighting

The details of the cost will be given below:


UNIT COST OF WORK
Sr No. Description Unit Qty. Rate Amount
(Rs.) (Rs.)

Supply, erection, testing & comissioning of hot dip


galvanised pole with PU (Polyurethene) paint, base dia 140
mm middle dia 76.1 mm top dia 60.3 mm with electrical
junction box at bottom of size 295X85 mm above 78 mm
from the base plate. The size of the base plate 200X200
mm, thickness 12 mm with cable entry hole. The base
1 No. 1 14,770.00 14,770.00
foundation size - base padding of concrete size
1000X1000X200 mm & concreting (1X3X6) from ground
level upto base padding 1300 mm and size of the concreting
is 500X500 mm for gouting of the pole. The size of the bolt
for grouting the pole is 500X20 mm with suitable nut.
Proper earthing to be done for pole.

Supply, erection, testing & comissioning of LED light fixture


2 No. 1 18,400.00 18,400.00
of 60 watt complete with fitting on above pole

Supply, erection, testing & comissioning of underground


aluminium armoured cable, 10 square mm 4 core cable for
3 Pole to pole electrical supply connection with 50 mm dia PVC KM 1.0 321,000.00 321,000.00
LGP Pipe for underground cable, connector for each pole for
connection including all item like cable gland, earthing etc.

Supply, erection, testing & comissioning of flexible copper


Cable of 3X2.5 square mm with connector and other
4 material required for the connection of LED light fixture on No. 1 1,000.00 1,000.00
above pole including all item like cable lugs, erathing etc.
(lump sum amount)

Supply, erection, testing & comissioning of High mast 12


metre height with 8 no. 120 Watt LED light fittings. Size of
the pole, bottom dia 340 mm, top dia 150 mm, thickness
3.3 mm. Junction box at bottom above 600 mm from the
base plate. Size of the junction box door opening window
1100 mm X 350 mm, motor 1.0 HP on top lantreen carriage
8 luminairies with aluminium pulley on top, lighting arrestor
5 1200 mm. The concreting size for erection of the pole base No. 1 350,000.00 350,000.00
padding of conrete 1800X1800X300 mm. Depth of the
concreting from GL to base padding 1775 mm. Foundation
bolt 08 no. size of the bolt 25 mm dia, length of the bolt 830
mm, anchor plate dia 540 mm, hole 8 no. dia 25 mm,
thickness of the plate 4 mm. Independent two GI plate
earth pit should be provided with charcoal & black cotton
soil. Depth of the earthpit will be 3.0 M.

TOTAL 705,170.00