BOQ for dam design

C) inlet and oulet channels ( for main ponds, silt rap and to sump well.
S/NO describtion unit Qty unit cost total cost
1 earth work
1.1 m2 222
Site clearing to remove the top loose soil
and vegetation & use the excavated soil
for constructing embankment around the
reservoir as shown in the drawing

1.2 Excavation of trench for construction of


inlet & out let cannels as shown in the
drawing & use the excavated soil for
constructing embankment around the
reservoir as shown in the drawing

2 masonry work
2.1 Semi - dressed stone pavement work
Joined & pointed with cement sand
mortar 1:2 for the in let canal

2.2 Ditto but for out let canal (from the silt
trap to the main reservoir
3 Concrete work
3.1 Supply & lay 1000mm in dia concrete pipe
as per the drawing (cost includes trench
excavation. Backfilling the trench &
compacting construction of concrete cut
off collars laying & joining to the sump )
which is from the main pond to the sump

D) Spillway structure
S/NO describtion unit Qty unit cost total cost
1
Site clearing to remove the top loose soil
and vegetation & use the excavated soil
for constructing embankment around the
reservoir as shown in the drawing

2 Exaction of trench for construction of


over flow canal use the excavated soil for
constructing embankment around the
reservoir as shown in the drawing
3 Filling selected site material & compact in
layers no exceeding 15cm thickness

4 Sub total
5 Masonry work
5.1 Semi dressed stone pavement work
joined & pointed with cement sand
mortar 1:3 for the over flow canal

sub total