4.2 Work Plan Budget

Objective Activity Duration Budget

i) To assess the - Planning - 1st week


sufficiency of the - Conducting the mini - 2nd to 3rdweek - 70,000/=
amount of water survey (Transport and Labor
that is collected at - Analysis of data - 5th week support)
household level. - Reporting Writing - 6th week
- 5,000/=
ii) To assess on the - Collection of - 2nd to 3rdweek
quality of the rain Samples
water harvested. - Laboratory tests - 4th week
- Analysis of results - 5th week
- Report writing - 6th week - 5,000/=
iii) To suggest and - Analysis of Results - 7th week
design the treatment - Design and - 8th and 9th week
method(s) required. suggesting
treatment methods
- Report writing - 10th week - 5,000/=
iv) To assess the cost - Estimating the - 11th week
efficiency of the costs of employing
system. RWHS - 12th week
- Assessment of the
cost efficiency
- Report writing - 13th week - 5,000/=
- Full Report Writing - 14th week to - 5000/=
15th week
Total= 95,000/=