Patrick Mbaabu Peter
Mayoni - Bumala Road (C30) Profession Registration by (ERB)
Ch12+000 to Ch16+000
2
Patrick Mbaabu Peter
Mayoni - Bumala Road (C30) Profession Registration by (ERB)
Ch12+000 to Ch16+000
8.10 Provide and place 300mm Invert Block Drains with single
side slabs. m
8.11 Provide and place 300mm Invert Block Drains with double
side slabs. m
3
Patrick Mbaabu Peter
Mayoni - Bumala Road (C30) Profession Registration by (ERB)
Ch12+000 to Ch16+000
4
Patrick Mbaabu Peter
Mayoni - Bumala Road (C30) Profession Registration by (ERB)
Ch12+000 to Ch16+000
5
Patrick Mbaabu Peter
Mayoni - Bumala Road (C30) Profession Registration by (ERB)
Ch12+000 to Ch16+000
12.01 Excavate and spoil contaminated existing existing and failed pavement
material as directed by the Engineer. m3
12.04 Provide gravel material for subbase and base layers to repair and
reconstruction areas, accessses and junctions in accordance with the
specifications or as directed by the Engineer. m3
12.05 Provide, lay and compact hand packed stones to road base
as directed by the Engineer. m3
6
Patrick Mbaabu Peter
Mayoni - Bumala Road (C30) Profession Registration by (ERB)
Ch12+000 to Ch16+000
14.01 Provide transport to site and spread cement for natural gravel base,
subbase,as specified or as directed by the Engineer at 40-60kg/m3
tonnes
14.02 Provide transport to site and spread lime for natural gravel base,
subbase,as specified or as directed by the Engineer at 20-30kg/m3 tonnes
7
Patrick Mbaabu Peter
Mayoni - Bumala Road (C30) Profession Registration by (ERB)
Ch12+000 to Ch16+000
8
Patrick Mbaabu Peter
Mayoni - Bumala Road (C30) Profession Registration by (ERB)
Ch12+000 to Ch16+000
(a) straight m
(b) radius 5 - 1 m m
9
Patrick Mbaabu Peter
Mayoni - Bumala Road (C30) Profession Registration by (ERB)
Ch12+000 to Ch16+000
5 EARTHWORKS
9 PASSAGE OF TRAFFIC
11 SHOULDER TO CARRIAGEWAY
16 BITUMINOUS MIXES
20 ROAD FURNITURE
22 DAYWORKS
SUB-TOTAL (1+2)(3)
10
BILL NO. 4 : SITE CLEARANCE AND TOPSOIL STRIPPING
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
SHS. CT.
5.06 Topsoiling over side slopes, cuts and fills m2 16,000 35.00 560,000.00
5.07 Grass over side slopes in fills and cuts m2 16,000 35.00 560,000.00
7.01 Excavate to spoil in soft material for box culverts and r.c
open drains, abutments, wingwalls and pier
foundation. m3 12,000 260.00 3,120,000.00
7.02 As for item 7.01 but in hard material m3 2,400 150.00 360,000.00
7.04 E.O. item 7.06 for cement grouting m2 4,500 350.00 1,575,000.00
12.01 Provide, lay and compact hand packed stones to road base
as directed by the Engineer. m3 8,500 1,200.00 10,200,000.00
24.02 E.O item 24.01 for Contractor's overheads and profits. % 20% 2,400,000.00
5 EARTHWORKS 7,890,000.00
11 SHOULDER TO CARRIAGEWAY
12,200,000.00
12 NATURAL MATERIAL SUBBASE AND BASE
22 DAYWORKS
Add 10% of (1) for Price Adjustment in accordance with clause 70.1 of the
Conditions of Contract (3) 12,269,625.00
OFFICE EQUIPMENT
14/1.04 Free standing paralled motion drawing No. 2 47,938.0 95,876.0
board A0 size
15/1.04 A0/A1 size drawing board. No. 2 10,133.0 20,266.0
29
List of Laboratory-Survey-Office Equipment
20/1.04 Set of full divided scale (metric 1/1000,1/2500, No. 2 413.0 826.0
1/500,1/2000, 1/1250, 1/1500
26/1.04 Autocad 2002 and Licences for above No. 1 150,000.0 150,000.0
computer
30
List of Laboratory-Survey-Office Equipment
37/1.04 Inkjet plain paper fax machine with 4MB No. 1 120,000.0 120,000.0
of memory
38/1.04 Reams of A4, A3 photocopying paper No 40 500.0 20,000.0
42/1.04 Theodolite reading to 1" arc and Tripod No. 1 494,339.0 494,339.0
31
List of Laboratory-Survey-Office Equipment
32
List of Laboratory-Survey-Office Equipment
33
List of Laboratory-Survey-Office Equipment
34
List of Laboratory-Survey-Office Equipment
30/1.05 1.5kg, 3.5kg hammers and 1kg rubber mallet Set 1 389.0 389.0
35
List of Laboratory-Survey-Office Equipment
36
List of Laboratory-Survey-Office Equipment
37
List of Laboratory-Survey-Office Equipment
38
List of Laboratory-Survey-Office Equipment
39
List of Laboratory-Survey-Office Equipment
40
List of Laboratory-Survey-Office Equipment
41
List of Laboratory-Survey-Office Equipment
7,613,541.0
Carried forward to Item 1.05
42