PEMBANGKIT LISTRIK KALTIM

BASED ON RUPTL 2015-2024 – PT PLN


Include Fast Track Program 1 & 2

NO PROJECT OWNER Unit Cap/MW Description

1 Kaltim Peaker 2 PT PLN PLTG/MG/GU 100 COD 2017


2 Mobile PP Kaltim PT PLN PLTG/MG 30 COD 2016
3 Teluk Balikpapan ( FTP 1) PT. PLN – cons Adhi PLTU 2x110 COD 2015
Karya and Sinohydro
Co. Ltd
4 Tanjung Redep, Berau PT. Indonesia Pusaka PLTU 2x7 COD 2015
Berau
5 Kelai PT PLN PLTA 55 COD 2024
6 Lati- expansion IPP PLTU 1x5 COD 2015
7 Tanah Grogot PT. Mahajaya Arya PLTU 2x7 COD 2016
Satya
PT. Indo Ridlotama
8 Kaltim Mine mouth PLTU 2X27,5 COD 2017
Power
9 Senipah (ST) IPP PLTGU 35 COD 2017
9 Kaltim/FTP 2 IPP PLTU 2x100 COD 2018/19
10 Kaltim 3a & 3b IPP PLTU 2X200 COD 2019/20
11 Kaltim 4-expansion Embalut IPP PLTU 2X100 COD 2022/23
12 Kaltim Peaker 3 unallocated PLTG/MG/GU 100 COD 2022
14 Kaltim 5 unallocated PLTU 2x200 COD 2023/24
Nearest RUPTL
NO PROJECT LOCATION OWNER Unit Cap/MW Description

PLTU Kaltim 4, PLTU


1 PLTU Kutai Kertanegara PT Resource Alam Indonesia 2 200 Proposal
Kaltim 3
2 PLTU Kutai Barat ESSAR Group 2 100 PLTU KALTIM 3 Proposal
3 PLTU Passer PT KIDECO JAYA AGUNG 1 - PLTU KALTIM 3 Proposal
PT ADMIRA BARATAMA Proposal
4 PLTU Muara Tawar 2 200 PLTU KALTIM 3
NUSANTARA
5 PLTU Muara Wahau PT Muara Wahau Energi - 100-300 PLTU KALTIM 3 Proposal

6 PLTU Loa Janan PT POWER ALAM LESTARI 2 200 PLTU KALTIM 3 Proposal
7 PLTU Muara Wahau PT MEC - 300 PLTU KALTIM 3 Proposal
PT Natrustparadigma Listrik Proposal
8 PLTU Sangata 2 200 PLTU KALTIM 3
Mandiri
Kaltim-3a CFPP (1x200 MW)

Kaltim-3a CFPP (1x200 MW)

Schedule COD: 2022/2023


Connection Point :
• Incomer double pi or,
• Radial to any 150 kV S/S between
150 kV Bukuan S/S to 150 kV
Sangata S/S

Kaltim-4a CFPP (1x200 MW)

Schedule COD: 2022/2023


Connection Point :
• Incomer double pi or,
• Radial to any 150 kV S/S between
150 kV Karingau S/S to 150 kV
Kalselteng-3 CFPP (2x100 MW) Kuaro S/S
Schedule COD: 2020/2021
Connection Point :
• 150 kV Pangkalan Bun S/S or,
• Incomer double pi Sampit-
Pangkalan Bun 150 kV

Tentative Pre-Qualification : Mid Jan 2016 K


Scheduled COD : 2018/2019 a
l
s
e
l
t
e
Kalselteng-3 CFPP (2x100 MW)
Glosary

RUPTL : Rencana Usaha Penyediaan Tenaga Listrik ( Electricity Supply Business Plan )
PT PLN : Perusahaan Listrik Negara ( The State Owned Electricity Company )
IPP : Independent Power Producer
FTP 1 : Fast Track Program 1 ( 2006 )
FTP 2 : Fast Track Program 2 ( 2010 )
PLTU : Steam Fired Power Plant ( coal )
PLTA : Hydro Power Plant
PLTG : Gas Fired Power Plant
PLTGU : Combined Cycle Power Plant