Sunteți pe pagina 1din 10

WELD DESIGN FOR STIFFENERS

(For Base Plate - BP1)


Vertical Weld: Node no: 4
Base pressure (Max) = 15.24 N/mm 2
L/C : 146

Projection of Base plate = 210 mm


500
Width of Base plate = 350 mm

Number of stiffeners = 2

Height of stiffeners = 500

Vertical Shear = 15.24 x 210 x 350


= 1120140 N

Max tensile stress in the bolts = 129.25 N/mm2 Node no: 33


Dia. of bolts = 24 mm L/C : 352
No. of Bolts in tension = 4
Max. tension per Bolt = 129.25xPI()x24^2/4*0.8
46777.06 N
Total tension in the bolts = 4 x 46777.06
187108.23 N
Design Force F = Max of ( 1120140,187108.23)
1120140 N
Total length of weld L = 2 x 2 x 500
2000 mm

Permissible Stress in weld = 145 N/mm2 ( As per AISC ASD 9th Edition )

Thickness of weld required = 1120140 /(0.707 x 145 x 2000 )


= 5.46 mm

Horizontal Weld:
Length of stiffeners = 200 mm 200
Assume 75% of contact area for horizontal
Shear Due to Base pressure = 0.75 x 15.24 x 210 x 350
= 840105 N
Total tension in the bolts = 187108 N
Design Force F = Max of ( 840105,187108.23)
840105 N
Total length of weld L = 2 x 2 x 200
800 mm

Permissible Stress in weld = 145 N/mm2 ( As per AISC ASD 9th Edition )

Thickness of weld required = 840105 /(0.707 x 145 x 800 )


= 10.24 mm
Thickness of weld provided = 12 mm OK
BHEL - 2X350 MW CCPP PIPAVAV PE-DC-292-614-C002
Design Calculation for BFP Building - Baseplate A - 4.12

WELD DESIGN FOR STIFFENERS


(For Base Plate - BP2)
Vertical Weld: Node no: 2
Base pressure (Max) = 5.11 N/mm2 L/C : 267

Projection of Base plate = 300 mm


400
Width of Base plate = 900 mm

Number of stiffeners = 4

Height of stiffeners = 400

Vertical Shear = 5.11 x 300 x 900


= 1379700 N

Max tensile stress in the bolts = 95.62 N/mm2 Node no: 1


Dia. of bolts = 42 mm L/C : 274
No. of Bolts in tension = 3
Max. tension per Bolt = 95.62xPI()x42^2/4*0.8
105980.80 N
Total tension in the bolts = 3 x 105980.8
317942.40 N
Design Force F = Max of ( 1379700,317942.4)
1379700 N
Total length of weld L = 4 x 2 x 400
3200 mm

Permissible Stress in weld = 107.91 N/mm2 ( As per IS: 816 -1969, cl. 7.1.2 )

Thickness of weld required = 1379700 /(0.707 x 107.91 x 3200 )


= 5.65 mm

Horizontal Weld:
Length of stiffeners = 300 mm 300
Assume 75% of contact area for horizontal
Shear Due to Base pressure = 0.75 x 5.11 x 300 x 900
= 1034775 N
Total tension in the bolts = 317942 N
Design Force F = Max of ( 1034775,317942.4)
1034775 N
Total length of weld L = 4 x 2 x 300
2400 mm

Permissible Stress in weld = 107.91 N/mm2 ( As per IS: 816 -1969, cl. 7.1.2 )

Thickness of weld required = 1034775 /(0.707 x 107.91 x 2400 )


= 5.65 mm
Thickness of weld provided = 10 mm OK

file:///conversion/tmp/scratch/378880407.xls
KHM 02/12/2018
378880407.xls
BHEL - 2X350 MW CCPP PIPAVAV PE-DC-292-614-C002
Design Calculation for BFP Building - Baseplate A - 5.32

WELD DESIGN FOR STIFFENERS


(For Base Plate - BP3)
Vertical Weld: Node no: 10
Base pressure (Max) = 7.33 N/mm2 L/C : 266

Projection of Base plate = 300 mm


500
Width of Base plate = 900 mm

Number of stiffeners = 4

Height of stiffeners = 500

Vertical Shear = 7.33 x 300 x 900


= 1979100 N

Max tensile stress in the bolts = 67.61 N/mm2 Node no: 18


Dia. of bolts = 32 mm L/C : 265
No. of Bolts in tension = 3
Max. tension per Bolt = 67.61xPI()x32^2/4*0.8
43500.15 N
Total tension in the bolts = 3 x 43500.15
130500.45 N
Design Force F = Max of ( 1979100,130500.45)
1979100 N
Total length of weld L = 4 x 2 x 500
4000 mm

Permissible Stress in weld = 107.91 N/mm2 ( As per IS: 816 -1969, cl. 7.1.2 )

Thickness of weld required = 1979100 /(0.707 x 107.91 x 4000 )


= 6.49 mm

Horizontal Weld:
Length of stiffeners = 300 mm 300
Assume 75% of contact area for horizontal
Shear Due to Base pressure = 0.75 x 7.33 x 300 x 900
= 1484325 N
Total tension in the bolts = 130500 N
Design Force F = Max of ( 1484325,130500.45)
1484325 N
Total length of weld L = 4 x 2 x 300
2400 mm

Permissible Stress in weld = 107.91 N/mm2 ( As per IS: 816 -1969, cl. 7.1.2 )

Thickness of weld required = 1484325 /(0.707 x 107.91 x 2400 )


= 8.11 mm
Thickness of weld provided = 10 mm OK

file:///conversion/tmp/scratch/378880407.xls
KHM 02/12/2018
378880407.xls
BHEL - 2X350 MW CCPP PIPAVAV PE-DC-292-614-C002
Design Calculation for BFP Building - Baseplate A - 6.12

WELD DESIGN FOR STIFFENERS


(For Base Plate - BP4)
Vertical Weld: Node no: 3
Base pressure (Max) = 5.52 N/mm2 L/C : 259

Projection of Base plate = 300 mm


400
Width of Base plate = 750 mm

Number of stiffeners = 4

Height of stiffeners = 400

Vertical Shear = 5.52 x 300 x 750


= 1242000 N

Max tensile stress in the bolts = 62.04 N/mm2 Node no: 4


Dia. of bolts = 25 mm L/C : 274
No. of Bolts in tension = 3
Max. tension per Bolt = 62.04xPI()x25^2/4*0.8
24363.05 N
Total tension in the bolts = 3 x 24363.05
73089.15 N
Design Force F = Max of ( 1242000,73089.15)
1242000 N
Total length of weld L = 4 x 2 x 400
3200 mm

Permissible Stress in weld = 107.91 N/mm2 ( As per IS: 816 -1969, cl. 7.1.2 )

Thickness of weld required = 1242000 /(0.707 x 107.91 x 3200 )


= 5.09 mm

Horizontal Weld:
Length of stiffeners = 300 mm 300
Assume 75% of contact area for horizontal
Shear Due to Base pressure = 0.75 x 5.52 x 300 x 750
= 931500 N
Total tension in the bolts = 73089 N
Design Force F = Max of ( 931500,73089.15)
931500 N
Total length of weld L = 4 x 2 x 300
2400 mm

Permissible Stress in weld = 107.91 N/mm2 ( As per IS: 816 -1969, cl. 7.1.2 )

Thickness of weld required = 931500 /(0.707 x 107.91 x 2400 )


= 5.09 mm
Thickness of weld provided = 10 mm OK

file:///conversion/tmp/scratch/378880407.xls
KHM 02/12/2018
378880407.xls
BHEL - 2X350 MW CCPP PIPAVAV PE-DC-292-614-C002
Design Calculation for BFP Building - Baseplate A - 7.12

WELD DESIGN FOR STIFFENERS


(For Base Plate - BP5)
Vertical Weld: Node no: 14
Base pressure (Max) = 5.15 N/mm2 L/C : 265

Projection of Base plate = 300 mm


500
Width of Base plate = 900 mm

Number of stiffeners = 4

Height of stiffeners = 500

Vertical Shear = 5.15 x 300 x 900


= 1390500 N

Max tensile stress in the bolts = 70.98 N/mm2 Node no: 14


Dia. of bolts = 42 mm L/C : 245
No. of Bolts in tension = 3
Max. tension per Bolt = 70.98xPI()x42^2/4*0.8
78670.96 N
Total tension in the bolts = 3 x 78670.96
236012.88 N
Design Force F = Max of ( 1390500,236012.88)
1390500 N
Total length of weld L = 4 x 2 x 500
4000 mm

Permissible Stress in weld = 107.91 N/mm2 ( As per IS: 816 -1969, cl. 7.1.2 )

Thickness of weld required = 1390500 /(0.707 x 107.91 x 4000 )


= 4.56 mm

Horizontal Weld:
Length of stiffeners = 300 mm 300
Assume 75% of contact area for horizontal
Shear Due to Base pressure = 0.75 x 5.15 x 300 x 900
= 1042875 N
Total tension in the bolts = 236013 N
Design Force F = Max of ( 1042875,236012.88)
1042875 N
Total length of weld L = 4 x 2 x 300
2400 mm

Permissible Stress in weld = 107.91 N/mm2 ( As per IS: 816 -1969, cl. 7.1.2 )

Thickness of weld required = 1042875 /(0.707 x 107.91 x 2400 )


= 5.70 mm
Thickness of weld provided = 10 mm OK

file:///conversion/tmp/scratch/378880407.xls
KHM 02/12/2018
378880407.xls
BHEL - 2X350 MW CCPP PIPAVAV PE-DC-292-614-C002
Design Calculation for BFP Building - Baseplate A - 8.12

WELD DESIGN FOR STIFFENERS


(For Base Plate - BP6)
Vertical Weld: Node no: 12
Base pressure (Max) = 1.47 N/mm2 L/C : 227

Projection of Base plate = 300 mm


200
Width of Base plate = 600 mm

Number of stiffeners = 4

Height of stiffeners = 200

Vertical Shear = 1.47 x 300 x 600


= 264600 N

Max tensile stress in the bolts = 34.28 N/mm2 Node no: 12


Dia. of bolts = 20 mm L/C : 254
No. of Bolts in tension = 2
Max. tension per Bolt = 34.28xPI()x20^2/4*0.8
8615.50 N
Total tension in the bolts = 2 x 8615.5
17231.01 N
Design Force F = Max of ( 264600,17231.01)
264600 N
Total length of weld L = 4 x 2 x 200
1600 mm

Permissible Stress in weld = 107.91 N/mm2 ( As per IS: 816 -1969, cl. 7.1.2 )

Thickness of weld required = 264600 /(0.707 x 107.91 x 1600 )


= 2.17 mm

Horizontal Weld:
Length of stiffeners = 300 mm 300
Assume 75% of contact area for horizontal
Shear Due to Base pressure = 0.75 x 1.47 x 300 x 600
= 198450 N
Total tension in the bolts = 17231 N
Design Force F = Max of ( 198450,17231.01)
198450 N
Total length of weld L = 4 x 2 x 300
2400 mm

Permissible Stress in weld = 107.91 N/mm2 ( As per IS: 816 -1969, cl. 7.1.2 )

Thickness of weld required = 198450 /(0.707 x 107.91 x 2400 )


= 1.08 mm
Thickness of weld provided = 10 mm OK

file:///conversion/tmp/scratch/378880407.xls
KHM 02/12/2018
378880407.xls
BHEL - 2 x 250 MW BHILAI TPS
PE-DC-239-611-C001
Design Calculation for Turbine Building Substructure

WELD DESIGN FOR STIFFENERS


(For Grid-A2 to A13)
Vertical Weld:
Base pressure = 6.49 N/mm2 from grid - A13

Projection of Base plate = 400 mm


700
Width of Base plate = 1300 mm

Number of stiffeners = 6

Height of stiffeners = 700

Vertical Shear = 6.49 x 400 x 1300


= 3374800 N

Max tensile stress in the bolts = 82.47 N/mm2 from grid - A4

Dia. of bolts = 72 mm
No. of Bolts in tension = 3
Max. tension per Bolt = 268622 N
Total tension in the bolts = 805865 N
Design Force F = 3374800 N
Total length of weld L = 6 x 2 x 700
8400 mm ( As per IS: 816 -1969, cl. 7.1.2 )

Permissible Stress in weld = 107.91 N/mm2

Thickness of weld required = 3374800 /(0.707 x 107.91 x 8400 )


= 5.27 mm

Horizontal Weld:
Length of stiffeners = 400 mm 400
Assume 75% of contact area
Shear Due to Base pressure = 0.75 x 6.49 x 400 x 1300
= 2531100 N

Total tension in the bolts = 805865 N


Design Force F = 2531100 N
Total length of weld L = 6 x 2 x 400
4800 mm ( As per IS: 816 -1969, cl. 7.1.2 )

Permissible Stress in weld = 107.91 N/mm2

Thickness of weld required = 2531100 /(0.707 x 107.91 x 4800 )


= 6.91 mm
Thickness of weld provided = 10 mm OK

file:///conversion/tmp/scratch/378880407.xlsGrid-A2 to A13 02/12/2018


BHEL - 2 x 250 MW BHILAI TPS
PE-DC-239-611-C001
Design Calculation for Turbine Building Substructure

WELD DESIGN FOR STIFFENERS


(For Grid-B1 to B13)
Vertical Weld:
Base pressure = 8.11 N/mm2 from grid - B2

Projection of Base plate = 400 mm


700
Width of Base plate = 1300 mm

Number of stiffeners = 6

Height of stiffeners = 700

Vertical Shear = 8.11 x 400 x 1300


= 4217200 N

Max tensile stress in the bolts = 74.09 N/mm2 from grid - B13

Dia. of bolts = 48 mm
No. of Bolts in tension = 3
Max. tension per Bolt = 107256 N
Total tension in the bolts = 321768 N
Design Force F = 4217200 N
Total length of weld L = 6 x 2 x 700
8400 mm ( As per IS: 816 -1969, cl. 7.1.2 )

Permissible Stress in weld = 107.91 N/mm2

Thickness of weld required = 4217200 /(0.707 x 107.91 x 8400 )


= 6.58 mm

Horizontal Weld:
Length of stiffeners = 400 mm 400
Assume 75% of contact area
Shear Due to Base pressure = 0.75 x 8.11 x 400 x 1300
= 3162900 N

Total tension in the bolts = 321768 N


Design Force F = 3162900 N
Total length of weld L = 6 x 2 x 400
4800 mm ( As per IS: 816 -1969, cl. 7.1.2 )

Permissible Stress in weld = 107.91 N/mm2

Thickness of weld required = 3162900 /(0.707 x 107.91 x 4800 )


= 8.64 mm
Thickness of weld provided = 10 mm OK

file:///conversion/tmp/scratch/378880407.xlsGrid-B1 to B13 02/12/2018


BHEL - 2 x 250 MW BHILAI TPS
PE-DC-239-611-C001
Design Calculation for Turbine Building Substructure

WELD DESIGN FOR STIFFENERS


(For Grid C1 to C13)
Vertical Weld:
Base pressure = 8.16 N/mm2 from grid - C2

Projection of Base plate = 400 mm


900
Width of Base plate = 1300 mm

Number of stiffeners = 6

Height of stiffeners = 900

Vertical Shear = 8.16 x 400 x 1300


= 4243200 N

Max tensile stress in the bolts = 88.26 N/mm2 from grid - C12

Dia. of bolts = 72 mm
No. of Bolts in tension = 3
Max. tension per Bolt = 287481 N
Total tension in the bolts = 862442 N
Design Force F = 4243200 N
Total length of weld L = 6 x 2 x 900
10800 mm ( As per IS: 816 -1969, cl. 7.1.2 )

Permissible Stress in weld = 107.91 N/mm2

Thickness of weld required = 4243200 /(0.707 x 107.91 x 10800 )


= 5.15 mm

Horizontal Weld:
Length of stiffeners = 400 mm 400
Assume 75% of contact area
Shear Due to Base pressure = 0.75 x 8.16 x 400 x 1300
= 3182400 N

Total tension in the bolts = 862442 N


Design Force F = 3182400 N
Total length of weld L = 6 x 2 x 400
4800 mm ( As per IS: 816 -1969, cl. 7.1.2 )

Permissible Stress in weld = 107.91 N/mm2

Thickness of weld required = 3182400 /(0.707 x 107.91 x 4800 )


= 8.69 mm
Thickness of weld provided = 10 mm OK

file:///conversion/tmp/scratch/378880407.xlsGrid-C1 to C13 02/12/2018


BHEL - 2 x 250 MW BHILAI TPS
PE-DC-239-611-C001
Design Calculation for Turbine Building Substructure

WELD DESIGN FOR STIFFENERS


(For Grid A0-9 to A013, Aa-9, Aa-11 & Aa-13)
Vertical Weld:
Base pressure = 7.67 N/mm2 from grid - A0-12

Projection of Base plate = 300 mm


500
Width of Base plate = 900 mm

Number of stiffeners = 4

Height of stiffeners = 500

Vertical Shear = 7.67 x 300 x 900


= 2070900 N

Max tensile stress in the bolts = 102.81 N/mm2 from grid - A0-10

Dia. of bolts = 42 mm
No. of Bolts in tension = 3
Max. tension per Bolt = 113950 N
Total tension in the bolts = 341850 N
Design Force F = 2070900 N
Total length of weld L = 4 x 2 x 500
4000 mm ( As per IS: 816 -1969, cl. 7.1.2 )

Permissible Stress in weld = 107.91 N/mm2

Thickness of weld required = 2070900 /(0.707 x 107.91 x 4000 )


= 6.79 mm

Horizontal Weld: 300


Length of stiffeners = 300 mm
Assume 75% of contact area
Shear Due to Base pressure = 0.75 x 7.67 x 300 x 900
= 1553175 N

Total tension in the bolts = 341850 N


Design Force F = 1553175 N
Total length of weld L = 4 x 2 x 300
2400 mm ( As per IS: 816 -1969, cl. 7.1.2 )

Permissible Stress in weld = 107.91 N/mm2

Thickness of weld required = 1553175 /(0.707 x 107.91 x 2400 )


= 8.48 mm
Thickness of weld provided = 10 mm OK

file:///conversion/tmp/scratch/378880407.xlsGrid-A0 & Aa 02/12/2018