Documente Academic
Documente Profesional
Documente Cultură
Summary
Bill
Description Amount ( Rs.)
No.
1 Site Clearance. 43002812
2 Earth works. 735292683
3 Sub base & Base. 1185685805.25084
4 Bituminous and Cement Concrete Pavement. 2492442801.10186
5 Culverts. 338855912
6 Bridges. 543200639
7 Drainage and Protective work. 78592639
8 Traffic Sign,Marking and other Road Appurtenances. 235828867
9 Documentation. 257500
10 Toll Plaza. 319586097
11 Highway Traffic Management Systeem (HTMS), 140307152
Administrative block, Operation and Maintenance
of base camp..
Total amount 6070050097.095
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
BILL NO. 1
1. SITE CLEARANCE AND DISMANTLING
1.01 Clearing and grubbing road land complete including removal of hct. 295 26000 7670000
stumps and roots as per Technical Specifications Section 201.
1.02 Removal of stumps and roots left over after cutting of trees carried 0
by Forest Department for trees of girth above 300m including
necessary back filling of pits to required compaction as per
Specification Clause 201.
f) Kilometre / 5th km /Boundary Stone including foundation concrete if Nr. 79 123 9717
any.
g) Hectometer / Edge stone including foundation concrete if any. Nr. 312 25 7800
h) RCC Pipe 0
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
BILL NO. 1
1. SITE CLEARANCE AND DISMANTLING
1.05 Construction of temporary diversion(with 7.0 m carriageway and 2.5 m. 2,000 10000 20000000
m earthen shoulders on each side. Pavement thickness consist of 200
mm (compacted) GSB, 225 mm (compacted) granular base course
and Premix carpet with Seal Coat surfacing complete as per
Technical Specifications Section 112.
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
BILL NO. 2
2. EARTH WORK
Estimated Unit Rate (Rs.)
Item Description Unit Amount
Quantity In Figure In Words
2.01 Earthwork in excavation necessary for construction of roadway cu.m. 60,800 132 8025600
embankment in all types of soil except in marshy soil all complete
as per Technical Specifications Section 301.
2.02 Excavation in all types of soil in road shoulders, verge, median etc. cu.m. 20,987 132 2770223.5731472
for widening of carriageway / pavement all complete as per
Technical Specifications Section 301.
2.03 Construction of embankment with suitable material obtained from cu.m. 75 0
roadway, drainage excavation etc. with all leads and lifts all
complete as per drawings and Technical Specifications Section 305.
2.04 Construction of embankment for roadway with selected earth or cu.m. 1,806,498 240 433559487.6
flyash satisfying the requirements, with all leads and lifts,
compaction etc., all complete as per drawings and Technical
Specifications Section 305.
2.07 Turfing with sods of embankment slopes, earthen verge and other sq.m. 663,911 25.00 16597775
locations all complete as per Technical Specifications Section 307.
2.08 Laying, spreading and compaction of local screened sand in water cum. 0 300.00 0
logged location for construction of road embankment including all
leads and lift complete job as per Technical Specification Clause 305
and direction of engineer.
2.09 Loosening and recompacting ground below subgrade in all kinds of cum. 58,500 50.00 2925000
soil, if necessary, complete as per Technical Specification Clause
301 and 305.
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
BILL NO. 3
3. SUB BASE & BASE.
Estimated Unit Rate (Rs.)
Item Description Unit Amount
Quantity In Figure In Words
3.01 Construction of granular sub-base by providing graded stone
material, spreading in uniform layers with motor grader on prepared
surface, mixing by mix in place method with rotavator at OMC, and
compacting with vibratory roller to achieve the desired density,
complete as per Technical Specification clause 301.
(i) Grading- II Material for Coarse Graded GSB Drainage layer cu.m. 212,380 1,732 367842637.4691
(Table 400-2) for Road
(iii) Grading- I Material for Close Graded GSB Upper layer (Table cu.m. 212,380 1,632 346604609.9016
400-1)
3.02 Providing, laying, spreading and compacting graded stone cu.m. 260,209 1,811 471238557.8801
aggregate to wet mix macadam specification including premixing
the Material with water at OMC in mechanical mix plant carriage of
mixed Material by tipper to site, laying in uniform layers with paver
in base course on well prepared surface and compacting with
vibratory roller to achieve the desired density, complete as per
Technical Specification clause 406.
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
BILL NO. 4
4. BITUMINOUS AND CEMENT CONCRETE PAVEMENT COURSES
Estimated Unit Rate (Rs.)
Item Description Unit Amount
Quantity In Figure In Words
4.01 Providing and applying bituminous primer coat with bitumen sq.m. 991,477 27 26769866
emultion @ 9.0 kg / 10 sqm by using pressure distributor on prepared
surface of granular base including clearing of road surface with
mechanical broom / air compressure, complete as per Technical
Specifications Section 502.
4.02 Providing and applying tack coat with bitumen emultion by using 0
pressure distributor on prepared bituminous/ granular surface
cleaned with mechanical broom / air compressure, complete as per
Technical Specifications Section 503.
On granular and bituminous surface @ 2.0 kg/10 sq.m. sq.m. 4,225,881 13 54936447
4.03 Providing and laying dense graded bituminous macadam with 100- cu.m. 223,420 7917 1768818314.41751
120 TPH batch type HMP producing an average output of 75 tonnes
per hour using crushed aggregates of specified grading, premixed
with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix
and filler, transporting the hot mix to work site, laying with electronic
paver finisher with sensor control to the required grade, level and
alignment, rolling with smooth wheeled, vibratory and tandem rollers
to achieve the desired compaction, complete as per Technical
Specification clause No. 507.
4.04 Providing and laying bituminous concrete wearing course with 100-
120 TPH batch type hot mix plant producing an average output of 75
tonnes per hour using crushed aggregates of specified grading,
premixed with bituminous binder @ 5.0% to 6.0% of mix and filler,
transporting the hot mix to work site, laying with hydrostatic paver
finisher with sensor control to the required grade, level and
alignment, rolling with smooth wheeled, vibratory and tandem rollers
to achieve the desired compaction, complete as per Technical
Specification clause No. 509.
(i) for Grading-1(19 mm nominal aggregate size) cu.m. 71,237 9011 641918173.56235
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
BILL NO. 5
BILL NO.5 : CULVERTS.
Item Estimated Unit Rate (Rs.) Amount
Description Unit
No. Quantity In Figure In Words Rs
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
BILL NO. 6
6. BRIDGES.
Estimated Unit Rate (Rs.)
Item Description Unit Amount
Quantity In Figure In Words
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
BILL NO. 7
7. DRAINAGE AND PROTECTIVE WORK..
21028500
7.05 Providing and laying Pitching on slopes with stone boulders of cum 28038 600
approved size & weight laid over prepared filter media including
boulder apron laid dry in front of toe of embankment complete as per
drawing and Technical specifications clause 2504.
16822800
7.06 Construction of 300 mm wide drainage chute in cement concrete as metre 15081 634
per drawings and Technical Specificationss Sections 1500 and 1700
including construction of bell mouth at entry.
9555571
7.07 Construction of energy dissipation basin at toe of chutes in M-15 as each 422 3240
per drawing and Technical Specificationss Sections 1500 & 1700.
1365768
Amount carried over to summary 78592639
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
BILL NO. 8
8. TAFFIC SIGN, MARKING AND OTHER ROAD APPURTENANCES.
8.04 Providing and laying of Road Marking Paint 2.5 mm thick.The sqm 57201 654 37409447
finished surface to be level, uniform and free from streaks and
holes.
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
BILL NO. 8
8. TAFFIC SIGN, MARKING AND OTHER ROAD APPURTENANCES.
8.07 Providing and applying two coat ( in black and white alternative ) sqm 54302 51 2769382.80972
synthetic enamel paint on single coat cement primer over concrete
kerb surface.
8.08 Providing and fixing RCC boundary stone complete as per drawing each 1562 456 712272
and technical specification clause 806
8.09 Providing and laying precast concrete tiles 25mm in cm 1:6 for the sqm 8326 290 2414540
footpath on prepared bed (excluding the cost of bedding)
8.10 Providing and fixing of double faced metal beam (W-Beam) Crash 0
barrier including foundation as pex drawing and Technical
Specifications Section 810 or as directed by the Engineer, including
Terminal Anchorage
i) Double faced metal beam (W-Beam) Crash barrier Rm 28525 3500 99837500
ii) Single faced metal beam (W-Beam) Crash barrier Rm 10080 2760 27820800
8.12 Providing and fixing Pedestrian guard rail complete as per drawing Rm. 600 1000 600000
& Technical Specifications.
8.13 Providing passenger shelter (12 sqm area) in bus bay as per drawing each 6 60000 360000
or as per direction of Engineer.
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
BILL NO. 8
8. TAFFIC SIGN, MARKING AND OTHER ROAD APPURTENANCES.
(ii) For fixing in footpath.( Single armed ) No. 143 55000 7876000
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
BILL NO. 9
9. DOCUMENTATION
Estimated Unit Rate (Rs.)
Item Description Unit Amount
Quantity In Figure In Words
9.01 Supply of colour record photographs with negatives and two colour Nr. 1,000 100 100000
prints therefrom mounted in album as per Technical Specifications
Section 125.
9.02 Supply of additional prints of coloured photographs as per Nr. 500 75 37500
Technical Specifications Section 125.
9.03 Supply of set of colour video casette records / CDs during Set 12 10000 120000
construction including 4 copies as per Technical Specifications
Section 126.
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
BILL NO. 10
10. TOLL PLAZA AND RIGID PAVEMENT
Estimated Unit Rate (Rs.)
Item Description Unit Amount
Quantity In Figure In Words
10.01 Providing & Construction of Dry Lean Cement cum 6296 2745 17282928
Concrete Base of Grade M15 for cement concrete
pavement as per drawing, as directed by the
Engineer and as per Technical Specification Clause
601.
10.02 Construction of M40 grade cement concrete cum 12211 5435 66365224
pavement in Toll Plaza including and providing
polythene film as separation membrane. Providing
of contraction joint, exansion joint, longitudinal
joint, construction joint, joint sealing compound etc
complete
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
(i) Lateral Covered Drains before and after Toll Booth RM 180 6490 1168216
Island (RCC M 20) with CI Gratings (0.5m x 0.5m)
(ii) Covered RCC side drains below footpath with RM 1300 4455 5791579
RCPC gratings every 10 m at Toll Plaza area
10.05 Toll Plaza Illumination system
(i) High most lighting : (30 M high capable of Nos. 8 600000 4800000
providing 30 Lux : 4 mast fabricated from mild
steel cut and folded and fillet welded to form
telescopic polygonal section, hot dip galvanized
(ii) Light of roof shading (canopy) for both toll booth Nos. 120
(up to 100 Lux), 40 no. of 150 watt metal halide
lamps and 20 nos. of 1000 watt halogen lamps at
the nodes of space frame (40 KW) diesel generator
as standby
MBL to put rate
10.06 Guidance / Informatory sign
(i) Beginning and end of toll road sqm 112 10950 1226400
(ii) Signs depicting toll rates will pictorial depiction of sqm 36 10950 394200
various categories
10.07 General
(i) Toll office / Administrative building sqm 4200 44000 184800000
(ii) Toll Booth Nos. 13 300000 3900000
(iii) Fencing (MS railing) RM 1258 1000 1258000
(iv) W beam metal barrier for traffic island of toll booth RM 800 2800000
3500
(v) Concrete barrier for safety of traffic island and toll RM 100 165000
booth 1650
(vi) Concrete Footpath sqm 3145 550 1729750
(vii) Filling of Islands in Administrative Area cum 10500 300 3150000
(viii) Kerb & Gutter around the Toll Booth islands RM 2600 390 1014000
10.08 Construction of Service Tunnel
(i) Common Excavation for tunnel cum 4248 100 424800
(ii) PCC (M15) for levelling in box cum 159 4500 715500
(iii) Reinforced Concrete M25 for box cum 2349 6500 15268500
(iv) Reinforcement steel in service tunnel. . MT 141 52000 7332000
Amount carried over to summary 319586097
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
BILL NO. 11
11. HIGHWAY TRAFFIC MANAGEMENT SYSTEM (HTMS), ADMINISTRATIVE BLOCK, OPERATION AND MAINTENANCE OF
BASE CAMP & MISC. ITEM.
Estimated Unit Rate (Rs.)
Item Description Unit Amount
Quantity In Figure In Words
11.01 Highway Traffic management System (HTMS) Administrative,
Operation and Maintenance Base Camp
a) Emergency communication system (ECB)
Primary-42 Nos and Secondary-42 Nos Nos 84 MBL to put rate 0
b) Radio Mobile System MBL to put rate 0
Base Station-3 Nos, Vehicle Mounted-8 Nos,
Sets 1
MBL to put rate 0
Voice Logger-1, Main Console-1 Nos
c) CCTV surveillance system Nos 10 MBL to put rate 0
d) Automatic traffic counter cum classifier Nos 3 MBL to put rate 0
e) Variable message signs MBL to put rate 0
6 Nos LED Based Nos 16 MBL to put rate 0
f) Metrological data system MBL to put rate 0
CR 10X Measurement & Control Module,
Model 41372-02 RH element, Model 09101
Wind monitor SE, Model 41372 VC Rel.
Humidity/Temp. Probe, SVS1-E-2 Visibility Nos 1 0
Sensor, Model 44203 Temp Sensor, Model
70092 Solar radiation Sensor
MBL to put rate
g) Solar Power Nos 4 MBL to put rate 0
h) Emergency Service (Cranes+Ambulance+Fire Brigades) Sets 2 MBL to put rate 0
i) Backbone Communication (OFC) Km 84 MBL to put rate 0
11.02 Providing and maintaining new vehicles as project facilities
including providing driver, POL etc. 0
MBL to put rate
a) Non A/C Hard top jeeps ( 01 no.) vehicle- month 180 MBL to put rate 0
b) Ambulance (01 no.) vehicle- month 180 MBL to put rate 0
c) Vehicle rescue crane (01 no.) vehicle- month 180 MBL to put rate 0
11.03 Carrying out repairs to pot-holes and patching to existing sq.m. 26,723 594
bituminous carriageway surfacing as per Technical
Specifications Section 3004 as per the directions and orders of 15867152
the Engineer.
11.05 construction of building in rest area and medical aid post. sqm 4,075 30000 122250000
11.06 Providing passenger shelters for bus bays as per drawing & sqm 72 15000
Technical Specification section 600, 700, 2000, 2200, 2300 1080000
11.07 Planting plants and shrubs in rest area. no 550 200 110000
11.08 Coordinating with respective serice provider/ authorities for Lump sum 1 1000000
cutting of trees, shifting of utilities and removal of encroachment
etc. as per Technical Specification clause 110. 1000000
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
BILL NO. 11
11. HIGHWAY TRAFFIC MANAGEMENT SYSTEM (HTMS), ADMINISTRATIVE BLOCK, OPERATION AND MAINTENANCE OF
BASE CAMP & MISC. ITEM.
Estimated Unit Rate (Rs.)
Item Description Unit Amount
Quantity In Figure In Words
Amount carried over to summary 140307152.44
STUP 02/13/2018
Four-laning of Krishnanagar - Baharampore section of NH-34 from km 115.000 to Four-laning of Krishnanagar - Baharampore sectiion of NH-34 from km 115.000 to km 193.000 in the State of West
Bengal under NHDP Phase-III.
COST
INCR ESCALATED
ORDINARY REPAIR CONSIDERED
EASE COST IN 2010
IN 2000 ORDINARY REPAIR COST Rs.
110012/- Ref: ANNEX. XXIII-G
LABOUR 30803 56% 48053
OF REPORT OF THE
MATERIALS 72608 15% 83499 COMMITTEE ON NORMS FOR
MACHINERIES/FUEL 6601 48% 9769 MAINTENANCE OF ROADS
IN INDIA
COST PER KM. 141321
COST COST
INCR
PERIODICAL REPAIR CONSIDERED CONSIDERED
EASE PERIODICAL REPAIR COST
IN 2000 IN 2010
Rs. 442024/- Ref: ANNEX.
LABOUR 22101 56% 34478 XXIII-G OF REPORT OF THE
MATERIALS 309417 15% 355829 COMMITTEE ON NORMS FOR
MAINTENANCE OF ROADS
MACHINERIES/FUEL 110506 48% 163549 IN INDIA
CONSIDERED
STRENGTHENING IN 1365000 SQM 980 1337993475 89199565 26 594 360 980
10 TH YEAR
KRISHNANAGA
R-
BERHAMPORE FOUR-LANE WITH
(115.00 KM- DIVIDED 78.00 KM 1.7 18739220 73441315 89199565 181380100 2325386
193.00 KM OF CARRIAGE WAY WITH
PAVED
NH-34) SHOULDER
FACTOR**AS PER CONVERSION FACTORS OF PARA 6.10 OF CHAPTER NO.6 OF REPORT OF THE COMMITTEE ON NORMS FOR MAINTENANCE OF ROADS IN INDIA
STUP 02/13/2018