Sunteți pe pagina 1din 10

S R Ranasinghe,

71 /63, 2nd Lane,


Heerassagala Road,
Kandy,
Sri Lanka.
18th September, 2015.

Dear Sir,

Application For the Post Of Construction Manager

I start my career in the National Water Supply & Drainage Board as a technical Officer in 1975 and retired
as a chief engineer in 2010. During this period construction of large scale water supply projects as well
as pipe laying of all types in all diameters were done. I have experience in direct supervision as well as
supervise monitor and manage contractors.

I have worked with foreign construction company called Kampsax Krruger in 1984 to 1987 in Matale
Plonnaruwa Water Supply Project, in 2004 as a Chief Engineer (Construction) in Eastern Province
handling construction activities in Ampara and Baticoloa Districts. In 2007 as a Chief Engineer in the
Nuwaraeliya District Water Supply Project, and finally retired as a Chief Engineer in charge of the
Development section in the RSC Central National Water Supply & Drainage Board Peradeniya.

I am a corporate member in the Institution of Incorporated Engineers of Sri Lanka, and a graduate
member in civil engineering of the City & Guilds of (UK).

After my retirement I worked as a civil engineer on a short term assignment preparing base line study on
water supply & sanitation in tea estates with a consultancy firm called “Environment Management Lanka
(EML)” for the World Bank. Thereafter as the Project Manager, Squire Mech Engineering (Pvt) Ltd,
Trincomalee Integrated Water Supply Project, Kantale. Thereafter as civil engineer for Kolon Global
Corporation, in charge of the construction of water treatment plant for Ruhunupura Water Supply Project
in Ambalantota. Then as a Training Specialist for Greentec Consultants for Jaffna Kilinochchi Water
Supply Project, thereafter as the local civil manager in charge of the Puttlam Water Supply Project for
Kolon Global Corporation and at present as a Resident Engineer Grntmij Consultants, Distribution
Network 1, Jaffna Kilinochchi Water Supply Project .

Thank You,

Eng. S R Ranasinghe.
I.Eng. MIIE(SL). GCGI (UK)
Curriculum Vitae

Full Name :- Sirilal Rohana Ranasinghe.

Date of Birth :- 5th April 1955

NIC No. :- 550961431V

Age :- 60 Years

Civil Status :- Married

Private Address :- 71/63, 2nd Lane, Heerassagala Road, Kandy.


Sri Lanka

Contact No :- Res :- 09481 –2205630


Mobile Phone :- 0772240500,
Email : srilal_rr@yahoo.com

Previous Employer: - Project Manager, Kolon Global Corporation, Chilaw Puttlam Water
Supply Project, Chilaw.

Designation :- Construction Coordinator

Official
Address :- Kolon Global Corporation,
Chilaw Puttlam Water Supply Project,
Jetty Street,
Chilaw.

Present Employer :- GRONMIJ Consultants,


Jaffna Kilinochchi Water Supply Project,
124, 1St Cross Street,
Jaffna.

Designation ;- Local Civil Manager, Puttlam Water Supply Project

Computer Literacy :- Familiar with, Micro soft Office


MS Project
Autocad

Present Duties :- Monitor daily work programs and progress of work sites
Provide Technical Advice
Check Method Statements
Check and Approve Construction Materials
Hold Progress Review Meetings

2
Qualifications :-

 Government Technical Officers Examination (Civil) 1&2

 Graduate Member (Civil Engineering) City & Guilds GCGI (UK)

 Incorporated Engineer (Institute of Incorporated Engineers of Sri Lanka) MIIE (SL)

 Diploma in Management (Open University of Sri Lanka)

 Certificate in water & Sanitation in Emergencies (University of Copenhagen, Denmark.)

 Diploma in Computer Studies (IDM)

 Certificate in Construction Management (Centre for Housing Planning and Building) in Sri Lanka

 Certificate in Management (Institute of Engineers Sri Lanka)

Experience :- 40 years
(20 years as an Engineer, 20 years as a Technical Officer,)
 May 27th 2015 to date, Resident Engineer, Distribution Network 1, Jaffna Kilinochchi Water
Supply Project,
Monitor Program and Progress of Work
Check and approve Method Statements
Provide Technical Advice
Hold Progress Review Meetings

 December 2014 to 20th May 2015, Local Civil Manager Chilaw &Puttlam Water Supply
Project, Kolon Global Corporation,
Construction of Water Treatment Plants at Chilaw & Puttlam
Monitor daily work programs with the Master program and adjust as necessary.
Follow-up material requirement, approval and supply
Monitor manpower & Machinery required and available and change activities accordingly

 May 2014 to December 2014, Engineer, in charge water treatment plant Puttlam, Chilaw &
Puttlam Water Supply Project.
Construction of Water Treatment Plant 9000 m3
Construction of Manager’s Office 3 Storied Building
Ground Reservoir 3000m3 in the existing water treatment plant
Ground Reservoir 1100m3 at Kalladiya

 August 2013 to April 2014, Training Specialist Jaffna Kilinochchi Water Supply Project
Assess training need
Design Training programs to enhance performance NWSDB Employees

3
 June 2012 to August 2013, Engineer In Charge, Kolon Global Corporation, Water
Treatment Plant Ruhunupura Water Supply Project.
Construction of 35000m3 Water Treatment Plant with Dissolve air flotation unit,
GAC Filter , 3000 m3 clear water tank
with the conventional treatment components.

 April 28 2011 to June 2012, Project Manager , Squire Mech Engineering (Pvt) Ltd, Greater
Trincomalee Integrated Water Supply Project, Kantale .

Construction of river intake and pump house at Mahaweli Ganga, Alla Kantale.

Augmentation of intake pump house at Kantale Lake.

Augmentation of Inlet arrangement, Chlorinator room, and the reservoirs at

Samplethivu, Wellamannal and Andankulam.

Working with minimum resources to achieve organizational goals.

 Water Supply Engineer, Environment Management Lanka


Data collection and preparation of reports of water supply & sanitation service level in the
selected 3 tea estates in Nuwara Eliya District.

 January 2008 - to April 2010 Chief Engineer (Development)


Regional Support Centre (Central), National Water Supply & Drainage Board Gatembe -
Peradeniya. Sri Lanka.

Responsible for supplying potable water for the rural Community with appropriate technology.

Preparation Project Identification Reports for rural / community water supply projects.

Promote rain water harvesting as an optional water resource and as means of water conservation
especially for urban community.

Prepare Standard Operation Procedures for Water Supply Schemes and Sewerage Schemes.
Prepare Skill Development Training programmes and Job Descriptions for water board
employees with the assistance of NEERAS.

Prepare, Organize, and Conduct awareness programmes and training programmes for school
and adults on Catchments protection, Water Treatment, Water Conservation,

Provide Technical Assistance in water supply and sanitation to Rural Governing bodies.

Protect and Develop Watershed in Catchments of the Intakes of water supply projects with the
assistance of the relevant Divisional Secretaries and the stake holders.

Provide tube wells for rural communities as a water source and assist in maintenance the same
with community participation.

Prepare, Organize and Conduct awareness and training programmes for water board employees
(Technical Officers and Skill grades) on water treatment, reduction of non revenue water,
Operation and maintenance of Water / sewerage treatment plants, Pipe laying, Providing service
connections, Operation and Maintenance of water distribution systems, Public relations,
Customer care.

4
 April 2007 - January 2008

Chief Engineer: (Construction) NuwaraEliya District Group Water Supply Project (Funded
by DANIDA), Project Director’s Office, National Water Supply & Drainage Board, Seibel
Place Kandy. Sri Lanka.

Supervision, monitor progress of construction of intake structures, water treatment plants,


reservoirs and lying of pipes (Gravity mains, Pumping mains and the distribution systems).

Contract management of urban water supply projects, funded by DANIDA under the Nuwaraeliya
District Group Water Supply Project.

Protect and Develop Watershed in Catchments of the Intakes and organize watershed
conservation committees.

Organize District level and Divisional level Watershed Management committees inclusive of
stake holders to protect and develop watershed in catchments.

 November 2004 - April 2007

Chief Engineer Construction Eastern Province,


Assistant General Manager’s Office, National water Supply & Drainage Board.Ampara. Sri
Lanka:

Organize emergency water supply and sanitation facilities to tsunami affected areas with the
assistance of the INGoo.

Monitor water supply projects under construction in tsunami affected areas.

Co- chairperson of water and Sanitation, in Ampara District, Eastern Province (Watson,
International NGOo)

Rein statement of 3 tier tube well maintenance system.

Organizing community base water supply projects in the area.

Contract Management of all construction water supply Projects in the Eastern Province.

Assist manager (O&M) in rehabilitation of distribution systems by analysis of water distribution


with computer software, Zoning the distribution systems and introduce new valves where
required, Identify and replace valves in malfunctioning status, Replace bundle service
connections with suitable pipes, Identify and relay the under depth pipes,

 June 2001 – November 2004

Senior Engineer Planning, Regional Support centre Central & Sabaragamuwa, National
Water Supply & Drainage Board, Peradeniya, Sri Lanka.:

Participate in planning of Kandy South Water Supply Project, Nuwaraeliya District Group Small
Towns Water Supply Project and Greater Matale Water Supply Project.

Participate in preparation of sector plan reports for Kandy, NuwaraEliya and Matale Districts.
5
Data collection of existing water demand, available potential water resources, gauging of water
sources, available water supply arrangement, mapping all the data with GIS software,
Preparation of conceptual designs of the treatment plant, preparation of forecasts and estimates
with the WACOSIS software, analysis of pipe lines with computer software, preparation project
identification reports of supply schemes

 June 1998 – June 2001

Engineer Planning, Greater Kandy water Supply Project, National Water Supply &
Drainage Board, Peradeniya Sri Lanka.:

Participate in planning of Greater Kandy Water Supply Project, and collection of data for Kandy
town sewerage project.

Data collection of existing water demand, available potential water resources, gauging of water
sources, available water supply arrangement, mapping all the data, preparation of forecasts and
estimates, analysis of pipe lines , preparation project identification reports of supply schemes.
Preparation of water tariff for proposed water supply project.

 June 1993 – June 1998

Engineer (Training), Regional Support Centre (Central), National Water Supply & Drainage
Board, Peradeniya Sri Lanka.:

Design and conduct training programs for Technical Officers on

1. Operation and Maintenance of water treatment plants.

2. Operation and maintenance of water distribution systems.

3. Analysis of water distribution systems.

4. Preventive maintenance of water supply schemes

5. Reduction of NRW in water supply schemes.

6. Operation and Maintenance of Hand Pump Tube wells.

7. Construction ferrocemnet water storage tanks

 1973 June - June 1993

Technical Officer, in the National Water Supply and Drainage Board, as an Officer in
charge of water supply projects and multi storied buildings.

 1990 June - !993 June


Engineering Assistant (Special Grade)
Coordination of internal and external works with the Regional manager.

 1983 June – 1990 June


Engineering Assistant (Grade 1)
6
Coordination of Operation and maintenance work with the Regional Manager.

 1977 June - !983 June


Engineering Assistant (Grade11)
Officer in Charge of Operation & Maintenance of WSS.

 1975 June - !977 June


Technical Assistant (Grade 1V)
Officer in Charge of construction water Supply Projects and multi storied building.
Supervision of Construction work, taking off quantities, Checking bills, Preparation BOQ.

 1973 June – 1975 June


Supervising Overseer
Supervision of construction works in water supply schemes.

Eng. S R Ranasinghe I.Eng.


MIIE(SL), GCGI (UK)

Unrelated Referees; 1. Eng. N.E.M.S.B. Ekanayake


Deputy General Manager
National Water Supply & Drainage Board
Regional Support Centre
Kurunegala
Mobile - 0772017800

2. Eng. Mrs.W. llangasinghe


Project Director,
Kandy Sewerage Project.
National Water Supply and Drainage Board
Peradeniya’
Mobile - 077-3404140
Fax - 081-2385745

7
Annex -1
Government Technical Officers Examination conducted by the Department of Examination of Sri
Lanka.

1st Examination !975

Subject No. Subject Name Examination No. Year Grade

01 Mathematics 1204 1973 Pass


02 Geometry 1204 1973 Pass
03 Taking off Quantities 1204 1973 Pass
04 Drawing & Tracing 1204 1973 Pass
05 Building Construction
& Maintenance 1204 1973 Pass
06 Surveying & Leveling 1204 1973 Pass
07 Water Supply &
Drainage J357 1975 Pass

2nd Examination !980

Subject No. Subject Name Examination No. Year Grade


14 Trigonometry B117 1977 Pass
16 Surveying & Leveling B117 1977 Pass
17 Draughtsman ship B117 1977 Pass
18 Building Construction B117 1977 Pass
21 Water Supply
& Drainage B117 1977 Pass
33 Work Organization B0011 1978 Pass
22 Taking off Quantities 733 1980 Pass

3rd Examination

Subject Subject Name Examination Year Grade


No. No.

46 Building Quantity Surveying &


Estimating of Building C43 1982 Pass
47 Architectural Drawing C43 1982 Pass
48 Surveying & Leveling C43 1982 Pass

Graduateship award in Civil Engineering Technology City & Guilds (UK) - GCGI (UK)

This compares to an award at level 6 on the National qualifications framework.


Awarded October 2007 0710/844081 / 910347 / SWB5851/ 1 / 05/ 04/55

Institution of Incorporated Engineers Sri Lanka, Class of Member Engr. MIIE(SL)

This certifies that the holder of this certificate having duly satisfied the Council of his Engineering
Education and Professional Competence has been admitted to the class of Member.

Membership No. 1122, 18th January 2000


(Established in 1977, incorporated by an act of Parliament of Democratic Republic of Sri Lanka)
Diploma In Management (Open University Of Sri Lanka) 21st April 2007
8
(3 year part time)

Course Code Title Overall Grade

MCD1201 Process of Management 1 PD


MCD 2203 Project Report PD
MCD2204 Production Management &
Elementary Quantitative Techniques PC
MCD2205 Export Marketing PD
MCD2301 Process of Management 11 PD
MCD2302 Accounts & Finance for Managers PD

Certificate in “Water & Sanitation in Emergencies” (University of Copenhagen)


6 weeks full time (2006 May)

Specific Objectives
- Key actors of Emergencies, their roles & Responsibilities

- The importance of socio-cultural perceptions & political aspects for water & sanitation intervention
in emergencies

- Key concepts & main issues of environmental health in emergencies with a focus on water related
and vector born dieses

- Methods of dieses surveillance and control with a focus on diarrheal dieses

- Appropriate solutions for water & sanitation interventions based on environmental hygiene
principles and methods

- Principles of sustainable & socio culturally acceptable water and sanitation programs

- Main constraints and solutions for refugee camp planning and management

Diploma in Computer Studies IDM


(1 year Part time) 1997

Course Unit Examination Date Grade

Basic Computer Principles 29 /07/90 B


Programming Technology 22/07/90 A+
Pascal Language 10/09/90 A
dBase 111+ Assist & Programming 20/11/90 B+
Programming Project Work 16/09/90 A
Basic Computer Principles 08/12/90 A

9
Construction Management - Centre for Housing Planning & Building
(2 months-Full-time) November 1986

General Topics : Role of the construction industry in the national economy, Structure o the
construction industry, Contract procedure.

Management : Personnel Management, Management Techniques, Stores Management, Site


Management, Site Organization, Principle of work study.

Planning : Construction Planning, Net work Analysis, Serial Production Techniques,


Resource Planning, Financial Planning, Resource Scheduling.

Control : Management Information System, Progress Control, Cost Control, Book


Keeping at site, Contract Accounting,

Management Development for Engineers – Institute of


Engineers, Sri Lanka.

(5 months part time) March 2002

 Fundamentals of Organization, Effective communication and public relations, Effective decision


making, Organizational Behavior,

 Introduction to Financial Accounting, Accounting techniques for decision making, interpreting


financial statements, Cash Flow,
.
 Administration of engineering contracts, Law of contracts,

 Effective time management, Human Resource management

Masters Degree in Business Administration (University of Wayamba) (3 Years) Post


Graduate Diploma in Business Management -2010

Code Subject Grade


PG1122 Management & Organization theory B
PG1122 Business Statistics C Referred
PG1132 Business Economics E Referred
PG1142 Business Law E Referred
PG1212 Human Resource Management B
PG1222 Production & Operations Management B
PG1232 Marketing Management B
PG1242 Financial Management B
PG1312 Organizational Behavior E Referred
PG1322 Management Information Systems C
PG1332 Professional Skill Management B
PG1342 Project Report B

10