Documente Academic
Documente Profesional
Documente Cultură
Dear Sir,
I start my career in the National Water Supply & Drainage Board as a technical Officer in 1975 and retired
as a chief engineer in 2010. During this period construction of large scale water supply projects as well
as pipe laying of all types in all diameters were done. I have experience in direct supervision as well as
supervise monitor and manage contractors.
I have worked with foreign construction company called Kampsax Krruger in 1984 to 1987 in Matale
Plonnaruwa Water Supply Project, in 2004 as a Chief Engineer (Construction) in Eastern Province
handling construction activities in Ampara and Baticoloa Districts. In 2007 as a Chief Engineer in the
Nuwaraeliya District Water Supply Project, and finally retired as a Chief Engineer in charge of the
Development section in the RSC Central National Water Supply & Drainage Board Peradeniya.
I am a corporate member in the Institution of Incorporated Engineers of Sri Lanka, and a graduate
member in civil engineering of the City & Guilds of (UK).
After my retirement I worked as a civil engineer on a short term assignment preparing base line study on
water supply & sanitation in tea estates with a consultancy firm called “Environment Management Lanka
(EML)” for the World Bank. Thereafter as the Project Manager, Squire Mech Engineering (Pvt) Ltd,
Trincomalee Integrated Water Supply Project, Kantale. Thereafter as civil engineer for Kolon Global
Corporation, in charge of the construction of water treatment plant for Ruhunupura Water Supply Project
in Ambalantota. Then as a Training Specialist for Greentec Consultants for Jaffna Kilinochchi Water
Supply Project, thereafter as the local civil manager in charge of the Puttlam Water Supply Project for
Kolon Global Corporation and at present as a Resident Engineer Grntmij Consultants, Distribution
Network 1, Jaffna Kilinochchi Water Supply Project .
Thank You,
Eng. S R Ranasinghe.
I.Eng. MIIE(SL). GCGI (UK)
Curriculum Vitae
Age :- 60 Years
Previous Employer: - Project Manager, Kolon Global Corporation, Chilaw Puttlam Water
Supply Project, Chilaw.
Official
Address :- Kolon Global Corporation,
Chilaw Puttlam Water Supply Project,
Jetty Street,
Chilaw.
Present Duties :- Monitor daily work programs and progress of work sites
Provide Technical Advice
Check Method Statements
Check and Approve Construction Materials
Hold Progress Review Meetings
2
Qualifications :-
Certificate in Construction Management (Centre for Housing Planning and Building) in Sri Lanka
Experience :- 40 years
(20 years as an Engineer, 20 years as a Technical Officer,)
May 27th 2015 to date, Resident Engineer, Distribution Network 1, Jaffna Kilinochchi Water
Supply Project,
Monitor Program and Progress of Work
Check and approve Method Statements
Provide Technical Advice
Hold Progress Review Meetings
December 2014 to 20th May 2015, Local Civil Manager Chilaw &Puttlam Water Supply
Project, Kolon Global Corporation,
Construction of Water Treatment Plants at Chilaw & Puttlam
Monitor daily work programs with the Master program and adjust as necessary.
Follow-up material requirement, approval and supply
Monitor manpower & Machinery required and available and change activities accordingly
May 2014 to December 2014, Engineer, in charge water treatment plant Puttlam, Chilaw &
Puttlam Water Supply Project.
Construction of Water Treatment Plant 9000 m3
Construction of Manager’s Office 3 Storied Building
Ground Reservoir 3000m3 in the existing water treatment plant
Ground Reservoir 1100m3 at Kalladiya
August 2013 to April 2014, Training Specialist Jaffna Kilinochchi Water Supply Project
Assess training need
Design Training programs to enhance performance NWSDB Employees
3
June 2012 to August 2013, Engineer In Charge, Kolon Global Corporation, Water
Treatment Plant Ruhunupura Water Supply Project.
Construction of 35000m3 Water Treatment Plant with Dissolve air flotation unit,
GAC Filter , 3000 m3 clear water tank
with the conventional treatment components.
April 28 2011 to June 2012, Project Manager , Squire Mech Engineering (Pvt) Ltd, Greater
Trincomalee Integrated Water Supply Project, Kantale .
Construction of river intake and pump house at Mahaweli Ganga, Alla Kantale.
Responsible for supplying potable water for the rural Community with appropriate technology.
Preparation Project Identification Reports for rural / community water supply projects.
Promote rain water harvesting as an optional water resource and as means of water conservation
especially for urban community.
Prepare Standard Operation Procedures for Water Supply Schemes and Sewerage Schemes.
Prepare Skill Development Training programmes and Job Descriptions for water board
employees with the assistance of NEERAS.
Prepare, Organize, and Conduct awareness programmes and training programmes for school
and adults on Catchments protection, Water Treatment, Water Conservation,
Provide Technical Assistance in water supply and sanitation to Rural Governing bodies.
Protect and Develop Watershed in Catchments of the Intakes of water supply projects with the
assistance of the relevant Divisional Secretaries and the stake holders.
Provide tube wells for rural communities as a water source and assist in maintenance the same
with community participation.
Prepare, Organize and Conduct awareness and training programmes for water board employees
(Technical Officers and Skill grades) on water treatment, reduction of non revenue water,
Operation and maintenance of Water / sewerage treatment plants, Pipe laying, Providing service
connections, Operation and Maintenance of water distribution systems, Public relations,
Customer care.
4
April 2007 - January 2008
Chief Engineer: (Construction) NuwaraEliya District Group Water Supply Project (Funded
by DANIDA), Project Director’s Office, National Water Supply & Drainage Board, Seibel
Place Kandy. Sri Lanka.
Contract management of urban water supply projects, funded by DANIDA under the Nuwaraeliya
District Group Water Supply Project.
Protect and Develop Watershed in Catchments of the Intakes and organize watershed
conservation committees.
Organize District level and Divisional level Watershed Management committees inclusive of
stake holders to protect and develop watershed in catchments.
Organize emergency water supply and sanitation facilities to tsunami affected areas with the
assistance of the INGoo.
Co- chairperson of water and Sanitation, in Ampara District, Eastern Province (Watson,
International NGOo)
Contract Management of all construction water supply Projects in the Eastern Province.
Senior Engineer Planning, Regional Support centre Central & Sabaragamuwa, National
Water Supply & Drainage Board, Peradeniya, Sri Lanka.:
Participate in planning of Kandy South Water Supply Project, Nuwaraeliya District Group Small
Towns Water Supply Project and Greater Matale Water Supply Project.
Participate in preparation of sector plan reports for Kandy, NuwaraEliya and Matale Districts.
5
Data collection of existing water demand, available potential water resources, gauging of water
sources, available water supply arrangement, mapping all the data with GIS software,
Preparation of conceptual designs of the treatment plant, preparation of forecasts and estimates
with the WACOSIS software, analysis of pipe lines with computer software, preparation project
identification reports of supply schemes
Engineer Planning, Greater Kandy water Supply Project, National Water Supply &
Drainage Board, Peradeniya Sri Lanka.:
Participate in planning of Greater Kandy Water Supply Project, and collection of data for Kandy
town sewerage project.
Data collection of existing water demand, available potential water resources, gauging of water
sources, available water supply arrangement, mapping all the data, preparation of forecasts and
estimates, analysis of pipe lines , preparation project identification reports of supply schemes.
Preparation of water tariff for proposed water supply project.
Engineer (Training), Regional Support Centre (Central), National Water Supply & Drainage
Board, Peradeniya Sri Lanka.:
Technical Officer, in the National Water Supply and Drainage Board, as an Officer in
charge of water supply projects and multi storied buildings.
7
Annex -1
Government Technical Officers Examination conducted by the Department of Examination of Sri
Lanka.
3rd Examination
Graduateship award in Civil Engineering Technology City & Guilds (UK) - GCGI (UK)
This certifies that the holder of this certificate having duly satisfied the Council of his Engineering
Education and Professional Competence has been admitted to the class of Member.
Specific Objectives
- Key actors of Emergencies, their roles & Responsibilities
- The importance of socio-cultural perceptions & political aspects for water & sanitation intervention
in emergencies
- Key concepts & main issues of environmental health in emergencies with a focus on water related
and vector born dieses
- Appropriate solutions for water & sanitation interventions based on environmental hygiene
principles and methods
- Principles of sustainable & socio culturally acceptable water and sanitation programs
- Main constraints and solutions for refugee camp planning and management
9
Construction Management - Centre for Housing Planning & Building
(2 months-Full-time) November 1986
General Topics : Role of the construction industry in the national economy, Structure o the
construction industry, Contract procedure.
10