VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C 18.63 18.362 17 107 Nil 107 30.0 86.0 44.6 0.98703 105 0.263 105 0.12544
2C 17.67 17.412 157 986 Nil 986 28.7 83.7 44.6 0.98818 974 2.436 972 0.12544
3C 14.68 14.449 1,363 8,571 Nil 8,571 29.2 84.6 44.6 0.98773 8,466 21.165 8,445 0.12544
4C 18.10 17.851 21 135 Nil 135 30.0 86.0 44.6 0.98703 133 0.332 132 0.12544
5C 18.15 17.903 13 84 Nil 84 30.0 86.0 44.6 0.98703 83 0.208 83 0.12544
6C 6.63 6.405 4,647 29,227 18.140 17.891 6.875 43 29,183 30.0 86.0 44.6 0.98703 28,805 72.01 28,733 0.12544
7C 12.69 12.461 2,170 13,648 Nil 13,648 29.6 85.3 44.6 0.98738 13,476 33.689 13,442 0.12544
8C 13.85 13.622 1,505 9,468 Nil 9,468 29.6 85.3 44.6 0.98738 9,349 23.372 9,325 0.12544
SL.P 18.49 18.215 0 2 Nil 2 28.8 83.8 44.6 0.98813 2 0.005 2 0.12544
SL.S 11.20 10.911 231 1,455 15.920 15.631 80.54 507 949 29.6 85.3 44.6 0.98738 937 2.342 934 0.12544
TOTAL
TOTAL 10,125 63,683 87 550 63,134 62,330 62,174
REMARKS: 987 43 944 931 930

PRODUCTION LOADING IN TO 6C

Gross Volume :(T.O.V.) 63,683 Oil Volume @ 60 F :(N.S.V.) 62,174 DRAFT FWD 6.30 m AFT
Less Free Water : 550 Less OBQ/ROB :
Oil Volume :(G.O.V.) 63,134 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 62,330 Long tons/Metric tons :
Long Tons/Metric Tons : 7,819 7,944 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.20 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 1-Feb-17

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

13.199 0.12745 13.411


122 0.12745 124.181
1,061.979 0.12745 1078.995
16.656 0.12745 16.923
10.437 0.12745 10.604
3,613.285 0.12745 3671.182
1,690.379 0.12745 1717.465
1,172.708 0.12745 1191.499
0.250 0.12745 0.254
117.515 0.12745 119.398

7,819 7,944

9.30 m TRIM 3.00 m


LIST NIL

Capt. Ihwan Asrul


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 1-Feb-17 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Ihwan Asrul Santos Rep. Capt. Saiful Bahri

Crude Storage Lifting

24 Hours Total (bbls) 987 Last Lifting 19-Dec

BS and W % 0.20 Lifting Vol (bbls) 141,46

Storage Gross (bbls) Next Lifting


63,134 -

Storage Net / G.S.V (Nbbls) 62,330 Next Lifting Vol (bbls) -

Storage Net / N.S.V (Nbbls) 62,174

Days to Tank Tops 262 Vessel ETA -

Total Crude This Month (Nbbls) 62,330

Water Offtake

Water Received 24hrs (bbls) 43 Offtake 24 Hours (bbls) -

Total Water in Cargo (bbls) 550 Note :

Total P/W Received (bbls) 85,478

Water Drawn off (bbls) 0 Loading/Incoming Temp 42.0

Specific Gravity 0 Storage tanks's temperature 30.0

PFW PH 0
Note: : PRODUCTION LOADING INTO COT 6C
OIW Average (mg/I) 10

OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0.00 0

Non Metal Waste 0.00 0

Metal Waste 0.00 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0.00 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0

Note :
OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 228,862 ### 83,108 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 0 1,310

Closing (m3) 228,862 81,798 0

Supply Remaining (days)

Remarks :

Meetings

Type Time Comment

1. Review previous day activity


2. Crew changed
3. Check and maintenance fire hose box equipment
4. Lifting materials
5. Final coating main deck, etc at COT 7C
6. House keeping in accommodation
Tool box meeting 06.30
7. Maintenance aux boiler
8. Repair wastafel pipe in engine room
9. Maintenance A/E No.2

1. Review deck, engine and galley dept. activity


2. Check and maintenance portable fire extinguisher
3. Maintenance main deck, etc at COT 7C to 8C
Supervisory Meeting 16.30

Incidents

Type Reference Comments


NIL
Drills
Type Time Comment

S.T.O.P. Audit program

Observation Card Report : 20


The details see SPKK sheet *)
###
Capt. Saiful Bahri

19-Dec-16

141,460

deg C

deg C

TO COT 6C

28767 / 62175
e Vessel

Comment

box equipment

T 7C

pt. activity
re extinguisher
T 7C to 8C
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C

Mooring/Unmooring :
NIL

Bunkering/Debunkering :
NIL

Personnel & Material Transfer :


05.30: 2 Persons Spektra, 2 Persons Mafhindo, 1 Person Nalco, 15 Persons Pkp by. KST.51 ( Out )
07.50: Materials santos by. KST.51 ( In )
08.00: 1 Person Santos Rep by. KST.51 ( Out )
10.15: 1 Person SKK Migas, 2 Persons Spj by. Cb. Adventurer 1 ( Out )
13.00: 3 Persons Spj by. Cb. Adventurer 1 ( In )
16.45: 1 Person Mafhindo, 2 Persons Spektra, 15 Persons Pkp by. KST.51 ( In )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist Transferred Santos Rep, SKK Migas, Spj and Contractor Personnel
2. Crew changed
3. Checked and maintenance fire hose box equipment
4. Lifted materials
5. Final coating main deck, etc at COT 7C

ENGINE :
1. Repaired by welding the sunrod pipe for aux boiler
2. Cleaned of drain pipe wastafel in engine room workshop
3. Cleaned of alternator and renewed air filter A/E No.2
4. Running up A/E No.1 & 3 :
07.00 - 08.00: - Lifted materials Santos from KST.51

2. PERMIT TO WORK PW MW HW CSE IP VAL


446 1714 375 173 7 971
2.1 J HA 446 1714 375 173 5 971
3. BUNKERS(M3) CONS RCVD
M.F.O 0 0
M.D.O 1,310 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 0 0 0 0
DOM 10 0 0 27
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
21 24
MAN HOURS ( POB X 12 HRS )
Previous man hours 217788 Days W/O LTI 1161 Since 28-Nov-13
Man hours today 252
Total man hours 218040
Safe man hours 218040
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings `
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


01-Feb-17 @2400 HRS

TOTAL
3686
3684
TRANS ROB
0 228,862
0 81,798
ROB `
64
156
ROB
200
POB
39

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1658 2 1660
2245 20 2265
3 0 3
0 0 0
79 5 84

NIL

NIL

NIL

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Feb-17

MDO

Opening A/E A/E A/E Closing


Receive Transfer Cons. Adj.
Date Balance No.1 No.2 No.3 Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) (Hrs) (Hrs) (Hrs) ( Ltr )
01 83,108 0 0 1,310 0 1.0 0.0 24.0 81,798
NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Feb-17

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 228,862 0 0 0 0 228,862
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 12 14
2 13
3 11
4 12
5 12
6 14
7 13
8 12
9 13
10 13
11 14
12 12
13 13
14 11
15 13
16 14
17 12
18 13
19 11
20 12
21 12
22 13
23 12
24 14
25 12
26 12
27 14
28 14
29 13
30 14
31 13

TOTAL 393 14 0 0 0 0 0 0 0 0 0 0
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 8 7
2 7
3 7
4 8
5 8
6 7
7 8
8 8
9 8
10 7
11 8
12 7
13 7
14 8
15 8
16 8
17 8
18 7
19 7
20 8
21 8
22 8
23 7
24 8
25 8
26 7
27 7
28 8
29 8
30 8
31 8

TOTAL 237 7 0 0 0 0 0 0 0 0 0 0
LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,964 4,970
2 4,951
3 4,971
4 4,954
5 4,980
6 4,969
7 4,972
8 4,957
9 4,960
10 4,987
11 4,991
12 4,984
13 4,966
14 4,958
15 4,963
16 4,974
17 4,988
18 4,964
19 4,978
20 4,971
21 4,973
22 4,970
23 4,966
24 4,960
25 4,969
26 4,972
27 4,974
28 4,975
29 4,970
30 4,973
31 4,978

TOTAL 154,082 4,970 0 0 0 0 0 0 0 0 0 0

Average/
Day 4,970 178 0 0 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity R.O Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 80 135
2 70
3 135
4 80
5 120
6 125
7 130
8 60
9 40
10 110
11 100
12 105
13 100
14 55
15 85
16 90
17 90
18 95
19 55
20 75
21 90
22 80
23 80
24 80
25 95
26 150
27 110
28 150
29 125
30 140
31 90

TOTAL 2,990 135 0 0 0 0 0 0 0 0 0 0


DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : Feb 2017

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Feb-2017 21 0 18 39

TOTAL 21 0 18 39
SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 1/Feb/17
Positive /
Reported by Rank Location Description Action/Comment Negative Total
Crew mess
1 IHWAN ASRUL Master room
Advice to Duty Officer for lifting materials Done Positive 1

Supervise maintenance main deck, etc at COT


2 DENNY DAVID PAULUS C/O Main deck
7C
Done Positive 1

Induction EHS Safety and security induction to New Crew


3 CENG UMAR 2/O room on board
Done Positive 1

Checked and maintenance fire hose box


4 IHSANUDIN 3/O On deck
equipment
Done Positive 1

Supervise repaired by welding the sunrod pipe


5 JULY MANGIRI C/E Engine room
for aux boiler
Done Positive 1

Supervise repaired by welding the sunrod pipe


6 MARTHEN KAMMA C/E Engine room
for aux boiler
Done Positive 1

7 AGUNG RISTIANTO 2/E Engine room Supervise maintenance A/E No.2 Done Positive 1

8 IRVAN TAHIR 3/E Engine room Maintenance A/E No.2 Done Positive 1

9 HENDRA PRATAMA 4/E Engine room Maintenance aux boiler Done Positive 1

10 SURYADINATA E/E Engine room Assisted 3/E maintenance A/E No.2 Done Positive 1

11 A AFANDI Bosun

12 ACHMAD NURUL HUDA AB Main deck Final coating main deck, etc at COT 7C Done Positive 1

13 MIFTAKHUL ARKHAM AB

Checked every hour regularly status SDV


14 BAYU SEGARA AB Main deck
,Nitrogen and recorded
Well Done Negative 1

15 DEDI OS Main deck Final coating main deck, etc at COT 7C Done Positive 1
Repaired by welding the sunrod pipe for aux
16 ELIK BUDIANTO FTR Engine room
boiler
Done Positive 1

17 SUAIB MTM Engine room Assisted 3/E maintenance A/E No.2 Done Positive 1

18 CHULWAN NURFALLAH WIPER Engine room Assisted 4/E maintenance aux boiler Done Positive 1

19 MASRUDI C/Cook B deck Lavatory in Deck B Clean and tidy Done Positive 1

20 BOBY MANGONTO STWD Galley Assisted C/COOK prepared a meal Done Positive 1

House keeping
21 HARIANTO SULE TANAN STWD A Deck MMC equipment mixed with others materials
(Closed)
Negative 1

TOTAL 19