TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.
1C 18.63 18.362 17 107 Nil 107 30.0 86.0 44.6 0.98703 105 0.263 105 0.12544
2C 17.66 17.412 157 986 Nil 986 28.7 83.7 44.6 0.98818 974 2.436 972 0.12544
3C 14.68 14.449 1,363 8,571 Nil 8,571 29.2 84.6 44.6 0.98773 8,466 21.165 8,445 0.12544
4C 18.10 17.851 21 135 Nil 135 30.0 86.0 44.6 0.98703 133 0.332 132 0.12544
5C 18.15 17.903 13 84 Nil 84 30.0 86.0 44.6 0.98703 83 0.208 83 0.12544
6C 5.54 5.312 5,091 32,023 18.081 17.833 27.786 175 31,848 30.0 86.0 44.6 0.98703 31,435 78.59 31,356 0.12544
7C 12.69 12.461 2,170 13,648 Nil 13,648 29.6 85.3 44.6 0.98738 13,476 33.689 13,442 0.12544
8C 13.84 13.622 1,505 9,468 Nil 9,468 29.6 85.3 44.6 0.98738 9,349 23.372 9,325 0.12544
SL.P 18.49 18.215 0 2 Nil 2 28.8 83.8 44.6 0.98813 2 0.005 2 0.12544
SL.S 11.20 10.911 231 1,455 15.919 15.631 80.54 507 949 29.6 85.3 44.6 0.98738 937 2.342 934 0.12544
TOTAL
TOTAL 10,569 66,479 108 682 65,798 64,959 64,797
REMARKS: 929 46 883 870 869
PRODUCTION LOADING IN TO 6C
Gross Volume :(T.O.V.) 66,479 Oil Volume @ 60 F :(N.S.V.) 64,797 DRAFT FWD 6.20 m AFT
Less Free Water : 682 Less OBQ/ROB :
Oil Volume :(G.O.V.) 65,798 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 64,959 Long tons/Metric tons :
Long Tons/Metric Tons : 8,149 8,279 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.20 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 4-Feb-17
8,149 8,279
Staff
Surya Putra Jaya Master Capt. Ihwan Asrul Santos Rep. Capt. Saiful Bahri
Water Offtake
PFW PH 0
Note: : PRODUCTION LOADING INTO COT 6C
OIW Average (mg/I) 10
Regulated Waste
Category Vol (m3) Kg Comments
Biological Waste 0 0
Note :
OYONG OPERATORS DAILY REPORT
Fuel
FSO-MFO FSO-MDO Service Vessel
MDO
Remarks :
Meetings
Incidents
19-Dec-16
141,460
deg C
deg C
TO COT 6C
31348 / 64756
e Vessel
Comment
DSS equipment
rgency machinery
ntainer at laydown
t on deck and accommodation
gement
m
elding cable
pt. activity
crew
PKK
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT
Mooring/Unmooring :
NIL
Bunkering/Debunkering :
NIL
ENGINE :
1. Overhauled booster pump RO No.1
2. Weekly running tested of emergency equipment
3. Collected garbage in engine room into garbage container at laydown
4. Repaired the socket connection for welding cable
5. Workplace inspection engine room space
6. Running up A/E No.1 & 3 :
10.00 - 11.00: - Lifted materials santos to KST.51
9. EHS AUDIT/INSPECTION
TOTAL
3702
3700
TRANS ROB
0 228,862
0 77,626
ROB `
70
161
ROB
200
POB
43
28-Nov-13
NIL
NIL
NIL
NIL
NIL
FUEL STATUS REPORT
MDO
NIL
FUEL STATUS REPORT
MFO
Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 228,862 0 0 0 0 228,862
02 228,862 0 0 0 0 228,862
03 228,862 0 0 0 0 228,862
04 228,862 0 0 0 0 228,862
LOG SHEET DOMESTIC & SANITARY WASTE WATER
TOTAL 393 54 0 0 0 0 0 0 0 0 0 0
LOG SHEET DOMESTIC & SANITARY WASTE WATER
TOTAL 237 31 0 0 0 0 0 0 0 0 0 0
LOG SHEET COOLING WATER
Average/
Day 4,970 710 0 0 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER
TOTAL 82 0 82 164
SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 4/Feb/17
Positive /
Reported by Rank Location Description Action/Comment Negative Total
Crew mess Advice to Duty Officer weekly tested LSA, FFA,
1 IHWAN ASRUL Master room and Nav/GMDSS equipment
Done Positive 1
2 DENNY DAVID PAULUS C/O Export hose 3 pcs sackle of export hose out of order Renewed (Closed) Negative 1
4 IHSANUDIN 3/O On deck Weekly tested LSA and FFA equipment Done Positive 1
5 MARTHEN KAMMA C/E Engine room Supervise overhouled of booster pump RO No.1 Done Positive 1
7 IRVAN TAHIR 3/E Engine room Overhouled of booster pump RO No.1 Done Positive 1
12 MIFTAKHUL ARKHAM AB Main deck Lubricated all grease point on deck Done Positive 1
14 DEDI BIN WARNA OS Main deck Assisted AB lubricated all grease point on deck Done Positive 1
15 ELIK BUDIANTO FTR Engine room Repaired the socket connection welding cable Done Positive 1
Assisted 3/E overhouled of booster pump RO
16 SUAIB MTM Engine room
No.1
Done Positive 1
Assisted Elect collected garbage engine room
17 CHULWAN NURFALLAH WIPER Engine room
into garbage container
Done Positive 1
19 BOBY MANGONTO STWD Galley Assisted C/Cook prepared visitor breakfast Done Positive 1
TOTAL 20