Organizations face many problems that impede rapid development of software systems critical to
their operations and growth. The challenge in any software product development lies in
minimizing the number of defects. Occurrence of defects is the greatest contributor to significant
increases in product costs due to correction and rework time. Most defects are caused by
process failures rather than human failures. Identifying and correcting process defects will
prevent many product defects from recurring.
This article will present various tools and techniques for use in creating a Defect Prevention (DP)
strategy that, when introduced at all stages of a Software life cycle, can reduce the time and
resources necessary to develop high quality systems. Specifically, how implementing a model-
based strategy to reduce Requirement Defects, Development Rework and Manual test
development efforts will lead to significant achievements in cost reduction and total productivity.
Defect Prevention
Defect Prevention (DP) is a strategy applied to the software development life cycle that identifies
root causes of defects and prevents them from recurring. It is the essence of Total Quality
Management (TQM). DP, identified by the Software Engineering Institute as a level 5 Key
Process Area (KPA) in the Capability Maturity Model (CMM), involves analyzing defects
encountered in the past and specifying checkpoints and actions to prevent the occurrence of
similar defects in the future. In general, DP activities are a mechanism for propagating the
knowledge of lessons learned between projects.
Mature IT organizations have an established software process to carry out their responsibilities.
This process is enhanced when DP methodologies are implemented to improve quality and
productivity and reduce development costs. Figure 1 clearly depicts that identifying defects late in
the game is costly.
Creation of an Action Plan plays a key role in the implementation process. At the beginning of a
software task, the members of the team meet to prepare for the task and related DP activities. A
kick-off meeting is held to familiarize members of the team with details of the implementation
process. Included in the meeting is information related to the software process, standards,
procedures, methods, and tools applicable to the task, with an emphasis on recent changes;
inputs required and available for the task; expected outputs; and methods for evaluation of
outputs and of adherence to the software process. A list of common errors and recommended
preventive actions are also introduced along with team assignments, a task schedule and project
goals.
Periodic reviews are conducted by each of the teams assigned to coordinate DP activities. During
the reviews, action items are identified and priorities set based on a causal analysis that
determines:
A pareto analysis is helpful in setting priorities and provides direction for assignment of action
items or reassignment to other teams, making changes to activities and documenting rationale for
decisions.
Additional DP activities involve reviewing results of defect prevention experiments and taking
actions to incorporate the results of successful experiments into the rest of the project or
organization, as appropriate. Examples of defect prevention experiments include using a
temporarily modified process or a new tool.
The DP teams oversee the work product in a "managed and controlled" environment with
changes incorporated in a controlled manner. If a greater degree of regulation is desired, teams
can invoke the full discipline of configuration management, as is described in the Software
Configuration Management key process area. Measurements are made and used to determine
the status of DP activities. Examples include the costs mentioned above; the number of action
items proposed, open, and completed; the number of defects injected in each stage, and the
overall number of defects. Verifying Implementation.
The organization's activities for defect prevention are reviewed with senior management on a
periodic basis to provide awareness of and insight into, software process activities at an
appropriate level of abstraction and in a timely manner. The time between reviews should meet
the needs of the organization and may be lengthy, as long as adequate mechanisms for
exception reporting are available. Management reviews include major defect and action
categories and the frequency of distribution across those categories; significant actions taken to
address major defect categories; and a summary of proposed, open and completed action items.
In addition, management should review the effectiveness of DP activities, the savings attributable
to the activities, and their actual and projected cost. Once the effectiveness of the activities are
verified, it is important for the team to ensure that significant efforts and successes in preventing
defects are recognized.
Case Study
A case study of a real time scenario is discussed below along with statistics derived from the
analysis.
The Beizer Taxonomy included ten major categories, each of which was divided into three levels,
resulting in a 4-digit number which specifies unique defects. The ten top level categories were:
0xxx Planning
1xxx Requirements and Features
2xxx Functionality as Implemented
3xxx Structural Bugs
4xxx Data
5xxx Implementation
6xxx Integration
7xxx Real-Time and Operating System
8xxx Test Definition or Execution Bugs
9xxx Other
The causes of the defects as determined by the engineers doing the classification, fell into four
major categories: Communication, Education, Oversight and Transcription.
In creating the reference line, detailed interviews with 24 software engineers took place. The
interviews allowed a full understanding of the reason for each defect, classification of the cause
and an understanding of defect prevention activities. This data mining was performed on all
defects, resulting in a series of classification tables and a Pareto analysis of the most common
problems. The results of the pareto analysis according to the Beizer Taxonomy top level
categories are presented below with the breakdown in descending order.
Within each development phase in the baseline project, the defects were further classified based
on the Beizer Taxonomy. For example, in the Requirement Specifications Phase, the second
level breakdown of the main defects occurred as follows:
The third level breakdown of the main Requirement Completeness defect was:
The same type of data analysis was performed for each development phase selected for the PIE.
The next step was to identify a tool-set of phase-specific improvement activities, based on the
root cause analysis, that would prevent defects from recurring in the next release. Highest priority
was given to the most common defect types. Extensive training and phase kickoff meetings were
held to empower the development team to integrate DP activities into the existing process. The
development team then applied the improvement activities determined in the analysis phase to
the development phases, and ongoing defect recordings and measurements were performed.
The final step was to compare the numbers and types of TETRA Release 2 defects with those of
the reference line. The effectiveness of the prevention tool-set was measured in the quantity and
types of defects found in the second release of the project. The effective prevention actions could
then be integrated into the OSSP to improve quality and cycle time for all the projects in MCIL.
The impact on the OSSP, including changes to Review Guidelines and changes to the Phase
Kickoffs, are considered part of the PIE results.
Expected Outcomes
Expected outcomes from the project consisted of a framework for establishing a Defect
Prevention program in a software development environment and alist of improvement actions the
TETRA project development group would take to prevent defects, including:
• A decrease in the overall number of defects found in the various development phases
• A shift in the distribution of defects, by phases
• Lower development costs
• Shorter cycle times
In each progressive phase, engineers became more adept at recording the defects using
Distributed Defect Tracking Systems and at performing causal analysis. They became more open
minded about reporting and recording their own defects, understanding the importance of a
systematic tracking approach to the quality of the product and the process.
Many TETRA engineers expressed satisfaction with the causal analysis process and kickoff
meetings, which made them feel better equipped to prevent defects and improved their general
attitude towards the software process.
Both technical and business staffs considered the PIE a positive process, which provided an
advantage in creating better quality products, and reducing cycle time of the development
process. As such, the TETRA development group adopted several changes to its processes to
accommodate the DP environment.
Internal dissemination outside of the TETRA development group, will begin with a presentation of
the DP method to the Software Engineering Process Group (SEPG), the owner of MCIL's OSSP.
This group will analyze results of the PIE project and update the OSSP accordingly. The SEPG
will also be responsible for deploying the new process and training the other development groups.
This will occur through a series of technical meetings with engineers and managers, who interact
with DP activities, the PIE and the updated OSSP.
The absolute reduction in defects, which relates to the % Improvement shown in the above table,
can be observed in the following figure.
The % Improvement column shows the improvement within each development phase with
respect to the absolute number of defects. This is a different view of the improvement in the
number of defects, partially attributable to the Improvement Actions.
Another comparison was made in respect to the Cause category with the following results.
The observation here is that the differences are not significant. The largest bulk of the defects are
caused by human errors.
Lessons Learned
There are several key lessons learned from this PIE project.
3. The Timing of the Phase Kickoff meetings is critical. A Phase Kickoff should be planned
early and performed as close as possible to the beginning of the phase.
4. In order for the Defect Prevention process to be effective, the software teams need in-
depth training and initial support in using the taxonomy and performing the root cause
analysis.
5. A tool to input the classification of defects according to the Beizer Taxonomy is essential.
An automatic tool is needed to analyze the defects and to obtain statistical results. The
current vehicle used for input of cause analysis and defect classification is deficient. A
better interface is needed, as well as a mechanism for adding new categories to the
Beizer Taxonomy. Standardized statistical analysis reports are needed for use by all
projects for ongoing Defect Prevention and process improvement.