Sunteți pe pagina 1din 28

VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C 18.63 18.362 17 107 Nil 107 30.0 86.0 44.6 0.98703 105 0.263 105 0.12544
2C 17.66 17.412 157 986 Nil 986 28.7 83.7 44.6 0.98818 974 2.436 972 0.12544
3C 14.67 14.449 1,363 8,571 Nil 8,571 29.2 84.6 44.6 0.98773 8,466 21.165 8,445 0.12544
4C 18.10 17.851 21 135 Nil 135 30.0 86.0 44.6 0.98703 133 0.332 132 0.12544
5C 18.15 17.903 13 84 Nil 84 30.0 86.0 44.6 0.98703 83 0.208 83 0.12544
6C 4.09 3.863 5,681 35,733 17.998 17.752 57.436 361 35,372 30.0 86.0 44.6 0.98703 34,913 87.28 34,826 0.12544
7C 12.68 12.461 2,170 13,648 Nil 13,648 29.6 85.3 44.6 0.98738 13,476 33.689 13,442 0.12544
8C 13.84 13.622 1,505 9,468 Nil 9,468 29.6 85.3 44.6 0.98738 9,349 23.372 9,325 0.12544
SL.P 18.49 18.215 0 2 Nil 2 28.8 83.8 44.6 0.98813 2 0.005 2 0.12544
SL.S 11.20 10.911 231 1,455 15.918 15.631 80.54 507 949 29.6 85.3 44.6 0.98738 937 2.342 934 0.12544
TOTAL
TOTAL 11,159 70,189 138 868 69,322 68,438 68,267
REMARKS: 920 47 873 858 856

PRODUCTION LOADING IN TO 6C

Gross Volume :(T.O.V.) 70,189 Oil Volume @ 60 F :(N.S.V.) 68,267 DRAFT FWD 6.20 m AFT
Less Free Water : 868 Less OBQ/ROB :
Oil Volume :(G.O.V.) 69,322 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 68,438 Long tons/Metric tons :
Long Tons/Metric Tons : 8,585 8,722 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.20 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 8-Feb-17

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

13.199 0.12745 13.411


122 0.12745 124.181
1,061.979 0.12745 1078.995
16.656 0.12745 16.923
10.437 0.12745 10.604
4,379.506 0.12745 4449.682
1,690.379 0.12745 1717.465
1,172.708 0.12745 1191.499
0.250 0.12745 0.254
117.515 0.12745 119.398

8,585 8,722

9.40 m TRIM 3.20 m


LIST NIL

Capt. Ihwan Asrul


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 8-Feb-17 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Ihwan Asrul Santos Rep. Capt. Saiful Bahri

Crude Storage Lifting

24 Hours Total (bbls) 920 Last Lifting 19-Dec

BS and W % 0.20 Lifting Vol (bbls) 141,46

Storage Gross (bbls) Next Lifting


69,322 -

Storage Net / G.S.V (Nbbls) 68,438 Next Lifting Vol (bbls) -

Storage Net / N.S.V (Nbbls) 68,267

Days to Tank Tops 276 Vessel ETA -

Total Crude This Month (Nbbls) 68,438

Water Offtake

Water Received 24hrs (bbls) 47 Offtake 24 Hours (bbls) -

Total Water in Cargo (bbls) 868 Note :

Total P/W Received (bbls) 85,796

Water Drawn off (bbls) 0 Loading/Incoming Temp 42.0

Specific Gravity 0 Storage tanks's temperature 30.0

PFW PH 0
Note: : PRODUCTION LOADING INTO COT 6C
OIW Average (mg/I) 10

OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0.00 0

Non Metal Waste 0.00 0

Metal Waste 0.00 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0.00 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0

Note :
OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 228,862 ### 73,696 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 0 1,338

Closing (m3) 228,862 72,358 0

Supply Remaining (days)

Remarks :

Meetings

Type Time Comment

1. Review previous day activity


2. Check and maintenance LSA
3. Maintenance main deck,etc at COT 8C
4. Maintenance garbage container at laydown
5. Maintenance lavatory at A deck accommodation
6. Maintenance COPT
Tool box meeting 06.30
7. Maintenance LO pump and electromotor main engine
8. Maintenance sea chest strainer
9. Maintenance RO No.1

1. Review deck, engine and galley dept. activity


2. Maintenance LSA and FFA
3. Maintenance main deck,etc at COT 8C
Supervisory Meeting 16.30 4. Corrective action for the workplace inspection / SPKK
5. Maintenance garbage container
6. Weekly sampling PW
7. Landing food stuff cradle , etc

Incidents

Type Reference Comments


NIL
Drills
Type Time Comment

S.T.O.P. Audit program

Observation Card Report : 20


The details see SPKK sheet *)
###
Capt. Saiful Bahri

19-Dec-16

141,460

deg C

deg C

TO COT 6C

34725 / 68132
e Vessel

Comment

8C
laydown
ommodation

motor main engine

pt. activity

8C
inspection / SPKK
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C

Mooring/Unmooring :
06.40: AHT. Tegap Jaya starboard alongside
10.20: AHT. Tegap Jaya cast off
16.50: Tb. KST.51 starboard alongside
20.00: Tb. KST.51 cast off

Bunkering/Debunkering :
06.45: Commenced transfer FW to AHT. Tegap Jaya
10.10: Completed transfer FW: 40T to AHT. Tegap Jaya
17.00: Commenced transfer FW to Tb. KST.51
19.50: Completed transfer FW: 30T to Tb. KST.51

Personnel & Material Transfer :


05.40: 1 Person Mafhindo, 2 Persons Spektra, 20 Persons Pkp by. KST.51 ( Out )
15.00: 8 Coil plat materials Santos, 1 Cradle yellow Santos by. KST.51 ( In )
15.40: Additional food stuff Spj by. Cb. Adventurer 1 ( In )
17.00: 1 Person Mafhindo, 2 Persons Spektra, 21 Persons Pkp by. KST.51 ( In )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist Transferred Contractor Personnel
2. Checked and maintenance LSA
3. Maintenance main deck,etc at COT 8C
4. Maintenance garbage container at laydown
5. Maintenance lavatory at A deck accommodation
6. Lifted materials from support KST 51 and Adventurer 1

ENGINE :
1. Chipping, brushing and coating strainer cover sea chest high and low
2. Chipping, brushing and coating LO cooler and electromotor body for main engine
3. Replaced fine filter RO No. 1 and 2
4. Painted of COPT body
5. Overhauled of booster pump for spare
6. House keeping in engine room store
7. Running up A/E No.2 & 3 :
13.00 - 16.00: - Lifted materials santos from KST.51
- Lifted additional food stuff from Cb. Adventurer 1

2. PERMIT TO WORK PW MW HW CSE IP VAL


449 1725 376 173 7 991
2.1 J HA 449 1725 376 173 5 991
3. BUNKERS(M3) CONS RCVD
M.F.O 0 0
M.D.O 1,338 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 0 0 0 0
DOM 10 0 70 22
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
24 23
MAN HOURS ( POB X 12 HRS )
Previous man hours 219492 Days W/O LTI 1168 Since 28-Nov-13
Man hours today 240
Total man hours 219732
Safe man hours 219732
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings `
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


08-Feb-17 @2400 HRS

TOTAL
3721
3719
TRANS ROB
0 228,862
0 72,358
ROB `
70
154
ROB
200
POB
44

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1672 2 1674
2385 20 2405
3 0 3
0 0 0
90 2 92

NIL

NIL

NIL

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Feb-17

MDO

Opening A/E A/E A/E Closing


Receive Transfer Cons. Adj.
Date Balance No.1 No.2 No.3 Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) (Hrs) (Hrs) (Hrs) ( Ltr )
01 83,108 0 0 1,310 0 1.0 0.0 24.0 81,798 Transfer materials
02 81,798 0 0 1,310 0 12.0 0.0 13.0 80,488 Transfer materials
Warm up boiler and crane
03 80,488 0 0 1,552 0 24.0 0.0 4.0 78,936 used

04 78,936 0 0 1,310 0 24.0 0.0 1.0 77,626 Transfer materials

05 77,626 0 0 1,310 0 24.0 0.0 1.0 76,316 Transfer materials


06 76,316 0 0 1,324 0 24.0 0.0 2.0 74,992 Transfer materials
07 74,992 0 0 1,296 0 24.0 0.0 0.0 73,696
08 73,696 0 0 1,338 0 13.0 11.0 3.0 72,358 Transfer materials
NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Feb-17

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 228,862 0 0 0 0 228,862
02 228,862 0 0 0 0 228,862
03 228,862 0 0 0 0 228,862
04 228,862 0 0 0 0 228,862
05 228,862 0 0 0 0 228,862
06 228,862 0 0 0 0 228,862
07 228,862 0 0 0 0 228,862
08 228,862 0 0 0 0 228,862
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 12 14
2 13 12
3 11 14
4 12 14
5 12 13
6 14 13
7 13 12
8 12 13
9 13
10 13
11 14
12 12
13 13
14 11
15 13
16 14
17 12
18 13
19 11
20 12
21 12
22 13
23 12
24 14
25 12
26 12
27 14
28 14
29 13
30 14
31 13

TOTAL 393 105 0 0 0 0 0 0 0 0 0 0


LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 8 7
2 7 8
3 7 8
4 8 8
5 8 7
6 7 8
7 8 8
8 8 8
9 8
10 7
11 8
12 7
13 7
14 8
15 8
16 8
17 8
18 7
19 7
20 8
21 8
22 8
23 7
24 8
25 8
26 7
27 7
28 8
29 8
30 8
31 8

TOTAL 237 62 0 0 0 0 0 0 0 0 0 0
LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,964 4,970
2 4,951 4,968
3 4,971 4,971
4 4,954 4,970
5 4,980 4,975
6 4,969 4,969
7 4,972 4,974
8 4,957 4,972
9 4,960
10 4,987
11 4,991
12 4,984
13 4,966
14 4,958
15 4,963
16 4,974
17 4,988
18 4,964
19 4,978
20 4,971
21 4,973
22 4,970
23 4,966
24 4,960
25 4,969
26 4,972
27 4,974
28 4,975
29 4,970
30 4,973
31 4,978

TOTAL 154,082 39,769 0 0 0 0 0 0 0 0 0 0

Average/
Day 4,970 1,420 0 0 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity R.O Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 80 135
2 70 120
3 135 110
4 80 90
5 120 120
6 125 90
7 130 95
8 60 110
9 40
10 110
11 100
12 105
13 100
14 55
15 85
16 90
17 90
18 95
19 55
20 75
21 90
22 80
23 80
24 80
25 95
26 150
27 110
28 150
29 125
30 140
31 90

TOTAL 2,990 870 0 0 0 0 0 0 0 0 0 0


DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : Feb 2017

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Feb-2017 21 0 18 39
2-Feb-2017 21 0 18 39
3-Feb-2017 20 0 23 43
4-Feb-2017 20 0 23 43
5-Feb-2017 20 0 23 43
6-Feb-2017 20 0 23 43
7-Feb-2017 20 0 23 43
8-Feb-2017 20 0 24 44

TOTAL 162 0 175 337


SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 8/Feb/17
Positive /
Reported by Rank Location Description Action/Comment Negative Total
Crew mess
1 IHWAN ASRUL Master room
Advice to all crew received additional food stuff Done Positive 1

2 DENNY DAVID PAULUS C/O Poop deck No. 1 deck compressor drip tray plug missed Renewed ( closed ) Negative 1

3 CENG UMAR 2/O Main deck Lifted materials at laydown area as signal man Done Positive 1

4 IHSANUDIN 3/O Forecastle Lifebuoy rope at forecastle was broken Renewed ( closed ) Negative 1

5 MARTHEN KAMMA C/E Engine room Supervise overhauled of booster pump for spare Done Positive 1

6 AGUNG RISTIANTO 2/E Engine room Overhauled of booster pump for spare Done Positive 1

Chipping, brushing and coating strainer cover


7 IRVAN TAHIR 3/E Engine room
sea chest low
Done Positive 1

Chipping, brushing and coating strainer cover


8 HENDRA PRATAMA 4/E Engine room
sea chest high
Done Positive 1

Chipping, brushing and coating LO cooler and


9 SURYADINATA E/E Engine room
electromotor body for main engine
Done Positive 1

Shifted to the right


10 A AFANDI Bosun Poop deck MMC sampler keep in deck store
place (Closed)
Negative 1

11 ACHMAD NURUL HUDA AB Main deck Maintenance main deck,etc at COT 8C Done Positive 1

12 MIFTAKHUL ARKHAM AB COT 1C Poster SDV 2nd backup was poor Replaced(Closed) Negative 1

13 M SAFARI AB A deck Maintenance lavatory Done Positive 1

14 DEDI BIN WARNA OS Main deck Assist AB Maintenance main deck,etc at COT 8C Done Positive 1

15 ELIK BUDIANTO FTR Engine room Painted of COPT body Done Positive 1

16 SUAIB MTM Engine room Cleaned A/E area floor Done Positive 1

17 CHULWAN NURFALLAH WIPER Engine room House keeping in engine room store Done Positive 1

Provision Checked and arranged additional provision new


18 MASRUDI C/Cook store arrival
Done Positive 1

19 BOBY MANGONTO STWD Main deck Assist deck Crew bring the provision to store Done Positive 1

20 HARIANTO SULE TANAN STWD Main deck Assist deck Crew bring the provision to store Done Positive 1

TOTAL 20

S-ar putea să vă placă și