TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.
1C 18.63 18.362 17 107 Nil 107 30.0 86.0 44.6 0.98703 105 0.263 105 0.12544
2C 17.66 17.412 157 986 Nil 986 28.7 83.7 44.6 0.98818 974 2.436 972 0.12544
3C 14.67 14.449 1,363 8,571 Nil 8,571 29.2 84.6 44.6 0.98773 8,466 21.165 8,445 0.12544
4C 18.10 17.851 21 135 Nil 135 30.0 86.0 44.6 0.98703 133 0.332 132 0.12544
5C 18.15 17.903 13 84 Nil 84 30.0 86.0 44.6 0.98703 83 0.208 83 0.12544
6C 4.09 3.863 5,681 35,733 17.998 17.752 57.436 361 35,372 30.0 86.0 44.6 0.98703 34,913 87.28 34,826 0.12544
7C 12.68 12.461 2,170 13,648 Nil 13,648 29.6 85.3 44.6 0.98738 13,476 33.689 13,442 0.12544
8C 13.84 13.622 1,505 9,468 Nil 9,468 29.6 85.3 44.6 0.98738 9,349 23.372 9,325 0.12544
SL.P 18.49 18.215 0 2 Nil 2 28.8 83.8 44.6 0.98813 2 0.005 2 0.12544
SL.S 11.20 10.911 231 1,455 15.918 15.631 80.54 507 949 29.6 85.3 44.6 0.98738 937 2.342 934 0.12544
TOTAL
TOTAL 11,159 70,189 138 868 69,322 68,438 68,267
REMARKS: 920 47 873 858 856
PRODUCTION LOADING IN TO 6C
Gross Volume :(T.O.V.) 70,189 Oil Volume @ 60 F :(N.S.V.) 68,267 DRAFT FWD 6.20 m AFT
Less Free Water : 868 Less OBQ/ROB :
Oil Volume :(G.O.V.) 69,322 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 68,438 Long tons/Metric tons :
Long Tons/Metric Tons : 8,585 8,722 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.20 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 8-Feb-17
8,585 8,722
Staff
Surya Putra Jaya Master Capt. Ihwan Asrul Santos Rep. Capt. Saiful Bahri
Water Offtake
PFW PH 0
Note: : PRODUCTION LOADING INTO COT 6C
OIW Average (mg/I) 10
Regulated Waste
Category Vol (m3) Kg Comments
Biological Waste 0 0
Note :
OYONG OPERATORS DAILY REPORT
Fuel
FSO-MFO FSO-MDO Service Vessel
MDO
Remarks :
Meetings
Incidents
19-Dec-16
141,460
deg C
deg C
TO COT 6C
34725 / 68132
e Vessel
Comment
8C
laydown
ommodation
pt. activity
8C
inspection / SPKK
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT
Mooring/Unmooring :
06.40: AHT. Tegap Jaya starboard alongside
10.20: AHT. Tegap Jaya cast off
16.50: Tb. KST.51 starboard alongside
20.00: Tb. KST.51 cast off
Bunkering/Debunkering :
06.45: Commenced transfer FW to AHT. Tegap Jaya
10.10: Completed transfer FW: 40T to AHT. Tegap Jaya
17.00: Commenced transfer FW to Tb. KST.51
19.50: Completed transfer FW: 30T to Tb. KST.51
ENGINE :
1. Chipping, brushing and coating strainer cover sea chest high and low
2. Chipping, brushing and coating LO cooler and electromotor body for main engine
3. Replaced fine filter RO No. 1 and 2
4. Painted of COPT body
5. Overhauled of booster pump for spare
6. House keeping in engine room store
7. Running up A/E No.2 & 3 :
13.00 - 16.00: - Lifted materials santos from KST.51
- Lifted additional food stuff from Cb. Adventurer 1
9. EHS AUDIT/INSPECTION
TOTAL
3721
3719
TRANS ROB
0 228,862
0 72,358
ROB `
70
154
ROB
200
POB
44
28-Nov-13
NIL
NIL
NIL
NIL
NIL
FUEL STATUS REPORT
MDO
NIL
FUEL STATUS REPORT
MFO
Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 228,862 0 0 0 0 228,862
02 228,862 0 0 0 0 228,862
03 228,862 0 0 0 0 228,862
04 228,862 0 0 0 0 228,862
05 228,862 0 0 0 0 228,862
06 228,862 0 0 0 0 228,862
07 228,862 0 0 0 0 228,862
08 228,862 0 0 0 0 228,862
LOG SHEET DOMESTIC & SANITARY WASTE WATER
TOTAL 237 62 0 0 0 0 0 0 0 0 0 0
LOG SHEET COOLING WATER
Average/
Day 4,970 1,420 0 0 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER
2 DENNY DAVID PAULUS C/O Poop deck No. 1 deck compressor drip tray plug missed Renewed ( closed ) Negative 1
3 CENG UMAR 2/O Main deck Lifted materials at laydown area as signal man Done Positive 1
4 IHSANUDIN 3/O Forecastle Lifebuoy rope at forecastle was broken Renewed ( closed ) Negative 1
5 MARTHEN KAMMA C/E Engine room Supervise overhauled of booster pump for spare Done Positive 1
6 AGUNG RISTIANTO 2/E Engine room Overhauled of booster pump for spare Done Positive 1
11 ACHMAD NURUL HUDA AB Main deck Maintenance main deck,etc at COT 8C Done Positive 1
12 MIFTAKHUL ARKHAM AB COT 1C Poster SDV 2nd backup was poor Replaced(Closed) Negative 1
14 DEDI BIN WARNA OS Main deck Assist AB Maintenance main deck,etc at COT 8C Done Positive 1
15 ELIK BUDIANTO FTR Engine room Painted of COPT body Done Positive 1
16 SUAIB MTM Engine room Cleaned A/E area floor Done Positive 1
17 CHULWAN NURFALLAH WIPER Engine room House keeping in engine room store Done Positive 1
19 BOBY MANGONTO STWD Main deck Assist deck Crew bring the provision to store Done Positive 1
20 HARIANTO SULE TANAN STWD Main deck Assist deck Crew bring the provision to store Done Positive 1
TOTAL 20