Sunteți pe pagina 1din 260

20180216-0021 FERC PDF (Unofficial) 02/16/2018

ORIGINAL
IN THE UNITED STATES COURT OF APPEALS
FOR THE DISTRICT OF COLUMBIA CIRCUIT

The Town of Weymouth, Massachusetts,


Petitioner,
)
)
PF IS
Fore River Residents Against the
)
) CIII -0I
Compressor Station, et al., )
Petitioners )
)
V. ) Nos. 17-1135,
) 17-1139, 17-1176, 17-1220
Federal Energy Regulatory Commission, ) (consolidated)
Respondent )
WQ
o.,- m n~

CERTIFIED INDEX TO THE RECORDi '0


t

Pursuant to the provisions of section 19(b) of the Nattgal GmAct,


Cb

15 U.S.C. g 717r(b), the provisions of 28 U.S.C. g 2112, and Rule 17 of the

Federal Rules of Appellate Procedure, the Federal Energy Regulatory Commission

hereby certifies that the materials listed and described below are: (1) the orders

issued in FERC Docket Nos. PF15-12 and CP16-9, including "Order Issuing

Certificate," 158 FERC $ 61,061 (January 25, 2017), "Order Granting Rehearing of

Certificate Order For Further Consideration," (March 27, 2017), "Letter Order

Authorizing Construction," (March 17, 2017), "Letter Order Authorizing

Construction," (April 13, 2017), "Order Granting Rehearing For Further

Consideration," (May 8, 2017), "Order On Rehearing," 160 FERC $ 61,016


20180216-0021 FERC PDF (Unofficial) 02/16/2018

(August 21, 2017), "Order On Rehearing," 161 FERC $ 61,255 (December 13,

2017), in Algonquin Gas Transmission LLC and Maritimes & Northeast Pipeline

LLC,; and (2) the complete record upon which such orders were entered.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Descrintion

Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast


Pipeline, LLC
Filed Date: 1/30/2015
Accession No: 20150130-5311
Description: Algonquin Gas Transmission, LLC, et al. submit the
Request for Approval of Pre-Filing Review for its proposed Atlantic
Bridge Project under PF15-12.

Filed By: FANG (Fighting Against Natural Gas)


Filed Date: 2/12/2015
Accession No: 20150212-5172
Description: 12 groups are raising the alarm regarding the
impermissible segmentation of three Spectra pipeline upgrade projects
(AIM, Atlantic Bridge and Access Northeast). The impacts of these
projects must be considered cumulatively.

3. Issued By: Energy Projects, Office of


Filed Date: 2/20/2015
Accession No: 20150220-3025
Description: Letter to Algonquin Gas Transmission, LLC discussing
the Approval of Pre-filing Request for the Atlantic Bridge Project
under PF15-12.

Filed By: FANG (Fighting Against Natural Gas)


Filed Date: 2/20/2015
Accession No: 20150220-5023
Description: FANG comments regarding the impermissible
segmentation of three Spectra pipeline upgrade projects (AIM,
Atlantic Bridge and Access Northeast). The impacts of these projects
must be considered cumulatively under CP14-96 et al.

Filed By: Van Dolsen


Filed Date: 2/27/2015
Accession No: 20150227-5088
Description: Comment of Susan Van Dolsen under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Descrintion

Filed By: John Sullivan


Filed Date: 3/12/2015
Accession No: 20150312-5029
Description: Comment of John Sullivan in Docket(s)/Project(s) PF15-
12.

Filed By: Algonquin Gas Transmission, LLC


Filed Date: 3/23/2015
Accession No: 20150323-5333
Description: Algonquin Gas Transmission, LLC hereby submits its
landowner list under PF15-12.

Filed By: Algonquin Gas Transmission, LLC


Filed Date: 3/23/2015
Accession No: 20150323-5334
Description: Algonquin Gas Transmission, LLC hereby submits its
landowner list under PF15-12.

Filed By: Algonquin Gas Transmission, LLC Maritimes k, Northeast


Pipeline, LLC
Filed Date: 3/24/2015
Accession No: 20150324-5023
Description: Algonquin Gas Transmission, LLC, et al. submits draft
Resource Report 1 and a summary of the alternatives for the Atlantic
Bridge Project under PF15-12.

10. Filed By: Judith Hyde


Filed Date: 3/25/2015
Accession No: 20150325-4006
Description: Comments of Judith Hyde re the Atlantic Bridge Project
under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Descrintioa

Filed By: Individual


Filed Date: 3/25/2015
Accession No: 20150325-4007
Description: Comments of Gomez re the Atlantic Bridge Project
under PF 15-12.

12. Filed By: John Lint


Filed Date: 3/25/2015
Accession No: 20150325-4008
Description: Comments of John Lint re the Atlantic Bridge Project
under PF15-12.

13. Filed By: Bob Mosher


Filed Date: 3/25/2015
Accession No: 20150325-4009
Description: Comments of Bob Mosher re the Atlantic Bridge Project
under PF15-12.

14. Filed By: John Gary Peters


Filed Date: 3/27/2015
Accession No: 20150327-5270
Description: Comment of John Gary Peters in Docket(s)/Project(s)
PF15-12.

15. Filed By: Alice Arena


Filed Date: 3/30/2015
Accession No: 20150330-4002
Description: Comments of Alice Arena regarding the Atlantic Bridge
Project under PF15-12.

16. Filed By: Margaret Bellafiore


Filed Date: 3/30/2015
Accession No: 20150330-5003
Description: Comment of Margaret Bellafiore in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Descrintion

17. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 4/2/2015
Accession No: 20150402-5066
Description: Algonquin Gas Transmission, LLC submits its monthly
progress report for the Atlantic Bridge Project under PF15-12

18. Filed By: James F. Hill


Filed Date: 4/2/2015
Accession No: 20150402-5196
Description: Comment of James F. Hill in Docket(s)/Project(s) PF15-
12-000

Filed By: Rhode Island Coastal Resources Management Council


Filed Date: 4/6/2015
Accession No: 20150406-0094
Description: The Rhode Island Coastal Resources Management
Council submits letter re a formal application for a Certificate of
Public Convenience and Necessity etc. under PF15-12.

20. Filed By: Cathy Bevans


Filed Date: 4/6/2015
Accession No: 20150406-5067
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
PF15-12.

21. Filed By: James F. Hill


Filed Date: 4/8/2015
Accession No: 20150408-5027
Description: Comment of James F. Hill in Docket(s)/Project(s) PF15-
12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Deserintioa

22. Filed By: Brady k Lauren Kittredge


Filed Date: 4/13/2015
Accession No: 20150413-0092
Description: Comments of Brady and Lauren Kittxedge re the
Atlantic Bridge Project under PF15-12.

23. Filed By: Dorothy Anderson


Filed Date: 4/13/2015
Accession No: 20150413-5229
Description: Comment of Dorothy Anderson in Docket(s)/Project(s)
PF15-12.

24. Filed By: Rachael Brennan


Filed Date: 4/15/2015
Accession No: 20150415-5005
Description: Comment of Rachael Brennan in Docket(s)/Project(s)
PF15-12.

25. Filed By: Kathleen Stimpson


Filed Date: 4/16/2015
Accession No: 20150416-5094
Description: Comment of Kathleen Stimpson in Docket(s)/Project(s)
PF15-12.

26. Filed By: Linda Cohen


Filed Date: 4/17/2015
Accession No: 20150417-0010
Description: Comments of Linda Cohen re the Atlantic Bridge
Project under PF15-12.

27. Filed By: Laura Borth


Filed Date: 4/17/2015
Accession No: 20150417-5008
Description: Comment of Laura Borth in Docket(s)/Project(s) PF15-
12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Descrintion

28. Filed By: Christa Dunn


Filed Date: 4/17/2015
Accession No: 20150417-5200
Description: Comment of Christa Dunn in Docket(s)/Project(s) PF15-
12.

29. Filed By: Stockbridge-Munsee Community Band of Mohican Indians


Filed Date: 4/23/2015
Accession No: 20150423-5111
Description: Comment of Stockbridge-Munsee Community Band of
Mohican Indians under PF15-12.

30. Filed By: Rebecca Haugh


Filed Date: 4/23/2015
Accession No: 20150423-5115
Description: Comment of Rebecca Haugh under PF15-12.

31. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 4/23/2015
Accession No: 20150423-5244
Description: Updated Stakeholder List for the Atlantic Bridge Project
under PF15-12.

32. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 4/23/2015
Accession No: 20150423-5245
Description: Updated Stakeholder List for the Atlantic Bridge Project
under PF15-12.

33. Filed By: Michael J. Lang


Filed Date: 4/24/2015
Accession No: 20150424-0007
Description: Comments of Michael J. Lang re the proposed Atlantic
Bridge Weymouth Fore River compression station under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Descrintion

34. Filed By: Henny Maddox


Filed Date: 4/27/2015
Accession No: 20150427-0142
Description: Comments of Henny and A. Doris Maddox re the
Spectra Atlantic Bridge Project under PF15-12.

35. Filed By: Carolyn C. Barthel


Filed Date: 4/27/2015
Accession No: 20150427-0149
Description: Comments of Camlyn C. Barthel re the Spectra Atlantic
Bridge Project under PF15-12.

36. Issued By: Secretary of the Commission, FERC


Filed Date: 4/27/2015
Accession No: 20150427-3015
Description: Notice of intent to prepare an Environmental
Assessment for the planned Atlantic Bridge Project, request for
Environmental Issues, and Notice of Public Scoping Meetings re
Algonquin Gas Transmission, LLC under PF15-12.

37. Filed By: Deborah Brown


Filed Date: 4/27/2015
Accession No: 20150427-5047
Description: Comment of Deborah Brown in Docket(s)/Project(s)
PF15-12.

38. Filed By: Rosella Cicchese


Filed Date: 4/27/2015
Accession No: 20150427-5051
Description: Comment of Rosella Cicchese in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

10

Record
Item No. Descrintion

39. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 4/29/2015
Accession No: 20150429-5140
Description: Updated stakeholder list of Algonquin Gas
Transmission, LLC for the Atlantic Bridge Project under PF15-12.

40. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 4/29/2015
Accession No: 20150429-5141
Description: Updated stakeholder list of Algonquin Gas
Transmission, LLC for the Atlantic Bridge Project under PF15-12.

41. Filed By: Miriam 8'c Michael Kurland


Filed Date: 5/5/2015
Accession No: 20150505-5126
Description: Comment of Miriam and Michael Kurland in
Docket(s)/Project(s) PF15-12.

42. Filed By: Jason Wilfert


Filed Date: 5/6/2015
Accession No: 20150506-5009
Description: Comment of Jason Wilfert in Docket(s)/Project(s) PF 15-
12.

43. Filed By: Robert S. Mazzawy


Filed Date: 5/6/2015
Accession No: 20150506-5034
Description: Comment of Robert S. Mazzawy in Docket(s)/Project(s)
PF15-12.

44. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 5/7/2015
Accession No: 20150507-5069
Description: Algonquin Gas Transmission, LLC submits its monthly
status report for the Atlantic Bridge Project under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

11

Record
Item No. Descrintion

45. Filed By: Stephen J. Reich


Filed Date: 5/11/2015
Accession No: 20150511-5129
Description: Comment of Stephen J. Reich in Docket(s)/Project(s)
PF15-12.

Filed By: Joann Rolfe Heileman


Filed Date: 5/13/2015
Accession No: 20150513-5123
Description: Comment of Joann Rolfe Heileman in
Docket(s)/Project(s) PF15-12.

47. Filed By: Janet McAuliffe


Filed Date: 5/14/2015
Accession No: 20150514-5038
Description: Comment of Janet McAuliffe in Docket(s)/Project(s)
PF15-12.

48. Issued By: Energy Projects, Office of


Filed Date: 5/15/2015
Accession No: 20150515-4002
Description: Transcript of the 5/11/15 meeting held in Yorktown, NY
re the Atlantic Bridge Project under PF15-12.

49. Filed By: Dan Daley


Filed Date: 5/15/2015
Accession No: 20150515-5 141
Description: Comment of Dan Daley in Docket(s)/Project(s) PF15-
12.

50. Filed By: Matthew E. Bryer


Filed Date: 5/15/2015
Accession No: 20150515-5224
Description: Comment of Matthew E. Bryer in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

12

Record
Item Xo. Descrintion

51. Filed By: Turner Bledsoe


Filed Date: 5/18/2015
Accession No: 20150518-5007
Description: Comment of Turner Bledsoe in Docket(s)/Project(s)
PF15-12.

52. Filed By: Individual


Filed Date: 5/18/2015
Accession No: 20150518-5150
Description: Comment of an Individual in Docket(s)/Project(s) PF15-
12.

53. Filed By: Frances E. Casey


Filed Date: 5/18/2015
Accession No: 20150518-5210
Description: Comment of Frances E. Casey in Docket(s)/Project(s)
PF15-12.

54. Filed By: John D. Calandrelli


Filed Date: 5/19/2015
Accession No: 20150519-5142
Description: Comment of John D. Calandrelli in Docket(s)/Project(s)
PF15-12.

55. Filed By: Spectra Energy Corp


Filed Date: 5/20/2015
Accession No: 20150520-0076
Description: Comments of R. Paul Goguen re Spectra Energy
Corporation's Atlantic Bridge Project under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

13

Record
Item No. Descrintion

56. Issued By: Energy Projects, Office of


Filed Date: 5/20/2015
Accession No: 20150520-3091
Description: Staffs Comments on Initial Draft Resource Reports 1
and 10 re Algonquin Gas Transmission, LLC's et al Atlantic Bridge
Project under PF15-12.

57. Filed By: Matt Malina


Filed Date: 5/20/2015
Accession No: 20150520-5007
Description: Comment of Matt Malina in Docket(s)/Project(s) PF15-
12.

58. Filed By: Lynn Flanagan


Filed Date: 5/20/2015
Accession No: 20150520-5012
Description: Comment of Lynn Flanagan in Docket(s)/Project(s)
PF15-12.

59. Filed By: Ann Bianchi Quota


Filed Date: 5/20/2015
Accession No: 20150520-5018
Description: Comment of Ann Bianchi Quota in Docket(s)/Project(s)
PF15-12.

60. Filed By: Jeffrey Silman


Filed Date: 5/20/2015
Accession No: 20150520-5020
Description: Comment of Jeffrey Silman in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

14

Record
1tem No. Descri ntion

61. Filed By: Sarita Eisenstark


Filed Date: 5/20/2015
Accession No: 20150520-5022
Description: Comment of Sarita Eisenstark in Docket(s)/Project(s)
PF15-12.

62. Filed By: Anita Ruhling


Filed Date: 5/20/2015
Accession No: 20150520-5028
Description: Comment of Anita Ruhling in Docket(s)/Project(s)
PF15-12.

63. Filed By: Peter Wood


Filed Date: 5/20/2015
Accession No: 20150520-5029
Description: Comment of Peter Wood in Docket(s)/Project(s) PF15-
12.

64. Filed By: Elizabeth Ungar


Filed Date: 5/20/2015
Accession No: 20150520-5030
Description: Comment of Elizabeth Ungar in Docket(s)/Project(s)
PF15-12.

65. Filed By: Tony Vazquez


Filed Date: 5/20/2015
Accession No: 20150520-5031
Description: Comment of Tony Vazquez in Docket(s)/Project(s)
PF15-12.

66. Filed By: Paul E. Sandstorm


Filed Date: 5/20/2015
Accession No: 20150520-5032
Description: Comment of Paul E. Sandstorm in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

15

Record
Item No. Descrintion

67. Filed By: Beth Gregg


Filed Date: 5/20/2015
Accession No: 20150520-5041
Description: Comment of Beth Gregg in Docket(s)/Project(s) PF15-
12.

68. Filed By: Stuart Ober


Filed Date: 5/20/2015
Accession No: 20150520-5043
Description: Comment of Stuart Ober in Docket(s)/Project(s) PF15-
12.

Filed By: John Harragin


Filed Date: 5/20/2015
Accession No: 20150520-5045
Description: Comment of John
PF15-12.
~n in Docket(s)/Project(s)

70. Filed By: Bobbie Flowers


Filed Date: 5/20/2015
Accession No: 20150520-5047
Description: Comment of Bobbie Flowers in Docket(s)/Project(s)
PF15-12.

71. Filed By: George Kormendi


Filed Date: 5/20/2015
Accession No: 20150520-5050
Description: Comment of George Kormendi in Docket(s)/Project(s)
PF15-12.

72. Filed By: Ilse Funk


Filed Date: 5/20/2015
Accession No: 20150520-5053
Description: Comment of Ilse Funk in Docket(s)/Project(s) PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

16

Record
Item No. Descrintion

73. Filed By: Richard Procida


Filed Date: 5/20/2015
Accession No: 20150520-5059
Description: Comment of Richard Procida in Docket(s)/Project(s)
PF15-12.

74. Filed By: Tracy Griswold


Filed Date: 5/20/2015
Accession No: 20150520-5069
Description: Comment of Tracy Griswold in Docket(s)/Project(s)
PF15-12.

75. Filed By: Anne & David Kern


Filed Date: 5/20/2015
Accession No: 20150520-5073
Description: Comment of Anne 85 David Kern in Docket(s)/Project(s)
PF15-12.

76. Filed By: Jose de Arteaga


Filed Date: 5/20/2015
Accession No: 20) 50520-5076
Description: Comment of Jose de Arteaga in Docket(s)/Project(s)
PF15-12.

77. Filed By: Amanda Smock


Filed Date: 5/20/2015
Accession No: 20150520-5077
Description: Comment of Amanda Smock in Docket(s)/Project(s)
PF15-12.

78. Filed By: Thomas Reyer


Filed Date: 5/20/2015
Accession No: 20150520-5078
Description: Comment of Thomas Reyer in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

17

Record
Item No. Descrintion

79. Filed By: Armanda A. Garcia


Filed Date: 5/20/2015
Accession No: 20150520-5083
Description: Comment of Armando A. Garcia in Docket(s)/Project(s)
PF15-12.

80. Filed By: William Sharfman


Filed Date: 5/20/2015
Accession No: 20150520-5094
Description: Comment of William Sharfman in Docket(s)/Project(s)
PF15-12.

81. Filed By: Alex Stavis


Filed Date: 5/20/2015
Accession No: 20150520-5105
Description: Comment of Alex Stavis in Docket(s)/Project(s) PF15-
12.

Filed By: Karlene Gunter


Filed Date: 5/20/2015
Accession No: 20150520-5111
Description: Comment of Karlene Gunter in Docket(s)/Project(s)
PF15-12.

83. Filed By: Jared Cornelia


Filed Date: 5/20/2015
Accession No: 20150520-5145
Description: Comment of Jared Cornelia in Docket(s)/Project(s)
PF15-12.

84. Filed By: Cheriel Jensen


Filed Date: 5/20/2015
Accession No: 20150520-5146
Description: Comment of Cheriel Jensen in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

18

Record
Item No. Descrintion

85. Filed By: Erma Lewis


Filed Date: 5/20/2015
Accession No: 20150520-5148
Description: Comment of Erma Lewis in Docket(s)/Project(s) PF15-
12.

86. Filed By: Valerie Gilbert


Filed Date: 5/20/2015
Accession No: 20150520-5166
Description: Comment of Valerie Gilbert in Docket(s)/Project(s)
PF15-12.

87. Filed By: Edward Butler


Filed Date: 5/20/2015
Accession No: 20150520-5227
Description: Comment of Edward Butler in Docket(s)/Project(s)
PF15-12.

88. Filed By: Carol Jackson


Filed Date: 5/20/2015
Accession No: 20150520-5243
Description: Comment of Carol Jackson in Docket(s)/Project(s)
PF15-12.

89. Filed By: Kevin Trotta


Filed Date: 5/20/2015
Accession No: 20150520-5246
Description: Comment of Kevin Trotta in Docket(s)/Project(s) PF15-
12.

90. Filed By: Dorothy Calvani 8r, Dava Weinstein


Filed Date: 5/21/2015
Accession No: 20150521-5002
Description: Comment of Dorothy Calvani tL Dava Weinstein in
Docket(s)/Project(s) PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

19

Record
Item No. Descrintion

91. Filed By: Amy Irene Anderson


Filed Date: 5/21/2015
Accession No: 20150521-5004
Description: Comment of Amy Irene Anderson in
Docket(s)/Project(s) PF15-12.

92. Filed By: Pamela Brocious


Filed Date: 5/21/2015
Accession No: 20150521-5005
Description: Comment of Pamela Brocious in Docket(s)/Project(s)
PF 15-12.

93. Filed By: Nicole Porto


Filed Date: 5/21/2015
Accession No: 20150521-5007
Description: Comment of Nicole Porto in Docket(s)/Project(s) PF15-
12.

Filed By: Lisa Brenner


Filed Date: 5/21/2015
Accession No: 20150521-5015
Description: Comment of Lisa Brenner in Docket(s)/Project(s) PF15-
12.

95. Filed By: Individual


Filed Date: 5/21/2015
Accession No: 20150521-5033
Description: Comment of S. in Docket(s)/Project(s) PF15-12.

96. Filed By: Walker Everett


Filed Date: 5/21/2015
Accession No: 20150521-5035
Description: Comment of Walker Everett in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

20

Record
Item No. Descrintion

97. Filed By: Michelle Lee Garrison


Filed Date: 5/21/2015
Accession No: 20150521-5044
Description: Comment of Michelle Lee Garrison in
Docket(s)/Project(s) PF15-12.

98. Filed By: Martin Wallace


Filed Date: 5/21/2015
Accession No: 20150521-5054
Description: Comment of Martin Wallace in Docket(s)/Project(s)
PF15-12.

99 Filed By: Mary Troland


Filed Date: 5/21/2015
Accession No: 20150521-5071
Description: Comment of Mary Troland in Docket(s)/Project(s)
PF15-12.

100. Filed By: Angelika Winner


Filed Date: 5/21/2015
Accession No: 20150521-5094
Description: Comment of Angelika Winner in Docket(s)/Project(s)
PF15-12.

101. Filed By: Steve Watson


Filed Date: 5/21/2015
Accession No: 20150521-5136
Description: Comment of Steve Watson in Docket(s)/Project(s)
PF15-12.

102. Filed By: Nic Tedesco


Filed Date: 5/21/2015
Accession No: 20150521-5175
Description: Comment of Nic Tedesco in Docket(s)/Project(s) PF15-
12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

21

Record
Item No. Descrintion

103. Filed By: Brian Fink


Filed Date: 5/21/2015
Accession No: 20150521-5212
Description: Comment of Brian Fink in Docket(s)/Project(s) PF15-
12.

Issued By: Energy Projects, Office of


Filed Date: 5/22/2015
Accession No: 20150522-4002
Description: Transcript of 5/12/15 scoping meeting held in
Glastonbury, CTre Pre-Filing Review for the Atlantic Bridge Project
under PF15-12.

105. Filed By: Lynda Kieffer


Filed Date: 5/22/2015
Accession No: 20150522-5000
Description: Comment of Lynda Kieffer in Docket(s)/Project(s)
PF15-12.

106. Filed By: Rosemary Cotnoir


Filed Date: 5/22/2015
Accession No: 20150522-5001
Description: Comment of Rosemary Cotnoir in Docket(s)/Project(s)
PF15-12.

107. Filed By: Gordon Howard


Filed Date: 5/22/2015
Accession No: 20150522-5002
Description: Comment of Gordon Howard in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

22

Record
Item No. Descrintion

108. Filed By: Elizabeth Schwartz


Filed Date: 5/22/2015
Accession No: 20150522-5007
Description: Comment of Elizabeth Schwartz in Docket(s)/Project(s)
PF15-12.

109. Filed By: Mark A. Sousa


Filed Date: 5/22/2015
Accession No: 20150522-5010
Description: Comment of Mark A. Sousa in Docket(s)/Project(s)
PF15-12.

110. Filed By: Jean Marie Naples


Filed Date: 5/22/2015
Accession No: 20150522-5014
Description: Comment of Jean Marie Naples in Docket(s)/Project(s)
PF15-12.

Filed By: Kevin Hughes


Filed Date: 5/22/2015
Accession No: 20150522-5025
Description: Comment of Kevin Hughes in Docket(s)/Project(s)
PF15-12.

112. Filed By: Timothy Glass


Filed Date: 5/22/2015
Accession No: 20150522-5028
Description: Comment of Timothy Glass in Docket(s)/Project(s)
PF15-12.

113. Filed By: Jean Standish


Filed Date: 5/22/2015
Accession No: 20150522-5062
Description: Comment of Jean Standish in Docket(s)/Project(s) PF15-
12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

23

Record
Item No. Descrintion

114. Filed By: Joseph Lawson


Filed Date: 5/22/2015
Accession No: 20150522-5395
Description: Comment of Joseph Lawson in Docket(s)/Project(s)
PF15-12.

115. Filed By: William Toner


Filed Date: 5/26/2015
Accession No: 20150526-5009
Description: Comment of William Toner in Docket(s)/Project(s)
PF15-12.

116. Filed By: Joan Ellen McCoy


Filed Date: 5/26/2015
Accession No: 20150526-5010
Description: Comment of Joan Ellen McCoy in Docket(s)/Project(s)
PF15-12.

117. Filed By: Heather Carman


Filed Date: 5/26/2015
Accession No: 20150526-5016
Description: Comment of Heather Carman in Docket(s)/Project(s)
PF15-12.

118. Filed By: Joann Ramos


Filed Date: 5/26/2015
Accession No: 20150526-5022
Description: Comment of Joann Ramos in Docket(s)/Project(s) PF15-
12.

119. Filed By: Michael J. Lang


Filed Date: 5/26/2015
Accession No: 20150526-5042
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

24

Record
Item No. Descrintion

120. Filed By: Katherine Cooke


Filed Date: 5/26/2015
Accession No: 20150526-5058
Description: Comment of Katherine Cooke in Docket(s)/Project(s)
PF15-12.

121. Filed By: Rita Raftery


Filed Date: 5/26/2015
Accession No: 20150526-5061
Description: Comment of Rita Raftery in Docket(s)/Project(s) PF15-
12.

122. Filed By: Judith Van Hamm


Filed Date: 5/26/2015
Accession No: 20150526-5182
Description: Comment of Judith Van Hamm in Docket(s)/Project(s)
PF15-12.

123. Filed By: Lawrence Ouellette


Filed Date: 5/26/2015
Accession No: 20150526-5212
Description: Comment of Lawrence Ouellette in Docket(s)/Project(s)
PF15-12.

124. Filed By: Lynn Wilson


Filed Date: 5/27/2015
Accession No: 20150527-5003
Description: Comment of Lynn Wilson in Docket(s)/Project(s) PF I 5-
12.

125. Filed By: April Churchill


Filed Date: 5/27/2015
Accession No: 20150527-5007
Description: Comment of April Churchill in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

25

Record
Item No. Descrintion

126. Filed By: Patrick Gillespie


Filed Date: 5/27/2015
Accession No: 20150527-5008
Description: Comment of Patrick Gillespie in Docket(s)/Project(s)
PF15-12.

127. Filed By: Jane C. Cleary


Filed Date: 5/27/2015
Accession No: 20150527-5044
Description: Comment of Jane C. Cleary in Docket(s)/Project(s)
PF15-12.

128. Filed By: Nicole Brogan


Filed Date: 5/27/2015
Accession No: 20150527-5072
Description: Comment of Nicole Brogan in Docket(s)/Project(s)
PF15-12.

129. Filed By: Ann Mackin


Filed Date: 5/27/2015
Accession No: 20150527-5145
Description: Comment of Ann Mackin in Docket(s)/Project(s) PF15-
12.

130. Filed By: Liz Wassell


Filed Date: 5/28/2015
Accession No: 20150528-5202
Description: Comment of Liz Wassell in Docket(s)/Project(s) PF15-
12.

131. Filed By: Gail Collins


Filed Date: 5/28/2015
Accession No: 20150528-5207
Description: Comment of Gail Collins in Docket(s)/Project(s) PF15-
12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

26

Record
Item No. Descrintion

132. Filed By: Margaret Bellafiiore


Filed Date: 5/28/2015
Accession No: 20150528-5273
Description: Comment of Margaret Bellafiore in Docket(s)/Project(s)
PF15-12.

133. Issued By: Energy Projects, Office of


Filed Date: 5/29/2015
Accession No: 20150529-4002
Description: Telephone Call Summary dated 3/13/15 re the Weekly
conference call for the pre-filing process for the Atlantic Project under
PF15-12.

134. Issued By: Energy Projects, Office of


Filed Date: 5/29/2015
Accession No: 20150529-4003
Description: Telephone Call Summary dated 4/21/15 re the Bi-
Weekly conference call for the pre-filing process for the Atlantic
Project under PF15-12.

135. Issued By: Energy Projects, Office of


Filed Date: 5/29/2015
Accession No: 20150529-4004
Description: Telephone Call Summary dated 5/5/15 re the Bi-Weekly
conference call for the pre-filing process for the Atlantic Project under
PF15-12.

136. Issued By: Energy Projects, Office of


Filed Date: 5/29/2015
Accession No: 20150529-4005
Description: Telephone Call Summary dated 5/19/15 re the Bi-
Weekly conference call for the pre-filing process for the Atlantic
Project under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

27

Record
Item No. Descrintion

137. Filed By: Carolyn Daly Brink


Filed Date: 5/29/2015
Accession No: 20150529-5081
Description: Comment of Carolyn Daly Brink in Docket(s)/Project(s)
PF15-12.

138. Filed By: Michael Pringle


Filed Date: 5/29/2015
Accession No: 20150529-5175
Description: Comment of Michael Pringle in Docket(s)/Project(s)
PF15-12.

139. Filed By: Tish Dixon


Filed Date: 6/1/2015
Accession No: 20150601-5038
Description: Comment of Tish Dixon in Docket(s)/Project(s) PF15-
12.

140. Filed By: Tracy Stiles


Filed Date: 6/1/2015
Accession No: 20150601-5045
Description: Comment of Tracy Stiles in Docket(s)/Project(s) PF15-
12.

141. Filed By: North Weymouth Civil Association


Filed Date: 6/1/2015
Accession No: 20150601-5084
Description: Comment of North Weymouth Civil Association under
PF15-12, Attached are our objections to the above mentioned
document.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

28

Record
Item No. Descrintion

142. Filed By: Stephen J. McGuire


Filed Date: 6/1/2015
Accession No: 20150601-5153
Description: Comment of Stephen J. McGuire in Docket(s)/Project(s)
PF15-12.

143. Filed By: Teresa Kunz


Filed Date: 6/1/2015
Accession No: 20150601-5154
Description: Comment of Teresa Kunz in Docket(s)/Project(s) PF15-
12.

144. Filed By: R. L. DiAngelo


Filed Date: 6/1/2015
Accession No: 20150601-5214
Description: Comment of R. L. DiAngelo in Docket(s)/Project(s)
PF15-12.

145. Filed By: Carrie Palazzo


Filed Date: 6/1/2015
Accession No: 20150601-5215
Description: Comment of Carrie Palazzo in Docket(s)/Project(s)
PF15-12.

146. Filed By: Jacquie Dann


Filed Date: 6/1/2015
Accession No: 20150601-5229
Description: Comment of Jacquie Dann in Docket(s)/Project(s) PF15-
12.

147. Filed By: Tish Dixon


Filed Date: 6/1/2015
Accession No: 20150602-0041
Description: Comments of Tish Dixon re the Atlantic Bridge Project
under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

29

Record
Item No. Descrintion

148. Filed By: Kristen Conrad


Filed Date: 6/1/2015
Accession No: 20150602-0102
Description: Comments of Kristen Conrad re the construction of the
Gas Compressor Station, Fore River, MA under PF15-12.

149. Filed By: Amy Conrad


Filed Date: 6/1/2015
Accession No: 20150602-0103
Description: Comments of Amy Conrad re the construction of the
Gas Compression Station, Fore River, MA under PF15-12.

150. Filed By: Ron Evans


Filed Date: 6/1/2015
Accession No: 20150602-0214
Description: Comments of Ron Evans re the Atlantic Bridge Project
under PF15-12.

151. Filed By: Michael P. Behrens


Filed Date: 6/1/2015
Accession No: 20150603-0078
Description: Comments of Michael P. Behrens re the Atlantic Bridge
Project under PF15-12.

152. Filed By: Beverly Sellers


Filed Date: 6/2/2015
Accession No: 20150602-0277
Description: Comments of Beverly Sellers re the Atlantic Bridge
Project under PF15-12.

153. Filed By: Irving Murstein


Filed Date: 6/2/2015
Accession No: 20150602-0278
Description: Comments of Irving Murstein re the Atlantic Bridge
Project under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

30

Record
Itein No. Descrintion

154. Filed By: Donna Pasteris


Filed Date: 6/2/2015
Accession No: 20150602-5007
Description: Comment of Donna Pasteris in Docket(s)/Project(s)
PF15-12.

155. Filed By: Gary Peters


Filed Date: 6/2/2015
Accession No: 20150602-5012
Description: Comment of Gary Peters in Docket(s)/Project(s) PF15-
12.

156. Filed By: Kristina Sheehan


Filed Date: 6/2/2015
Accession No: 20150602-5023
Description: Comment of Kristina Sheehan in Docket(s)/Project(s)
PF15-12.

157. Filed By: Kimm Gauthier


Filed Date: 6/2/2015
Accession No: 20150602-5068
Description: Protest of Kimm Gauthier under PF15-12.

158. Filed By: Laura Malagodi


Filed Date: 6/2/2015
Accession No: 20150602-5105
Description: Comment of Laura Malagodi in Docket(s)/Project(s)
PF15-12.

159. Issued By: Energy Projects, Office of


Filed Date: 6/3/2015
Accession No: 20150603-4005
Description: Transcript of May 13, 2015 Public Scoping Meeting re
National Environmental Policy Act pre-filing review for the Atlantic
Bridge Project under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

31

Record
Item No. Descrintion

160. Filed By: Maureen Sousa


Filed Date: 6/3/2015
Accession No: 20150603-5005
Description: Comment of Maureen Sousa in Docket(s)/Project(s)
PF15-12.

161. Filed By: Lauren Campbell


Filed Date: 6/3/2015
Accession No: 20150603-5008
Description: Comment of Lauren Campbell in Docket(s)/Project(s)
PF15-12.

162. Filed By: Doreen Buckley


Filed Date: 6/3/2015
Accession No: 20150603-5014
Description: Comment of Doreen Buckley in Docket(s)/Project(s)
PF15-12.

163. Filed By: Douglas Buckley


Filed Date: 6/3/2015
Accession No: 20150603-5015
Description: Comment of Douglas Buckley in Docket(s)/Project(s)
PF15-12.

Filed By: Weymouth Town Council


Filed Date: 6/3/2015
Accession No: 20150603-5047
Description: Comment of Weymouth Town Council in
Docket(s)/Project(s) PF15-12.

165. Filed By: Benjamin Kessel


Filed Date: 6/3/2015
Accession No: 20150603-5088
Description: Comment of Benjamin Kessel in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

32

Record
Item No. Descrintion

166. Filed By: Margaret Bellafiore


Filed Date: 6/4/2015
Accession No: 20150604-5003
Description: Comment of Margaret Bellafiore in Docket(s)/Project(s)
PF15-12.

167. Filed By: Leo Silva


Filed Date: 6/4/2015
Accession No: 20150604-5004
Description: Comment of Leo Silva in Docket(s)/Project(s) PF15-12.

168. Filed By: Debra Santon


Filed Date: 6/4/2015
Accession No: 20150604-5008
Description: Comment of Debra Santon in Docket(s)/Project(s) PF15-
12.

169. Filed By: Mary Walsh


Filed Date: 6/4/2015
Accession No: 20150604-5012
Description: Comment of Mary Walsh in Docket(s)/Project(s) PF15-
12.

170. Filed By: Brad L. Croall


Filed Date: 6/4/2015
Accession No: 20150604-5013
Description: Comment of Brad L. Croall in Docket(s)/Project(s)
PF15-12.

171. Filed By: Karen Duval


Filed Date: 6/4/2015
Accession No: 20150604-5055
Description: Comment of Karen Duval in Docket(s)/Project(s) PF15-
12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

33

Record
Item No. Descrintion

172. Filed By: Debra Fontaine


Filed Date: 6/4/2015
Accession No: 20150604-5065
Description: Comment of Debra Fontaine in Docket(s)/Project(s)
PF15-12.

173. Filed By: Carole Osborn


Filed Date: 6/4/2015
Accession No: 20150604-5067
Description: Comment of Carole Osborn in Docket(s)/Project(s)
PF15-12.

174. Filed By: Thomas Crider


Filed Date: 6/4/2015
Accession No: 20150604-5077
Description: Comment of Thomas Crider in Docket(s)/Project(s)
PF15-12.

175. Filed By: Patricia Shea


Filed Date: 6/4/2015
Accession No: 20150604-5144
Description: Comment of Patricia Shea in Docket(s)/Project(s) PF15-
12.

176. Filed By: Clara de Jong


Filed Date: 6/4/2015
Accession No: 20150604-5178
Description: Comment of Clara de Jong in Docket(s)/Project(s)
PF15-12.

177. Filed By: Jane C. Cleary


Filed Date: 6/5/2015
Accession No: 20150605-0013
Description: Comments of Jane C. Cleary re the Gas Pipeline Project
under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

34

Record
Item No. Descrintion

178. Issued By: Energy Projects, Office of


Filed Date: 6/5/2015
Accession No: 20150605-4002
Description: Transcript of May 14, 2015 Public Scoping Meeting re
the Atlantic Bridge Project under PF15-12.

179. Filed By: Alfred G. Woelfle


Filed Date: 6/5/2015
Accession No: 20150605-5001
Description: Comment of Alfred G. Woelfle in Docket(s)/Project(s)
PF15-12.

180. Filed By: Allison Malonson


Filed Date: 6/5/2015
Accession No: 20150605-5003
Description: Comment of Allison Malonson in Docket(s)/Project(s)
PF15-12.

181. Filed By: Rene Phillips


Filed Date: 6/5/2015
Accession No: 20150605-5005
Description: Comment of Rene Phillips in Docket(s)/Project(s) PF15-
12.

182. Filed By: Joseph Harden


Filed Date: 6/5/2015
Accession No: 20150605-5008
Description: Comment of Joseph Harden in Docket(s)/Project(s)
PF15-12.

183. Filed By: Joseph Harden


Filed Date: 6/5/2015
Accession No: 20150605-5009
Description: Comment of Joseph Harden in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

35

Record
Item No. Descrintion

Filed By: Kaitlyn Pedotti


Filed Date: 6/5/2015
Accession No: 20150605-5010
Description: Comment of Kaitlyn Pedotti in Docket(s)/Project(s)
PF15-12.

185. Filed By: Cathy Bevans


Filed Date: 6/5/2015
Accession No: 20150605-5011
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
PF15-12.

186. Filed By: Stephanie Roberts-Pedotti


Filed Date: 6/5/2015
Accession No: 20150605-5012
Description: Comment of Stephanie Roberts-Pedotti in
Docket(s)/Project(s) PF15-12.

187. Filed By: Laura West


Filed Date: 6/5/2015
Accession No: 20150605-5013
Description: Comment of Laura West in Docket(s)/Project(s) PF15-
12.

188. Filed By: Alice Arena


Filed Date: 6/5/2015
Accession No: 20150605-5014
Description: Comment of Alice Arena in Docket(s)/Project(s) PF15-
12.

189. Filed By: Alice Arena


Filed Date: 6/5/2015
Accession No: 20150605-5015
Description: Comment of Alice Arena in Docket(s)/Project(s) PF15-
12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

36

Record
Item No. Descrintion

190. Filed By: Sian Nimkoff


Filed Date: 6/5/2015
Accession No: 20150605-5065
Description: Comment of Sian Nimkoff in Docket(s)/Project(s) PF15-
12.

191. Filed By: John S. McDonough


Filed Date: 6/8/2015
Accession No: 20150608-0059
Description: Comments of John S. McDonough re the Atlantic
Bridge Project under PF15-12.

192. Filed By: Margaret Mascaro


Filed Date: 6/8/2015
Accession No: 20150608-0064
Description: Comments of Margaret Mascaro re the Atlantic Bridge
Project under PF15-12.

193. Filed By: Laura Smock


Filed Date: 6/8/2015
Accession No: 20150608-5018
Description: Comment of Laura Smock in Docket(s)/Project(s) PF15-
12.

194. Filed By: Scott Schweizer


Filed Date: 6/8/2015
Accession No: 20150608-5019
Description: Comment of Scott Schweizer in Docket(s)/Project(s)
PF15-12.

195. Filed By: Marie Shaw


Filed Date: 6/8/2015
Accession No: 20150608-5023
Description: Comment of Marie Shaw in Docket(s)/Project(s) PF15-
12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

37

Record
Item No. Descrintion

'Filed By: Laura Jones


Filed Date: 6/8/2015
Accession No: 20150608-5024
Description: Comment of Laura Jones in Docket(s)/Project(s) PF15-
12.

197. Filed By: Victoria M. Dreisbach


Filed Date: 6/8/2015
Accession No: 20150608-5025
Description: Comment of Victoria M. Dreisbach in
Docket(s)/Project(s) PF15-12.

198. Filed By: Jennifer Kleindienst


Filed Date: 6/8/2015
Accession No: 20150608-5096
Description: Comment of Jennifer Kleindienst in Docket(s)/Project(s)
PF15-12.

199. Filed By: James Ryan


Filed Date: 6/8/2015
Accession No: 20150608-5136
Description: Comment of James Ryan in Docket(s)/Project(s) PF15-
12.

200. Filed By: Lois Happe


Filed Date: 6/8/2015
Accession No: 20150608-5178
Description: Comment of Lois Happe in Docket(s)/Project(s) PF15-
12.

201. Filed By: Kate Sherwood


Filed Date: 6/8/2015
Accession No: 20150608-5191
Description: Comment of Kate Sherwood in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

38

Record
Item No. Descrintion

202. Filed By: Barbara Darling


Filed Date: 6/9/2015
Accession No: 20150609-0046
Description: Comments of Barbara Darling re the Atlantic Bridge
Project under PF15-12.

203. Filed By: Alfred E. Kelly


Filed Date: 6/9/2015
Accession No: 20150609-0051
Description: Comments of Mr. and Mrs. Alfred E. Kelly re the
Atlantic Bridge Project under PF15-12.

204. Filed By: Kathleen Caslin


Filed Date: 6/9/2015
Accession No: 20150609-0067
Description: Comments of Kathleen Caslin re the Atlantic Bridge
Project under PF15-12.

205. Filed By: Alexandra Gordon


Filed Date: 6/9/2015
Accession No: 20150609-0068
Description: Comments of Alexandra Gordon re the Atlantic Bridge
Project under PF15-12.

206. Filed By: Denise Cody


Filed Date: 6/9/2015
Accession No: 20150609-0069
Description: Comments of Denise Cody re the Atlantic Bridge
Project under PF15-12.

207. Filed By: Judith K. Kerr


Filed Date: 6/9/2015
Accession No: 20150609-0070
Description: Comments of Judith K. Kerr re the Atlantic Bridge
Project under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

39

Record
Item No. Descrintion

208. Filed By: Catherine Lawton


Filed Date: 6/9/2015
Accession No: 20150609-0071
Description: Comments of Catherine Lawton re the Atlantic Bridge
Project under PF15-12.

209. Filed By: Denise Cody


Filed Date: 6/9/2015
Accession No: 20150609-0072
Description: Comments of Denise Cody re the Atlantic Bridge
Project under PF15-12.

210. Filed By: Helen Bartkan


Filed Date: 6/9/2015
Accession No: 20150609-0073
Description: Comments of Helen Bartkan re the Atlantic Bridge
Project under PF15-12.

211. Filed By: M. Watro


Filed Date: 6/9/2015
Accession No: 20150609-0074
Description: Comments of M. Watro re the Atlantic Bridge Project
under PF15-12.

212. Filed By: Jonet O'eary


Filed Date: 6/9/2015
Accession No: 20150609-0075
Description: Comments of Jonet O'eary re the Atlantic Bridge
Project under PF15-12.

213. Filed By: Patti Sidor


Filed Date: 6/9/2015
Accession No: 20150609-0076
Description: Comments of Patti Sidor re the Atlantic Bridge Project
under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

40

Record
Item No. Descriution

214. Filed By: Julie Stark


Filed Date: 6/9/2015
Accession No: 20150609-0077
Description: Comments of Julie Stark re the Atlantic Bridge Project
under PF15-12.

215. Filed By: Kim Cross


Filed Date: 6/9/2015
Accession No: 20150609-0078
Description: Comments of Kim Cross re the Atlantic Bridge Project
under PF15-12.

216. Filed By: Cathy Bevans


Filed Date: 6/9/2015
Accession No: 20150609-5000
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
PF15-12.

217. Filed By: Cathy Bevans


Filed Date: 6/9/2015
Accession No: 20150609-5001
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
PF15-12.

218. Filed By: Cathy Bevans


Filed Date: 6/9/2015
Accession No: 20150609-5004
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
PF15-12.

219. Filed By: Rev. Eileen Mahood-Jose


Filed Date: 6/9/2015
Accession No: 20150609-5006
Description: Comment of Rev. Eileen Mahood-Jose in
Docket(s)/Project(s) PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

41

Record
Item No. Descrintion

220. Filed By: Delores Wood


Filed Date: 6/9/2015
Accession No: 20150609-5018
Description: Comment of Dolores Wood in Docket(s)/Project(s)
PF15-12.

221. Filed By: Justin Ballard


Filed Date: 6/9/2015
Accession No: 20150609-5047
Description: Comment of Justin Ballard in Docket(s)/Project(s)
PF15-12.

222. Filed By: Marilyn Stern


Filed Date: 6/9/2015
Accession No: 20150609-5073
Description: Comment of Marilyn Stern in Docket(s)/Project(s)
PF15-12.

223. Filed By: Michael Kurland


Filed Date: 6/9/2015
Accession No: 20150609-5105
Description: Comment of Michael and Miriam Kurland in
Docket(s)/Project(s) PF15-12.

224. Filed By: Michael J. Lang


Filed Date: 6/9/2015
Accession No: 20150609-5108
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
PF15-12.

225. Filed By: Ann Mackin


Filed Date: 6/9/2015
Accession No: 20150609-5132
Description: Comment of Ann Mackin in Docket(s)/Project(s) PF15-
12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

42

Record
Item No. Descrintion

226. Filed By: Yorktown Town Hall, NY


Filed Date: 6/10/2015
Accession No: 20150610-0016
Description: Town of Yorktown, New York submits comments on
Notice of Intent to Prepare an Environmental Assessment for the
Planned Atlantic Bridge Project under PF15-12.

227. Filed By: Nike Desis


Filed Date: 6/10/2015
Accession No: 20150610-0019
Description: Comments of Nike Desis re the Atlantic Bridge Pipeline
Project under PF15-12.

228. Filed By: James Root


Filed Date: 6/10/2015
Accession No: 20150610-0023
Description: Comments of James Root re the Atlantic Coast Pipeline
Project under PF15-12.

229. Filed By: Cathy Bevans


Filed Date: 6/10/2015
Accession No: 20150610-5003
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
PF15-12.

230. Filed By: Leslie Colello


Filed Date: 6/10/2015
Accession No: 20150610-5004
Description: Comment of Leslie Colello in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

43

Record
Item No. Descrintion

231. Filed By: Edith A. Folta


Filed Date: 6/10/2015
Accession No: 20150610-5009
Description: Comment of Edith A. Folta in Docket(s)/Project(s)
PF15-12.

232. Filed By: Joanna Napolitano


Filed Date: 6/10/2015
Accession No: 20150610-5012
Description: Comment of Joanna Napolitano in Docket(s)/Project(s)
PF15-12.

233. Filed By: Lori Hayden, Esq.


Filed Date: 6/10/2015
Accession No: 20150610-5039
Description: Comments of Lori Hayden, Esq. under PF15-12.

234. Filed By: Richard E. Ramponi


Filed Date: 6/10/2015
Accession No: 20150610-5048
Description: Comment of Richard E. Ramponi in
Docket(s)/Project(s) PF15-12.

235. Filed By: City of New York Dept. Of Environmental Protection


Filed Date: 6/10/2015
Accession No: 20150610-5101
Description: Comment of City of New York Dept. of Environmental
Protection under PF15-12.

236. Filed By: Riverkeeper, Inc.


Filed Date: 6/10/2015
Accession No: 20150610-5105
Description: Scoping comments of Riverkeeper, Inc. under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

44

Record
Item No. Descrintion

237. Filed By: Rebecca Haugh


Filed Date: 6/10/2015
Accession No: 20150610-5120
Description: Comment of Rebecca Haugh in Docket(s)/Project(s)
PF15-12.

238. Filed By: Rebecca Haugh


Filed Date: 6/10/2015
Accession No: 20150610-5121
Description: Comment of Rebecca Haugh in Docket(s)/Project(s)
PF15-12.

239. Filed By: Sarah Ganong


Filed Date: 6/10/2015
Accession No: 20150610-5137
Description: Comment of Sarah Ganong in Docket(s)/Project(s)
PF15-12.

240. Filed By: Helen Armstrong


Filed Date: 6/10/2015
Accession No: 20150610-5154
Description: Comment of Helen Armstrong in Docket(s)/Project(s)
PF15-12.

241. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 6/10/2015
Accession No: 20150610-5174
Description: Algonquin Gas Transmission, LLC submits its monthly
status report for the period ending May 31, 2015 for the Atlantic
Bridge Project under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

45

Record
Item No. Descrintion

242. Filed By: Mark Lonergan


Filed Date: 6/10/2015
Accession No: 20150610-5193
Description: Comment of Mark Lonergan in Docket(s)/Project(s)
PF15-12.

243. Filed By: Patrick Angland


Filed Date: 6/10/2015
Accession No: 20150610-5203
Description: Comment of Patrick Angland in Docket(s)/Project(s)
PF15-12.

Filed By: Eileen White


Filed Date: 6/10/2015
Accession No: 20150610-5204
Description: Comment of Eileen White in Docket(s)/Project(s) PF15-
12.

245. Filed By: Carolyn Mustin


Filed Date: 6/10/2015
Accession No: 20150610-5210
Description: Comment of Carolyn Mustin in Docket(s)/Project(s)
PF15-12.

Filed By: Heather Deschenes


Filed Date: 6/10/2015
Accession No: 20150610-5213
Description: Comment of Heather Deschenes in Docket(s)/Project(s)
PF15-12.

247. Filed By: Nathaniel J. Wales


Filed Date: 6/10/2015
Accession No: 20150610-5266
Description: Comment of Nathaniel J. Wales in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

46

Record
Item No. Descrintion

248. Filed By: Majority Leader Ronald Mariano


Filed Date: 6/10/2015
Accession No: 20150610-5328
Description: Letter of Opposition from Majority Leader Ronald
Mariano and Representative James M. Murphy under PF15-12.

249. Filed By: Kathy Wang


Filed Date: 6/11/2015
Accession No: 20150610-0017
Description: Comments of Kathy Wang re the Atlantic Bridge Project
under PF15-12.

250. Filed By: Margaret Kiley


Filed Date: 6/I I/2015
Accession No: 20150611-0064
Description: Comments of Margaret Kiley re the Atlantic Bridge
Project under PF15-12.

251. Filed By: Judith A. Kelliher


Filed Date: 6/11/2015
Accession No: 20150611-0065
Description: Comments of Judith A. Kelliher re the Atlantic Bridge
Project under PF15-12.

252. Filed By: Andrew Lopez


Filed Date: 6/11/2015
Accession No: 20150611-0074
Description: Comments of Andrew Lopez re the Atlantic Bridge
Pipeline Expansion Project under PF15-12.

253. Filed By: Jennifer Byrne


Filed Date: 6/11/2015
Accession No: 20150611-5001
Description: Comment of Jennifer Byrne in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

47

Record
Item No. Descrintion

254. Filed By: Robert Kearns


Filed Date: 6/11/2015
Accession No: 20150611-5004
Description: Comment of Robert Kearns in Docket(s)/Project(s)
PF15-12.

255. Filed By: Gary D. Bent


Filed Date: 6/11/2015
Accession No: 20150611-5005
Description: Comment of Gary D. Bent in Docket(s)/Project(s) PF15-
12.

256. Filed By: Russ Bowles


Filed Date: 6/11/2015
Accession No: 20150611-5006
Description: Comment of Russ Bowles in Docket(s)/Project(s) PF15-
12.

257. Filed By: Marcia Wilkins


Filed Date: 6/11/2015
Accession No: 20150611-5007
Description: Comment of Marcia Wilkins in Docket(s)/Project(s)
PF15-12.

258. Filed By: Tulay Luciano


Filed Date: 6/11/2015
Accession No: 20150611-5008
Description: Comment of Tulay Luciano in Docket(s)/Project(s)
PF15-12.

259. Filed By: Sandra Peters


Filed Date: 6/11/2015
Accession No: 20150611-5014
Description: Comment of Sandra Peters in Docket(s)/Project(s) PF15-
12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

48

Record
Item No. Descrintion

260. Filed By: Sandra Peters


Filed Date: 6/11/2015
Accession No: 20150611-5016
Description: Comment of Sandra Peters in Docket(s)/Project(s) PF15-
12.

261. Filed By: Richard Joyce


Filed Date: 6/11/2015
Accession No: 20150611-5017
Description: Comment of Richard Joyce in Docket(s)/Project(s)
PF15-12.

262. Filed By: Douglas F. Fraser


Filed Date: 6/11/2015
Accession No: 20150611-5020
Description: Comment of Douglas F. Fraser under PF15-12 describes
the impact of the gas line construction on the timber rattlesnake in the
Glastonbury, Ct area. It recommends a no-build option, but includes
recommendations if the option is declined.

263. Filed By: Sierra Club Lower Hudson Group


Filed Date: 6/11/2015
Accession No: 20150611-5034
Description: Comments of Sierra Club Lower Hudson Group under
PF15-12.

Filed By: Kathleen J. Crowell


Filed Date: 6/11/2015
Accession No: 20150611-5035
Description: Comment of Kathleen J. Crowell under PF15-12
20180216-0021 FERC PDF (Unofficial) 02/16/2018

49

Record
Item No. Descrintion

265. Filed By: Robert Hedlund


Filed Date: 6/11/2015
Accession No: 20150611-5043
Description: Comment of Robert Hedlund in Docket(s)/Project(s)
PF15-12.

266. Filed By: Michael J. Lang


Filed Date: 6/11/2015
Accession No: 20150611-5092
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
PF15-12.

267. Filed By: James Gannon


Filed Date: 6/11/2015
Accession No: 20150611-5099
Description: Comment of James Gannon in Docket(s)/Project(s)
PF15-12.

268. Filed By: David J. Reich


Filed Date: 6/11/2015
Accession No: 20150611-5109
Description: Comment of David J. Reich in Docket(sg roject(s)
PF15-12.

269. Filed By: Alan F. Haughty


Filed Date: 6/11/2015
Accession No: 20150611-5111
Description: Comments of Alan F. Haughty opposing the Cromwell
Discharge Loop Route Variation under PF15-12.

270. Filed By: William Schwartz


Filed Date: 6/11/2015
Accession No: 20150611-5127
Description: Comment of William Schwartz in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

50

Record
Item No. Descrintion

271. Filed By: Connecticut Department of Energy and Environmental


Protection
Filed Date: 6/11/2015
Accession No: 20150611-5144
Description: Scoping Comments of Connecticut Department of
Energy and Environmental Protection under PF15-12, Spectra
Atlantic Bridge Project.

272. Filed By: Geoff Potter


Filed Date: 6/11/2015
Accession No: 20150611-5155
Description: Comment of Geoff Potter in Docket(s)/Project(s) PF15-
12.

273. Filed By: D. Shakti Lane


Filed Date: 6/11/2015
Accession No: 20150611-5157
Description: Comment of D. Shakti Lane in Docket(s)/Project(s)
PF15-12.

274. Filed By: Regina M. Potter


Filed Date: 6/11/2015
Accession No: 20150611-5163
Description: Comment of Regina M. Potter in Docket(s)/Project(s)
PF15-12.

275. Filed By: Patrick O'onnor


Filed Date: 6/11/2015
Accession No: 20150611-5167
Description: Comment of Patrick O'onnor in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

51

Record
Item No. Descrintion

276. Filed By: Food k Water Watch Stop the Algonquin Pipeline
Expansion
Filed Date: 6/11/2015
Accession No: 20150611-5175
Description: Scoping Comments of Food 4, Water Watch, 350 MA,
Better Future Project, Clean Water Action MA, No Fracked Gas in
Mass, Stop NED, Toxics Action Center, 350 CT, CT Chapter of The
Sierra Club, Sierra Club Lower Hudson Group, Keep Yorktown Safe,
SAPE, PF15-12

277. Filed By: Jonathan Hyman


Filed Date: 6/11/2015
Accession No: 20150611-5190
Description: Comment of Jonathan Hyman in Docket(s)/Project(s)
PF15-12.

278. Filed By: Town of Weymouth


Filed Date: 6/11/2015
Accession No: 20150611-5216
Description: Comment of the Town of Weymouth under PF15-12.

279. Filed By: Massachusetts Energy Facilities Siting Board


Filed Date: 6/11/2015
Accession No: 20150611-5231
Description: Comment of Massachusetts Energy Facilities Siting
Board under PF15-12, Due to the volume of comments received from
the public and elected officials the Board cannot file a final comment
letter now, but will do so at earliest convenience.

280. Filed By: Sarah Belfort


Filed Date: 6/12/2015
Accession No: 20150612-5001
Description: Comment of Sarah Belfort in Docket(s)/Project(s) PF15-
12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

52

Record
Item No. Descri otion

281. Filed By: Amy Conrad


Filed Date: 6/12/2015
Accession No: 20150612-5002
Description: Comment of Amy Conrad in Docket(s)/Project(s) PF15-
12.

282. Filed By: Councilor Margaret Laforest


Filed Date: 6/12/2015
Accession No: 20150612-5004
Description: Comment of Councilor Margaret Laforest in
Docket(s)/Project(s) PF15-12.

283. Filed By: Edith Schade


Filed Date: 6/12/2015
Accession No: 20150612-5006
Description: Comment of Edith Schade in Docket(s)/Project(s) PF15-
12.

284 Filed By: Garrett Sullivan


Filed Date: 6/12/2015
Accession No: 20150612-5008
Description: Comment of Garrett Sullivan in Docket(s)/Project(s)
PF15-12.

285. Filed By: Jodi Purdy-Quinlan


Filed Date: 6/12/2015
Accession No: 20150612-5010
Description: Comment of Jodi Purdy-Quinlan in Docket(s)/Project(s)
PF15-12.

286. Filed By: Jennifer Mazgelis


Filed Date: 6/12/2015
Accession No: 20150612-5012
Description: Comment of Jennifer Mazgelis in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

53

Record
Item No. Descrintion

287. Filed By: Rachel Wencek


Filed Date: 6/12/2015
Accession No: 20150612-5013
Description: Comment of Rachel Wencek in Docket(s)/Project(s)
PF15-12.

288. Filed By: Jim Bacon


Filed Date: 6/12/2015
Accession No: 20150612-5016
Description: Comment of Jim Bacon in Docket(sg roject(s) PF15-
12.

289. Filed By: Grassroots Environmental Education


Filed Date: 6/12/2015
Accession No: 20150612-5036
Description: Report of Grassroots Environmental Education under
PF15-12.

290. Filed By: Martha Smith-Blackmore


Filed Date: 6/12/2015
Accession No: 20150612-5042
Description: Comment of Martha Smith-Blackmore in
Docket(s)/Project(s) PF15-12.

291. Filed By: Peter McKnight


Filed Date: 6/12/2015
Accession No: 20150612-5154
Description: Comment of Peter McKnight in Docket(s)/Project(s)
PF15-12.

292. Filed By: Michael J. Lang


Filed Date: 6/15/2015
Accession No: 20150616-0016
Description: Comments of Michael J. Lang re the Atlantic Bridge
Project under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

54

Record
Item No. Descrintion

293. Filed By: Rosemary Thibodaux


Filed Date: 6/15/2015
Accession No: 20150616-0025
Description: Comments of Rosemary Thibodaux re the Mountain
Valley Pipeline Project under PF15-12.

Filed By: Christine Walsh


Filed Date: 6/15/2015
Accession No: 20150616-0036
Description: Comments of Christine Walsh re the Gas Pipeline
Project under PF15-12.

295. Filed By: Patricia Ramondetta


Filed Date: 6/15/2015
Accession No: 20150616-0054
Description: Comments of Patricia Ramondetta re Spectra Energy's
Atlantic Bridge Project under PF15-12.

296. Filed By: Marilyn N. McLeod


Filed Date: 6/15/2015
Accession No: 20150616-0094
Description: Comments of Marilyn N. McLeod re the Atlantic Bridge
Project under PF15-12.

297. Filed By: Richard Dorey


Filed Date: 6/15/2015
Accession No: 20150616-0096
Description: Comments of Richard Dorey re the Atlantic Bridge
Project under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

55

Record
Item No. Descriution

298. Filed By: New York City Dept. of Environmental Protection


Filed Date: 6/15/2015
Accession No: 20150618-0009
Description: New York City Department of Environmental Protection
submits comments on Algonquin Gas Transmission, LLC's Atlantic
Bridge Project under PF15-12.

Filed By: US Environmental Protection Agency


Filed Date: 6/16/2015
Accession No: 20150616-4003
Description: US Environmental Protection Agency submits
comments re the Atlantic Bridge Project under PF15-12.

300. Filed By: Thomas P. Koch


Filed Date: 6/17/2015
Accession No: 20150617-0029
Description: Comments of Thomas P. Koch re the Atlantic Bridge
Project under PF15-12.

301. Filed By: Weymouth, Town of (MA)


Filed Date: 6/18/2015
Accession No: 20150618-0021
Description: Comments of Mayor of Town of Weymouth
Massachusetts, Susan M. Kay re the Atlantic Bridge Project under
PF15-12.

302. Filed By: Massachusetts Energy Facilities Siting Board


Filed Date: 6/18/2015
Accession No: 20150618-5179
Description: Comment of Massachusetts Energy Facilities Siting
Board under PF15-12, including copies of all comments received from
elected officials and local residents and a transcript of the public
comment hearing held by the EFSB on May 27, 2015.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

56

Record
Item No. Descrintion

303. Filed By: Sue Chris Carrillo


Filed Date: 6/22/2015
Accession No: 20150622-5100
Description: Amended Motion to Intervene of Sue Chris Carrillo
under CP14-522-000 to include the Algonquin pipeline and Atlantic
Bridge Projects.

Filed By: Massachusetts Energy Facilities Siting Board


Filed Date: 6/22/2015
Accession No: 20150622-5164
Description: Comment of Massachusetts Energy Facilities Siting
Board under PF15-12, enclosing comment letter from Mayor Thomas
Koch of Quincy, Massachusetts, which was inadvertently omitted
I'rom the previous filing on June 18, 2015.

305. Filed By: Algonquin Gas Transmission, LLC Maritimes 4Northeast


Pipeline, LLC
Filed Date: 6/25/2015
Accession No: 20150625-5139
Description: Algonquin Gas Transmission, LLC, et al. Response to
Scoping Comments, Docket No. PF15-12.

306. Issued By: Energy Projects, Office of


Filed Date: 6/29/2015
Accession No: 20150629-4003
Description: Meeting minutes for the 6/2/15 bi-weekly conference
call between FERC staff and Natural Resource Group, LLC re the
Atlantic Bridge Project under PF15-12.

307. Issued By: Energy Projects, Office of


Filed Date: 6/29/2015
Accession No: 20150629-4004
Description: Meeting minutes for the 6/16/15 bi-weekly conference
call between FERC staff and Natural Resource Group, LLC re the
Atlantic Bridge Project under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

57

Record
Item No. Descrintion

308. Filed By: Nathaniel J. Wales


Filed Date: 6/30/2015
Accession No: 20150630-5124
Description: Report / Form of Nathaniel J. Wales under PF15-12.

309. Filed By: Nathaniel J. Wales


Filed Date: 6/30/2015
Accession No: 20150630-5129
Description: Report / Form of Nathaniel J. Wales under PF15-12.

310. Filed By: Nathaniel J. Wales


Filed Date: 7/1/2015
Accession No: 20150701-5050
Description: Air quality health hazards modeled from SWPA-EHP
research plotted at proposed site of Weymouth compressor station
submitted by Nathaniel J. Wales under PF15-12.

311. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/1/2015
Accession No: 20150701-5121
Description: Updated Stakeholder List of Algonquin Gas
Transmission, LLC under PF15-12.

312. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/1/2015
Accession No: 20150701-5122
Description: Updated Stakeholder List of Algonquin Gas
Transmission, LLC under PF15-12.

313. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/1/2015
Accession No: 20150701-5287
Description: Algonquin Gas Transmission, LLC hereby submits its
Draft Resource Reports 1 through 12 for the Atlantic Bridge Project
under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

58

Record
Item No. Descrintion

314. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/1/2015
Accession No: 20150701-5288
Description: Algonquin Gas Transmission, LLC hereby submits its
Draft Resource Reports 1 through 12 for the Atlantic Bridge Project
under PF15-12.

315. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/1/2015
Accession No: 20150701-5289
Description: Algonquin Gas Transmission, LLC hereby submits its
Draft Resource Reports 1 through 12 for the Atlantic Bridge Project
under PF15-12.

316. Filed By: Stop the Algonquin Pipeline Expansion


Filed Date: 7/6/2015
Accession No: 20150706-5048
Description: Protest of Stop the Algonquin Pipeline Expansion under
PF15-12.

317. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/9/2015
Accession No: 20150709-5213
Description: Monthly Report No. 4 of Algonquin Gas Transmission,
LLC for the Atlantic Bridge Project under PF15-12.

318. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/15/2015
Accession No: 20150715-5136
Description: Response of Algonquin Gas Transmission, LLC to
Comments of Stop the Algonquin Pipeline Expansion, et al. under
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Descrintion

319. Filed By: Joseph Lipoma


Filed Date: 7/20/2015
Accession No: 20150720-0068
Description: Comments of Joseph Lipoma re the Spectra Atlantic
Bridge Project under PF15-12.

320. Filed By: Suzanna Torres


Filed Date: 7/23/2015
Accession No: 20150723-0027
Description: Comments of Suzanne Torres re the Atlantic Bridge
Project under PF15-12.

321. Filed By: Town of Weymouth


Filed Date: 7/24/2015
Accession No: 20150724-5064
Description: Comment of Weymouth's District 1 Town Councilor
Rebecca Hough requesting afFected landowners list for Atlantic
Bridge Project Docket ¹PF15-12.

322. Filed By: Massachusetts Energy Facilities Siting Board


Filed Date: 7/24/2015
Accession No: 20150724-5145
Description: Comment of Massachusetts Energy Facilities Siting
Board on draft resource reports submitted in Atlantic Bridge pre-filing
proceeding: PF15-12.

323. Filed By: Christopher S. Sweeney


Filed Date: 7/27/2015
Accession No: 20150727-5026
Description: Comments of Christopher S. Sweeney under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

60

Record
Item No. Descrintion

324. Filed By: Brad L. Croall


Filed Date: 7/28/2015
Accession No: 20150728-5008
Description: Comment of Brad L. Croall in Docket(s)/Project(s)
PF15-12.

325. Filed By: Sue Carrillo


Filed Date: 7/28/2015
Accession No: 20150728-5010
Description: Motion to Intervene of Sue Camllo under CP14-522, et
al.

326. Filed By: Weymouth, Town of (MA)


Filed Date: 7/30/2015
Accession No: 20150730-0020
Description: Town of Weymouth, MA submits comments re the
Atlantic Bridge Project under PF15-12.

327. Filed By: Weymouth, Town of (MA)


Filed Date: 7/30/2015
Accession No: 20150730-0021
Description: Susan M. Kay, Mayor of the Town of Weymouth, MA,
submits comments re the Atlantic Bridge Project under PF15-12.

328. Filed By: Stockbridge-Munsee Community Band of Mohican Indians


Filed Date: 8/5/2015
Accession No: 20150805-5139
Description: Comment of Stockbridge-Munsee Community Band of
Mohican Indians under PF15-12.

329. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 8/7/2015
Accession No: 20150807-5018
Description: Updated Landowner List of Algonquin Gas
Transmission, LLC for the Atlantic Bridge Project under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

61

Record
Item No. Descrintion

330. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 8/7/2015
Accession No: 20150807-5019
Description: Updated Landowner List of Algonquin Gas
Transmission, LLC for the Atlantic Bridge Project under PF15-12.

331. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 8/11/2015
Accession No: 20150811-5155
Description: Monthly Progress Report No. 5 of Algonquin Gas
Transmission, LLC for the Atlantic Bridge Project under PF15-12.

332. Filed By: Weymouth Town Counsel


Filed Date: 8/13/2015
Accession No: 20150813-5136
Description: Comment of Weymouth's District 1 Town Councilor
Rebecca Haugh requesting an EIS for the Atlantic Bridge Project
under PF15-12.

333. Issued By: Energy Projects, Office of


Filed Date: 8/19/2015
Accession No: 20150819-3009
Description: Letter to Spectra Energy Partners re comments on Draft
Resource Reports 1 through 11 for Algonquin Gas Transmission,
LLC's et al Atlantic Bridge Project under PF15-12.

334. Filed By: New York City Department of Environmental Protection


Filed Date: 8/19/2015
Accession No: 20150819-5089
Description: Comment of New York City Department of
Environmental Protection under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

62

Record
Item No. Descrintion

335. Issued By: Energy Projects, Office of


Filed Date: 8/20/2015
Accession No: 20150820-3015
Description: Letter inviting the Delaware Tribe of Indians to
participate in the review of the Atlantic Bridge Pipeline Project
planned by Algonquin Gas Transmission, LLC under PF15-12.

336. Issued By: Energy Projects, Office of


Filed Date: 8/20/2015
Accession No: 20150820-3016
Description: Letter inviting the Mashantucket Pequot Indian Tribe to
participate in the review of the Atlantic Bridge Pipeline Project
planned by Algonquin Gas Transmission, LLC under PF15-12.

337. Issued By: Energy Projects, Office of


Filed Date: 8/20/2015
Accession No: 20150820-3017
Description: Letter inviting the Mohegan Tribe of Indians to
participate in the review of the Atlantic Bridge Pipeline Project
planned by Algonquin Gas Transmission, LLC under PF15-12.

338. Issued By: Energy Projects, Office of


Filed Date: 8/20/2015
Accession No: 20150820-3018
Description: Letter inviting Mashpee Wampanoag Tribe to participate
in the review of the Atlantic Bridge Project planned by Algonquin
Gas Transmission, LLC under PF15-12.

339. Issued By: Secretary of the Commission, FERC


Filed Date: 8/20/2015
Accession No: 20150820-3019
Description: Letter inviting Narragansett Indian Tribe to participate
in the review of the Atlantic Bridge Pipeline Project planned by
Algonquin Gas Transmission, LLC under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

63

Record
Item No. Descriotion

340. Issued By: Energy Projects, Ofnce of


Filed Date: 8/20/2015
Accession No: 20150820-3020
Description: Letter inviting Stockbridge-Munsee Band of the
Mohican Nation to participate in the review of the Atlantic Bridge
Pipeline Project planned by Algonquin Gas Transmission, LLC under
PF15-12.

341. Issued By: Energy Projects, Office of


Filed Date: 8/20/2015
Accession No: 20150820-3021
Description: Letter inviting Saint Regis Mohawk Tribe to participate
in the review of the Atlantic Bridge Project planned by Algonquin
Gas Transmission, LLC under PF15-12.

342. Issued By: Energy Projects, Office of


Filed Date: 8/20/2015
Accession No: 20150820-3022
Description: Letter inviting Saint Regis Mohawk Tribe of New York
to participate in the review of Algonquin Gas Transmission, LLC's
Atlantic Bridge Pipeline Project under PF15-12.

343. Issued By: Energy Projects, Office of


Filed Date: 8/20/2015
Accession No: 20150820-3023
Description: Letter inviting Saint Regis Mohawk Tribe to participate
in the review of the Atlantic Bridge Pipeline Project planned by
Algonquin Gas Transmission, LLC under PF15-12.

Issued By: Energy Projects, Office of


Filed Date: 8/20/2015
Accession No: 20150820-3024
Description: Letter inviting Wampanoag Tribe of Gay Head
(Aquinnah) to participate in the review of Algonquin Gas
Transmission, LLC's Atlantic Bridge Project under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Deseriotioa

345. Issued By: Energy Projects, Office of


Filed Date: 8/20/2015
Accession No: 20150820-3025
Description: Letter inviting Delaware Nation of Oklahoma to
participate in the review of the Atlantic Bridge Project planned by
Algonquin Gas Transmission, LLC under PF15-12.

346. Issued By: Energy Projects, Office of


Filed Date: 8/20/2015
Accession No: 20150820-3026
Description: Letter inviting Wampanoag Houlton Band of Maliseet
Indians to participate in the review of the Atlantic Bridge Project
planned by Algonquin Gas Transmission, LLC under PF15-12.

347. Issued By: Energy Projects, Office of


Filed Date: 8/20/2015
Accession No: 20150820-3027
Description: Letter inviting Arrostook Band of Micmacs to
participate in the review of the Atlantic Bridge Pipeline Project
planned by Algonquin Gas Transmission, LLC under PF15-12.

348. Issued By: Energy Projects, Office of


Filed Date: 8/20/2015
Accession No: 20150820-3028
Description: Letter inviting Penobscot Indian Nation to participate in
the review of the proposed Atlantic Bridge Pipeline Project planned
by Algonquin Gas Transmission, LLC under PF15-12.

349. Issued By: Energy Projects, Office of


Filed Date: 8/20/2015
Accession No: 20150820-3029
Description: Letter inviting Passamaquoddy Tribe-Indian Township
to participate in the review of the Atlantic Bridge Project planned by
Algonquin Gas Transmission, LLC under PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

65

Record
Item No. Descrintion

350. Issued By: Energy Projects, Office of


Filed Date: 8/20/2015
Accession No: 20150820-3030
Description'. Letter inviting Passamaquoddy Tribe-Pleasant Point to
participate in the review of the Atlantic Bridge Pipeline Project
planned by Algonquin Gas Transmission, LLC under PF15-12.

351. Filed By: New York City Department of Environmental Protection


Filed Date: 8/21/2015
Accession No: 20150824-0006
Description: New York City Department of Environmental Protection
submits comments re the Draft Resource Reports 1 through 12 for the
Atlantic Bridge Project under PF15-12.

352. Filed By: Connecticut Department of Energy and Environmental


Protection
Filed Date: 9/4/2015
Accession No: 20150904-5346
Description: Comments of Connecticut Department of Energy and
Environmental Protection under PF15-12, on Resource Reports for
Atlantic Bridge Project.

353. Filed By: Connecticut Siting Council


Filed Date: 9/23/2015
Accession No: 20150923-0012
Description: The Connecticut Siting Council submits comments re
the Atlantic Bridge Project under PF15-12.

354. Issued By: Energy Projects, Office of


Filed. Date: 9/28/2015
Accession No: 20150928-4005
Description: Summary of the June 30, 2015 agency meeting minutes
between FERC staff, Natural Resource Group, LLC, Algonquin Gas
Transmission, et al regarding the Atlantic Bridge Project under PF15-
12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Descrintion

355. Issued By: Energy Projects, Office of


Filed Date: 9/28/2015
Accession No: 20150928-4006
Description: Summary of the August 11, 2015 agency meeting
minutes between FERC staff, Natural Resource Group, LLC,
Algonquin Gas Transmission, et al regarding the Atlantic Bridge
Project under PF15-12.

356. Issued By: Energy Projects, Once of


Filed Date: 9/28/2015
Accession No: 20150928-4007
Description: Summary of the July 14, 2015 agency meeting minutes
between FERC staff, Natural Resource Group, LLC, Algonquin Gas
Transmission, et al regarding the Atlantic Bridge Project under PF15-
12.

357. Issued By: Energy Projects, Office of


Filed Date: 9/28/2015
Accession No: 20150928-4008
Description: Summary of the September 8, 2015 agency meeting
minutes between FERC staff, Natural Resource Group, LLC,
Algonquin Gas Transmission, et al regarding the Atlantic Bridge
Project under PF15-12.

358. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 10/22/2015
Accession No: 20151022-5282
Description: Algonquin Gas Transmission, LLC's Abbreviated
Application for a Certificate of Public Convenience and Necessity and
for Related Authorizations for its proposed Atlantic Bridge Project
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

67

Record
Item No. Descrintion

359. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 10/22/2015
Accession No: 20151022-5283
Description: Algonquin Gas Transmission, LLC's Abbreviated
Application for a Certificate of Public Convenience and Necessity and
for Related Authorizations for its proposed Atlantic Bridge Project
under CP16-9.

360. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 10/22/2015
Accession No: 20151022-5284
Description: Algonquin Gas Transmission, LLC's Abbreviated
Application for a Certificate of Public Convenience and Necessity and
for Related Authorizations for its proposed Atlantic Bridge Project
under CP16-9.

361. Issued By: Secretary of the Commission, FERC


Filed Date: 11/5/2015
Accession No: 20151105-3006
Description: Notice of Algonquin Gas Transmission, LLC's et al
10/22/15 application requesting authorization to construct and operate
the Atlantic Bridge Project etc. under CP16-9 et al.

362. Issued By: Secretary of the Commission, FERC


Filed Date: 11/5/2015
Accession No: 20151105-3059
Description: Errata for Notice of Application re Algonquin Gas
Transmission, LLC et al under CP16-9 et aL

363. Filed By: New York State Department of Environmental Conservation


Filed Date: 11/6/2015
Accession No: 20151106-5032
Description: Motion to Intervene of New York State Department of
Environmental Conservation under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

68

Record
Item No. Descrintion

Filed By: New Jersey Natural Gas Company


Filed Date: 11/6/2015
Accession No: 20151106-5149
Description: Motion to Intervene of New Jersey Natural Gas
Company under CP16-9.

365. Filed By: NJR Energy Services Company


Filed Date: 11/6/2015
Accession No: 20151106-5156
Description: Motion to Intervene of NJR Energy Services Company
under CP16-9.

Filed By: Gary Peters


Filed Date: 11/10/2015
Accession No: 20151110-5083
Description: Comment of Gary Peters in Docket(s)/Project(s) CP16-
9

367. Filed By: PSEG Energy Resources 4, Trade LLC


Filed Date: 11/10/2015
Accession No: 20151110-5087
Description: Motion to Intervene of PSEG Energy Resources 8c
Trade LLC under CP16-9.

368. Filed By: Debra Santon


Filed Date: 11/13/2015
Accession No: 20151113-5003
Description: Comment of Debra Santon in Docket(s)/Project(s)
CP16-9.

369. Filed By: Christopher Garofalo


Filed Date: 11/13/2015
Accession No: 20151113-5004
Description: Comment of Christopher Garofalo in
Docket(s)/Project(s) CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Descrintion

370. Filed By: Peter Delano


Filed Date: 11/13/2015
Accession No: 20151113-5029
Description: Comment of Peter Delano in Docket(s)/Project(s) CP16-
9.
371. Filed By: John P. Sullivan
Filed Date: 11/13/2015
Accession No: 20151113-5032
Description: Comment of John P. Sullivan in Docket(s)/Project(s)
CP16-9.

372. Filed By: Massachusetts Energy Facilities Siting Board


Filed Date: 11/13/2015
Accession No: 20151113-5229
Description: Motion to Intervene of Massachusetts Energy Facilities
Siting Board under CP16-9.

373. Filed By: Andrea McLain


Filed Date: 11/16/2015
Accession No: 20151116-5001
Description: Comment of Andrea McLain in Docket(s)/Project(s)
CP16-9.

374. Filed By: Eugene Brusin


Filed Date: 11/17/2015
Accession No: 20151117-5029
Description: Comment of Eugene Brusin in Docket(s)/Project(s)
CP16-9.

375. Filed By: Calpine Energy Services, L.P.


Filed Date: 11/17/2015
Accession No: 20151117-5098
Description: Motion to Intervene of Calpine Energy Services, L.P.
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

70

Record
Item No. Descrintion

376. Filed By: Eversource Energy Service Company


Filed Date: 11/17/2015
Accession No: 20151117-5109
Description: Motion to Intervene of Eversource Energy Service
Company under CP16-9.

377. Filed By: Weymouth, Massachusetts, Town of


Filed Date: 11/18/2015
Accession No: 20151118-5071
Description: Motion to Intervene of Town of Weymouth
Massachusetts under CP16-9.

378. Filed By: Cindy Lydon


Filed Date: 11/18/2015
Accession No: 20151118-5104
Description: Comment of Cindy Lydon in Docket(s)/Proj ect(s) CP16-
9.

379. Filed By: GDF Suez Gas NA LLC


Filed Date: 11/18/2015
Accession No: 20151118-5159
Description: Motion to Intervene of GDF Suez Gas NA LLC under
CP16-9

380. Filed By: Wayne Mathews


Filed Date: 11/18/2015
Accession No: 20151118-5172
Description: Comment of Wayne Mathews in Docket(s)/Proj ect(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

71

Record
Item No. Descrintion

381. Issued By: Secretary of the Commission, FERC


Filed Date: 11/19/2015
Accession No: 20151119-3085
Description: Supplemental Notice of Intent to Prepare an
Environmental Assessment for and Requesting Comments on the
Proposed Atlantic Bridge Project re Algonquin Gas Transmission,
LLC under CP16-9.

382. Filed By: Chris Garofalo


Filed Date: 11/19/2015
Accession No: 20151119-5004
Description: Comment of Chris Garofalo in Docket(s)/Project(s)
CP16-9.

383. Filed By: Repsol Energy North America Corporation


Filed Date: 11/19/2015
Accession No: 20151119-5013
Description: Motion to Intervene of Repsol Energy North America
Corporation under CP16-9.

384. Filed By: New York State Electric 8c Gas Corporation Maine Natural
Gas Corporation
Filed Date: 11/19/2015
Accession No: 20151119-5037
Description: Motion to Intervene of New York State Electric k, Gas
Corporation and Maine Natural Gas Company under CP16-9.

385. Filed By: Michael J. Lang


Filed Date: 11/19/2015
Accession No: 20151119-5129
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

72

Record
Item No. Descrintion

386. Filed By: New York State Department of Environmental Conservation


Filed Date: 11/19/2015
Accession No: 20151119-5155
Description: Request for Extension of Time to File Comments of
New York State Department of Environmental Conservation under
CP16-9.

387. Filed By: Consolidated Edison Company of New York, Inc. and
Orange and Rockland Utilities, Inc.
Filed Date: 11/19/2015
Accession No: 20151119-5161
Description: Motion to Intervene of Consolidated Edison Company
of New York, Inc. and Orange and Rockland Utilities, Inc. under
CP16-9.

388. Filed By: Sandra Peters


Filed Date: 11/20/2015
Accession No: 20151120-5056
Description: Motion to Intervene of Sandra Peters under CP16-9.

389. Filed By: Portland Natural Gas Transmission System


Filed Date: 11/20/2015
Accession No: 20151120-5212
Description: Portland Natural Gas Transmission System Motion for
Leave to Intervene under CP16-9.

390. Filed By: Repsol Energy North America Corporation


Filed Date: 11/20/2015
Accession No: 20151120-5280
Description: Motion for Extension of Time of Repsol Energy North
America Corporation under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

73

Record
Item No. Descrintion

391. Filed By: Christa Dunn


Filed Date: 11/23/2015
Accession No: 20151123-5018
Description: Comment of Christa Dunn in Docket(s)/Project(s) CP16-
9.
392. Filed By: Mary-Ellen Devine
Filed Date: 11/23/2015
Accession No: 20151123-5037
Description: Comment of Mary-Ellen Devine in Docket(s)/Project(s)
CP16-9.

393. Filed By: Allegheny Defense Project


Filed Date: 11/23/2015
Accession No: 20151123-5040
Description: Motion to Intervene of Allegheny Defense Project under
CP16-9.

394. Filed By: National Grid Gas Delivery Companies


Filed Date: 11/23/2015
Accession No: 20151123-5120
Description: Motion to Intervene of the National Grid Gas Delivery
Companies under CP16-9.

395. Filed By: Rebecca Haugh


Filed Date: 11/23/2015
Accession No: 20151123-5150
Description: Motion to Intervene of Rebecca Haugh under CP16-9.

396. Filed By: Sara McLaughlin


Filed Date: 11/23/2015
Accession No: 20151123-5162
Description: Comment of Sara McLaughlin in Docket(s)/Project(s)
PF15-12.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

74

Record
Item No. Des crintion

397. Filed By: Margaret Bellafiore


Filed Date: 11/23/2015
Accession No: 20151123-5218
Description: Comment of Margaret Bellafiore in Docket(s)/Project(s)
CP16-9.

398. Filed By: Mobil Natural Gas Inc.


Filed Date: 11/23/2015
Accession No: 20151123-5260
Description: Motion to Intervene of Mobil Natural Gas Inc. under
CP16-9.

Filed By: William Bolsover


Filed Date: 11/24/2015
Accession No: 20151124-5001
Description: Comment of William Bolsover in Docket(s)/Project(s)
CP16-9.

400. Filed By: Angel Montanez


Filed Date: 11/24/2015
Accession No: 20151124-5011
Description: Comment of Captain Angel Montanez in
Docket(s)/Project(s) CP16-9.

401. Filed By: Exelon Corporation


Filed Date: 11/24/2015
Accession No: 20151 124-5136
Description: Motion to Intervene of Exelon Corporation under CP16-
9.
402. FiledBy: CityofNew York
Filed Date: 11/24/2015
Accession No: 20151124-5146
Description: Motion to Intervene of the City of New York under
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

75

Record
Item No. Descrintion

403. Filed By: Quincy, City of


Filed Date: 11/24/2015
Accession No: 20151124-5194
Description: Motion to Intervene of Quincy, City of under CP16-9.

Filed By: Riverkeeper, Inc.


Filed Date: 11/24/2015
Accession No: 20151124-5218
Description: Comments of Riverkeeper, Inc. under CP16-9.

405. Filed By: Riverkeeper, Inc.


Filed Date: 11/24/2015
Accession No: 20151124-5237
Description: Motion to Intervene of Riverkeeper, Inc. under CP16-9.

406. Filed By: Tenaska Marketing Ventures


Filed Date: 11/24/2015
Accession No: 20151125-5056
Description: Motion to Intervene of Tenaska Marketing Ventures
under CP16-9.

407. Issued By: Energy Projects, 06ice of


Filed Date: 11/25/2015
Accession No: 20151125-3002
Description: Letter requesting Algonquin Gas Transmission, LLC et
al to file a complete response within ten days re the data request to
assist in the analysis of the application under CP16-9.

408. Filed By: Natural Gas Supply Association


Filed Date: 11/25/2015
Accession No: 20151125-5001
Description: Comment of Natural Gas Supply Association on
Algonquin Gas Transmission, LLC and Maritimes 8t Northeast
Pipeline on Atlantic Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

76

Record
Item No. Descrintion

409. Filed By: James C. Root


Filed Date: 11/25/2015
Accession No: 20151125-5041
Description: Comment of James C. Root in Docket(s)/Project(s)
CP16-9.

410. Filed By: Arnold Piacentini


Filed Date: 11/25/2015
Accession No: 20151125-5088
Description: Report of Arnold Piacentini Conclusions of work
evaluating fracked gas public policy under CP14-529, et aL Requests
that FERC reevaluate fundamentals of this policy. Requests that
FERC cease approving fracked gas infrastructure proposals.

411. Filed By: John McDonough


Filed Date: 11/25/2015
Accession No: 20151125-5106
Description: Comment of John McDonough in Docket(s)/Project(s)
CP16-9.

412. Filed By: New England Local Distribution Companies


Filed Date: 11/25/2015
Accession No: 20151125-5213
Description: Motion to Intervene and Comments in Support of the
New England Local Distribution Companies under CP16-9.

413. Filed By: Lisa Clemence


Filed Date: 11/25/2015
Accession No: 20151125-5284
Description: Comment of Lisa Clemence in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

77

Record
Item No. Descrintion

414. Filed By: Pipe Line Awareness Network for the Northeast, Inc.
Filed Date: 11/25/2015
Accession No: 20151125-5373
Description: Motion to Intervene of Pipe Line Awareness Network
for the Northeast, Inc. under CP16-9.

415. Filed By: Elliot Savitz


Filed Date: 11/27/2015
Accession No: 20151127-5002
Description: Comment of Elliot Savitz in Docket(s)/Project(s) CP16-
9

416. Filed By: Michael J. Lang


Filed Date: 11/27/2015
Accession No: 20151127-5005
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.

417. Filed By: Lori Hayden


Filed Date: 11/27/2015
Accession No: 20151127-5056
Description: Motion to Intervene and Protest of Lori Hayden and
Michael Hayden under CP16-9.

418. Filed By: Stephen J. Cole-Hatchard, Sr.


Filed Date: 11/27/2015
Accession No: 20151127-5070
Description: Motion to Intervene of Stephen J. Cole-Hatchard, Sr.
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

78

Record
Item No. Descrintion

419. Filed By: Food 8'c Water Watch Stop the Algonquin Pipeline
Expansion
Filed Date: 11/27/2015
Accession No: 20151127-5071
Description: Motion to Intervene of Food 4 Water Watch, Stop the
Pipeline Expansion, and 18 other groups, CP16-9.

420. Filed By: Repsol Energy North America Corporation


Filed Date: 11/27/2015
Accession No: 20151127-5117
Description: Comments of Repsol Energy North America
Corporation under CP16-9.

421. Filed By: New England NG Supply, Ltd.


Filed Date: 11/27/2015
Accession No: 20151127-5119
Description: Motion to Intervene of New England NG Supply, Ltd.
under CP16-9.

422. Filed By: Mark Lonergan


Filed Date: 11/27/2015
Accession No: 20151127-5137
Description: Comment of Mark Lonergan in Docket(s)/Project(s)
CP16-9.

423. Filed By: Turner Bledsoe


Filed Date: 11/27/2015
Accession No: 20151127-5138
Description: Comment of Turner Bledsoe in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Descrintion

424. Filed By: Turner Bledsoe


Filed Date: 11/27/2015
Accession No: 20151127-5141
Description: Comment of Turner Bledsoe in Docket(s)/Project(s)
CP16-9.

425. Filed By: Deborah Brown


Filed Date: 11/27/2015
Accession No: 20151127-5143
Description: Comment of Deborah Brown in Docket(s)/Project(s)
CP16-9.

426. Filed By: Almar LLC


Filed Date: 11/27/2015
Accession No: 20151127-5144
Description: Motion to Intervene of Almar LLC under CP16-9.
427. Filed By: NYS Department of Environmental Conservation
Filed Date: 11/27/2015
Accession No: 20151127-5145
Description: New York State Department of Environmental
Conservation (NYSDEC) Comments on the FERC's Notice of
Application, dated November 5, 2015 - Atlantic Bridge Project under
CP16-9, and PF15-12.

428. Filed By: New York Attorney General


Filed Date: 11/27/2015
Accession No: 20151127-5165
Description: Motion to Intervene of New York Attorney General
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

$0

Record
Item No. Descrintlon

429. Filed By: Gail J. Collins


Filed Date: 11/30/2015
Accession No: 20151130-5005
Description: Comment of Gail J. Collins in Docket(s)/Project(s)
CP16-9.

430. Filed By: Cathy Bevans


Filed Date: 11/30/2015
Accession No: 20151130-5007
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
CP16-9.

431. Filed By: Patricia Shea


Filed Date: 11/30/2015
Accession No: 20151130-5011
Description: Comment of Patricia Shea in Docket(s)/Project(s) CP16-
9.
432. Filed By: Franklin Country Day Camp
Filed Date: 12/2/2015
Accession No: 20151202-0020
Description: Franklin Country Day Camp submits comments re the
Atlantic Bridge Project under CP16-9.

433. Filed By: Frank Geary


Filed Date: 12/2/2015
Accession No: 20151202-5130
Description: Comment of Frank Geary in Docket(s)/Project(s) CP16-
9.
434. Filed By: Tanner Coldbrook, LLC
Filed Date: 12/3/2015
Accession No: 20151203-5045
Description: Comments of Robert S. Mazzawy in regards to Tanner
Coldbrook, LLC under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

81

Record
Item No. Descrintion

435. Filed By: NYS Department of Environmental Conservation


Filed Date: 12/7/2015
Accession No: 20151207-5180
Description: Notice of Incomplete Application - Section 401 Water
Quality Certification - Atlantic Bridge Project - NYS Department of
Environmental Conservation —under CP16-9.

436. Filed By: Mike Lang


Filed Date: 12/8/2015
Accession No: 20151208-5001
Description: Comment of Mike Lang in Docket(s)/Project(s) CP16-9.

437. Filed By: Algonquin Gas Transmission, LLC Maritimes 8r, Northeast
Pipeline, LLC
Filed Date: 12/8/2015
Accession No: 20151208-5015
Description: Algonquin Gas Transmission, LLC and Maritimes k
Northeast Pipeline, LLC submit responses to the November 25, 2015
Data Request under CP16-9.

438. Filed By: Algonquin Gas Transmission, LLC Maritimes 8'c Northeast
Pipeline, LLC
Filed Date: 12/8/2015
Accession No: 20151208-5016
Description: Algonquin Gas Transmission, LLC and Maritimes 8t
Northeast Pipeline, LLC submit responses to the November 25, 2015
Data Request under CP16-9.

439. Filed By: Virginia Casey


Filed Date: 12/8/2015
Accession No: 20151208-5039
Description: Comment of Virginia Casey in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

82

Record
Item No. Descrintion

440. Filed By: Gary Peters


Filed Date: 12/10/2015
Accession No: 20151210-5111
Description: Comments of Gary Peters re the Atlantic Bridge Project
under CP16-9.

441. Filed By: Michael J. Lang


Filed Date: 12/14/2015
Accession No: 20151214-5003
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.

442. Filed By: Michael J. Lang


Filed Date: 12/14/2015
Accession No: 20151214-5022
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.

443. Filed By: Michael J. Lang


Filed Date: 12/14/2015
Accession No: 20151214-5023
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.

444. Filed By: Michael J. Lang


Filed Date: 12/14/2015
Accession No: 20151214-5026
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.

445. Filed By: Michael J. Lang


Filed Date: 12/14/2015
Accession No: 20151214-5117
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

83

Record
Item No. Descrintion

446. Filed By: Michael J. Lang


Filed Date: 12/14/2015
Accession No: 20151214-5119
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9-000, CP16-9.

447. Filed By: Michael J. Lang


Filed Date: 12/14/2015
Accession No: 20151214-5121
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.

Filed By: Suzanne Torres


Filed Date: 12/14/2015
Accession No: 20151215-0009
Description: Comments of Suzanne Torres re the proposed station
under CP16-9.

449. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 12/15/2015
Accession No: 20151215-5021
Description: Motion for Leave to Answer and Answer of Algonquin
Gas Transmission, LLC and Maritimes 4 Northeast Pipeline, LLC
under CP16-9.

450. Filed By: Arnold Piacentini


Filed Date: 12/15/2015
Accession No: 20151215-5034
Description: Report of Arnold Piacentini of Conclusions of his work
to evaluate the public policy on fracked gas with supporting
documents. Request that FERC cease issuing Certificates and/or
tolling orders, and rescind them wherever issued under CP14-529 et
al.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

84

Record
Item No. Descrintion

451. Filed By: Judith Rizzo


Filed Date: 12/15/2015
Accession No: 20151215-5041
Description: Comment of Judith Rizzo in Docket(s)/Project(s) CP16-
9.

452. Filed By: Michael J. Lang


Filed Date: 12/15/2015
Accession No: 20151215-5089
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.

453. Filed By: U.S. Army Corps of Engineers


Filed Date: 12/17/2015
Accession No: 20151217-5193
Description: Comment on Notice of Intent by U.S. Army Corps of
Engineers under CP16-9.

454. Filed By: Susan Greene


Filed Date: 12/18/2015
Accession No: 20151218-5203
Description: Comment of Susan Greene in Docket(s)/Project(s)
CP16-9.

455. Filed By: Michael J. Lang


Filed Date: 12/21/2015
Accession No: 20151221-5008
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.

456. Filed By: Virginia Rosen


Filed Date: 12/21/2015
Accession No: 20151221-5009
Description: Comment of Virginia Rosen in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

85

Record
Item No. Descrintlon

457. Filed By: Dorothy Anderson


Filed Date: 12/21/2015
Accession No: 20151221-5024
Description: Comment of Dorothy Anderson in Docket(s)/Project(s)
CP16-9;

458. Filed By: Elaine Hyland


Filed Date: 12/21/2015
Accession No: 20151221-5026
Description: Comment of Elaine Hyland in Docket(s)/Project(s)
PF15-12.

459. Filed By: Patrick Martinec


Filed Date: 12/21/2015
Accession No: 20151221-5027
Description: Comment of Patrick Martinec in Docket(s)/Project(s)
PF15-12.

460. Filed By: Marjorie Brown


Filed Date: 12/21/2015
Accession No: 20151221-5028
Description: Comment of Marjorie Brown in Docket(s)/Project(s)
PF15-12.

461. Filed By: Town of Weymouth, MA


Filed Date: 12/21/2015
Accession No: 20151221-5121
Description: Comment of District 1 Town Councilor Rebecca Haugh
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

86

Record
Item No. Descrintion

Filed By: Curtis Nordgaard, MD


Filed Date: 12/21/2015
Accession No: 20151221-5157
Description: Comment of Curtis Nordgaard, MD MSc under CP16-9.
Documenting health risks due to compressor station emissions of
formaldehyde and nitrogen dioxide, as well as unpublished data
demonstrating the inaccurate assumptions used for air quality
analyses.

463. Filed By: Gary Bent


Filed Date: 12/21/2015
Accession No: 20151221-5185
Description: Supplemental Information of Gary Bent under CP16-9.

Filed By: City of New York Dept. of Ep


Filed Date: 12/21/2015
Accession No: 20151221-5222
Description: Comment of City of New York Dept. of Environmental
Protection under CP16-9.

465. Filed By: Cathy Bevans


Filed Date: 12/21/2015
Accession No: 20151221-5290
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
CP16-9.

466. Filed By: Cathy Bevans


Filed Date: 12/21/2015
Accession No: 20151221-5302
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

87

Record
Item No. Descrintion

467. Filed By: Chris Primiano


Filed Date: 12/21/2015
Accession No: 20151221-5303
Description: Comment of Chris Primiano in Docket(s)/Project(s)
CP16-9.

468. Filed By: Weymouth, Massachusetts, Town of


Filed Date: 12/21/2015
Accession No: 20151221-5331
Description: Comment of Town of Weymouth, Massachusetts under
CP16-9.

469. Filed By: Lori Hayden


Filed Date: 12/21/2015
Accession No: 20151221-5348
Description: Additional Comments of Lori Hayden and Michael
Hayden under CP16-9.

470. Filed By: Patrick Woodcock


Filed Date: 12/22/2015
Accession No: 20151222-5000
Description: Comment of Patrick Woodcock in Docket(s)/Project(s)
CP16-9.

471. Filed By: Cathy Bevans


Filed Date: 12/22/2015
Accession No: 20151222-5002
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
CP16-9.

472. Filed By: Cathy Bevans


Filed Date: 12/22/2015
Accession No: 20151222-5004
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

88

Record
Item No. Descrintion

473. Filed By: Robert Hedlund


Filed Date: 12/22/2015
Accession No: 20151222-5006
Description: Comment of Robert Hedlund in Docket(s)/Project(s)
CP16-9.

474. Filed By: Matthew A. Talion


Filed Date: 12/22/2015
Accession No: 20151222-5007
Description: Comment of Matthew A. Talion in Docket(s)/Project(s)
CP16-9.

475. Filed By: Kaitlyn Pedotti


Filed Date: 12/22/2015
Accession No: 20151222-5008
Description: Comment of Kaitlyn Pedotti in Docket(s)/Project(s)
CP16-9.

476. Filed By: Stephanie Roberts-Pedotti


Filed Date: 12/22/2015
Accession No: 20151222-5009
Description: Comment of Stephanie Roberts-Pedotti in
Docket(s)/Project(s) CP16-9.

477. .Filed By: Sandra Peters


Filed Date: 12/22/2015
Accession No: 20151222-5010
Description: Comment of Sandra Peters in Docket(s)/Project(s)
CP16-9.

478. Filed By: Cathy Bevans


Filed Date: 12/22/2015
Accession No: 20151222-5011
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

89

Record
Item No. Descrintion

479. Filed By: Massachusetts Energy Facilities Siting Board


Filed Date: 12/22/2015
Accession No: 20151222-5035
Description: Comment of Massachusetts Energy Facilities Siting
Board on the Abbreviated Application for a Certificate of Public
Convenience and Necessity seeking to construct the Atlantic Bridge
project: CP16-9.

480. Filed By: New York State Department of Environmental Conservation


Filed Date: 12/22/2015
Accession No: 20151222-5039
Description: NYSDEC Comments to FERC on Notice of Intent to
Prepare an EA - Atlantic bridge Project FERC ID Number: CP16-9.

481. Filed By: Sandra Peters


Filed Date: 12/22/2015
Accession No: 20151222-5063
Description: Comments of Sandra Peters under CP16-9.

482. Filed By: Algonquin Gas Transmission, LLC Maritimes 8h Northeast


Pipeline, LLC
Filed Date: 12/22/2015
Accession No: 20151222-5236
Description: Algonquin Gas Transmission, LLC, et al. submit a
periodic update to the previously filed Landowner Lists under CP16-
9.
483. Filed By: Algonquin Gas Transmission, LLC Maritimes 8'c Northeast
Pipeline, LLC
Filed Date: 12/22/2015
Accession No: 20151222-5237
Description: Algonquin Gas Transmission, LLC, et aL. submit a
periodic update to the previously filed Landowner Lists under CP16-
9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

90

Record
Item No. Descrintion

484. Filed By: Governor of Maine


Filed Date: 12/22/2015
Accession No: 20151223-0022
Description: Maine State Governor Paul R. LePage submits
comments re the Atlantic Bridge Project under CP16-9.

485. Filed By: Michael J. Lang


Filed Date: 12/23/2015
Accession No: 20151223-0007
Description: Comments of Michael J. Lang re the Atlantic Bridge
Project under CP16-9.

486. Filed By: US Army Corps of Engineers


Filed Date: 12/28/2015
Accession No: 20151228-0020
Description: US Army Corps of Engineers submits comments re
Algonquin Gas Transmission, LLC's et al Atlantic Bridge Project
under CP16-9.

487. Filed By: Don Brennan


Filed Date: 12/28/2015
Accession No: 20151228-0030
Description: Comments of Don Brennan re the Atlantic Bridge
Project under CP16-9.

488. Filed By: Louis Mazzini


Filed Date: 12/28/2015
Accession No: 20151228-0031
Description: Comments of Louis Mazzini re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

91

Record
Item No. Descrintion

489. Filed By: Bruce Hanson


Filed Date: 12/28/2015
Accession No: 20151228-0032
Description: Comments of Bruce Hanson re the Atlantic Bridge
Project under CP16-9.

490. Filed By: Brian Keegan


Filed Date: 12/29/2015
Accession No: 20151229-5011
Description: Comment of Brian Keegan in Docket(s)/Project(s)
CP16-9.

491. Filed By: Repsol Energy North America Corporation


Filed Date: 12/29/2015
Accession No: 20151229-5124
Description: Motion for Leave to Answer and Answer of Repsol
Energy North America Corporation under CP16-9.

492. Filed By: Repsol Energy North America Corporation


Filed Date: 12/29/2015
Accession No: 20151229-5125
Description: Motion for Leave to Answer and Answer of Repsol
Energy North America Corporation under CP16-9.

493. Filed By: Repsol Energy North America Corporation


Filed Date: 12/29/2015
Accession No: 20151229-5126
Description: Motion for Leave to Answer and Answer of Repsol
Energy North America Corporation under CP16-9.

494. Filed By: New York City Department of Environmental Protection


Filed Date: 12/30/2015
Accession No: 20151231-0015
Description: New York City Department of Environmental Protection
submits comments re the Atlantic Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

92

Record
Item No. Descrintion

495. Filed By: Department of the Army


Filed Date: 1/4/2016
Accession No: 20160104-0023
Description: Correspondence from US Department of the Army to
TRC Environmental re the Atlantic Bridge Project under CP16-9.

496. Filed By: House of Representatives, United States


Filed Date: 1/4/2016
Accession No: 20160105-0023
Description: US Representative Stephen F. Lynch submits comments
regarding the Atlantic Bridge Project under CP16-9.

497. Filed By: Julianna Lichatz


Filed Date: 1/5/2016
Accession No: 20160105-5001
Description: Comment of Julianna Lichatz in Docket(s)/Project(s)
CP16-9.

498. Filed By: Liberty Utilities (Pipeline & Transmission) Corp.,


Algonquin Tinker Gen Co.
Filed Date: 1/5/2016
Accession No: 20160105-5394
Description: Motion to Intervene of Liberty Utilities (Pipeline &
Transmission) Corp., and Algonquin Tinker Gen Co., under CP16-9.

499. Filed By: Braintree, City of(MA)


Filed Date: 1/7/2016
Accession No: 20160107-0008
Description: Town of Braintree, MA Mayor Joseph C. Sullivan
submits comments re the Atlantic Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

93

Record
Item No. Descrintion

500. Issued By: Chair and Immediate StafF (CHAIR)


Filed Date: I/8/2016
Accession No: 20160113-0017
Description: Response to Governor (Maine) Paul Lepage's 12/21/15
leffer regarding Algonquin Gas Transmission, LLC's et al Atlantic
Bridge Project under CP16-9.

501. Filed By: Laborers International Union of North America


Filed Date: 1/12/2016
Accession No: 20160112-0012
Description: Laborers International of North America Local 754
submits comments re the Atlantic Bridge Project under CP16-9.

502. Filed By: Algonquin Gas Transmission, LLC Maritimes 8r, Northeast
Pipeline, LLC
Filed Date: 1/13/2016
Accession No: 20160113-5257
Description: Motion for Leave to Answer and Answer of Algonquin
Gas Transmission, LLC, et al., CP16-9.

503. Filed By: Paula Georges


Filed Date: 1/19/2016
Accession No: 20160119-5000
Description: Comment of Paula Georges in Docket(s)/Project(s)
CP16-9.

Filed By: Chad Hood-Solon


Filed Date: 1/21/2016
Accession No: 20160121-0017
Description: Comments of Chad Hood-Solon re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

94

Record
Item No. Descrintion

505. Filed By: Tom Munson


Filed Date: 1/21/2016
Accession No: 20160121-0018
Description: Comments of Tom Munson re the Atlantic Bridge
Project under CP16-9.

506. Filed By: Matt Korycki


Filed Date: 1/21/2016
Accession No: 20160121-0019
Description: Comments of Matt Korycki re the Atlantic Bridge
Project under CP16-9.

507. Filed By: Kathy Bauer


Filed Date: 1/21/2016
Accession No: 20160121-0020
Description: Comments of Kathy Bauer re the Atlantic Bridge Project
under CP16-9.

508. Filed By: Theresa Bunyea


Filed Date: 1/21/2016
Accession No: 20160121-0021
Description: Comments of Theresa Bunyea re the Atlantic Bridge
Project under CP16-9.

509. Filed By: Tom Grace


Filed Date: 1/21/2016
Accession No: 20160121-0022
Description: Comments of Tom Grace re the Atlantic Bridge Project
under CP16-9.

510. Filed By: John Martini


Filed Date: 1/21/2016
Accession No: 20160121-0023
Description: Comments of John Martini re the Atlantic Bridge Project
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

95

Record
Item No. Descrintion

511. Filed By: John Lewis


Filed Date: 1/21/2016
Accession No: 20160121-0024
Description: Comments of John Lewis regarding the Atlantic Bridge
Project under CP16-9.

512. Filed By: Larry Ferris


Filed Date: 1/21/2016
Accession No: 20160121-0025
Description: Comments of Larry Ferris regarding the Atlantic Bridge
Project under CP16-9.

513. Filed By: Joe Nery


Filed Date: 1/21/2016
Accession No: 20160121-0041
Description: Comments of Joe Nery re the Atlantic Bridge Project
under CP16-9.

514. Filed By: Aurelia Jessamy


Filed Date: 1/21/2016
Accession No: 20160121-0042
Description: Comments of Aurelia Jessamy re the Atlantic Bridge
Project under CP16-9.

515. Filed By: Tom Corrigan


Filed Date: 1/21/2016
Accession No: 20160121-0043
Description: Comments of Tom Corrigan re the Atlantic Bridge
Project under CP16-9.

516. Filed By: Matt Korycki


Filed Date: 1/21/2016
Accession No: 20160121-0044
Description: Comments of Matt Korycki re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

96

Record
Item No. Descrintion

517. Filed By: Individual


Filed Date: 1/21/2016
Accession No: 20160121-0045
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

518. Filed By: Clyde Davis


Filed Date: 1/21/2016
Accession No: 20160121-0046
Description: Comments of Clyde Davis re the Atlantic Bridge Project
under CP16-9.

519. Filed By: Scott Moneaw


Filed Date: 1/21/2016
Accession No: 20160121-0047
Description: Comments of Scott Moneaw re the Atlantic Bridge
Project under CP16-9.

520. Filed By: Kyle Decker


Filed Date: 1/21/2016
Accession No: 20160121-0048
Description: Comments of Kyle Decker regarding the Atlantic Bridge
Project under CP16-9.

521. Filed By: Barbara Amoruso


Filed Date: 1/21/2016
Accession No: 20160121-0049
Description: Comments of Barbara Amoruso re the Atlantic Bridge
Project under CP16-9.

522. Filed By: John Alvino


Filed Date: 1/21/2016
Accession No: 20160121-0050
Description: Comments of John Alvino re the Atlantic Bridge Project
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

97

Record
Item No. Descrintion

523. Filed By: Art Lewis


Filed Date: 1/21/2016
Accession No: 20160121-0052
Description: Comments of Art Lewis regarding the Atlantic Bridge
Project under CP16-9.

524. Filed By: Tyler Schaub


Filed Date: 1/21/2016
Accession No: 20160121-0053
Description: Comments of Tyler Schaub re the Atlantic Bridge
Project under CP16-9.

525. Filed By: Paul Caprioglio


Filed Date: 1/21/2016
Accession No: 20160121-0054
Description: Comments of Paul Caprioglio regarding the Atlantic
Bridge Project under CP16-9.

526. Filed By: Kenneth Lewis


Filed Date: 1/21/2016
Accession No: 20160121-0055.
Description: Comments of Kenneth Lewis regarding the Atlantic
Bridge Project under CP16-9.

527. Filed By: Jason Brozdonski


Filed Date: 1/21/2016
Accession No: 20160121-0067
Description: Comments of Jason Brozdonski re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Descrintion

528. Filed By: Senate, United States


Filed Date: 1/21/2016
Accession No: 20160121-0095
Description: US Senator Elizabeth Warren and US Senator Edward J.
Markey submit comments regarding the Atlantic Bridge Project under
CP16-9.

529. Issued By: Energy Projects, Once of


Filed Date: 1/21/2016
Accession No: 20160121-3076
Description: Letter requesting Algonquin Gas Transmission, LLC et
al to provide within 20 days the environmental data information to
assist in the analysis of the certificate application under CP16-9.

530. Filed By: Weymouth District 1 Town Councilor


Filed Date: 1/27/2016
Accession No: 20160127-5389
Description: Comment of Weymouth District 1 Town Councilor
Rebecca Haugh in regards to air quality/children's health impacts at
the proposed Weymouth Compressor Station site for CP16-9 (Atlantic
Bridge) & PF16-1 (Access Northeast) and need and desire for EIS.

531. Filed By: Harry Davis


Filed Date: 1/29/2016
Accession No: 20160129-0034
Description: Comments of Hany Davis re the Atlantic Bridge Project
under CP16-9.

532. Filed By: Dale Armstrong


Filed Date: 1/29/2016
Accession No: 20160129-0035
Description: Comments of Dale Armstrong re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

99

Record
Item No. Descrintion

533. Filed By: Brad Ashford


Filed Date: 1/29/2016
Accession No: 20160129-0036
Description: Comments of Brad Ashford re the Atlantic Bridge
Project under CP16-9.

534. Filed By: Paul Caprioglio


Filed Date: 1/29/2016
Accession No: 20160129-0037
Description: Comments of Paul Caprioglio re the Atlantic Bridge
Project under CP16-9.

535. Filed By: Jim Timmins


Filed Date: 1/29/2016
Accession No: 20160129-0038
Description: Comments of Jim Timmins re the Atlantic Bridge
Project under CP16-9.

536. Filed By: Jeff Flynn


Filed Date: 1/29/2016
Accession No: 20160129-0039
Description: Comments of Jeff Flynn re the Atlantic Bridge Project
under CP16-9.

537. Filed By: Brandon Forzono


Filed Date: 1/29/2016
Accession No: 20160129-0040
Description: Comments of Brandon Forzono re the Atlantic Bridge
Project under CP16-9.

538. Filed By: Frank Hewitt


Filed Date: 1/29/2016
Accession No: 20160129-0041
Description: Comments of Frank Hewitt re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

100

Record
Item No. Descrintion

539. Filed By: Apolinar Cruz


Filed Date: 1/29/2016
Accession No: 20160129-0042
Description: Comments of Apolinar Cruz re the Atlantic Bridge
Project under CP16-9.

540. Filed By: Kathy Ramsey


Filed Date: 1/29/2016
Accession No: 20160129-0043
Description: Comments of Kathy Ramsey re the Atlantic Bridge
Project under CP16-9.

541. Filed By: Timothy Sebastian


Filed Date: 1/29/2016
Accession No: 20160129-0044
Description: Comments of Timothy Sebastian re the Atlantic Bridge
Project under CP16-9.

542. Filed By: William G. Gorman


Filed Date: 1/29/2016
Accession No: 20160129-0045
Description: Comments of William G. Gorman re the Atlantic Bridge
Project under CP16-9.

543. Filed By: John DeVilliers


Filed Date: 1/29/2016
Accession No: 20160129-0046
Description: Comments of John DeVilliers re the Atlantic Bridge
Project under CP16-9.

Filed By: Doug Giorgino


Filed Date: 1/29/2016
Accession No: 20160129-0047
Description: Comments of Doug Giorgino re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

101

Record
Item No. Descrintion

545. Filed By: Howard Shaffer


Filed Date: 1/29/2016
Accession No: 20160129-0048
Description: Comments of Howard Shaffer re the Atlantic Bridge
Project under CP16-9.

546. Filed By: Jose Silva


Filed Date: 1/29/2016
Accession No: 20160129-0049
Description: Comments of Jose Silva re the Atlantic Bridge Project
under CP16-9.

547. Filed By: Steve Pozzani


Filed Date: 1/29/2016
Accession No: 20160129-0050
Description: Comments of Steve Pozzani re the Atlantic Bridge
Project under CP16-9.

548. Filed By: Melissa Badick


Filed Date: 1/29/2016
Accession No: 20160129-0051
Description: Comments of Melissa Badick re the Atlantic Bridge
Project under CP16-9.

549. Filed By: Glen Altomonte


Filed Date: 1/29/2016
Accession No: 20160129-0052
Description: Comments of Glen Altomonte re the Atlantic Bridge
Project under CP16-9.

550. Filed By: Individual


Filed Date: 1/29/2016
Accession No: 20160129-0053
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

102

Record
Item No. Descrintion

551. Filed By: Scott Nichols


Filed Date: 1/29/2016
Accession No: 20160129-0055
Description: Comments of Scott Nichols re the Atlantic Bridge
Project under CP16-9.

552. Filed By: Leonard-Paul Cecere


Filed Date: 1/29/2016
Accession No: 20160129-0056
Description: Comments of Leonard-Paul Cecere re the Atlantic
Bridge Project under CP16-9.

553. Filed By: Lorenzo Henderson


Filed Date: 1/29/2016
Accession No: 20160129-0057
Description: Comments of Lorenzo Henderson re the Atlantic Bridge
Project under CP16-9.

554. Filed By: Cody Wellman


Filed Date: 1/29/2016
Accession No: 20160129-0058
Description: Comments of Cody Wellman re the Atlantic Bridge
Project under CP16-9.

555. Filed By: John MacAulay


Filed Date: 1/29/2016
Accession No: 20160129-0059
Description: Comments of John MacAulay re the Atlantic Bridge
Project under CP16-9.

556. Filed By: Quincy Sam


Filed Date: 1/29/2016
Accession No: 20160129-0060
Description: Comments of Quincy Sam re the Atlantic Bridge Project
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

103

Record
Item No. Descrintion

557. Filed By: Tom McDowell


Filed Date: 1/29/2016
Accession No: 20160129-0061
Description: Comments of Tom McDowell re the Atlantic Bridge
Project under CP16-9.

558. Filed By: Steve Sepinski


Filed Date: 1/29/2016
Accession No: 20160129-0062
Description: Comments of Steve Sepinski re the Atlantic Bridge
Project under CP16-9.

559. Filed By: Ester A. VanHouten


Filed Date: 1/29/2016
Accession No: 20160129-0063
Description: Comments of Ester A. VanHouten re the Atlantic Bridge
Project under CP16-9.

560. Filed By: Joe Coskey


Filed Date: 1/29/2016
Accession No: 20160129-0064
Description: Comments of Joe Coskey re the Atlantic Bridge Project
under CP16-9.

561. Filed By: Dale Scott


Filed Date: 1/29/2016
Accession No: 20160129-0065
Description: Comments of Dale Scott re the Atlantic Bridge Project
under CP16-9.

562. Filed By: Tom Ziegler


Filed Date: 1/29/2016
Accession No: 20160129-0066
Description: Comments of Tom Ziegler re the Atlantic Bridge Project
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Descrintion

563. Filed By: Joseph P. Stranger


Filed Date: 1/29/2016
Accession No: 20160129-0067
Description: Comments of Joseph P. Stranger re the Atlantic Bridge
Project under CP16-9.

564. Filed By: The New England Local Distribution Companies, et al.
Filed Date: 1/29/2016
Accession No: 20160129-5163
Description: Request to Update Information of The New England
Local Distribution Companies, et al. under CP16-9.

565. Filed By: Margaret Bellafiore


Filed Date: 2/1/2016
Accession No: 20160201-5030
Description: Comment of Margaret Bellafiore in Docket(s)/Project(s)
CP16-9.

566. Filed By: Michael J. Lang


Filed Date: 2/1/2016
Accession No: 20160201-5068
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.

567. Filed By: Liberty Utilities (Pipeline k Transmission) Corp.,


Algonquin Tinker Gen Co.
Filed Date: 2/2/2016
Accession No: 20160202-5312
Description: Motion to Compel Production of Privileged Information
Pursuant to Protective Agreement under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

105

Record
Item No. Descrintion

568. Filed By: Charles Jones


Filed Date: 2/3/2016
Accession No: 20160203-0058
Description: Comments of Charles Jones re the Atlantic Bridge
Project under CP16-9.

569. Filed By: Charles Ford


Filed Date: 2/3/2016
Accession No: 20160203-0062
Description: Comments of Charles Ford re the Atlantic Bridge
Project under CP16-9.

570. Filed By: Individual


Filed Date: 2/3/2016
Accession No: 20160203-0063
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

571. Filed By: Jeff Flynn


Filed Date: 2/3/2016
Accession No: 20160203-0066
Description: Comments of Jeff Flynn re the Atlantic Bridge Project
under CP16-9.

572. Filed By: Town of Franklin, MA


Filed Date: 2/4/2016
Accession No: 20160204-0010
Description: Town of Franklin, MA submits comments re the
Atlantic Bridge Project under CP16-9.

573. Filed By: Harold Jones


Filed Date: 2/8/2016
Accession No: 20160208-0024
Description: Comments of Harold Jones re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

106

Record
Item No. Descrintion

574. Filed By: Algonquin Gas Transmission, LLC Maritimes k Northeast


Pipeline, LLC
Filed Date: 2/9/2016
Accession No: 20160209-5058
Description: Answer to the Motion to Compel Production of
Privileged Information Pursuant to Protective Agreement and Request
for Shortened Answer Periods and Expedited Consideration under
CP16-9.

575. Filed By: Algonquin Gas Transmission, LLC Maritimes k Northeast


Pipeline, LLC
Filed Date: 2/9/2016
Accession No: 20160209-5261
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental documentation of correspondence with USFWS under
CP16-9.

576. Filed By: Algonquin Gas Transmission, LLC Maritimes k Northeast


Pipeline, LLC
Filed Date: 2/10/2016
Accession No: 20160210-5200
Description: Algonquin Gas Transmission, LLC, et al. submit their
responses to the Commission Staff Data Request issued January 21,
2016 under CP16-9.

577. Filed By: Algonquin Gas Transmission, LLC Maritimes k, Northeast


Pipeline, LLC
Filed Date: 2/10/2016
Accession No: 20160210-5201
Description: Algonquin Gas Transmission, LLC, et al. submit their
responses to the Commission Staff Data Request issued January 21,
2016 under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

107

Record
Item No. Descrintion

578. Issued By: Chair and Immediate Staff (CHAIR)


Filed Date: 2/12/2016
Accession No: 20160216-0008
Description: Response to U.S. Senator Edward J. Markey's 12/21/15
letter regarding Algonquin Gas Transmission, LLC's et al proposed
Weymouth Compressor Station as part of the proposed Atlantic
Bridge Project under CP16-9.

579. Issued By: Chair and Immediate Staff (CHAIR)


Filed Date: 2/12/2016
Accession No: 20160216-0009
Description: Response to U.S. Senator Elizabeth Warren's 12/21/15
letter regarding Algonquin Gas Transmission, LLC's et al proposed
Weymouth Compressor Station as part of the proposed Atlantic
Bridge Project under CP16-9.

580. Filed By: Liberty Utilities (Pipeline 8r, Transmission) Corp.,


Algonquin Tinker Gen Co.
Filed Date: 2/16/2016
Accession No: 20160216-5118
Description: Notice of Withdrawal of Liberty Utilities (Pipeline 4,
Transmission) Corp. and Algonquin Tinker Gen Co. under Docket
No. CP16-9.

581. Issued By: Office of Energy Market Regulation


Filed Date: 2/17/2016
Accession No: 20160217-3041
Description: Letter requesting Algonquin Gas Transmission, LLC to
provide within 7 days the data request to assist in the analysis of the
certificate application under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

108

Record
Item No. Descrintion

582. Filed By: Margaret Bellafiore


Filed Date: 2/22/2016
Accession No: 20160222-5011
Description: Comment of Margaret Bellafiore in Docket(s)/Project(s)
CP16-9.

583. Filed By: Algonquin Gas Transmission, LLC Maritimes 8r, Northeast
Pipeline, LLC
Filed Date: 2/22/2016
Accession No: 20160222-5248
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental information under CP16-9.

584. Filed By: Algonquin Gas Transmission, LLC Maritimes 8r, Northeast
Pipeline, LLC
Filed Date: 2/23/2016
Accession No: 20160223-5068
Description: Algonquin Gas Transmission, LLC, et al. hereby submit
supplemental information regarding proposed minor pipeline and
workspace adjustments under CP16-9.

585. Filed By: Algonquin Gas Transmission, LLC Maritimes k, Northeast


Pipeline, LLC
Filed Date: 2/23/2016
Accession No: 20160223-5069
Description: Algonquin Gas Transmission, LLC, et al. hereby submit
supplemental information regarding proposed minor pipeline and
workspace adjustments under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

109

Record
Item No. Descrintion

586. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 2/23/2016
Accession No: 20160223-5098
Description: Algonquin Gas Transmission, LLC, et aL submits
supplemental documentation of communication regarding cultural
resource information under CP16-9.

587. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 2/23/2016
Accession No: 20160223-5099
Description: Algonquin Gas Transmission, LLC, et aL submits
supplemental documentation of communication regarding cultural
resource information under CP16-9.

588. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 2/25/2016
Accession No: 20160225-5221
Description: Algonquin Gas Transmission, LLC, et al. hereby submit
supplemental information regarding revisions to the Access
Management Plan and Traffic Management Plan under CP16-9.

589. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 2/25/2016
Accession No: 20160225-5225
Description: Algonquin Gas Transmission, LLC, et al. submit their
responses to the Commission StafF Data Request issued February 17,
2016 under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

110

Record
Item No. Descrintion

590. Filed By: Algonquin Gas Transmission, LLC Maritimes k Northeast


Pipeline, LLC
Filed Date: 2/25/2016
Accession No: 20160225-5226
Description: Algonquin Gas Transmission, LLC, et al. submit their
responses to the Commission Staff Data Request issued February 17,
2016 under CP16-9.

591. Issued By: Chair and Immediate Staff (CHAIR)


Filed Date: 3/1/2016
Accession No: 20160302-0015
Description: Response to Congressman Stephen F. Lynch's 12/18/15
letter regarding Algonquin Gas Transmission, LLC's et al proposed
Atlantic Bridge Project under CP16-9.

592. Filed By: Algonquin Gas Transmission, LLC Maritimes k Northeast


Pipeline, LLC
Filed Date: 3/3/2016
Accession No: 20160303-5193
Description: Algonquin Gas Transmission, LLC, et aL submit
supplemental information under CP16-9.

593. Filed By: Algonquin Gas Transmission, LLC Maritimes 4 Northeast


Pipeline, LLC
Filed Date: 3/4/2016
Accession No: 20160304-5099
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental documentation of communication with the Narragansett
Indian Tribe regarding cultural resource information under CP16-9.

594. Filed By: Jose Adasilvla


Filed Date: 3/7/2016
Accession No: 20160308-0006
Description: Comments of Jose Adasilvla re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

111

Record
Item No. Descriution

595. Filed By: Rodrigo Ramirez


Filed Date: 3/7/2016
Accession No: 20160308-0007
Description: Comments of Rodrigo Ramirez regarding the Atlantic
Bridge Project under CP16-9.

596. Filed By: Individual


Filed Date: 3/7/2016
Accession No: 20160308-0008
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

597. Filed By: Jose Maravilla


Filed Date: 3/7/2016
Accession No: 20160308-0009
Description: Comments of Jose Maravilla regarding the Atlantic
Bridge Project under CP16-9.

598. Filed By: Antonio Dias


Filed Date: 3/7/2016
Accession No: 20160308-0011
Description: Comments of Antonio Dias regarding the Atlantic
Bridge Project under CP16-9.

599. Filed By: Luis S. Quintuno


Filed Date: 3/7/2016
Accession No: 20160308-0012
Description: Comments of Luis S. Quintuno regarding the Atlantic
Bridge Project under CP16-9.

600. Filed By: James Bongo


Filed Date: 3/7/2016
Accession No: 20160308-0013
Description: Comments of James Bongo regarding the Atlantic
Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

112

Record
Item No. Descrintion

601. Filed By: Irving Silfa


Filed Date: 3/7/2016
Accession No: 20160308-0014
Description: Comments of Irving Silfa regarding the Atlantic Bridge
Project under CP16-9.

602. Filed By: Louise Mendozo Rodriguez


Filed Date: 3/7/2016
Accession No: 20160308-0015
Description: Comments of Louise Mendoza Rodriguez regarding the
Atlantic Bridge Project under CP16-9.

603. Filed By: Jose Martin


Filed Date: 3/7/2016
Accession No: 20160308-0016
Description: Comments of Jose Martin regarding the Atlantic Bridge
Project under CP16-9.

604. Filed By: Luis Munguia


Filed Date: 3/7/2016
Accession No: 20160308-0017
Description: Comments of Luis Munguia regarding the Atlantic
Bridge Project under CP16-9.

605. Filed By: J. Assuncao


Filed Date: 3/7/2016
Accession No: 20160308-0018
Description: Comments of J. Assuncao regarding the Atlantic Bridge
Project under CP16-9.

606. Filed By: Orlando Carvalho


Filed Date: 3/7/2016
Accession No: 20160308-0021
Description: Comments of Orlando Carvalho regarding the Atlantic
Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

113

Record
Item No. Descrintion

607. Filed By: Juan Luna Rodriguez


Filed Date: 3/7/2016
Accession No: 20160308-0022
Description: Comments of Juan Luna Rodriguez regarding the
Atlantic Bridge Project under CP16-9.

608. Filed By: Luis Franco


Filed Date: 3/7/2016
Accession No: 20160308-0023
Description: Comments of Luis Franco regarding the Atlantic Bridge
Project under CP16-9.

609. Filed By: Julio Zoria


Filed Date: 3/7/2016
Accession No: 20160308-0049
Description: Comments of Julio Zoria re the Atlantic Bridge Project
under CP16-9.

610. Filed By: Lee Carlos Bubieta


Filed Date: 3/7/2016
Accession No: 20160308-0053
Description: Comments of Lee Carlos Bubieta regarding the Atlantic
Bridge Project under CP16-9.

611. Filed By: Francelino Martins


Filed Date: 3/7/2016
Accession No: 20160308-0054
Description: Comments of Francelino Martins re the Atlantic Bridge
Project under CP16-9.

612. Filed By: Individual


Filed Date: 3/7/2016
Accession No: 20160308-0055
Description: Comments of an Individual regarding Spectra Energy's
Atlantic Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

114

Record
Item No. Descrintion

613. Filed By: Individual


Filed Date: 3/7/2016
Accession No: 20160308-0056
Description: Comments of an Individual regarding the Atlantic
Bridge Project under CP16-9.

614. Filed By: Individual


Filed Date: 3/7/2016
Accession No: 20160308-0057
Description: Comments of an Individual regarding the Atlantic
Bridge Project under CP16-9.

615. Filed By: Individual


Filed Date: 3/7/2016
Accession No: 20160308-0067
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

616. Filed By: Jeffrey D. Black


Filed Date: 3/7/2016
Accession No: 20160308-0069
Description: Comments of Jeflrey D. Black re the Atlantic Bridge
Project under CP16-9.

617. Filed By: Luis Quintuna


Filed Date: 3/7/2016
Accession No: 20160308-0070
Description: Comments of Luis Quintuna regarding the Atlantic
Bridge Project under CP16-9.

618. Filed By: Edwin Godou


Filed Date: 3/7/2016
Accession No: 20160308-0071
Description: Comments of Edwin Godou re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

115

Record
Item No. Des crintion

619. Filed By: Pablo Santiago Figueroa


Filed Date: 3/7/2016
Accession No: 20160308-0072
Description: Comments of Pablo Santiago Figueroa re the Atlantic
Bridge Project under CP16-9.

620. Filed By: Jose R. Caamano


Filed Date: 3/7/2016
Accession No: 20160308-0073
Description: Comments of Jose R. Caamano re the Atlantic Bridge
Project under CP16-9.

621. Filed By: Individual


Filed Date: 3/8/2016
Accession No: 20160308-0010
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

622. Filed By: Raimoe Robinson


Filed Date: 3/8/2016
Accession No: 20160309-0051
Description: Comments of Raimoe Robinson re the Atlantic Bridge
Project under CP16-9.

623. Filed By: Luis A. Glivicura


Filed Date: 3/8/2016
Accession No: 20160309-0052
Description: Comments of Luis A. Glivicura re the Atlantic Bridge
Project under CP16-9.

624. Filed By: Individual


Filed Date: 3/8/2016
Accession No: 20160309-0053
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

116

Record
Item No. Descrintion

625. Filed By: Agustin Lorenzo


Filed Date: 3/8/2016
Accession No: 20160309-0055
Description: Comments of Agustin Lorenzo regarding the Atlantic
Bridge Project under CP16-9.

626. Filed By: Michelle Fernandez


Filed Date: 3/8/2016
Accession No: 20160309-0063
Description: Comments of Michelle Fernandez re the Atlantic Bridge
Project under CP16-9.

627. Filed By: Eric Dias


Filed Date: 3/8/2016
Accession No: 20160309-0065
Description: Comments of Eric Dias re the Atlantic Bridge Project
under CP16-9.

628. Filed By: Luis Lourero


Filed Date: 3/8/2016
Accession No: 20160309-0066
Description: Comments of Luis Lourero re the Atlantic Bridge
Project under CP16-9.

629. Filed By: Arnulfo Ramirez


Filed Date: 3/8/2016
Accession No: 20160309-0067
Description: Comments of Arnulfo Ramirez re the Atlantic Bridge
Project under CP16-9.

630. Filed By: Vaslo Melreles


Filed Date: 3/8/2016
Accession No: 20160309-0070
Description: Comments of Vaslo Melreles regarding the Atlantic
Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

117

Record
Item No. Descrintion

631. Filed By: Individual


Filed Date: 3/8/2016
Accession No: 20160309-0071
Description: Comments of an Individual regarding the Atlantic
Bridge Project under CP16-9.

632. Filed By: Cynthia Woods-Rudolph


Filed Date: 3/9/2016
Accession No: 20160309-0124
Description: Comments of Cynthia Woods-Rudolph re the Atlantic
Bridge Project under CP16-9.

633. Filed By: Mario Neven


Filed Date: 3/9/2016
Accession No: 20160309-0127
Description: Comments of Mario Neven re the Atlantic Bridge
Project under CP16-9.

634. Filed By: Ronelio Reyes


Filed Date: 3/9/2016
Accession No: 20160309-0128
Description: Comments of Ronelio Reyes re the Atlantic Bridge
Project under CP16-9.

635. Filed By: R. Goncalves


Filed Date: 3/9/2016
Accession No: 20160309-0129
Description: Comments of R. Goncalves re the Atlantic Bridge
Project under CP16-9.

636. Filed By: Emanuel Neves


Filed Date: 3/9/2016
Accession No: 20160309-0130
Description: Comments of Emanuel Neves re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

118

Record
Item No. Descrintion

637. Filed By: Andrew Smith


Filed Date: 3/9/2016
Accession No: 20160309-0131
Description: Comments of Andrew Smith re the Atlantic Bridge
Project under CP16-9.

638. Filed By: Michael J. Lang


Filed Date: 3/10/2016
Accession No: 20160310-0029
Description: Correspondence of Michael J. Lang to Spectra Energy
Corporation regarding Spectra's privacy policy under CP16-9 et al.

639. Filed By: Pirad Pell


Filed Date: 3/11/2016
Accession No: 20160311-0036
Description: Comments of Pirad Pell re the Atlantic Bridge Project
under CP16-9.

640. Filed By: Individual


Filed Date: 3/11/2016
Accession No: 20160311-0044
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

641. Filed By: Individual


Filed Date: 3/11/2016
Accession No: 20160311-0045
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

642. Filed By: A. Vaz Fernandez


Filed Date: 3/11/2016
Accession No: 20160311-0046
Description: Comments of A. Vaz Fernandez re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

119

Record
Item No. Descrintion

Filed By: Myles B. Dunne


Filed Date: 3/11/2016
Accession No: 20160311-0047
Description: Comments of Myles B.Dunne re the Atlantic Bridge
Project under CP16-9.

Filed By: Agostinho Santos


Filed Date: 3/11/2016
Accession No: 20160311-0048
Description: Comments of Agostinho Santos re the Atlantic Bridge
Project under CP16-9.

645. Filed By: John Barretto


Filed Date: 3/11/2016
Accession No: 20160311-0049
Description: Comments of John Barretto re the Atlantic Bridge
Project under CP16-9.

Filed By: Sergio Castillo


Filed Date: 3/11/2016
Accession No: 20160311-0050
Description: Comments of Sergio Castillo re the Atlantic Bridge
Project under CP16-9.

647. Filed By: Christina Castillo


Filed Date: 3/11/2016
Accession No: 20160311-0051
Description: Comments of Christina Castillo re the Atlantic Bridge
Project under CP16-9.

Filed By: Individual


Filed Date: 3/11/2016
Accession No: 20160311-0053
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

120

Record
Item No. Descriotion

649. Filed By: Liberty Utilities (Pipeline k, Transmission) Corp.


Algonquin Tinker Gen Co.
Filed Date: 3/11/2016
Accession No: 20160311-5202,
Description: Comments 8c Questions of Liberty Utilities {Pipeline 4,
Transmission) Corp. And Algonquin Tinker Gen Co. under CP16-9.

650. Filed By: Algonquin Gas Transmission, LLC Maritimes 4, Northeast


Pipeline, LLC
Filed Date: 3/11/2016
Accession No: 20160311-5252
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental documentation of communication with Indian Tribes
regarding cultural resource information under CP16-9.

651. Filed By: Algonquin Gas Transmission, LLC Maritimes k Northeast


Pipeline, LLC
Filed Date: 3/11/2016
Accession No: 20160311-5253
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental documentation of communication with Indian Tribes
regarding cultural resource information under CP16-9.

652. Filed By: Jesus Becerra


Filed Date: 3/14/2016
Accession No: 20160314-0021
Description: Comments of Jesus Becerra re the Atlantic Bridge
Project under CP16-9.

653. Filed By: Manuel Acrespo


Filed Date: 3/14/2016
Accession No: 20160314-0022
Description: Comments of Manuel Acrespo re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

121

Record
Item No. Descrintion

654. Filed By: Leon W. Joseph


Filed Date: 3/14/2016
Accession No: 20160314-0023
Description: Comments of Leon W. Joseph re the Atlantic Bridge
Project under CP16-9.

655. Filed By: Stephanie DiRubba


Filed Date: 3/14/2016
Accession No: 20160314-0024
Description: Comments of Stephanie DiRubba re the Atlantic Bridge
Project under CP16-9.

656. Filed By: Samantha S. Chiard


Filed Date: 3/14/2016
Accession No: 20160314-0025
Description: Comments of Samantha S. Chiard re the Atlantic Bridge
Project under CP16-9.

657. Filed By: Individual


Filed Date: 3/15/2016
Accession No: 20160315-0021
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

658. Filed By: Individual


Filed Date: 3/15/2016
Accession No: 20160315-0022
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

659. Filed By: Donald Lape


Filed Date: 3/15/2016
Accession No: 20160315-0023
Description: Comments of Donald Lape re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

122

Record
Item No. Descrintion

660. Filed By: Oscar Magana


Filed Date: 3/15/2016
Accession No: 20160315-0024
Description: Comments of Oscar Magana re the Atlantic Bridge
Project under CP16-9.

661. Filed By: Anthony Rico


Filed Date: 3/15/2016
Accession No: 20160315-0025
Description: Comments of Anthony Rico re the Atlantic Bridge
Project under CP16-9.

662. Filed By: Kevin Nickles


Filed Date: 3/15/2016
Accession No: 20160315-0026
Description: Comments of Kevin Nickles re the Atlantic Bridge
Project under CP16-9.

663. Filed By: Individual


Filed Date: 3/15/2016
Accession No: 20160315-0027
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

Filed By: Esteban Olivero


Filed Date: 3/15/2016
Accession No: 20160315-0028
Description: Comments of Esteban Olivero re the Atlantic Bridge
Project under CP16-9.

665. Filed By: Brian J. Powell


Filed Date: 3/15/2016
Accession No: 20160315-0029
Description: Comments of Brian J. Powell re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

123

Record
Item Pio. Descrintion

666. Filed By: Individual


Filed Date: 3/18/2016
Accession No: 20160318-0067
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

667. Filed By: Algonquin Gas Transmission, LLC Maritimes 8r, Northeast
Pipeline, LLC
Filed Date: 3/18/2016
Accession No: 20160318-5144
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental information under CP16-9.

668. Filed By: Peter Bokowski


Filed Date: 3/21/2016
Accession No: 20160321-0036
Description: Comments of Peter Bokowski regarding the Atlantic
Bridge Project under CP16-9.

669. Filed By: James Bhgeja


Filed Date: 3/21/2016
Accession No: 20160321-0037
Description: Comments of James Bhgeja regarding the Atlantic
Bridge Project under CP16-9.

670. Filed By: Alejenetro Ahorez


Filed Date: 3/21/2016
Accession No: 20160321-0038
Description: Comments of Alejenetro Ahorez regarding the Atlantic
Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

124

Record
Item No. Descrintion

671. Filed By: Jose M. Reyes


Filed Date: 3/21/2016
Accession No: 20160321-0039
Description: Comments of Jose M. Reyes regarding the Atlantic
Bridge Project under CP16-9.

672. Filed By: Gerardo B.Andrade


Filed Date: 3/21/2016
Accession No: 20160321-0045
Description: Comments of Gerardo B. Andrade regarding the Atlantic
Bridge Project under CP16-9.

673. Filed By: John Carlo Valencia


Filed Date: 3/21/2016
Accession No: 20160321-0046
Description: Comments of John Carlos Valencia re the Atlantic
Bridge Project under CP16-9.

674. Filed By: Antonio Valencia


Filed Date: 3/21/2016
Accession No: 20160321-0047
Description: Comments of Antonio Valencia regarding the Atlantic
Bridge Project under CP16-9.

675. Filed By: Roberto Suarez


Filed Date: 3/21/2016
Accession No: 20160321-0048
Description: Comments of Roberto Suarez regarding the Atlantic
Bridge Project under CP16-9.

676. Filed By: Peter Kiley


Filed Date: 3/21/2016
Accession No: 20160321-0055
Description: Comments of Peter Kiley re the Access Northeast
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

125

Record
Item No. Descrintion

677. Filed By: William Vargus


Filed Date: 3/21/2016
Accession No: 20160321-0057
Description: Comments of William Vargus re the Atlantic Bridge
Project under CP16-9.

678. Filed By: Anthony Fiaqoso


Filed Date: 3/21/2016
Accession No: 20160321-0066
Description: Comments of Anthony Fiaqoso re the Atlantic Bridge
Project under CP16-9.

679. Filed By: Juan Valencia


Filed Date: 3/21/2016
Accession No: 20160321-0067
Description: Comments of Juan Valencia re the Atlantic Bridge
Project under CP16-9.

680. Filed By: Victor Bermeo


Filed Date: 3/21/2016
Accession No: 20160321-0068
Description: Comments of Victor Bermeo re the Atlantic Bridge
Project under CP16-9.

681. Filed By: Kevin Young


Filed Date: 3/21/2016
Accession No: 20160321-0069
Description: Comments of Kevin Young re the Atlantic Bridge
Project under CP16-9.

682. Filed By: Bruno P. De Oliveira


Filed Date: 3/21/2016
Accession No: 20160321-0070
Description: Comments of Bruno P. De Oliveira re the Atlantic
Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

126

Record
Item No. Descrintion

683. Filed By: Millard Reynolds


Filed Date: 3/21/2016
Accession No: 20160321-0071
Description: Comments of Millard Reynolds re the Atlantic Bridge
Project under CP16-9.

Filed By: Maryam M. McGuire


Filed Date: 3/21/2016
Accession No: 20160321-0072
Description: Comments of Maryam M. McGuire regarding the
Atlantic Bridge Project under CP16-9.

685. Filed By: Amileer Santos


Filed Date: 3/21/2016
Accession No: 20160321-0073
Description: Comments of Amileer Santos re the Atlantic Bridge
Project under CP16-9.

686. Filed By: Individual


Filed Date: 3/21/2016
Accession No: 20160321-0074
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

687. Filed By: Bryant Rudolph


Filed Date: 3/21/2016
Accession No: 20160321-0077
Description: Comments of Bryant Rudolph re the Atlantic Bridge
Project under CP16-9.

688. Filed By: Christopher Richards


Filed Date: 3/21/2016
Accession No: 20160321-0078
Description: Comments of Christopher Richards regarding the
Atlantic Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

127

Record
Item No. Descrintion

689. Filed By: Mauro Cordero


Filed Date: 3/21/2016
Accession No: 20160321-0079
Description: Comments of Mauro Cordero regarding the Atlantic
Bridge Project under CP16-9.

690. Filed By: Josue Suazo


Filed Date: 3/21/2016
Accession No: 20160321-0080
Description: Comments of Josue Suazo regarding the Atlantic Bridge
Project under CP16-9.

691. Filed By: Adam Lear


Filed Date: 3/21/2016
Accession No: 20160321-0081
Description: Comments of Adam Lear regarding the Atlantic Bridge
Project under CP16-9.

692. Filed By: Roopnarine Surooj


Filed Date: 3/21/2016
Accession No: 20160321-0082
Description: Comments of Roopnarine Surooj regarding the Atlantic
Bridge Project under CP16-9.

693. Filed By: Antonio Figueiredo


Filed Date: 3/21/2016
Accession No: 20160321-0083
Description: Comments of Antonio Figueiredo regarding the Atlantic
Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

128

Record
Item No. Descrintion

694. Issued By: Energy Projects, Office of


Filed Date: 3/21/2016
Accession No: 20160321-4004
Description: Telephone Call Summary dated 3/8/16 between FERC
and Natural Resource Group, LLC et al regarding the discussion of
data request responses and supplemental filings under CP16-9.

695. Filed By: Algonquin Gas Transmission, LLC Maritimes Br, Northeast
Pipeline, LLC
Filed Date: 3/22/2016
Accession No: 20160322-5176
Description: Algonquin Gas Transmission, LLC, et al. submits as
supplemental information a letter replying to Michael J. Lang under
CP16-9.

696. Filed By: Paul Lourenco


Filed Date: 3/23/2016
Accession No: 20160323-0008
Description: Comments of Paul Lourenco re the Atlantic Bridge
Project under CP16-9.

697. Filed By: Individual


Filed Date: 3/23/2016
Accession No: 20160323-0009
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

698. Filed By: Sean Sheeran


Filed Date: 3/23/2016
Accession No: 20160323-0011
Description: Comments of Sean Sheeran re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

129

Record
Item No. Descrintion

699. Filed By: Individual


Filed Date: 3/23/2016
Accession No: 20160323-0012
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

700. Filed By: Luis A. Irizarry


Filed Date: 3/23/2016
Accession No: 20160323-0015
Description: Comments of Luis A. Irizarry re the Atlantic Bridge
Project under CP16-9.

701. Issued By: 06ice of Energy Market Regulation


Filed Date: 3/23/2016
Accession No: 20160323-3020
Description: Letter requesting Algonquin Gas Transmission, LLC et
al to provide additional information within 5 days re the OEMR
second data request to assist in the analysis of the application under
CP16-9.

702. Filed By: Individual


Filed Date: 3/25/2016
Accession No: 20160325-0014
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

703. Filed By: Juan B. Quinturo


Filed Date: 3/25/2016
Accession No: 20160325-0015
Description: Comments of Juan B. Quinturo re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

130

Record
Item No. Descrintion

Filed By: Gilberto Cisneves


Filed Date: 3/25/2016
Accession No: 20160325-0016
Description: Comments of Gilberto Cisneves re the Atlantic Bridge
Project under CP16-9.

705. Filed By: Sebastian Dinis


Filed Date: 3/25/2016
Accession No: 20160325-0017
Description: Comments of Sebastian Dinis re the Atlantic Bridge
Project under CP16-9.

706. Filed By: Eduardo Esteves


Filed Date: 3/25/2016
Accession No: 20160325-0019
Description: Comments of Eduardo Esteves re the Atlantic Bridge
Project under CP16-9.

707. Issued By: Energy Projects, Office of


Filed Date: 3/25/2016
Accession No: 20160325-3000
Description: Letter requesting Algonquin Gas Transmission, LLC to
provide information to assist in FERC's analysis of their proposal in
the certificate application under CP16-9.

708. Issued By: Secretary of the Commission, FERC


Filed Date: 3/25/2016
Accession No: 20160325-3004
Description: Notice of Schedule for Environmental Review of the
Atlantic Bridge Project re Algonquin Gas Transmission, LLC et al
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

131

Record
Item No. Descrintion

Filed By: Algonquin Gas Transmission, LLC Maritimes 8c Northeast


Pipeline, LLC
Filed Date: 3/25/2016
Accession No: 20160325-5073
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental information under CP16-9.

710. Filed By: Ruben Barajas


Filed Date: 3/28/2016
Accession No: 20160328-0052
Description: Comments of Ruben Barajas re the Atlantic Bridge
Project under CP16-9.

711. Filed By: Luis A. Magana


Filed Date: 3/28/2016
Accession No: 20160328-0053
Description: Comments of Luis A. Magana re the Atlantic Bridge
Project under CP16-9.

712. Filed By: Luis Sumba


Filed Date: 3/28/2016
Accession No: 20160328-0054
Description: Comments of Luis Sumba re the Atlantic Bridge Project
under CP16-9.

713. Filed By: Rafael Mendoza


Filed Date: 3/28/2016
Accession No: 20160328-0059
Description: Comments of Rafael Mendoza re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

132

Record
Item No. Descrintion

714. Filed By: Jose Godoy


Filed Date: 3/28/2016
Accession No: 20160328-0060
Description: Comments of Jose Godoy re the Atlantic Bridge Project
under CP16-9.

715. Filed By: Carlos Figueroa


Filed Date: 3/28/2016
Accession No: 20160328-0061
Description: Comments of Carlos Figueroa re the Atlantic Bridge
Project under CP16-9.

716. Filed By: Ivan Holluin


Filed Date: 3/28/2016
Accession No: 20160328-0062
Description: Comments of Ivan Holluin re the Atlantic Bridge Project
under CP16-9.

717. Filed By: Jay Fragoso


Filed Date: 3/28/2016
Accession No: 20160328-0064
Description: Comments of Jay Fragoso re the Atlantic Bridge Project
under CP16-9.

718. Filed By: Joao Caluao


Filed Date: 3/28/2016
Accession No: 20160328-0078
Description: Comments of Joao Caluao re the Atlantic Bridge Project
under CP16-9.

719. Filed By: Segundo Gallego


Filed Date: 3/28/2016
Accession No: 20160328-0079
Description: Comments of Segundo Gallego re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

133

Record
Item No. Descrintion

720. Filed By: Algonquin Gas Transmission, LLC Maritimes 8r, Northeast
Pipeline, LLC
Filed Date: 3/28/2016
Accession No: 20160328-5216
Description: Algonquin Gas Transmission, LLC and Maritimes 8'c
Northeast Pipeline, LLC - Answer, Docket No. CP16-9.

721. Filed By: Fabio Gurgo


Filed Date: 3/29/2016
Accession No: 20160329-0013
Description: Comments of Fabio Gurgo regarding the Atlantic Bridge
Project under CP16-9.

722. Filed By: Jorge C. Mota


Filed Date: 3/29/2016
Accession No: 20160329-0014
Description: Comments of Jorge C. Mota regarding the Atlantic
Bridge Project under CP16-9.

723. Filed By: Luis A. Gonzalez


Filed Date: 3/29/2016
Accession No: 20160329-0015
Description: Comments of Luis A. Gonzalez regarding the Atlantic
Bridge Project under CP16-9.

724. Filed By: George Sousa


Filed Date: 3/29/2016
Accession No: 20160329-0016
Description: Comments of George Sousa regarding the Atlantic
Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

134

Record
Item No. Descrintlon

725. Filed By: Manuel V. Pinho


Filed Date: 3/29/2016
Accession No: 20160329-0017
Description: Comments of Manuel V. Pinho regarding the Atlantic
Bridge Project under CP16-9.

726. Filed By: Susan Marie Lee


Filed Date: 3/30/2016
Accession No: 20160330-0016
Description: Comments of Susan Marie Lee re the Atlantic Bridge
Project under CP16-9.

727. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 3/31/2016
Accession No: 20160331-5041
Description: Algonquin Gas Transmission, LLC, et al. submit their
response to the Commission Staff Data Request issued March 23,
2016 under CP16-9.

728. Filed By: Michael J. Lang


Filed Date: 4/1/2016
Accession No: 20160404-0009
Description: Correspondence trom Michael J. Lang to Frank
Taormina providing comments re the Atlantic Bridge Project under
CP16-9.

729. Filed By: Cesario Nobrega


Filed Date: 4/4/2016
Accession No: 20160404-0011
Description: Comments of Cesario Nobrega re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

135

Record
Item No. Descrintion

730. Filed By: Juan Jimenez


Filed Date: 4/4/2016
Accession No: 20160404-0012
Description: Comments of Juan Jimenez re the Atlantic Bridge
Project under CP16-9.

731. Filed By: Gerardo Garcia


Filed Date: 4/4/2016
Accession No: 20160404-0013
Description: Comments of Gerardo Garcia re the Atlantic Bridge
Project under CP16-9.

732. Filed By: Paul Alves


Filed Date: 4/4/2016
Accession No: 20160404-0014
Description: Comments of Paul Alves re the Atlantic Bridge Project
under CP16-9.

733. Filed By: Steven Pereira


Filed Date: 4/4/2016
Accession No: 20160404-0019
Description: Comments of Steven Pereira re the Atlantic Bridge
Project under CP16-9.

734. Filed By: Antonio Martins


Filed Date: 4/4/2016
Accession No: 20160404-0020
Description: Comments of Antonio Martins re the Atlantic Bridge
Project under CP16-9.

735. Filed By: Jesus Becerra


Filed Date: 4/4/2016
Accession No: 20160404-0024
Description: Comments of Jesus Becerra re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

136

Record
Item No. Descrintion

736. Filed By: Antonio Monteiro


Filed Date: 4/4/2016
Accession No: 20160404-0025
Description: Comments of Antonio Monteiro re the Atlantic Bridge
Project under CP16-9.

737. Filed By: Sergio Baraja


Filed Date: 4/4/2016
Accession No: 20160404-0035
Description: Comments of Sergio Barajas re the Atlantic Bridge
Project under CP16-9.

73S. Filed By: Ismael Hernandez


Filed Date: 4/4/2016
Accession No: 20160404-0036
Description: Comments of Ismael Hernandez re the Atlantic Bridge
Project under CP16-9.

739. Filed By: Mike Gome


Filed Date: 4/4/2016
Accession No: 20160404-0037
Description: Comments of Mike Gome re the Atlantic Bridge Project
under CP16-9.

740. Filed By: John O'rien


Filed Date: 4/4/2016
Accession No: 20160404-0038
Description: Comments of John O'rien re the Atlantic Bridge
Project under CP16-9.

741. Filed By: Individual


Filed Date: 4/4/2016
Accession No: 20160404-0039
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

137

Record
Item No. Descrintion

742. Filed By: Algonquin Gas Transmission, LLC Maritimes 8'c Northeast
Pipeline, LLC
Filed Date: 4/4/2016
Accession No: 20160404-5301
Description: Algonquin Gas Transmission, LLC, et al. submit their
response to the Commission Staff Data Request issued March 25,
2016 under CP16-9.

743. Filed By: Michael J. Lang


Filed Date: 4/4/2016
Accession No: 20160405-0054
Description: Correspondence from Michael J. Lang to Algonquin Gas
Transmission, LLC re the Atlantic Bridge Project under CP16-9.

Filed By: Michael J. Lang


Filed Date: 4/4/2016
Accession No: 20160405-0061
Description: Comments of Michael J. Lang re the Atlantic Bridge
Project under CP16-9.

745. Filed By: Luis Torres


Filed Date: 4/5/2016
Accession No: 20160404-0027
Description: Comments of Luis Torres re the Atlantic Bridge Project
under CP16-9.

746. Filed By: Joseph Scipioni


Filed Date: 4/5/2016
Accession No: 20160405-0079
Description: Comments of Joseph Scipioni re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

138

Record
Item No. Descrintion

747. Filed By: Thomas Lopez


Filed Date: 4/5/2016
Accession No: 20160405-0080
Description: Comments of Thomas Lopez re the Atlantic Bridge
Project under CP16-9.

748. Filed By: Raul Ramirez


Filed Date: 4/5/2016
Accession No: 20160405-0081
Description: Comments of Raul Ramirez re the Atlantic Bridge
Project under CP16-9.

749. Filed By: Armando Sousa


Filed Date: 4/5/2016
Accession No: 20160405-0082
Description: Comments of Armando Sousa re the Atlantic Bridge
Project under CP16-9.

750. Filed By: Rafael Valencia


Filed Date: 4/5/2016
Accession No: 20160405-0083
Description: Comments of Rafael Valencia re the Atlantic Bridge
Project under CP16-9.

751. Filed By: Javier Goday


Filed Date: 4/5/2016
Accession No: 20160405-0084
Description: Comments of Javier Goday regarding the Atlantic
Bridge Project under CP16-9.

752. Filed By: Saul Pesoutez


Filed Date: 4/5/2016
Accession No: 20160405-0085
Description: Comments of Saul Pesoutez re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

139

Record
Item No. Descrintion

753. Filed By: Individual


Filed Date: 4/5/2016
Accession No: 20160405-0091
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

754. Filed By: Individual


Filed Date: 4/5/2016
Accession No: 20160405-0092
Description: Comments of an Individual re the Atlantic Bridge
Project under CP16-9.

755. Filed By: Antonio Mendoza


Filed Date: 4/5/2016
Accession No: 20160405-0093
Description: Comments of Antonio Mendoza re the Atlantic Bridge
Project under CP16-9.

756. Filed By: Gregory J. Gulb


Filed Date: 4/5/2016
Accession No: 20160405-0094
Description: Comments of Gregory J. Gulb regarding the Atlantic
Bridge Project under CP16-9.

757. Filed By: Rafael Mendoza


Filed Date: 4/7/2016
Accession No: 20160407-0068
Description: Comments of Rafael Mendoza regarding the Atlantic
Bridge Project under CP16-9.

758. Filed By: JD Chesloff


Filed Date: 4/8/2016
Accession No: 20160408-0020
Description: Comments of JD Chesloff regarding the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

140

Record
Item No. Descrintion

759. Filed By: Weymouth District 1 Town Councilor


Filed Date: 4/8/2016
Accession No: 20160408-5223
Description: Request of Weymouth District 1 Town Councilor
Rebecca Haugh for FERC to hold a Public Scoping Meeting in
Weymouth, MA for the Access Northeast Project under PF16-1, et al.

760. Filed By: Besnik Ibrahimai


Filed Date: 4/11/2016
Accession No: 20160411-0017
Description: Comments of Besnik Ibrahimai regarding the Atlantic
Bridge Project under CP16-9.

761. Filed By: James Landrey


Filed Date: 4/11/2016
Accession No: 20160411-0020
Description: Comments of James Landrey regarding the Atlantic
Bridge Project under CP16-9.

762. Filed By: Michael J. Lang


Filed Date: 4/11/2016
Accession No: 20160411-0071
Description: Correspondence from Michael J. Lang to Weymouth
Conservation Commission providing comments regarding the
Algonquin Compressor Station under CP16-9.

763. Filed By: Michael J. Lang


Filed Date: 4/11/2016
Accession No: 20160411-0072
Description: Correspondence from Michael J. Lang to Weymouth
Conservation Commission providing comments regarding the
Algonquin Compressor Station under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

141

Record
Item No. Descrintion

Filed By: Sandra Peters


Filed Date: 4/11/2016
Accession No: 20160411-5058
Description: Motion of Sandra Peters under CP16-9.

765. Issued By: Energy Projects, Office of


Filed Date: 4/13/2016
Accession No: 20160413-3021
Description: Letter requesting Algonquin Gas Transmission, LLC et
al to file a response within 5 days re the data request to assist in the
analysis of the certificate application under CP16-9.

766. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 4/14/2016
Accession No: 20160414-5119
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental information under CP16-9.

767. Filed By: Susan M. Sanders


Filed Date: 4/18/2016
Accession No: 20160418-5005
Description: Comment of Susan M Sanders in Docket(s)/Project(s)
CP16-9.

768. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 4/18/2016
Accession No: 20160418-5256
Description: Algonquin Gas Transmission, LLC, et al. submit notice
of a delay to their response to the Commission Staff Data Request
issued on April 13, 2016 under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

142

Record
Item No. Descrintion

769. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 4/19/2016
Accession No: 20160419-5086
Description: Algonquin Gas Transmission, LLC, et al. submit their
response to the Commission Staff Data Request issued April 13, 2016
under CP16-9.

770. Filed By: Liberty Utilities (Pipeline & Transmission) Corp.


Algonquin Tinker Gen Co.
Filed Date: 4/19/2016
Accession No: 20160419-5222
Description: Response to Failure to Provide Information of Liberty
Utilities (Pipeline & Transmission) Corp., and Algonquin Tinker Gen
Co. under CP16-9.

771. Filed By: Kenneth Wilson


Filed Date: 4/26/2016
Accession No: 20160426-0054
Description: Comments of Kenneth Wilson re the Atlantic Bridge
Project under CP16-9.

772. Filed By: Rosella Cicchese


Filed Date: 4/26/2016
Accession No: 20160426-0068
Description: Comments of Rosella Cicchese re the Atlantic Bridge
Project under CP16-9.

773. Filed By: Almar LLC


Filed Date: 4/26/2016
Accession No: 20160426-5032
Description: Report of Almar LLC under CP16-9; Comments of
Almar LLC Concerning Environmental Impacts with Appendices A
and B
20180216-0021 FERC PDF (Unofficial) 02/16/2018

143

Record
Item No. Descrintion

774. Filed By: Riverkeeper, Inc.


Filed Date: 4/28/2016
Accession No: 20160428-5046
Description: Notice of Substitution of James Bacon, Esq. for Misti
Duvall, Esq. of Riverkeeper, Inc. under CP16-9.

775. Filed By: John Gary Peters


Filed Date: 4/28/2016
Accession No: 20160428-5091
Description: Motion to Intervene Out-of-Time of John Gary Peters
under CP16-9, et al.

776. Filed By: Matthew Roundtree


Filed Date: 4/29/2016
Accession No: 20160429-5357
Description: Comment of Matthew Roundtree in Docket(s)/Project(s)
CP16-9.

777. Filed By: Individuals


Filed Date: 5/2/2016
Accession No: 20160502-0029
Description: John P. Gauley submits comments from 93 individuals
re the Atlantic Bridge Project under CP16-9.

778. Filed By: Charles Flynn


Filed Date: 5/2/2016
Accession No: 20160502-0033
Description: Comments of Charles Flynn regarding the Atlantic
Bridge Project under CP16-9.

779. Filed By: Marilyn Flynn


Filed Date: 5/2/2016
Accession No: 20160502-0034
Description: Comments of Marilyn Flynn regarding the natural gas
compressor station under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Descrintion

780. Issued By: Secretary of the Commission, FERC


Filed Date: 5/2/2016
Accession No: 20160502-3001
Description: Notice of Availability of the Environmental Assessment
for the proposed Tri-County Bare Steel Replacement Project re
Algonquin Gas Transmission, LLC et al under CP16-9.

781. Issued By: Secretary of the Commission, FERC


Filed Date: 5/2/2016
Accession No: 20160502-3010
Description: Errata Notice Correcting a Notice of Availability re
Algonquin Gas Transmission, LLC et al under CP16-9.

782. Issued By: Energy Projects, Office of


Filed Date: 5/2/2016
Accession No: 20160502-4001
Description: Environmental Assessment for Algonquin Gas
Transmission, LLC's et al Atlantic Bridge Project under CP16-9.

783. Filed By: Gradeigh Mack


Filed Date: 5/2/2016
Accession No: 20160502-5327
Description: Comment of Gradeigh Mack under CP16-9.

Filed By: Brandon Diem


Filed Date: 5/3/2016
Accession No: 20160503-5000
Description: Comment of Brandon Diem in Docket(s)/Project(s)
CP16-9.

785. Filed By: Dennis Dunn


Filed Date: 5/4/2016
Accession No: 20160504-5115
Description: Comment of Dennis Dunn in Docket(s)/Project(s) CP16-
9
20180216-0021 FERC PDF (Unofficial) 02/16/2018

145

Record
Item No. Descrintion

786. Filed By: Ann Macklin


Filed Date: 5/4/2016
Accession No: 20160504-5159
Description: Comment of Ann Macklin in Docket(s)/Project(s) CP16-
9-000, PF16-1.

787. Filed By: Christa Dunn


Filed Date: 5/5/2016
Accession No: 20160505-5013
Description: Comment of Christa Dunn in Docket(s)/Project(s) CP16-
9

788. Filed By: Christopher Garofalo


Filed Date: 5/5/2016
Accession No: 20160505-5014
Description: Comment of Christopher Garofalo in
Docket(s)/Project(s) CP16-9-000, PF16-1.

789. Filed By: Dan Daley


Filed Date: 5/5/2016
Accession No: 20160505-5067
Description: Comment of Dan Daley in Docket(s)/Project(s) CP16-9-
000, PF16-1.

790. Filed By: Tricia Kerr


Filed Date: 5/5/2016
Accession No: 20160505-5133
Description: Comment of Tricia Kerr in Docket(s)/Project(s) CP16-9-
000, PF16-1.

791. Filed By: Tera Beaird


Filed Date: 5/5/2016
Accession No: 20160505-5156
Description: Comment of Tara Beaird in Docket(s)/Project(s) PF16-
1-000, CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

146

Record
Item No. Descrintion

792. Filed By: Hannah Sullivan


Filed Date: 5/5/2016
Accession No: 20160505-5219
Description: Comment of Hannah Sullivan in Docket(s)/Project(s)
PF16-1-000, CP16-9.

793. Filed By: Catherine Altier


Filed Date: 5/6/2016
Accession No: 20160506-5009
Description: Comment of Catherine Altier in Docket(s)/Project(s)
CP16-9-000, PF16-1.

794. Filed By: Elizabeth Mack


Filed Date: 5/6/2016
Accession No: 20160506-5010
Description: Comment of Elizabeth Mack in Docket(s)/Project(s)
CP16-9-000, PF16-1.

795. Filed By: C. Dunn


Filed Date: 5/6/2016
Accession No: 20160506-5013
Description: Comment of C. Dunn in Docket(s)/Project(s) CP16-9.

796. Filed By: Victoria Bossley


Filed Date: 5/6/2016
Accession No: 20160506-5043
Description: Comment of Victoria Bossley in Docket(s)/Project(s)
CP16-9-000, PF16-1.

797. Filed By: Christa Dunn


Filed Date: 5/9/2016
Accession No: 20160509-5026
Description: Comment of Christa Dunn in Docket(s)/Project(s) CP16-
9
20180216-0021 FERC PDF (Unofficial) 02/16/2018

147

Record
Item No. Descrintion

798. Filed By: Lisa Kimbell


Filed Date: 5/9/2016
Accession No: 20160509-5027
Description: Comment of Lisa Kimball in Docket(s)/Project(s) PF16-
1-000, CP16-9.

799. Filed By: Dr. Peter H. Lapchak


Filed Date: 5/9/2016
Accession No: 20160509-5028
Description: Comment of Dr. Peter H. Lapchak in
Docket(s)/Project(s) CP16-9-000, PF16-1-000.

800. Filed By: Christo Darsch


Filed Date: 5/9/2016
Accession No: 20160509-5053
Description: Comment of Christo Darsch in Docket(s)/Project(s)
CP16-9-000, PF16-1.

801. Filed By: Cynthia Lydon


Filed Date: 5/9/2016
Accession No: 20160509-5066
Description: Comment of Cynthia Lydon in Docket(s)/Project(s)
CP16-9.

802. Filed By: Kiki Fluhr


Filed Date: 5/9/2016
Accession No: 20160509-5067
Description: Comment of Kiki Fluhr in Docket(s)/Project(s) CP16-9.

803. Filed By: Kiki Fluhr


Filed Date: 5/9/2016
Accession No: 20160509-5070
Description: Comment of Kiki Fluhr in Docket(s)/Project(s) CP16-9-
000, PF16-1.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

148

Record
Item No. Descrintion

804. Filed By; Kristin Fluhr


Filed Date: 5/9/2016
Accession No: 20160509-5075
Description: Comment of Kristin Fluhr in Docket(s)/Project(s) CP16-
9.
805. Filed By: Cindy Lydon
Filed Date: 5/9/2016
Accession No: 20160509-5076
Description: Comment of Cindy Lydon in Docket(s)/Project(s) CP16-
9.
806. Filed By: Kiki Fluhr
Filed Date: 5/9/2016
Accession No: 20160509-5083
Description: Comment of Kiki Fluhr in Docket(s)/Project(s) CP16-9.

807. Filed By: Anne Clogston


Filed Date: 5/9/2016
Accession No: 20160509-5095
Description: Comment of Anne Clogston in Docket(s)/Project(s)
CP16-9-000, PF16.

808. Filed By: Laura Foley


Filed Date: 5/9/2016
Accession No: 20160509-5097
Description: Comment of Laura Foley in Docket(s)/Project(s) CP16-
9-000, PF16-1.

809. Filed By: Terrence Gibbons


Filed Date: 5/10/2016
Accession No: 20160510-0020
Description: Comments of Terrence Gibbons re the project under
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

149

Record
Item No. Descrintion

810. Filed By: Laura L. Adams


Filed Date: 5/10/2016
Accession No: 20160510-5000
Description: Comment of Laura L. Adams in Docket(s)/Project(s)
PF16-1-000, CP16-9.

811. Filed By: Paula Harwood


Filed Date: 5/10/2016
Accession No: 20160510-5009
Description: Comment of Paula Harwood in Docket(s)/Project(s)
CP16-9.

812. Filed By: Christa Dunn


Filed Date: 5/10/2016
Accession No: 20160510-5011
Description: Comment of Christa Dunn in Docket(s)/Project(s) CP16-
9

813. Filed By: Individual


Filed Date: 5/10/2016
Accession No: 20160510-5046
Description: Comment of Cynthia in Docket(s)/Project(s) CP16-9.

814. Filed By: Cindy Lydon


Filed Date: 5/10/2016
Accession No: 20160510-5059
Description: Comment of Cindy Lydon in Docket(s)/Project(s) CP16-
9

815. Filed By: Maryann Foley


Filed Date: 5/10/2016
Accession No: 20160510-5063
Description: Comment of Maryann Foley in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

150

Record
Item No. Des crintion

816. Filed By: Kevin Lowney


Filed Date: 5/10/2016
Accession No: 20160510-5095
Description: Comment of Kevin Lowney in Docket(s)/Project(s)
PF16-1-000, CP16-9.

817. Filed By: Terry Gibbons


Filed Date: 5/10/2016
Accession No: 20160510-5107
Description: Comment of Terry Gibbons in Docket(s)/Project(s)
CP16-9.

818. Filed By: Peter Lydon


Filed Date: 5/10/2016
Accession No: 20160510-5145
Description: Comment of Peter Lydon in Docket(s)/Project(s) CP16-
9.

819. Filed By: Terry Gibbons


Filed Date: 5/11/2016
Accession No: 20160511-5010
Description: Comment of Terry Gibbons in Docket(s)/Project(s)
CP16-9.

820. Filed By: Pipe Line Awareness Network for the Northeast, Inc.
Filed Date: 5/11/2016
Accession No: 20160511-5066
Description: Request of Pipe Line Awareness Network for the
Northeast, Inc. under PF16-1-000 and CP16-9 for comment deadline
extension and comprehensive environmental review.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

151

Record
Item No. Descrintion

821. Filed By: Christa Dunn


Filed Date: 5/11/2016
Accession No: 20160511-5247
Description: Comment of Christa Dunn in Docket(s)/Project(s) CP16-
9

822. Filed By: Pat Purcell


Filed Date: 5/12/2016
Accession No: 20160512-5003
Description: Comment of Pat Purcell in Docket(s)/Project(s) CP16-9.

823. Filed By: Tracy Stiles


Filed Date: 5/12/2016
Accession No: 20160512-5010
Description: Comment of Tracy Stiles in Docket(s)/Project(s) CP16-
9-000, PF16-1.

824. Filed By: Michael J. Lang


Filed Date: 5/13/2016
Accession No: 20160513-5023
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.

825. Filed By: Michael J. Lang


Filed Date: 5/13/2016
Accession No: 20160513-5024
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

152

Record
Item No. Descrintion

826. Filed By: Dr. Curtis Nordgaard


Filed Date: 5/13/2016
Accession No: 20160513-5086
Description: Comment of Dr. Curtis Nordgaard, incorporating data
released from two studies in April 2016. These reports demonstrate
the flawed nature of the EA air quality analysis. As it stands, the EA is
not a legitimate assessment of impacts under CP16-9.

827. Filed By: Savanah Lydon


Filed Date: 5/13/2016
Accession No: 20160513-5205
Description: Comment of Savanah Lydon in Docket(s)/Project(s)
CP16-9.

828. Filed By: Individual


Filed Date: 5/16/2016
Accession No: 20160516-0098
Description: Comments of an Individual re the Environmental
Assessment under CP16-9.

829. Filed By: Joseph Foley


Filed Date: 5/16/2016
Accession No: 20160516-5003
Description: Comment of Joseph Foley in Docket(s)/Project(s) CP16-
9-000, PF16-1.

830. Filed By: Terry Gibbons


Filed Date: 5/16/2016
Accession No: 20160516-5026
Description: Comment of Terry Gibbons in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

153

Record
Item No. Descrintion

831. Filed By: Individual


Filed Date: 5/16/2016
Accession No: 20160516-5027
Description: Comment of Cynthia in Docket(s)/Project(s) CP16-9.

832. Filed By: Mary Perez


Filed Date: 5/16/2016
Accession No: 20160516-5029
Description: Comment of Mary Perez in Docket(s)/Project(s) CP16-
9.
833. Filed By: Tracy Stiles
Filed Date: 5/16/2016
Accession No: 20160516-5034
Description: Comment of Tracy Stiles in Docket(s)/Project(s) PF16-
1-000, CP16-9.

834. Filed By: Carrie Palazzo


Filed Date: 5/16/2016
Accession No: 20160516-5036
Description: Comment of Carrie Palazzo in Docket(s)/Project(s)
CP16-9.

835. Filed By: Tracy Stiles


Filed Date: 5/16/2016
Accession No: 20160516-5038
Description: Comment of Tracy Stiles in Docket(s)/Project(s) CP16-
9-000, PF16-1.

836. Filed By: Emily DaRosa


Filed Date: 5/16/2016
Accession No: 20160516-5039
Description: Comment of Emily DaRosa in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

154

Record
Item No. Descrintion

837. Filed By: Kellie Cloudman


Filed Date: 5/16/2016
Accession No: 20160516-5040
Description: Comment of Kellie Cloudman in Docket(s)/Project(s)
CP16-9.

838. Filed By: John Carroll


Filed Date: 5/16/2016
Accession No: 20160516-5041
Description: Comment of John Carroll in Docket(s)/Project(s) CP16-
9.

839. Filed By: Stephanie Rollins


Filed Date: 5/16/2016
Accession No: 20160516-5042
Description: Comment of Stephanie Rollins in Docket(s)/Project(s)
CP16-9.

840. Filed By: Christopher Primiano


Filed Date: 5/16/2016
Accession No: 20160516-5045
Description: Comment of Christopher Primiano in
Docket(s)/Project(s) CP16-9.

841. Filed By: Lori Lanergan


Filed Date: 5/16/2016
Accession No: 20160516-5046
Description: Comment of Lori Lanergan in Docket(s)/Project(s)
CP16-9.

842. Filed By: Russell Drysdale


Filed Date: 5/16/2016
Accession No: 20160516-5047
Description: Comment of Russell Drysdale in Docket(s)/Project(s)
PF16-1-000, CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

155

Record
Item No. Descrintion

843. Filed By: Michael Yavorsky


Filed Date: 5/16/2016
Accession No: 20160516-5050
Description: Comment of Michael Yavorsky in Docket(s)/Project(s)
CP16-9.

Filed By: Rachael Brennan


Filed Date: 5/16/2016
Accession No: 20160516-5051
Description: Comment of Rachael Brennan in Docket(s)/Project(s)
CP16-9-000, PF16-1.

845. Filed By: Christopher Castro


Filed Date: 5/16/2016
Accession No: 20160516-5052
Description: Comment of Christopher Castro in Docket(s)/Project(s)
CP16-9.

846. Filed By: Andrea Honore


Filed Date: 5/16/2016
Accession No: 20160516-5053
Description: Comment of Andrea Honore in Docket(s) Project(s)
CP16-9.

847. Filed By: Jennifer Mazgelis


Filed Date: 5/16/2016
Accession No: 20160516-5055
Description: Comment of Jennifer Mazgelis in Docket(s)/Project(s)
CP16-9.

848. Filed By: Kelly Aieta


Filed Date: 5/16/2016
Accession No: 20160516-5056
Description: Comment of Kelly Aieta in Docket(s)/Project(s) CP16-
9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

156

Record
Item No. Descrintion

849. Filed By: Christopher Primiano


Filed Date: 5/16/2016
Accession No: 20160516-5057
Description: Comment of Christopher Primiano in Docket(s)
/Project(s) CP16-9.

850. Filed By: Rev. Betsy Sowers


Filed Date: 5/16/2016
Accession No: 20160516-5059
Description: Comment of The Rev. Betsy Sowers in
Docket(s)/Project(s) CP16-9.

851. Filed By: Carol Livingstone


Filed Date: 5/16/2016
Accession No: 20160516-5060
Description: Comment of Carol Livingstone in Docket(s)/Project(s)
CP16-9.

852. Filed By: Patricia Ahern


Filed Date: 5/16/2016
Accession No: 20160516-5061
Description: Comment of Patricia Ahern in Docket(s)/Project(s)
CP16-9.

853. Filed By: Kristina Sheehan


Filed Date: 5/16/2016
Accession No: 20160516-5062
Description: Comment of Kristina Sheehan in Docket(s)/Project(s)
CP16-9.

854. Filed By: Heather Deschenes


Filed Date: 5/16/2016
Accession No: 20160516-5063
Description: Comment of Heather Deschenes in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

157

Record
Item No. Descrintion

855. Filed By: Kathleen M. Godbout


Filed Date: 5/16/2016
Accession No: 20160516-5066
Description: Comment of Kathleen M. Godbout in
Docket(s)/Project(s) CP16-9.

856. Filed By: Mary Perez


Filed Date: 5/16/2016
Accession No: 20160516-5071
Description: Comment of Mary Perez in Docket(s)/Project(s) CP16-
9.
857. Filed By: Mary Perez
Filed Date: 5/16/2016
Accession No: 20160516-5073
Description: Comment of Mary Perez in Docket(s)/Project(s) CP16-
9.
858. Filed By: Felipe Vieira
Filed Date: 5/16/2016
Accession No: 20160516-5074
Description: Comment of Felipe Vieira in Docket(s)/Project(s) CP16-
9.
859. Filed By: Peter Delano
Filed Date: 5/16/2016
Accession No: 20160516-5075
Description: Comment of Peter Delano in Docket(s)/Project(s) CP16-
9.
860. Filed By: Annie Roman
Filed Date: 5/16/2016
Accession No: 20160516-5076
Description: Comment of Annie Roman in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

158

Record
Item No. Descrintion

861. Filed By: Carol Livingstone


Filed Date: 5/16/2016
Accession No: 20160516-5079
Description: Comment of Carol Livingstone in Docket(s)/Project(s)
CP16-9.

862. Filed By: Rev. Tina Walker-Morin


Filed Date: 5/16/2016
Accession No: 20160516-5082
Description: Comment of Rev. Tina Walker-Morin in
Docket(s)/Project(s) CP16-9-000, PF16-1.

863. Filed By: Christine White


Filed Date: 5/16/2016
Accession No: 20160516-5084
Description: Comment of Christine White in Docket(s)/Project(s)
CP16-9.

Filed By: Cindy Lyle


Filed Date: 5/16/2016
Accession No: 20160516-5086
Description: Comment of Cindy Lyle in Docket(s)/Project(s) CP16-9.

865. Filed By: Colleen Sullivan


Filed Date: 5/16/2016
Accession No: 20160516-5087
Description: Comment of Colleen Sullivan in Docket(s)/Project(s)
PF16-1-000, CP16-9.

866. Filed By: Cynthia Lyons


Filed Date: 5/16/2016
Accession No: 20160516-5088
Description: Comment of Cynthia Lyons in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

159

Record
Item No. Descrintion

867. Filed By: Christopher Lyons


Filed Date: 5/16/2016
Accession No: 20160516-5090
Description: Comment of Christopher Lyons in Docket(s)/Project(s)
CP16-9.

868. Filed By: Lisa Daley


Filed Date: 5/16/2016
Accession No: 20160516-5092
Description: Comment of Lisa Daley in Docket(s)/Project(s) PF16-1-
000, CP16-9.

869. Filed By: Sarah Joyce


Filed Date: 5/16/2016
Accession No: 20160516-5093
Description: Comment of Sarah Joyce in Docket(s)/Project(s) CP16-
9

870. Filed By: Nolan Daley


Filed Date: 5/16/2016
Accession No: 20160516-5094
Description: Comment of Nolan Daley in Docket(s)/Project(s) CP16-
9-000, PF16-1.

871. Filed By: Amy Farrell


Filed Date: 5/16/2016
Accession No: 20160516-5095
Description: Comment of Amy Farrell in Docket(s)/Project(s) CP16-
9.
872. Filed By: Kay Gibbons
Filed Date: 5/16/2016
Accession No: 20160516-5097
Description: Comment of Kay Gibbons in Docket(s)/Project(s) CP16-
9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

160

Record
Item No. Descrintion

873. Filed By: Sharon Shaw


Filed Date: 5/16/2016
Accession No: 20160516-5098
Description: Comment of Sharon Shaw in Docket(s)/Project(s) CP16-
9.
874. Filed By: Dan Daley
Filed Date: 5/16/2016
Accession No: 20160516-5099
Description: Comment of Dan Daley in Docket(s)/Project(s) CP16-9-
000, PF16-1.

875. Filed By: Teresa Kunz


Filed Date: 5/16/2016
Accession No: 20160516-5100
Description: Comment of Teresa Kunz in Docket(s)/Project(s) CP16-
9

876. Filed By: Laura West


Filed Date: 5/16/2016
Accession No: 20160516-5102
Description: Comment of Laura West in Docket(s)/Project(s) CP16-
9.
Filed By: Robert Kearns
Filed Date: 5/16/2016
Accession No: 20160516-5104
Description: Comment of Robert Kearns in Docket(s)/Project(s)
CP16-9.

878. Filed By: Laurie Delano


Filed Date: 5/16/2016
Accession No: 20160516-5105
Description: Comment of Laurie Delano in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

161

Record
Item No. Descrintion

879. Filed By: Dan Daley


Filed Date: 5/16/2016
Accession No: 20160516-5106
Description: Comment of Dan Daley in Docket(s)/Project(s) CP16-9-
000, PF16-1.

880. Filed By: Elizabeth Weckbacher


Filed Date: 5/16/2016
Accession No: 20160516-5109
Description: Comment of Elizabeth Weckbacher in
Docket(s)/Project(s) CP16-9.

881. Filed By: Laura West


Filed Date: 5/16/2016
Accession No: 20160516-5110
Description: Comment of Laura West in Docket(s)/Project(s) PF16-1-
000, PF16-3.

882. Filed By: Brendan Weckbacher


Filed Date: 5/16/2016
Accession No: 20160516-5111
Description: Comment of Brendan Weckbacher in
Docket(s)/Project(s) CP16-9.

883. Filed By: Heather Falconer


Filed Date: 5/16/2016
Accession No: 20160516-5112
Description: Comment of Heather Falconer in Docket(s)/Project(s)
CP16-9.

Filed By: Gerard Grenier


Filed Date: 5/16/2016
Accession No: 20160516-5113
Description: Comment of Gerard Grenier in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

162

Record
Item No. Descrintion

885. Filed By: Fran McGaffigan


Filed Date: 5/16/2016
Accession No: 20160516-5114
Description: Comment of Fran McGaffigan in Docket(s)/Project(s)
CP16-9.

886. Filed By: Liz Moore


Filed Date: 5/16/2016
Accession No: 20160516-5115
Description: Comment of Liz Moore in Docket(s)/Project(s) CP16-9.

887. Filed By: Dan Daley


Filed Date: 5/16/2016
Accession No: 20160516-5117
Description: Comment of Dan Daley in Docket(s)/Project(s) CP16-9-
000, PF16-1.

888. Filed By: Scott Moore


Filed Date: 5/16/2016
Accession No: 20160516-5119
Description: Comment of Scott Moore in Docket(s)/Project(s) CP16-
9.
889. Filed By: George Mutch
Filed Date: 5/16/2016
Accession No: 20160516-5120
Description: Comment of George Mutch in Docket(s)/Project(s)
CP16-9.

890. Filed By: Fran McGaffigan


Filed Date: 5/16/2016
Accession No: 20160516-5121
Description: Comment of Fran McGaftigan in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

163

Record
Item No. Descrintion

891. Filed By: Wendy Cullivan


Filed Date: 5/16/2016
Accession No: 20160516-5122
Description: Comment of Wendy Cullivan in Docket(s)/Project(s)
CP16-9.

892. Filed By: Laura Adams


Filed Date: 5/16/2016
Accession No: 20160516-5123
Description: Comment of Laura Adams in Docket(s)/Project(s)
CP16-9.

893. Filed By: Caroline Tomasetta


Filed Date: 5/16/2016
Accession No: 20160516-5124
Description: Comment of Caroline Tomasetta in Docket(s)/Project(s)
CP16-9.

Filed By: Alexis O'onnell


Filed Date: 5/16/2016
Accession No: 20160516-5126
Description: Comment of Alexis O'onnell in Docket(s)/Project(s)
CP16-9.

895. Filed By: Leah McCarthy


Filed Date: 5/16/2016
Accession No: 20160516-5127
Description: Comment of Leah McCarthy in Docket(s)/Project(s)
CP16-9.

896. Filed By: Carolyn Zanotti


Filed Date: 5/16/2016
Accession No: 20160516-5128
Description: Comment of Carolyn Zanotti Keane in
Docket(s)/Project(s) CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

164

Record
Item No. Descrintion

897. Filed By: John Leurini


Filed Date: 5/16/2016
Accession No: 20160516-5130
Description: Comment of John Leurini in Docket(s)/Project(s) CP16-
9-000, PF16-1.

898. Filed By: Beverly Sellers


Filed Date: 5/16/2016
Accession No: 20160516-5132
Description: Comment of Beverly Sellers in Docket(s)/Project(s)
CP16-9.

899. Filed By: Janet McAuliffe


Filed Date: 5/16/2016
Accession No: 20160516-5141
Description: Comment of Janet McAuliffe in Docket(s)/Project(s)
CP16-9.

900. Filed By: Sarah Young


Filed Date: 5/16/2016
Accession No: 20160516-5166
Description: Comment of Sarah Young in Docket(s)/Project(s) CP16-
9

901. Filed By: Nicole Gulla


Filed Date: 5/16/2016
Accession No: 20160516-5168
Description: Comment of Nicole Gulla in Docket(s)/Project(s) CP16-
9-000, PF16-1.

902. Filed By: Karen Kearns


Filed Date: 5/16/2016
Accession No: 20160516-5189
Description: Comment of Karen Kearns in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

165

Record
Item No. Descrintion

903. Filed By: Sarah DelVecchio


Filed Date: 5/16/2016
Accession No: 20160516-5190
Description: Comment of Sarah DelVecchio in Docket(s)/Project(s)
CP16-9-000, PF16-1.

Filed By: Janel C. Morrow


Filed Date: 5/16/2016
Accession No: 20160516-5197
Description: Comment of Janel C. Morrow in Docket(s)/Project(s)
CP16-9.

905. Filed By: Chelsea Sedani


Filed Date: 5/16/2016
Accession No: 20160516-5207
Description: Comment of Chelsea Sedani in Docket(s)/Project(s)
CP16-9.

906. Filed By: Dustin Di Bona


Filed Date: 5/16/2016
Accession No: 20160516-5208
Description: Comment of Dustin Di Bona in Docket(s)/Project(s)
CP16-9.

907. Filed By: Marissa O'rien


Filed Date: 5/16/2016
Accession No: 20160516-5257
Description: Comment of Marissa O'rien in Docket(s)/Project(s)
CP16-9.

908. Filed By: Eileen White


Filed Date: 5/16/2016
Accession No: 20160516-5319
Description: Comment of Eileen White in Docket(s)/Project(s) CP16-
9
20180216-0021 FERC PDF (Unofficial) 02/16/2018

166

Record
Item No. Descrintion

909. Filed By: Individual


Filed Date: 5/17/2016
Accession No: 20160517-0026
Description: Comments of an Individual re the Environmental
Assessment in the application under CP16-9.

910. Filed By: William Glickman


Filed Date: 5/17/2016
Accession No: 20160517-0031
Description: Comments of William Glickman re the Access
Northeast Project under CP16-9. (CD unloadable due to unacceptable
file extensions.)

911. Filed By: William Glickman


Filed Date: 5/17/2016
Accession No: 20160517-0032
Description: Comments of William Glickman re the Access
Northeast Project under CP16-9. (CD unloadable due to unacceptable
file extensions.)

912. Filed By: Kathleen M. Godbout


Filed Date: 5/17/2016
Accession No: 20160517-5001
Description: Comment of Kathleen M. Godbout in
Docket(s)/Project(s) CP16-9.

913. Filed By: Lisa Doucette


Filed Date: 5/17/2016
Accession No: 20160517-5002
Description: Comment of Lisa Doucette in Docket(s)/Project(s)
CP16-9-000, PF16-1.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

167

Record
Item No. Descrintion

914. Filed By: Jennifer Ahern


Filed Date: 5/17/2016
Accession No: 20160517-5007
Description: Comment of Jennifer Ahern in Docket(s)/Project(s)
CP16-9.

915. Filed By: Jennifer Ahern


Filed Date: 5/17/2016
Accession No: 20160517-5009
Description: Comment of Jennifer Ahern in Docket(s)/Project(s)
CP16-9.

916. Filed By: Teresa Kunz


Filed Date: 5/17/2016
Accession No: 20160517-5013
Description: Comment of Teresa Kunz in Docket(s)/Project(s) CP16-
9

917. Filed By: Clara de Jong


Filed Date: 5/17/2016
Accession No: 20160517-5015
Description: Comment of Clara de Jong in Docket(s)/Project(s)
CP16-9.

918. Filed By: Teresa Kunz


Filed Date: 5/17/2016
Accession No: 20160517-5017
Description: Comment of Teresa Kunz in Docket(s)/Project(s) CP16-
9

919. Filed By: Peter H. Lapchak


Filed Date: 5/17/2016
Accession No: 20160517-5021
Description: Comment of Peter H. Lapchak in Docket(s)/Project(s)
PF16-1-000, CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

168

Record
Item No. Descrintion

920. Filed By: John P. Sullivan, Ph.D.


Filed Date: 5/17/2016
Accession No: 20160517-5074
Description: Comment of John P. Sullivan, Ph.D. in
Docket(s)/Project(s) CP16-9-000, PF16-1.

921. Filed By: Cynthia Lydon


Filed Date: 5/17/2016
Accession No: 20160517-5081
Description: Comment of Cynthia Lydon and Family in
Docket(s)/Project(s) CP16-9.

922. Filed By: Weymouth District 1 Town Councilor


Filed Date: 5/17/2016
Accession No: 20160517-5089
Description: Comment of Weymouth District 1 Town Councilor
Rebecca Haugh to request an extension for the Environmental
Assessment comment period due to complexity of multiple open
comment periods for both Atlantic Bridge 8c Access Northeast
projects under CP16-9.

923. Filed By: Peter H. Lapchak, Ph.D


Filed Date: 5/17/2016
Accession No: 20160517-5097
Description: Comment of Peter H. Lapchak, Ph.D. in
Docket(s)/Project(s) CP16-9-000, PF16-1.

924. Filed By: Peter H. Lapchak, Ph.D


Filed Date: 5/17/2016
Accession No: 20160517-5148
Description: Comment of Peter H. Lapchak, Ph.D. in
Docket(s)/Project(s) PF16-1-000, CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

169

Record
Item No. Descrintion

925. Filed By: Andrea Poudrier


Filed Date: 5/17/2016
Accession No: 20160517-5160
Description: Comment of Andrea Poudrier in Docket(s)/Project(s)
CP16-9-000, PF16-1.

926. Filed By: Teresa Kunz


Filed Date: 5/18/2016
Accession No: 20160518-5001
Description: Comment of Teresa Kunz in Docket(s)/Project(s) CP16-
9

927. Filed By: Dan Daley


Filed Date: 5/18/2016
Accession No: 20160518-5018
Description: Comment of Dan Daley in Docket(s)/Project(s) CP16-9-
000, PF16-1.

928. Filed By: Nathaniel J. Wales


Filed Date: 5/18/2016
Accession No: 20160518-5028
Description: Comment's on Chairman Bay's response letter to
Senators Warren and Markey and request for full EIS. Nathaniel J.
Wales under CP16-9.

929. Filed By: Dan Daley


Filed Date: 5/18/2016
Accession No: 20160518-5029
Description: Comments of Dan Daley under Dockets CP16-9, et al

930. Filed By: Paula Keeman


Filed Date: 5/18/2016
Accession No: 20160518-5089
Description: Comment of Paula Keeman in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

170

Record
Item No. Descrintion

931. Filed By: Frank Taormina


Filed Date: 5/19/2016
Accession No: 20160519-0068
Description: Comments of Frank Taormina re the compressor station
under CP16-9.

932. Filed By: Lisa Clemence


Filed Date: 5/19/2016
Accession No: 20160519-5004
Description: Comment of Lisa Clemence in Docket(s)/Project(s)
CP16-9.

933. Filed By: Teresa Kunz


Filed Date: 5/19/2016
Accession No: 20160519-5006
Description: Comment of Teresa Kunz in Docket(s)/Project(s) CP16-
9.
934. Filed By: Hollynd Biro
Filed Date: 5/19/2016
Accession No: 20160519-5007
Description: Comment of Hollynd Biro in Docket(s)/Project(s) CP16-
9.

935. Filed By: Peter Pilalas


Filed Date: 5/19/2016
Accession No: 20160519-5010
Description: Comment of Peter Pilalas in Docket(s)/Project(s) PF16-
1-000, CP16-9.

936. Filed By: Alicia Farnum


Filed Date: 5/19/2016
Accession No: 20160519-5011
Description: Comment of Alicia Farnum in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

171

Record
Item No. Descrintion

937. Filed By: Madison Farnum


Filed Date: 5/19/2016
Accession No: 20160519-5012
Description: Comment of Madison Farnum in Docket(s)/Project(s)
CP16-9.

938. Filed By: Christa Dunn


Filed Date: 5/19/2016
Accession No: 20160519-5014
Description: Comment of Christa Dunn in Docket(s)/Project(s) CP16-
9.
939. Filed By: Hollynd Biro
Filed Date: 5/19/2016
Accession No: 20160519-5024
Description: Comment of Hollynd Biro in Docket(s)/Project(s) CP16-
9.
940. Filed By: Hollynd Biro
Filed Date: 5/19/2016
Accession No: 20160519-5026
Description: Comment of Hollynd Biro in Docket(s)/Project(s) CP16-
9.
941. Filed By: Hollynd Biro
Filed Date: 5/19/2016
Accession No: 20160519-5033
Description: Comment of Hollynd Biro in Docket(s)/Project(s) CP16-
9.

942. Filed By: Hollynd Biro


Filed Date: 5/19/2016
Accession No: 20160519-5034
Description: Comment of Hollynd Biro in Docket(s)/Project(s) CP16-
9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

172

Record
Item No. Descrintion

943. Filed By: Hollynd Biro


Filed Date: 5/19/2016
Accession No: 20160519-5035
Description: Comment of Hollynd Biro in Docket(s)/Project(s) CP16-
9.
944. Filed By: Town of Freetown, MA Board of Selectmen
Filed Date: 5/19/2016
Accession No: 20160519-5084
Description: Report of Town of Freetown, MA Board of Selectmen
under PF16-1, et al. requesting a 30 day extension of the scoping
comment deadline in the Access Northeast processing. Also,
informing FERC of a resolution adopted opposing the pipeline.

945. Filed By: Dan Daley


Filed Date: 5/19/2016
Accession No: 20160519-5089
Description: Comments of Dan Daley under Dockets CP16-9, et al

946. Filed By: Thomas Daly


Filed Date: 5/19/2016
Accession No: 20160519-5099
Description: Comment of Thomas Daly in Docket(s)/Project(s)
CP16-9-000, PF16-1.

947. Filed By: Dan Daley


Filed Date: 5/19/2016
Accession No: 20160519-5108
Description: Opposition - Dan Daley under CP16-9-000, PF16-1-000
et al. The area for the proposed compressor station is too densely
populated.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

173

Record
Item No. Descrintion

948. Filed By: Dan Daley


Filed Date: 5/19/2016
Accession No: 20160519-5111
Description: Public Safety Concern/Complaint of Dan Daley under
CP16-9 and PF16-9.

949. Filed By: E. Lorraine Daly


Filed Date: 5/19/2016
Accession No: 20160519-5138
Description: Comment of E. Lorraine Daly in Docket(s)/Project(s)
CP16-9-000, PF16-1.

950. Filed By: Susan Johnson


Filed Date: 5/19/2016
Accession No: 20160519-5141
Description: Comment of Susan Johnson in Docket(s)/Project(s)
CP16-9-000, PF16-1.

951. Filed By: Hollynd Biro


Filed Date: 5/19/2016
Accession No: 20160519-5209
Description: Comment of Hollynd Biro in Docket(s)/Project(s) CP16-
9.

952. Filed By: Hollynd Biro


Filed Date: 5/19/2016
Accession No: 20160519-5210
Description: Comment of Hollynd Biro in Docket(s)/Project(s) CP16-
9.
953. Filed By: Hollynd Biro
Filed Date: 5/20/2016
Accession No: 20160520-5001
Description: Comment of Hollynd Biro in Docket(s)/Project(s) CP'16-
9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

174

Record
Item No. Deserintion

954. Filed By: Jill Garzik Guptill


Filed Date: 5/20/2016
Accession No: 20160520-5038
Description: Comment of Jill Garzik Guptill in Docket(s)/Project(s)
CP16-9-000, PF16-1.

955. Filed By: Ann Macklin


Filed Date: 5/20/2016
Accession No: 20160520-5039
Description: Comment of Ann Macklin in Docket(s)/Project(s) CP16-
9-000, PF16-1.

956. Filed By: Mary Perez


Filed Date: 5/20/2016
Accession No: 20160520-5046
Description: Comment of Mary Perez in Docket(s)/Project(s) PF16-1-
000, CP16-9.

957. Filed By: Andrea E. Honore


Filed Date: 5/20/2016
Accession No: 20160520-5116
Description: Comment of Andrea E. Honore in Docket(s)/Project(s)
CP16-9-000, PF16-1.

958. Filed By: Laura Foley


Filed Date: 5/20/2016
Accession No: 20160520-5135
Description: Comment of Laura Foley in Docket(s)/Project(s) CP16-
9-000, PF16-1.

959. Filed By: Dr. Curtis Nordgaard


Filed Date: 5/20/2016
Accession No: 20160520-5152
Description: Comment of Dr. Curtis Nordgaard under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

175

Record
Item No. Descrintion

960. Filed By: Pat Purcell


Filed Date: 5/20/2016
Accession No: 20160520-5166
Description: Comment of Pat Purcell in Docket(s)/Project(s) CP16-9.

961. Filed By: Town of Freetown, MA Board of Selectmen


Filed Date: 5/23/2016
Accession No: 20160524-0018
Description: Freetown Board of Selectmen submits a request for a 30
day extension of time re the scoping comment deadline for the
National Grid Access Northeast Proposal Project under PF15-1 et al.

962. Filed By: Wally Rios


Filed Date: 5/23/2016
Accession No: 20160523-0035
Description: Comments of Wally Rios re the Atlantic Bridge Project
under CP16-9.

963. Filed By: Anne O'rady


Filed Date: 5/23/2016
Accession No: 20160523-0054
Description: Comments of Anne O'rady re the Atlantic Bridge
Project under CP16-9.

Filed By: Tim Wildridge


Filed Date: 5/23/2016
Accession No: 20160523-0055
Description: Comments of Tim Wildridge re Atlantic Bridge Project
under CP16-9.

965. Filed By: Evangeline Lydon


Filed Date: 5/23/2016
Accession No: 20160523-0086
Description: Comments of Evangeline Lydon re the compressor
station under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

176

Record
Item No. Descrintion

966. Filed By: Mary Perez


Filed Date: 5/23/2016
Accession No: 20160523-5003
Description: Comment of Mary Perez in Docket(s)/Project(s) PF16-1-
000, CP16-9.

967. Filed By: Minerva Figueroa


Filed Date: 5/23/2016
Accession No: 20160523-5005
Description: Comment of Minerva Figueroa in Docket(s)/Project(s)
CP16-9.

968. Filed By: Mary Perez


Filed Date: 5/23/2016
Accession No: 20160523-5018
Description: Comment of Mary Perez in Docket(s)/Project(s) PF16-1-
000, CP16-9.

969. Filed By: Elizabeth Mack


Filed Date: 5/23/2016
Accession No: 20160523-5023
Description: Comment of Elizabeth Mack in Docket(s)/Project(s)
CP16-9-000, PF16-1.

970. Filed By: Marie Shaw


Filed Date: 5/23/2016
Accession No: 20160523-5026
Description: Comment of Marie Shaw in Docket(s)/Project(s) CP16-
9.

971. Filed By: Cathy Bevans


Filed Date: 5/23/2016
Accession No: 20160523-5029
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

177

Record
Item No. Descrintion

972. Filed By: Robert Kearns


Filed Date: 5/23/2016
Accession No: 20160523-5035
Description: Comment of Robert Kearns in Docket(s)/Project(s)
CP16-9.

973. Filed By: Kimberly McCutcheon


Filed Date: 5/23/2016
Accession No: 20160523-5095
Description: Comment of Kimberly McCutcheon in
Docket(s)/Project(s) CP16-9.

974. Filed By: Lisa M. Kerr


Filed Date: 5/23/2016
Accession No: 20160523-5163
Description: Comment of Lisa M. Kerr under CP16-9-000.

975. Filed By: Lisa M. Kerr


Filed Date: 5/23/2016
Accession No: 20160523-5223
Description: Comment of Lisa M. Kerr under PF16-1, et al.

976. Filed By: Maine State Chamber of Commerce


Filed Date: 5/24/2016
Accession No: 20160524-0035
Description: Comments of Maine State Chamber of Commerce re the
Atlantic Bridge Project under CP16-9.

977. Filed By: Dan Daley


Filed Date: 5/24/2016
Accession No: 20160524-5027
Description: Supplemental Information: There is no Demand for this
product. -Request of Dan Daley under CP16-9, et al.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

178

Record
Item No. Descrintion

978. Filed By: Dan Daley


Filed Date: 5/24/2016
Accession No: 20160524-5028
Description: Supplemental Information: Clean Water Act /
Requirement to Consider Alternative Locations - Request of Dan
Daley under CP16-9, et al.

979. Filed By: Richard Stiles


Filed Date: 5/24/2016
Accession No: 20160524-5074
Description: Comment of Richard Stiles in Docket(s)/Project(s)
CP16-9-000, PF16-1.

980. Filed By: Massachusetts State Representative


Filed Date: 5/24/2016
Accession No: 20160525-0040
Description: Massachusetts State Senator John F. Keenan submits
comments re the Access Northeast Project et al under PF16-1 et al

981. Filed By: Maureen Spencer


Filed Date: 5/25/2016
Accession No: 20160525-0047
Description: Comments of Maureen Spencer re the gas compressor
statement under CP16-9.

982. Filed By: Elliot Savitz


Filed Date: 5/25/2016
Accession No: 20160525-5000
Description: Comment of Elliot Savitz in Docket(s)/Project(s) PF16-
1-000, CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

179

Record
Item No. Descrintion

983. Filed By: Dr. Lesley C. Acton


Filed Date: 5/25/2016
Accession No: 20160525-5003
Description: Comment of Dr. Lesley C. Acton in Docket(s)/Project(s)
CP16-9-000, PF16-1-000.

Filed By: Peter H. Lapchak


Filed Date: 5/25/2016
Accession No: 20160525-5025
Description: Comments of Peter H. Lapchak regarding the Access
Northeast Project under CP16-9, et al.

985. Filed By: Dr. Curtis Nordgaard


Filed Date: 5/25/2016
Accession No: 20160525-5035
Description: Comment of Dr. Curtis Nordgaard describing presence
of radioactive lead-210 buildup in pipelines transporting Marcellus
fracked gas and requests to address omission of appropriate evaluation
in EA. Supporting study data included under CP16-9.

986. Filed By: Nathaniel J. Wales


Filed Date: 5/25/2016
Accession No: 20160525-5079
Description: Response by Nathaniel J. Wales to Resource Report 10
concerning accuracy of Spectra's statements on Children's Island
under CP16-9.

987. Filed By: Dorothy Anderson


Filed Date: 5/26/2016
Accession No: 20160526-5011
Description: Comment of Dorothy Anderson in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

180

Record
Item No. Descrintion

988. Filed By: Cindy Lydon


Filed Date: 5/26/2016
Accession No: 20160526-5052
Description: Comment of Cindy Lydon in Docket(s)/Project(s) CP16-
9.
989. Filed By: Matthew Symonds
Filed Date: 5/26/2016
Accession No: 20160526-5068
Description: Comment of Matthew Symonds in Docket(s)/Project(s)
CP16-9-000, PF16-1-000.

990. Filed By: New York State Department of Environmental Conservation


Filed Date: 5/26/2016
Accession No: 20160526-5114
Description: NYS Department of Environmental Conservation,
Notice of Incomplete Application (NOIA) FERC Docket No. CP16-9,
Algonquin Gas Transmission - State Pollutant Discharge Elimination
System (SPDES) Permit for Stormwater SPDES Permit

991. Filed By: Margaret Bellafiore


Filed Date: 5/26/2016
Accession No: 20160526-5215
Description: Comment of Margaret Bellafiore in Docket(s)/Project(s)
CP16-9.

992. Filed By: Richard Stiles


Filed Date: 5/27/2016
Accession No: 20160527-5008
Description: Comment of Richard Stiles in Docket(s)/Project(s)
CP16-9-000, PF16-1-000.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

181

Record
Item No. Descrintion

993. Filed By: Elizabeth Mack


Filed Date: 5/27/2016
Accession No: 20160527-5009
Description: Comment of Elizabeth Mack in Docket(s)/Project(s)
CP16-9-000, PF16-1-000.

994. Filed By: Kathleen Elizabeth Chouinard


Filed Date: 5/27/2016
Accession No: 20160527-5014
Description: Comment of Kathleen Elizabeth Chouinard in
Docket(s)/Project(s) CP16-9.

995. Filed By: Dr. Curtis Nordgaard


Filed Date: 5/27/2016
Accession No: 20160527-5020
Description: Comment of Curtis Nordgaard under CP16-9: Public
allegation of conflict of interest. The consultant hired by the
Commission to prepare the Atlantic Bridge EA is paid by Spectra
Energy to work on a separate project, in violation of FERC rules.

996. Filed By: Nathaniel J. Wales


Filed Date: 5/27/2016
Accession No: 20160527-5090
Description: Protest of Nathaniel J. Wales for FERC to conduct a
new review of alternative locations and Environmental Assessment
due to conflict of interest with NRG the contractor who was hired to
create these reports under CP16-9.

997. Filed By: Kathleen L. Curran


Filed Date: 5/27/2016
Accession No: 20160527-5137
Description: Comment of Kathleen L. Curran in Docket(s)/Project(s)
CP16-9-000, PF16-1-000.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

182

Record
Item No. Descrintion

998. Filed By: Gary Bent


Filed Date: 5/27/2016
Accession No: 20160527-5141
Description: Comment of Gary Bent under CP16-9.

Filed By: Weymouth, Massachusetts, Town of


Filed Date: 5/27/2016
Accession No: 20160527-5170
Description: Request for Extension of Public Comment Deadline
Weymouth, Massachusetts, Town of under CP16-9.

1000. Filed By: Sandra Peters


Filed Date: 5/27/2016
Accession No: 20160527-5237
Description: Comment of Sandra Peters under CP16-9. Request for
extension of time period to submit public comment

1001. Filed By: Sandra Peters


Filed Date: 5/27/2016
Accession No: 20160527-5255
Description: Motion to Compel of Sandra Peters Pursuant to Rule
212 of the Federal Energy Regulatory Commission's ("FERC")Rules
of Practice and Procedure under CP16-9.

1002. Filed By: Quincy, City of (MA)


Filed Date: 5/31/2016
Accession No: 20160531-0015
Description: Quincy Town Councilor Margaret E. Laforest submits
comments re the Atlantic Bridge Project under CP16-9.

1003. Filed By: Norman Rollo


Filed Date: 5/31/2016
Accession No: 20160531-0024
Description: Comments of Norman Rollo re the natural gas pipeline
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

183

Record
Item No. Descrintion

1004. Filed By: Quincy Point Congregational Church


Filed Date: 5/31/2016
Accession No: 20160531-0051
Description: Quincy Point Congregational Church submits comments
re the Access Northeast Project under PF16-1 et al.

1005. Filed By: Jennifer Ahern


Filed Date: 5/31/2016
Accession No: 20160531-5001
Description: Comment of Jennifer Ahern in Docket(s)/Project(s)
CP16-9.

1006. Filed By: Jennifer Ahern


Filed Date: 5/31/2016
Accession No: 20160531-5002
Description: Comment of Jennifer Ahern in Docket(s)/Project(s)
CP16-9.

1007. Filed By: Jennifer Ahern


Filed Date: 5/31/2016
Accession No: 20160531-5003
Description: Comment of Jennifer Ahern in Docket(s)/Project(s)
CP16-9.

1008. Filed By: Jennifer Ahern


Filed Date: 5/31/2016
Accession No: 20160531-5004
Description: Comment of Jennifer Ahern in Docket(sj/Project(s)
CP16-9.

1009. Filed By: Jennifer Ahern


Filed Date: 5/31/2016
Accession No: 20160531-5005
Description: Comment of Jennifer Ahern in Docket(sj/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

184

Record
Item No. Descrintion

1010. Filed By: Jennifer Ahern


Filed Date: 5/31/2016
Accession No: 20160531-5006
Description: Comment of Jennifer Ahern in Docket(s)/Project(s)
CP16-9.

1011. Filed By: Michael and Miriam Kurland


Filed Date: 5/31/2016
Accession No: 20160531-5016
Description: Comment of Michael and Miriam Kurland in
Docket(s)/Project(s) CP16-9.

1012. Filed By: Teresa Kunz


Filed Date: 5/31/2016
Accession No: 20160531-5023
Description: Comment of Teresa Kunz in Docket(s)/Project(s) CP16-
9.
1013. Filed By: Dorothy Anderson
Filed Date: 5/31/2016
Accession No: 20160531-5041
Description: Comment of Dorothy Anderson in Docket(s)/Project(s)
PF15-12.

1014. Filed By: Brad L. Croall


Filed Date: 5/31/2016
Accession No: 20160531-5044
Description: Comment of Brad L. Croall in Docket(s)/Project(s)
CP16-9.

1015. Filed By: Michael J. Lang


Filed Date: 5/31/2016
Accession No: 20160531-5048
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

185

Record
Item No. Descrintion

1016. Filed By: Cathy Bevans


Filed Date: 5/31/2016
Accession No: 20160531-5053
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
CP16-9-000, PF16-1-000.

1017. Filed By: Cathy Bevans


Filed Date: 5/31/2016
Accession No: 20160531-5054
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
CP16-9-000, PF16-1-000.

1018. Filed By: Priya Sonal


Filed Date: 5/31/2016
Accession No: 20160531-5056
Description: Comment of Priya Sonal in Docket(s)/Project(s) CP16-
9-000, PF16-1-000.

1019. Filed By: Cathy Bevans


Filed Date: 5/31/2016
Accession No: 20160531-5061
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
CP16-9-000, PF16-1-000.

1020. Filed By: David Schneider


Filed Date: 5/31/2016
Accession No: 20160531-5062
Description: Comment of David Schneider in Docket(s)/Project(s)
CP16-9.

1021. Filed By: Dorothy Anderson


Filed Date: 5/31/2016
Accession No: 20160531-5065
Description: Comment of Dorothy Anderson in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

186

Record
Item No. Descrintion

1022. Filed By: Wendy Cullivan


Filed Date: 5/31/2016
Accession No: 20160531-5067
Description: . Comment of Wendy Cullivan in Docket(s)/Project(s)
CP16-9.

1023. Filed By: Cindy Lydon


Filed Date: 5/31/2016
Accession No: 20160531-5069
Description: Comment of Cindy Lydon in Docket(s)/Project(s) CP16-
9.
1024. Filed By: Jo-Ann Rolfe Heileman
Filed Date: 5/31/2016
Accession No: 20160531-5074
Description: Comment of Jo-Ann Rolfe Heileman in
Docket(s)/Project(s) CP16-9.

1025. Filed By: Cathy Bevans


Filed Date: 5/31/2016
Accession No: 20160531-5077
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
CP16-9-000, PF16-1.

1026. Filed By: John 6t Jan Ryan


Filed Date: 5/31/2016
Accession No: 20160531-5080
Description: Comment of John 8'c Jan Ryan in Docket(s)/Project(s)
CP16-9.

1027. Filed By: Kiki Fluhr


Filed Date: 5/31/2016
Accession No: 20160531-5084
Description: Comment of Kiki Fluhr in Docket(s)/Project(s) CP16-9-
000, PF16-1.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

187

Record
Item No. Descrintion

1028. Filed By: Kiki Fluhr


Filed Date: 5/31/2016
Accession No: 20160531-5086
Description: Comment of Kiki Fluhr in Docket(s)/Project(s) CP16-9-
000, PF16-1-000.

1029. Filed By: Kiki Fluhr


Filed Date: 5/31/2016
Accession No: 20160531-5087
Description: Comment of Kiki Fluhr in Docket(s)/Project(s) CP16-9-
000, PF16-1-000.

1030. Filed By: Kiki Fluhr


Filed Date: 5/31/2016
Accession No: 20160531-5088
Description: Comment of Kiki Fluhr in Docket(s)/Project(s) CP16-9-
000, PF16-1-000.

1031. Filed By: Deborah Brown


Filed Date: 5/31/2016
Accession No: 20160531-5090
Description: Comment of Deborah Brown in Docket(s)/Project(s)
CP16-9.

1032. Filed By: James Root


Filed Date: 5/31/2016
Accession No: 20160531-5094
Description: Comment of James Root in Docket(s)/Project(s) CP16-
9

1033. Filed By: Christina Fitzpatrick


Filed Date: 5/31/2016
Accession No: 20160531-5108
Description: Comment of Christina Fitzpatrick in
Docket(s)/Project(s) CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

188

Record
Item No. Descrintlon

1034. Filed By: Don Ogden


Filed Date: 5/31/2016
Accession No: 20160531-5112
Description: Comment of Don Ogden in Docket(s)/Project(s) CP16-
9.
1035. Filed By: Jill Governor
Filed Date: 5/31/2016
Accession No: 20160531-5118
Description: Comment of Jill Governor in Docket(s)/Project(s) PF16-
1-000, CP16-9.

1036. Filed By: Tracy Stiles


Filed Date: 5/31/2016
Accession No; 20160531-5123
Description: Comment of Tracy Stiles in Docket(s)/Project(s) PF16-
1-000, CP16-9.

1037. Filed By: Cathy Bevans


Filed Date: 5/31/2016
Accession No: 20160531-5128
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
CP16-9.

1038. Filed By: Peter H. Lapchak, Ph.D.


Filed Date: 5/31/2016
Accession No: 20160531-5134
Description: Comment of Peter H. Lapchak, Ph.D. in
Docket(s)/Project(s) PF16-1-000, CP16-9.

1039. Filed By: Melanic Nunes


Filed Date: 5/31/2016
Accession No: 20160531-5141
Description: Comment of Melanic Nunes in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

189

Record
Item No. Descrintion

1040. Filed By: Chet Clem


Filed Date: 5/31/2016
Accession No: 20160531-5146
Description: Comment of Chet Clem in Docket(s)/Project(s) CP16-9.

1041. Filed By: Michaela Nunes


Filed Date: 5/31/2016
Accession No: 20160531-5148
Description: Comment of Michaela Nunes in Docket(s)/Project(s)
CP16-9.

1042. Filed By: Weymouth Town Councilor


Filed Date: 5/31/2016
Accession No: 20160531-5166
Description: Comment of Weymouth Town Councilor Rebecca
Haugh under CP16-9 in regards to Section 1.8, 1.9, 8'c 2.5.1 in relation
to the workforce and local hires.

1043. Filed By: Weymouth Town Councilor


Filed Date: 5/31/2016
Accession No: 20160531-5167
Description: Comment of Weymouth Town Councilor Rebecca
Haugh under CP16-9 regarding Section 2.7 Air Quality and 2.10.9
Climate Change for the Atlantic Bridge Project

1044. Filed By: Weymouth Town Councilor


Filed Date: 5/31/2016
Accession No: 20160531-5197
Description: Comment of Weymouth District 1 Town Councilor
Rebecca Haugh under CP16-9 in regards to Section 1.2 of the Atlantic
Bridge EA. Capacity created with this project is not being accurately
reported in this EA.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

190

Record
Item No. Descrintion

1045. Filed By: Weymouth Town Councilor


Filed Date: 5/31/2016
Accession No: 20160531-5198
Description: Comment in opposition of Weymouth District 1 Town
Councilor Rebecca Haugh under CP16-9. In regards to Section 1.3 of
the EA titled "Scope of This Environmental Assessment". The lack of
EIS prepared, the lack of studying fracked gas production, etc.

1046. Filed By: Weymouth Town Councilor


Filed Date: 5/31/2016
Accession No: 20160531-5199
Description: Comment of Weymouth District 1 Town Councilor
Rebecca Haugh under CP16-9 in regards to lack of properly
disclosing how many written comments were in opposition to the
Atlantic Bridge Project in Section IP of the EA.

1047. Filed By: Weymouth Town Councilor


Filed Date: 5/31/2016
Accession No: 20160531-5200
Description: Comment of Weymouth Town Councilor Rebecca
Haugh under CP16-9 in regards to an inaccurate map showing the
Weymouth Compressor Station Siting in Section 1.5 and Appendix A
of the EA.

1048. Filed By: Neil J Decry


Filed Date: 5/31/2016
Accession No: 20160531-5225
Description: Neil J. Decry North Weymouth is an environmentally
sensitive area and one of the worst choices for a compressor station
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

191

Record
Item No. Descrintion

1049. Filed By: Pipe Line Awareness Network for the Northeast, Inc.
Filed Date: 5/31/2016
Accession No: 20160531-5238
Description: Comment of Pipe Line Awareness Network for the
Northeast, Inc. on air quality, noise, and improper segmentation under
PF16-1 and CP16-9.

1050. Filed By: Connecticut Chapter Sierra Club


Filed Date: 5/31/2016
Accession No: 20160531-5277
Description: Comment of Connecticut Chapter Sierra Club under
CP16-9.

1051. Filed By: Arnold Piacentini


Filed Date: 5/31/2016
Accession No: 20160531-5481
Description: Arnold Piacentini's Scoping Comments for Access
Northeast Docket with Additional Comments on the Atlantic Bridge
and AIM Dockets and a Request for FERC to Cease Considering
these Three Dockets Separately under PF16-1, et al.

1052. Filed By: Joseph Madigan


Filed Date: 5/31/2016
Accession No: 20160531-5511
Description: Comment of Joseph Madigan in Docket(s)/Project(s)
CP16-9.

1053. Filed By: Massachusetts State Senator


Filed Date: 5/31/2016
Accession No: 20160531-5537
Description: Comment of Massachusetts State Senator Patrick
O'onnor under PF16-1, et al.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

192

Record
Item No. Descrintion

1054. Filed By: Philip Dooley


Filed Date: 5/31/2016
Accession No: 20160531-5552
Description: Comment of Philip Dooley in Docket(s)/Project(s)
CP16-9.

1055. Filed By: State Representative James Murphy


Filed Date: 5/31/2016
Accession No: 20160531-5584
Description: Comment of State Representative James Murphy in
Docket(s)/Project(s) PF16-1-000, CP16-9. Submission Date:
5/31/2016

1056. Filed By: Carol Madigan


Filed Date: 5/31/2016
Accession No: 20160531-5600
Description: Comment of Carol Madigan in Docket(s)/Project(s)
CP16-9.

1057. Filed By: Joseph Madigan


Filed Date: 5/31/2016
Accession No: 20160531-5739
Description: Comment of Joseph Madigan in Docket(s)/Project(s)
CP16-9.

1058. Filed By: U.S. House of Representatives


Filed Date: 5/31/2016
Accession No: 20160601-0006
Description: U.S. Representative Stephen F. Lynch submits
comments regarding the Atlantic Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

193

Record
Item No. Descrintion

1059. Filed By: Cynthia Lydon


Filed Date: 6/1/2016
Accession No: 20160601-5024
Description: Comment of Cynthia Lydon in Docket(s)/Project(s)
CP16-9.

1060. Filed By: Marilyn Learner


Filed Date: 6/1/2016
Accession No: 20160601-5027
Description: Comment of Marilyn Learner in Docket(s)/Project(s)
CP16-9.

1061. Filed By: Cathy Bevans


Filed Date: 6/1/2016
Accession No: 20160601-5038
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
CP16-9-000, PF16-1-000.

1062. Filed By: Michelle Keith


Filed Date: 6/1/2016
Accession No: 20160601-5039
Description: Comment of Michelle Keith in Docket(s)/Project(s)
CP16-9-000, PF16-1-000.

1063. Filed By: Taylor Johnston


Filed Date: 6/1/2016
Accession No: 20160601-5043
Description: Comment of Taylor Johnston in Docket(s)/Project(s)
PF16-1-000, CP16-9.

1064. Filed By: Dave Johnston


Filed Date: 6/1/2016
Accession No: 20160601-5046
Description: Comment of Dave Johnston in Docket(s)/Project(s)
CP16-9-000, PF16-1-000.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

194

Record
Item No. Descrintion

1065. Filed By: Nancy Bowden


Filed Date: 6/1/2016
Accession No: 20160601-5047
Description: Comment of Nancy Bowden in Docket(s)/Project(s)
CP16-9.

1066. Filed By: Adriana Graca


Filed Date: 6/1/2016
Accession No: 20160601-5052
Description: Comment of Adriana Graca in Docket(s)/Project(s)
CP16-9.

1067. Filed By: Laura West


Filed Date: 6/1/2016
Accession No: 20160601-5054
Description: Comment of Laura West in Docket(s)/Project(s) CP16-
9.
1068. Filed By: Wendy Graca
Filed Date: 6/1/2016
Accession No: 20160601-5056
Description: Comment of Wendy Graca in Docket(s)/Project(s)
CP16-9.

1069. Filed By: Christa Dunn


Filed Date: 6/1/2016
Accession No: 20160601-5060
Description: Comment of Christa Dunn in Docket(s)/Project(s) CP16-
9

1070. Filed By: Wendy Graca


Filed Date: 6/1/2016
Accession No: 20160601-5068
Description: Comment of Wendy Graca in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

195

Record
Item No. Descrintion

1071. Filed By: Rebecca Haugh


Filed Date: 6/1/2016
Accession No: 20160601-5073
Description: Comment of Rebecca Haugh in Docket(s)/Project(s)
CP16-9.

1072. Filed By: Weymouth Town Councilor


Filed Date: 6/1/2016
Accession No: 20160601-5074
Description: Comment of Weymouth Town Councilor Rebecca
Haugh in Docket(s)/Project(s) CP16-9.

1073. Filed By: Weymouth Town Councilor


Filed Date: 6/1/2016
Accession No: 20160601-5075
Description: Comment of Weymouth Town Councilor Rebecca
Haugh in Docket(s)/Project(s) CP16-9.

1074. Filed By: Susan Greene


Filed Date: 6/1/2016
Accession No: 20160601-5076
Description: Comment of Susan Greene in Docket(s)/Project(s)
CP16-9.

1075. Filed By: Kathleen Caslin


Filed Date: 6/1/2016
Accession No: 20160601-5079
Description: Comment of Kathleen Caslin in Docket(s)/Project(s)
CP16-9.

1076. Filed By: Geoffrey Potter


Filed Date: 6/1/2016
Accession No: 20160601-5107
Description: Comment of Geoffrey Potter in Docket(s)/Project(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

196

Record
Item No. Descrintion

1077. Filed By: Linda Ilies


Filed Date: 6/1/2016
Accession No: 20160601-5109
Description: Comment of Linda Ilies in Docket(s)/Project(s) CP16-9.

1078. Filed By: Weymouth Town Councilor


Filed Date: 6/1/2016
Accession No: 20160601-5131
Description: Comment of Weymouth Town Councilor Rebecca
Haugh under CP16-9, et al.

1079. Filed By: Cathy Kristofferson and Paula Tenasi


Filed Date: 6/1/2016
Accession No: 20160601-5156
Description: Comment of Cathy Kristofferson and Paula Terrasi
under CP16-9-000.

1080. Filed By: New York State Department of Environmental Conservation


Filed Date: 6/1/2016
Accession No: 20160601-5180
Description: NYSDEC Comment Letter on the Environmental
Assessment (EA) for the Algonquin Atlantic Bridge Project under
CP16-9

1081. Filed By: Conservation Law Foundation


Filed Date: 6/1/2016
Accession No: 20160601-5201
Description: Comment of Conservation Law Foundation regarding
Draft Environmental Assessment under CP16-9.

1082. Filed By: Riverkeeper, Inc.


Filed Date: 6/1/2016
Accession No: 20160601-5230
Description: Comment of Riverkeeper, Inc. under PF15-12-000.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

197

Record
Item No. Descrintion

1083. Filed By: Riverkeeper, Inc.


Filed Date: 6/1/2016
Accession No: 20160601-5232
Description: Comment of Riverkeeper, Inc. under PF15-12-000.

1084. Filed By: Stop the Algonquin Pipeline Expansion


Filed Date: 6/1/2016
Accession No: 20160601-5254
Description: Comment of Stop the Algonquin Pipeline Expansion
under PF15-12.

1085. Filed By: Jacquie Dreschler


Filed Date: 6/1/2016
Accession No: 20160601-5256
Description: Comment of Jacqui Dreschler under PF15-12.

1086. Filed By: Weymouth Town Councilor


Filed Date: 6/1/2016
Accession No: 20160601-5260
Description: Comment of Weymouth Town Councilor Rebecca
Haugh under CP16-9, et al.

1087. Filed By: State Representative James Murphy


Filed Date: 6/1/2016
Accession No: 20160601-5279
Description: Comment of State Representative James Murphy in
Docket(s)/Project(s) CP16-9.

1088. Filed By: State Representative James Murphy


Filed Date: 6/1/2016
Accession No: 20160601-5281
Description: Comment of State Representative James Murphy
requesting an Environmental Impact Statement under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

198

Record
Item No. Descrintion

1089. Filed By: NYCDEP-Bureau of Water Supply


Filed Date: 6/1/2016
Accession No: 20160601-5297
Description: Comments on Environmental Assessment from
NYCDEP-Bureau of Water Supply under Docket CP16-9.

1090. Filed By: Gary Peters


Filed Date: 6/1/2016
Accession No: 20160601-5299
Description: Intervener Comments of Gary Peters BS, RS, REHS,
INCE of the EA for CP16-9.

1091. Filed By: Gary Peters


Filed Date: 6/1/2016
Accession No: 20160601-5307
Description: Comments of Intervener Gary Peters BS, RS, REHS,
INCE regarding the EA of CP16-9.

1092. Filed By: Food & Water Watch


Filed Date: 6/1/2016
Accession No: 20160601-5310
Description: Comment of Food & Water Watch on Atlantic Bridge
Environmental Assessment, Lack of Environmental Impact Statement
under CP16-9.

1093. Filed By: Kim Vautour


Filed Date: 6/1/2016
Accession No: 20160601-5374
Description: Comment of Kim Vautour in Docket(s)/Project(s) CP16-
9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

199

Record
Item No. Descrintion

1094. Filed By: Carolyn C. Barthel


Filed Date: 6/1/2016
Accession No: 20160601-5379
Description: Comment of Carolyn C. Barthel in Docket(s)/Project(s)
CP16-9.

1095. Filed By: Kim Vautour


Filed Date: 6/1/2016
Accession No: 20160601-5419
Description: Comment of Kim Vautour in Docket(s)/Project(s) CP16-
9

1096. Filed By: Linda Ilies


Filed Date: 6/1/2016
Accession No: 20160601-5423
Description: Comment of Linda Ilies in Docket(s)/Project(s) CP16-9.

1097. Filed By: House of Representatives, United States


Filed Date: 6/1/2016
Accession No: 20160602-0013
Description: US Representative Stephen F. Lynch submits comments
regarding the comment period for the Environmental Assessment of
the Atlantic Bridge Project under CP16-9.

1098. Filed By: Michael H. Hayden


Filed Date: 6/1/2016
Accession No: 20160602-5067
Description: Comment of Michael H. Hayden re Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

200

Record
Item No. Descrintion

1099. Filed By: Massachusetts Energy Facilities Siting Board


Filed Date: 6/1/2016
Accession No: 20160602-5077
Description: Comments of Massachusetts Energy Facilities Siting
Board Regulatory Commission regarding the Environmental
Assessment for the Atlantic Bridge Project under CP16-9.

1100. Filed By: Weymouth, Massachusetts, Town of


Filed Date: 6/1/2016
Accession No: 20160602-5143
Description: Town of Weymouth's Comments on the Environmental
Assessment for the Atlantic Bridge Project under CP16-9.

1101. Filed By: Sierra Club Massachusetts


Filed Date: 6/1/2016
Accession No: 20160602-5201
Description: Comment of Sierra Club Massachusetts under CP16-9.

1102. Filed By: Julie Smith


Filed Date: 6/2/2016
Accession No: 20160602-5001
Description: Comment of Julie Smith in Docket(s)/Project(s) CP16-9-
000, PF16-1-000.

1103. Filed By: Monika Cone


Filed Date: 6/2/2016
Accession No: 20160602-5007
Description: Comment of Monika Cone in Docket(s)/Project(s) PF16-
1-000, CP16-9.

1104. Filed By: Lynda L. Smethurst


Filed Date: 6/2/2016
Accession No: 20160602-5009
Description: Comment of Lynda L. Smethurst in Docket(s)/Project(s)
CP16-9-000, PF16-1-000.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

201

Record
Item No. Descrintion

1105. Filed By: Linda DiAngelo


Filed Date: 6/2/2016
Accession No: 20160602-5011
Description: Comment of Linda DiAngelo in Docket(s)/Project(s)
CP16-9.

1106. Filed By: Andrea Honore


Filed Date: 6/2/2016
Accession No: 20160602-5014
Description: Comment of Andrea Honore in Docket(s)/Project(s)
CP16-9.

1107. Filed By: Pat Purcell


Filed Date: 6/2/2016
Accession No: 20160602-5015
Description: Comment of Pat Purcell in Docket(s)/Project(s) CP16-9

1108. Filed By: Kaitlyn Pedotti


Filed Date: 6/2/2016
Accession No: 20160602-5018
Description: Comment of Kaitlyn Pedotti in Docket(s)/Project(s)
CP16-9.

1109. Filed By: Sandra Peters


Filed Date: 6/2/2016
Accession No: 20160602-5035
Description: Comment of Sandra Peters in Docket(s)/Project(s)
CP16-9.

1110. Filed By: Teresa Kunz


Filed Date: 6/2/2016
Accession No: 20160602-5036
Description: Comment of Teresa Kunz in Docket(s)/Project(s) CP16-
9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

202

Record
Item No. Descrintion

1111. Filed By: And Macklin


Filed Date: 6/2/2016
Accession No: 20160602-5037
Description: Comment of Ann Macklin in Docket(s)/Proj ect(s) CP16-
9-000, PF16-1-000.

1112. Filed By: Mary-Ellen Devine


Filed Date: 6/2/2016
Accession No: 20160602-5042
Description: Comment of Mary-Ellen Devine in Docket(s)/Proj ect(s)
CP16-9.

1113. Filed By: Amanda Donnelly


Filed Date: 6/2/2016
Accession No: 20160602-5045
Description: Comment of Amanda Donnelly in Docket(s)/Proj ect(s)
PF16-1-000, CP16-9.

1114. Filed By: Amanda Donnelly


Filed Date: 6/2/2016
Accession No: 20160602-5046
Description: Comment of Amanda Donnelly in Docket(s j/Proj ect(s)
CP16-9-000, PF16-1-000.

1115. Filed By: Susan Eastwood


Filed Date: 6/2/2016
Accession No: 20160602-5049
Description: Comment of Susan Eastwood in Docket(s)/Project(s)
CP16-9.

1116. Filed By: Alice P. Arena


Filed Date: 6/2/2016
Accession No: 20160602-5050
Description: Comment of Alice P. Arena in Docket(s)/Proj ect(s)
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

203

Record
Item No. Descrintion

1117. Filed By: Amanda Donnelly


Filed Date: 6/2/2016
Accession No: 20160602-5051
Description: Comment of Amanda Donnelly in Docket(s)/Project(s)
CP16-9-000, PF16-1-000.

1118. Filed By: Amanda Donnelly


Filed Date: 6/2/2016
Accession No: 20160602-5053
Description: Comment of Amanda Donnelly in Docket(s)/Project(s)
PF16-1-000, CP16-9.

1119. Filed By: Susan Harden


Filed Date: 6/2/2016
Accession No: 20160602-5054
Description: Comment of Susan Harden in Docket(s)/Project(s)
CP16-9.

1120. Filed By: Sharon Giroux


Filed Date: 6/2/2016
Accession No: 20160602-5057
Description: Comment of Sharon Giroux in Docket(s)/Project(s)
CP16-9.

1121. Filed By: George West


Filed Date: 6/2/2016
Accession No: 20160602-5059
Description: Comment of George West in Docket(s)/Project(s) CP16-
9.
1122. Filed By: Massachusetts Attorney General
Filed Date: 6/2/2016
Accession No: 20160602-5066
Description: Massachusetts Attorney General Comments on the EA
for Atlantic Bridge under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Descrintion

1123. Filed By: United States Environmental Protection Agency


Filed Date: 6/2/2016
Accession No: 20160602-5079
Description: Report of United States Environmental Protection
Agency under CP16-9. (Erroneously Filed)

1124. Filed By: Almar LLC


Filed Date: 6/2/2016
Accession No: 20160602-5107
Description: Comment on EA of Almar LLC under CP16-9.

1125. Filed By: William Walsh-Rogalski


Filed Date: 6/2/2016
Accession No: 20160602-5108
Description: Comment of William Walsh-Rogalski in
Docket(s)/Project(s) CP16-9.

1126. Filed By: Almar LLC


Filed Date: 6/2/2016
Accession No: 20160602-5109
Description: Comment of Willingham Engineering on EA on behalf
of Almar LLC under CP16-9.

1127. Filed By: Almar LLC


Filed Date: 6/2/2016
Accession No: 20160602-5110
Description: Letter to FERC from Legislator Kaplowitz re AIM
Blowdown submitted by Almar LLC under CP16-9.

1128. Filed By: Almar LLC


Filed Date: 6/2/2016
Accession No: 20160602-5113
Description: Comments of Almar LLC on the Environmental
Assessment for the proposed Atlantic Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

205

Record
Item No Descrintion

1129. Filed By: City of Quincy, Massachusetts


Filed Date: 6/2/2016
Accession No: 20160602-5117
Description: Comment of City of Quincy, Massachusetts under
CP16-9.

1130. Filed By: Sandra Peters


Filed Date: 6/2/2016
Accession No: 20160602-5123
Description: Comment of Sandra Peters under CP16-9.

1131. Filed By: Michael H. Hayden


Filed Date: 6/2/2016
Accession No: 20160602-5124
Description: Motion to Accept Comments of Michael H. Hayden
under CP16-9.

1132. Filed By: Andrea Honore


Filed Date: 6/2/2016
Accession No: 20160602-5130
Description: Report of Andrea Honore under CP16-9. Slide show
illustrating the densely populated aspect of the proposed site to
illustrate the clear danger to public safety of the residents of
Weymouth, Braintree, Quincy and Kngham, MA

1133. Filed By: Environmental Protection Agency


Filed Date: 6/2/2016
Accession No: 20160602-5133
Description: Comment of Environmental Protection Agency under
CP16-9. (Erroneously Filed)

1134. Filed By: Nathaniel J. Wales


Filed Date: 6/2/2016
Accession No: 20160602-5202
Description: Comment of Nathaniel J. Wales under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

206

Record
Item No. Descrintion

1135. Filed By: Weymouth, Massachusetts, Town of


Filed Date: 6/2/2016
Accession No: 20160602-5204
Description: Motion to Accept the Comments of the Town of
Weymouth as Timely Filed on June 1, 2016 under CP16-9.

1136. Filed By: Gradeigh Mack


Filed Date: 6/2/2016
Accession No: 20160602-5267
Description: Comment of Gradeigh Mack in Docket(s)/Project(s)
CP16-9.

1137. Filed By: Jill Sugrue


Filed Date: 6/2/2016
Accession No: 20160602-5294
Description: Comment of Jill Sugrue in Docket(s)/Project(s) CP16-9.

1138. Filed By: Jill Sugrue


Filed Date: 6/2/2016
Accession No: 20160602-5296
Description: Comment of Jill Sugrue in Docket(s)/Project(s) CP16-9-
000, PF16-1-000.

1139. Filed By: Environmental Protection Agency


Filed Date: 6/2/2016
Accession No: 20160602-5422
Description: Comment of Environmental Protection Agency under
CP16-9. (Erroneously Filed)

1140. Filed By: Environmental Protection Agency


Filed Date: 6/2/2016
Accession No: 20160602-5435
Description: Comment of Environmental Protection Agency under
CP16-9. (Erroneously Filed)
20180216-0021 FERC PDF (Unofficial) 02/16/2018

207

Record
Item No. Descrintion

1141. Filed By: Cathy Bevans


Filed Date: 6/3/2016
Accession No: 20160603-5151
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
PF16-1-000, CP16-9.

1142. Filed By: Cathy Bevans


Filed Date: 6/3/2016
Accession No: 20160603-5161
Description: Comment of Cathy Bevans in Docket(s)/Project(s)
CP16-9-000, PF16-1-000.

1143. Filed By: Kathleen Cobb


Filed Date: 6/6/2016
Accession No: 20160606-0074
Description: Comments of Kathleen Cobb re the compressor station
under CP16-9.

1144. Filed By: Sarah Scales


Filed Date: 6/6/2016
Accession No: 20160606-0093
Description: Comments of Sarah Scales re the Atlantic Bridge Project
under CP16-9.

1145. Filed By: Amanda Berte


Filed Date: 6/6/2016
Accession No: 20160606-0128
Description: Comments of Amanda Berte re the Atlantic Bridge
Project under CP16-9.

1146. Filed By: John Mazares


Filed Date: 6/6/2016
Accession No: 20160606-0148
Description: Comments of Joan Mazares re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

208

Record
Item No. Descrintion

1147. Filed By: New York City Dept. of Environmental Protection


Filed Date: 6/6/2016
Accession No: 20160606-0153
Description: Comments of the New York City Department of
Environmental Protection re the Environmental Assessment for the
Atlantic Bridge Project under CP16-9.

1148. Filed By: Shannon Sheehan


Filed Date: 6/6/2016
Accession No: 20160606-0160
Description: Comments of Shannon Sheehan re the Atlantic Bridge
Project under CP16-9.

1149. Filed By: Steve Berte


Filed Date: 6/6/2016
Accession No: 20160606-0161
Description: Comments of Steve Berte re the Atlantic Bridge Project
under CP16-9.

1150. Filed By: Andrea Berte


Filed Date: 6/6/2016
Accession No: 20160606-0162
Description: Comments of Andrea Berte re the Atlantic Bridge
Project under CP16-9.

1151. Filed By: Alexandra Berte


Filed Date: 6/6/2016
Accession No: 20160606-0163
Description: Comments of Alexandra Berte re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

209

Record
Item No. Descrintion

1152. Filed By: Weymouth, Town of (MA)


Filed Date: 6/6/2016
Accession No: 20160606-0177
Description: Comments of Town of Weymouth, MA re the
Environmental Assessment of the Atlantic Bridge Project under
CP16-9.

1153. Filed By: Jill Berry


Filed Date: 6/6/2016
Accession No: 20160606-5017
Description: Comment of Jill Berry in Docket(s)/Project(s) CP16-9.

1154. Filed By: US Environmental Protection Agency


Filed Date: 6/6/2016
Accession No: 20160606-5180
Description: Comment of the United States Environmental Protection
Agency regarding the Atlantic Bridge Project under CP16-9.

1155. Filed By: Braintree, City of (MA)


Filed Date: 6/8/2016
Accession No: 20160608-0015
Description: Comments of the Town of Braintree, MA re the
Algonquin Natural Gas Pipeline under CP16-9.

1156. Filed By: Nick Mazares


Filed Date: 6/8/2016
Accession No: 20160608-0019
Description: Comments of Nick Mazares re the Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

210

Record
Item No. Descrintion

1157. Filed By: Algonquin Gas Transmission, LLC Maritimes 4 Northeast


Pipeline, LLC
Filed Date: 6/8/2016
Accession No: 20160608-5006
Description: Algonquin Gas Transmission, LLC, et al. submit
Supplemental Cultural Resource Information under CP16-9.

1158. Filed By: Algonquin Gas Transmission, LLC Maritimes 8'c Northeast
Pipeline, LLC
Filed Date: 6/8/2016
Accession No: 20160608-5007
Description: Algonquin Gas Transmission, LLC, et al. submit
Supplemental Cultural Resource Information under CP16-9.

1159. Filed By: Algonquin Gas Transmission, LLC Maritimes Bc Northeast


Pipeline, LLC
Filed Date: 6/8/2016
Accession No: 20160608-5021
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental documentation of consultation with the USFWS under
CP16-9.

1160. Filed By: Maine House of Representatives


Filed Date: 6/9/2016
Accession No: 20160609-0008
Description: Maine State Representative Jeff McCabe submits
comments re the Atlantic Bridge Project under CP16-9.

1161. Filed By: Senate of Maine


Filed Date: 6/9/2016
Accession No: 20160609-0011
Description: Maine State Senator Justin Alfond submits comments re
the Atlantic Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

211

Record
Item No. Descrintion

1162. Filed By: Senate of Maine


Filed Date: 6/9/2016
Accession No: 20160613-0051
Description: Comments of Maine State Senator Andre Cushing re the
Atlantic Bridge Project under CP16-9.

1163. Filed By: Repsol Energy North America Corporation


Filed Date: 6/10/2016
Accession No: 20160610-5312
Description: Request to Update Service List of Repsol Energy North
America Corporation under RP16-618, et al.

1164. Filed By: John Flynn


Filed Date: 6/13/2016
Accession No: 20160613-0034
Description: Comments of John Flynn re the Atlantic Bridge Project
under CP16-9.

1165. Filed By: Al Anzuoni


Filed Date: 6/13/2016
Accession No: 20160613-0037
Description: Comments of Al Anzuoni re the Atlantic Bridge Project
under CP16-9.

1166. Filed By: Dr. Curtis Nordgaard


Filed Date: 6/13/2016
Accession No: 20160613-5058
Description: Comment of Dr. Curtis Nordgaard under CP16-9-000,
showing that contamination at the proposed Weymouth compressor
station site likely exceeds what was acknowledged by the EA, while a
FOIA request strangely produced no documents on this matter.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

212

Record
Item No. Descrintion

1167. Filed By: Senate, United States


Filed Date: 6/13/2016
Accession No: 20160614-0011
Description: US Senator Elizabeth Warren et al submit comments re
the Atlantic Bridge Project under CP16-9.

1168. Issued By: Chair and Immediate Staff (CHAIR)


Filed Date: 6/13/2016
Accession No: 20160614-0012
Description: Response to Massachusetts State Senator John Keenan's
5/12/16 letter regarding the proposed Atlantic Bridge Project et al
under CP16-9 et al.

1169. Filed By: U.S. House of Representatives


Filed Date: 6/13/2016
Accession No: 20160614-0014
Description: Maine State Representative Mark Eves submits
comments re the Atlantic Bridge Project under CP16-9.

1170. Filed By: Teresa Kunz


Filed Date: 6/14/2016
Accession No: 20160614-5002
Description: Comment of Teresa Kunz in Docket(s)/Project(s) CP16-
9.
1171. Filed By: State Senator
Filed Date: 6/14/2016
Accession No: 20160614-5020
Description: Comment of Massachusetts State Senator Patrick
O'onnor under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

213

Record
Item No. Descrintion

1172. Filed By: Michael Yavitch


Filed Date: 6/15/2016
Accession No: 20160615-0009
Description: Comments of Michael Yavitch rescinding property
access to the Spectra Energy Corporation under CP16-9.

1173. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 6/16/2016
Accession No: 20160616-5147
Description: Algonquin Gas Transmission, LLC, et al. hereby
respond to certain comments regarding the Environmental Assessment
under CP16-9.

1174. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 6/16/2016
Accession No: 20160616-5148
Description: Algonquin Gas Transmission, LLC, et al. hereby
respond to certain comments regarding the Environmental Assessment
under CP16-9.

1175. Filed By: Weymouth, Town of


Filed Date: 6/20/2016
Accession No: 20160620-5112
Description: Weymouth, Town of Request for Delay on EA Decision
Pending MEPA Advisory Opinion under CP16-9.

1176. Filed By: Gradeigh Mack


Filed Date: 6/24/2016
Accession No: 20160624-4002
Description: Comments of Gradeigh Mack regarding the Atlantic
Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

214

Record
Item No. Descrintion

1177. Filed By: Gradeigh Mack


Filed Date: 6/24/2016
Accession No: 20160624-4003
Description: Comments of Gradeigh Mack regarding the Atlantic
Bridge Project under CP16-9.

1178. Filed By: Weymouth, Massachusetts, Town of


Filed Date: 6/29/2016
Accession No: 20160629-5171
Description: Comments of the Weymouth Conservation Commission
re the June 15, 2016 Decision and Certificate of Service under CP16-
9.

1179. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 6/29/2016
Accession No: 20160629-5217
Description: Algonquin Gas Transmission, LLC, et al. hereby submit
supplemental information under CP16-9.

1180. Filed By: Gary Peters


Filed Date: 6/30/2016
Accession No: 20160630-5150
Description: Response to Supplemental Filing of 6/30/16 of Gary
Peters under CP16-9.

1181. Filed By: Sue Carrillo


Filed Date: 6/30/2016
Accession No: 20160630-5385
Description: Amended Motion to Intervene of Sue Carrillo under
CP16-9 for the purposes of requesting an extension of time for public
comment on the EA, a stay of Spectra construction, and a full EIS for
the Algonquin/Aim/Atlantic Bridge projects.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

215

Record
Item No. Descrintion

1182. Filed By: Maritimes & Northeast Pipeline, LLC, Algonquin Gas
Transmission, LLC
Filed Date: 7/1/2016
Accession No: 20160701-5212
Description: Algonquin Gas Transmission, LLC, et al. hereby submit
their response to a request to delay consideration of the Project under
CP16-9.

1183. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 7/7/2016
Accession No: 20160707-5171
Description: Algonquin Gas Transmission, LLC, et aL hereby submit
supplemental information in response to certain comments regarding
the Environmental Assessment under CP16-9.

1184. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 7/8/2016
Accession No: 20160708-5196
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental information regarding cultural resources under CP16-9.

1185. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 7/8/2016
Accession No: 20160708-5197
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental information regarding cultural resources under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

216

Record
Item No. Descrintion

1186. Filed By: Dr. Curtis Nordgaard


Filed Date: 7/11/2016
Accession No: 20160711-5038
Description: Response of Dr. Curtis Nordgaard under CP16-9 to
Spectra Energy comments in June 2016. Operation of a compressor
station in Weymouth will significantly impair air quality. Also
additional response to the Applicant re: conflict of interest.

1187. Filed By: Michael Lang


Filed Date: 7/13/2016
Accession No: 20160713-0013
Description: Comments of Michael Lang re the Atlantic Bridge
Project et al under CP16-9 et al.

1188. Filed By: Algonquin Gas Transmission, LLC Maritimes 4 Northeast


Pipeline, LLC
Filed Date: 7/14/2016
Accession No: 20160714-5073
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental information regarding a request for Advisory Opinion
under CP16-9.

1189. Filed By: Sandra Peters


Filed Date: 7/15/2016
Accession No: 20160715-5165
Description: Comments of Sandra Peters re the Request for further
FERC review and analysis, and response from applicant under CP16-
9.
1190. Issued By: Chair and Immediate Staff (CHAIR)
Filed Date: 7/15/2016
Accession No: 20160718-0010
Description: Response to U.S. Representative Stephen Lynch's 5/9/16
et al letters regarding Algonquin Transmission, LLC's et al proposed
Atlantic Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

217

Record
Item No. Descrintion

1191. Filed By: Cindy Lydon


Filed Date: 7/19/2016
Accession No: 20160719-5054
Description: Comment of Cindy Lydon in Docket(s)/Project(s) CP16-
9.
1192. Issued By: Chair and Immediate Staff (CHAIR)
Filed Date: 7/19/2016
Accession No: 20160720-0008
Description: Response to U.S. Senator Edward J. Markey's 6/9/16
letter regarding the use of Natural Resource Group as third-party
contractor to prepare the Environmental Impact Statement for the
Atlantic Bridge Project under CP16-9.

1193. Issued By: Chair and Immediate Staff (CHAIR)


Filed Date: 7/19/2016
Accession No: 20160720-0009
Description: Response to U.S. Senator Elizabeth Warren's 6/9/16
letter re the use of Natural Resource Group as the third-party
contractor to prepare the Environmental Impact Statement for the
Atlantic Bridge Project under CP16-9.

1194. Filed By: Gordon Saverse


Filed Date: 7/20/2016
Accession No: 20160720-0018
Description: Comments Gordon Saverse re the Atlantic Bridge
Project under CP16-9.

1195. Filed By: Patricia C. Gird


Filed Date: 7/22/2016
Accession No: 20160722-0032
Description: Comments of Patricia C. Gird re the proposed Spectra
Pipeline Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

218

Record
Item No. Descrintion

1196. Filed By: Dr. Curtis Nordgaard


Filed Date: 7/22/2016
Accession No: 20160722-5058
Description: Comment of Dr. Curtis Nordgaard, demonstrating that
the Environmental Assessment did not meet state noise standards and
that the noise data collection and analysis process was flawed under
CP16-9.

1197. Filed By: Senate, United States


Filed Date: 7/25/2016
Accession No: 20160729-0014
Description: US Senator Elizabeth Warren et al submit comments re
the Atlantic Bridge Project under CP16-9.

1198. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 8/3/2016
Accession No: 20160803-5028
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental information regarding the proposed Weymouth
Compressor Station under CP16-9.

1199. Filed By: Commonwealth of Massachusetts


Filed Date: 8/5/2016
Accession No: 20160805-4003
Description: Correspondence of the Massachusetts Office of Coastal
Zone Management to Algonquin Gas Transmission, LLC regarding
the federal consistency review of the Atlantic Bridge Project under
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

219

Record
Item No. Descrintion

1200. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 8/9/2016
Accession No: 20160809-5217
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental information under CP16-9.

1201. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 8/9/2016
Accession No: 20160809-5218
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental information under CP16-9.

1202. Filed By: John Stella


Filed Date: 8/15/2016
Accession No: 20160815-0206
Description: Comments of John Stella under CP16-9.

1203. Issued By: Secretary of the Commission, FERC


Filed Date: 8/16/2016
Accession No: 20160816-3047
Description: Order denying stay re Algonquin Gas Transmission,
LLC et al under CP14-96 et al.

1204. Filed By: Riverkeeper


Filed Date: 8/18/2016
Accession No: 20160818-5206
Description: Substitution of Counsel for Intervenor Riverkeeper and
Request to Update Information of Riverkeeper under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

220

Record
Item No. Descrintion

1205. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 8/19/2016
Accession No: 20160819-5077
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental information re the Atlantic Bridge Project under CP16-
9

1206. Filed By: Weymouth, Massachusetts, Town of


Filed Date: 8/22/2016
Accession No: 20160822-5199
Description: Comments of the Town of Weymouth requesting FERC
to revise its Environmental Assessment under CP16-9.

1207. Filed By: Town of Stoughton, MA


Filed Date: 8/25/2016
Accession No: 20160826-0010
Description: The Board of Selectmen for Stoughton, MA submits
comments re Spectra Energy's proposed Access Northeast Gas
Pipeline Project under CP16-9.

1208. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 8/31/2016
Accession No: 20160831-5303
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental information to clarify the record regarding the
Weymouth Compressor Station site under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

221

Record
Item No. Descrintion

1209. Filed By: Algonquin Gas Transmission, LLC Maritimes 8'c Northeast
Pipeline, LLC
Filed Date: 9/2/2016
Accession No: 20160902-5029
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental information re the Atlantic Bridge Project under CP16-
9

1210. Filed By: Margaret Bellafiore


Filed Date: 9/6/2016
Accession No: 20160906-5067
Description: Comment of Margaret Bellafiore in Docket(s)/Project(s)
CP16-9.

1211. Filed By: Michael J. Lang


Filed Date: 9/6/2016
Accession No: 20160906-5138
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.

1212. Filed By: Weymouth Town Councilor


Filed Date: 9/6/2016
Accession No: 20160906-5257
Description: Comment of Weymouth Town Councilor Rebecca
Haugh in regards to the proposed purchase of under water land by
Algonquin in the Town of Weymouth, Massachusetts under CP16-9,
et al

1213. Filed By: Dr. Curtis Nordgaard


Filed Date: 9/6/2016
Accession No: 20160906-5259
Description: Comment of Dr. Curtis Nordgaard under CP16-9
documenting the presence of lead, mercury, cadmium, and PCBs in
the Algonquin pipeline and their release into the environment - none
addressed by the EA. With recommendations under NEPA & NGA.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

222

Record
Item No. Descrintion

1214. Filed By: U.S. Department of Transportation


Filed Date: 9/8/2016
Accession No: 20160908-0009
Description: Correspondence &om U.S. Department of
Transportation to East Braintree Civic Association re comments on
the Atlantic Bridge Project et al under CP16-9 et al.

1215. Filed By: Almar LLC


Filed Date: 9/16/2016
Accession No: 20160916-5202
Description: Supplemental Comment of Almar LLC on
Environmental Assessment under CP16-9.

1216. Filed By: Michael Lang


Filed Date: 9/21/2016
Accession No: 20160921-0029
Description: Correspondence from Michael Lang to US Department
of Transportation re the Atlantic Bridge Project under CP16-9 et al.

1217. Filed By: Sandra Peters


Filed Date: 9/23/2016
Accession No: 20160923-5290
Description: Comment of Small Business Owner - Sandra Peters
(formal intervenor) re the Atlantic Bridge Project under CP16-9.

1218. Filed By: Alice Arena


Filed Date: 10/7/2016
Accession No: 20161007-4002
Description: Non-Decisional: Comments of Alice Arena re the
Atlantic Bridge Project under CP16-9 et al.

1219. Filed By: Riverkeeper, Inc.


Filed Date: 10/20/2016
Accession No: 20161020-5095
Description: Comment of Riverkeeper, Inc. under CP14-96, et al.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

223

Record
Item No. Descrintion

1220. Filed By: Michael J. Lang


Filed Date: 10/24/2016
Accession No: 20161024-5001
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.

1221. Filed By: Sandra Peters


Filed Date: 11/4/2016
Accession No: 20161104-5096
Description: Comments of Sandra Peters re the Atlantic Bridge
Project under CP16-9.

1222. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 11/4/2016
Accession No: 20161104-5100
Description: Algonquin Gas Transmission, LLC, et al. submit
supplemental information re the Atlantic Bridge Project under CP16-
9.
1223. Filed By: New York State Department of Environmental Conservation
Filed Date: 11/17/2016
Accession No: 20161117-5079
Description: Comment of New York State Department of
Environmental Conservation under CP16-9.

1224. Issued By: Chair and Immediate Staff (CHAIR)


Filed Date: 11/23/2016
Accession No: 20161128-0006
Description: Response to US Senator Elizabeth Warren's 7/25/16
letter concerning the use of Environmental Resources Management re
Algonquin Gas Transmission, LLC's et al proposed Atlantic Bridge
Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

224

Record
Item No. Descrintion

1225. Issued By: Chair and Immediate Staff (CHAIR)


Filed Date: 11/23/2016
Accession No: 20161128-0007
Description: Response to US Senator Elizabeth Warren's 7/25/16
letter concerning the use of Environmental Resources Management re
Algonquin Gas Transmission, LLC's et al proposed Atlantic Bridge
Project under CP16-9.

1226. Issued By: Chair and Immediate Staff (CHAIR)


Filed Date: 11/23/2016
Accession No: 20161128-0008
Description: Response to US Senator Edward Markey's 7/25/16 letter
concerning the use of Environmental Resources Management re
Algonquin Gas Transmission, LLC's et al proposed Atlantic Bridge
Project under CP16-9.

1227. Issued By: Chair and Immediate Staff (CHAIR)


Filed Date: 11/23/2016
Accession No: 20161128-0009
Description: Response to US Senator Edward Markey's 7/25/16 letter
concerning the use of Environmental Resources Management re
Algonquin Gas Transmission, LLC's et al proposed Atlantic Bridge
Project under CP16-9.

1228. Filed By: Food & Water Watch Stop the Algonquin Pipeline
Expansion Pipe Line Awareness Network for the Northeast, Inc.
Filed Date: 12/1/2016
Accession No: 20161201-5379
Description: Comment of Food & Water Watch, et al. Coalition of 16
intervening organizations and one affected Weymouth resident and
intervenor regarding Spectra NRG and FERC staff conflicts of interest
on the Atlantic Bridge project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

225

Record
Item No. Descrintion

1229. Issued By: Chair and Immediate Staff (FERC)


Filed Date: 12/21/2016
Accession No: 20161222-0007
Description: Response to US Representative Stephen F. Lynch's
11/2/2016 and 11/18/2016 letters re Algonquin Gas Transmission
LLC's Algonquin Incremental Market Project et al under CP14-96 et
al.

1230. Filed By: Sandra Peters


Filed Date: 12/27/2016
Accession No: 20161227-5013
Description: Comment of Sandra Peters in Docket(s)/Project(s)
CP16-9.

1231. Filed By: United States Senator


Filed Date: 1/5/2017
Accession No: 20170109-0048
Description: US Senator Edward Markey et al submit comments re
the Atlantic Bridge Project under CP16-9.

1232. Filed By: Michael J. Lang


Filed Date: 1/6/2017
Accession No: 20170106-5164
Description: Comment of Michael J. Lang in Docket(s)/Project(s)
CP16-9.

1233. Filed By: Industrial Energy Consumers of America


Filed Date: 1/9/2017
Accession No: 20170109-5238
Description: Comment of Industrial Energy Consumers of America
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

226

Record
Item No. Descrintion

1234. Filed By: Dr. Curtis Nordgaatd


Filed Date: 1/9/2017
Accession No: 20170109-5308
Description: Comment of Curtis Nordgaard under CP16-9 updating
the Commission on the occurrence of a gas leak at Spectra's
Weymouth MBr R station on Jan 6 2017, demonstrating the health and
safety risks from siting M8r R or compressor stations in residential

1235. Issued By: Commissioners & Immediate Staff (THE COMMISSION),


Secretary of the Commission, FERC
Filed Date: 1/25/2017
Accession No: 20170125-3054
Description: Order Issuing Certificate and Authorizing Abandonment
re Algonquin Gas Transmission, LLC et al under CP16-9. For errata
notice see accession number 20170126-3033.

1236. Issued By: Secretary of the Commission, FERC


Filed Date: 1/26/2017
Accession No: 20170126-3033
Description: Errata Notice Order Issuing Certificate and Authorizing
Abandonment re Algonquin Gas Transmission, LLC et al under
CP16-9. For order see accession number 20170125-3054.

1237. Filed By: Cynthia Lydon


Filed Date: 1/30/2017
Accession No: 20170130-5000
Description: Comment of Cynthia Lydon in Docket(s)/Project(s)
CP16-9.

1238. Filed By: United States Senate


Filed Date: 2/1/2017
Accession No: 20170201-0010
Description: US Representative Edward J. Markey submits comments
re the Atlantic Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

227

Record
Item No. Descrintion

1239. Filed By: Algonquin Gas Transmission, LLC Maritimes 8r. Northeast
Pipeline, LLC
Filed Date: 2/3/2017
Accession No: 20170203-5266
Description: Algonquin Gas Transmission, LLC, et al. submit their
Initial Implementation Plan under CP16-9.

1240. Filed By: Algonquin Gas Transmission, LLC Maritimes 8'c Northeast
Pipeline, LLC
Filed Date: 2/3/2017
Accession No: 20170203-5267
Description: Algonquin Gas Transmission, LLC, et al. submit their
Initial Implementation Plan under CP16-9.

1241. Filed By: Algonquin Gas Transmission, LLC Maritimes k, Northeast


Pipeline, LLC
Filed Date: 2/6/2017
Accession No: 20170206-5211
Description: Algonquin Gas Transmission, LLC, et al. hereby accept
the certificate of public convenience and necessity issued on January
25, 2017 under CP16-9.

1242. Filed By: Weymouth, Massachusetts, Town of


Filed Date: 2/24/2017
Accession No: 20170224-5121
Description: Request of the Town of Weymouth for Rehearing and
Rescission of January 25, 2017 Order under CP16-9

1243. Filed By: Weymouth, Massachusetts, Town of


Filed Date: 2/24/2017
Accession No: 20170224-5123
Description: Town of Weymouth's Motion for Stay of Order under
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

228

Record
Item No. Descrintion

1244. Filed By: Lori and Michael Hayden


Filed Date: 2/24/2017
Accession No: 20170224-5181
Description: Request for Rehearing of the Commission's January 25,
2017 Order of Lori Hayden and Michael Hayden under CP16-9.

1245. Filed By: Sandra Peters


Filed Date: 2/24/2017
Accession No: 20170224-5186
Description: Request for Rehearing and Recession of January 25,
2017 Order of Sandra Peters under CP16-9.

1246. Filed By: FRRACS


Filed Date: 2/24/2017
Accession No: 20170224-5187
Description: Request for Rehearing of FRRACS, FWW et al. under
CP16-9.

1247. Issued By: Chair and Immediate StafF(CHAIR)


Filed Date: 3/9/2017
Accession No: 20170310-0096
Description: Response to US Senator Edward Markey's 1/5/17
correspondence in response to former Chairman Norman Bay's
11/23/16 letter regarding the use of Environmental Resources
Management etc. under CP16-9.

1248. Issued By: Chair and Immediate Staff (CHAIR)


Filed Date: 3/9/2017
Accession No: 20170310-0097
Description: Response to U.S. Senator Elizabeth Warren's 1/5/17
letter re the Atlantic Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

229

Record
Item No. Descrintion

1249. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 3/13/2017
Accession No: 20170313-5334
Description: Motion for Leave to Answer and Answer of Algonquin
Gas Transmission, LLC and Maritimes & Northeast Pipeline, L.L.C.
under CP16-9.

1250. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 3/14/2017
Accession No: 20170314-5160
Description: Algonquin Gas Transmission, LLC requests
authorization to proceed with construction of certain Project facilities
under CP16-9.

1251. Filed By: Save Passamaquoddy Bay


Filed Date: 3/20/2017
Accession No: 20170320-5142
Description: Conflict of interest resolution comment of Save
Passamaquoddy Bay under CP16-9.

1252. Filed By: Food & Water Watch


Filed Date: 3/20/2017
Accession No: 20170320-5218
Description: Protest comment of Food & Water Watch, Fore River
Residents against the Compressor Station (FRRACS), Weymouth
Councilor Rebecca Haugh, 350 MA So. Shore Node, Eastern CT
Green Action and others regarding Spectra's (Algonquin) request for
NTP under CP16-9
20180216-0021 FERC PDF (Unofficial) 02/16/2018

230

Record
Item No. Descrintion

1253. Issued By: Chair and Immediate Staff (CHAIR)


Filed Date: 3/20/2017
Accession No: 20170324-0024
Description: Response to United States Senator Edward Markey's
2/1/17 letter regarding Algonquin Gas Transmission LLC Atlantic
Bridge Project under CP16-9.

1254. Issued By: Chair and Immediate Staff (CHAIR)


Filed Date: 3/20/2017
Accession No: 20170324-0025
Description: Response to US Senator Elizabeth Warren's 2/1/17 letter
regarding the Atlantic Bridge Project under CP16-9.

1255. Filed By: Lois K. Happe


Filed Date: 3/21/2017
Accession No: 20170321-5069
Description: Comment of Lois K. Happe in Docket(s)/Project(s)
CP16-9-001.

1256. Filed By: Algonquin Gas Transmission, LLC Maritimes & Northeast
Pipeline, LLC
Filed Date: 3/24/2017
Accession No: 20170324-5151
Description: Algonquin Gas Transmission, LLC, et al. hereby
submits supplemental information under CP16-9

1257. Issued By: Secretary of the Commission, FERC


Filed Date: 3/27/2017
Accession No: 20170327-3006
Description: Order Granting Rehearings for Further Consideration re
Algonquin Gas Transmission, LLC et al under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

231

Record
Item No. Descrintion

1258. Issued By: Energy Projects, Office of


Filed Date: 3/27/2017
Accession No: 20170327-3018
Description: Letter order granting Algonquin Gas Transmission
LLC's 3/14/17 request to proceed with construction of Connecticut
facilities re the Atlantic Bridge Project under CP16-9.

1259. Filed By: House of Representatives, United States


Filed Date: 4/5/2017
Accession No: 20170405-0192
Description: US Representative Stephen F Lynch submits comments
re the Algonquin Incremental Market Project et al under CP14-96 et
al.

1260. Filed By: Michael J. Lang


Filed Date: 4/5/2017
Accession No: 20170406-0024
Description: Comments of Michael J. Lang re the Atlantic Bridge
Project under CP16-9.

1261. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 4/7/2017
Accession No: 20170407-5209
Description: Algonquin Gas Transmission, LLC hereby submits
supplemental information under CP16-9.

1262. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 4/7/2017
Accession No: 20170407-5210
Description: Algonquin Gas Transmission, LLC requests
authorization to proceed with construction of certain Project facilities
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

232

Record
Item No. Descrintlon

1263. Filed By: Food & Water Watch Food & Water Watch
Filed Date: 4/7/2017
Accession No: 20170407-5231
Description: Food & Water Watch, FRRACS and 13 other parties
Request for Rehearing of March 27, 2017 Order to Proceed with
construction in Connecticut under CP16-9.

1264. Issued By: Energy Projects, Office of


Filed Date: 4/13/2017
Accession No: 20170413-3020
Description: Letter order granting Algonquin Gas Transmission,
LLC's 4/7/17 request as supplemented on 4/13/17, filing of the request
to proceed with construction and use of the Atlantic Bridge Project
facilities under CP16-9.

1265. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 4/13/2017
Accession No: 20170413-5085
Description: Algonquin Gas Transmission, LLC submits
supplemental information under CP16-9.

1266. Issued By: Chair and Immediate Staff (CHAIR)


Filed Date: 4/19/2017
Accession No: 20170421-0008
Description: Response to US Representative Stephen Lynch's 4/5/17
letter regarding the Atlantic Bridge Project et al under CP16-9 et al.

1267. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 4/24/2017
Accession No: 20170424-5274
Description: Algonquin Gas Transmission, LLC - Response to U.S.
Representative Stephen F. Lynch, Docket Nos. CP14-96 and CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

233

Record
Item No. Descrintion

1268. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 4/24/2017
Accession No: 20170424-5263
Description: Motion for Leave to Answer and Answer of Algonquin
Gas Transmission, LLC under CP16-9.

1269. Filed By: Braintree Electric Light Department


Filed Date: 4/24/2017
Accession No: 20170425-0035
Description: Braintree Electric Light Department submits comments
re the Atlantic Bridge Project under CP16-9.

1270. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 4/25/2017
Accession No: 20170425-5028
Description: Algonquin Gas Transmission, LLC - Response to U. S.
Representative Stephen F. Lynch (Errata), Docket Nos. CP14-96,
CP16-9.

1271. Filed By: Weymouth, Massachusetts, Town of


Filed Date: 4/26/2017
Accession No: 20170426-5383
Description: Request of the Town of Weymouth for Rehearing and
Rescission of Tolling Order under CP16-9.

1272. Filed By: Lori and Michael Hayden


Filed Date: 4/26/2017
Accession No: 20170426-5384
Description: Request for Rehearing of Intervenors, Lori Hayden and
Michael Hayden under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

234

Record
Item No. Descrintion

1273. Filed By: Hingham, City of {MA)


Filed Date: 5/3/2017
Accession No: 20170503-0032
Description: Town of Hingham, MA submits comments re the
Atlantic Bridge Project under CP16-9.

1274. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 5/4/2017
Accession No: 20170504-5030
Description: Algonquin Gas Transmission, LLC hereby submits as
supplemental information Permit Authorizations issued by the New
York State Department of Environmental Conservation under CP16-
9-000.

1275. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 5/4/2017
Accession No: 20170504-5032
Description: Algonquin Gas Transmission, LLC hereby submits as
supplemental information Permit Authorizations issued by the New
York State Department of Environmental Conservation under CP16-
9-000.

1276. Issued By: Secretary of the Commission, FERC


Filed Date: 5/8/2017
Accession No: 20170508-3013
Description: Order Granting Rehearing for Further Consideration re
Algonquin Gas Transmission, LLC under CP16-9.

1277. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 5/11/2017
Accession No: 20170511-5116
Description: Algonquin Gas Transmission, LLC submits its Notice of
Commencement of Construction under CP16-9
20180216-0021 FERC PDF (Unofficial) 02/16/2018

235

Record
Item No. Descrintion

1278. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 5/11/2017
Accession No: 20170511-5154
Description: Algonquin Gas Transmission, LLC submits
supplemental information in response to the letter from the Braintree
Electric Light Dept. dated April 13, 2017 and submitted under CP16-
9

1279. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 5/11/2017
Accession No: 20170511-5171
Description: Algonquin Gas Transmission, LLC - Answer to
Weymouth Request and Hayden Request for Rehearing, Docket Nos.
CP16-9-003 and CP16-9.

1280. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 5/12/2017
Accession No: 20170512-5121
Description: Algonquin Gas Transmission, LLC submits its 3rd
request for authorization to proceed with construction of certain
Project facilities under CP16-9.

1281. Issued By: Energy Projects, Office of


Filed Date: 5/19/2017
Accession No: 20170519-3018
Description: Letter order granting Algonquin Gas Transmission,
LLC's 5/12/2017 request to proceed with
construction/installation/modification of new facilities re the Atlantic
Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

236

Record
Item No. Descrintion

1282. Filed By: Braintree, City of(MA)


Filed Date: 5/22/2017
Accession No: 20170523-0009
Description: Correspondence Irom Braintree Mayor Joseph Sullivan
of MA et al to Massachusetts Office of Coastal Zone Management re
the Atlantic Bridge Project under CP16-9.

1283. Issued By: Secretary of the Commission, FERC


Filed Date: 5/24/2017
Accession No: 20170524-3018
Description: Order Granting Rehearing for Further Consideration re
Algonquin Gas Transmission, LLC et al under CP16-9.

1284. Filed By: Lori Hayden and Michael Hayden


Filed Date: 5/26/2017
Accession No: 20170526-5290
Description: Motion for Leave to Intervene in D.C. Circuit Court of
Appeals of Lori Hayden and Michael Hayden under CP16-9.

1285. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 5/26/2017
Accession No: 20170526-5298
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 1 for the reporting period ending April 28, 2017
under CP16-9.

1286. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 5/26/2017
Accession No: 20170526-5300
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 2 for the reporting period ending May 5, 2017
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

237

Record
Item No. Descrintion

1287. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 5/26/2017
Accession No: 20170526-5302
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 3 for the reporting period ending May 12, 2017
under CP16-9.

1288. Filed By: FRRACS


Filed Date: 5/30/2017
Accession No: 20170530-5202
Description: Petition for Review by FRRACS, Food 8'c Water Watch
et al. under CP16-9.

1289. Issued By: Chair and Immediate StafF(CHAIR)


Filed Date: 5/30/2017
Accession No: 20170531-0098
Description: Response to Hingham Town Administrator Ted
Alexiades'/19/17 letter regarding the Atlantic Bridge Project under
CP16-9.

1290. Filed By: Lori Hayden and Mchael Hayden


Filed Date: 6/5/2017
Accession No: 20170606-0021
Description: Lori Hayden and Michael Hayden submit a Motion for
Leave to Intervene re the Town of Weymouth, MA v. FERC under
CP16-9 (US Court of Appeals for the DC Circuit). Case No. 17-1135.

1291. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 6/7/2017
Accession No: 20170607-5128
Description: Algonquin Gas Transmission, LLC submits variance
request under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

238

Record
Item No. Descrintion

1292. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 6/9/2017
Accession No: 20170609-5182
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 4 for the reporting period ending May 19, 2017
under CP16-9.

1293. Issued By: Once of Energy Projects


Filed Date: 6/12/2017
Accession No: 20170612-3011
Description: Letter order granting Algonquin Gas Transmission,
LLC's June 7, 2017 variance request to use an 80-foot by 45-foot
additional temporary workspace re the Atlantic Bridge Project under
CP16-9.

1294. Filed By: Lori k Michael Hayden


Filed Date: 6/19/2017
Accession No: 20170619-5152
Description: Request for Rehearing of Lori Hayden and Michael
Hayden under CP16-9.

1295. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 6/23/2017
Accession No: 20170623-5159
Description: Algonquin Gas Transmission, LLC hereby submits its
request to place certain project facilities in-service under CP16-9.

1296. Filed By: House of Representatives, United States


Filed Date: 6/26/2017
Accession No: 20170627-0055
Description: US Representative Elizabeth H. Esty forwards
comments on behalf of her constituents re the Atlantic Bridge Project
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

239

Record
Item No. Descrintion

1297. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 6/29/2017
Accession No: 20170629-5226
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 5 for the reporting period ending May 26, 2017
under CP16-9.

1298. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 6/29/2017
Accession No: 20170629-5227
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 6 for the reporting period ending June 2, 2017
under CP16-9.

1299. Issued By: Energy Projects, 01Iice of


Filed Date: 6/30/2017
Accession No: 20170630-3048
Description: Letter order granting Algonquin Gas Transmission,
LLC's 6/23/17 request to place into service the Oxford Compressor
Station piping modifications under the Atlantic Bridge Project under
CP16-9.

1300. Filed By: Weymouth, Massachusetts, Town of


Filed Date: 7/5/2017
Accession No: 20170705-0031
Description: Town Council of Weymouth, Massachusetts submits
Resolutions for the proposed Enbridge Energy Compressor Station
under PF16-1 et aL

1301. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/5/2017
Accession No: 20170705-5094
Description: Algonquin Gas Transmission, LLC - Answer to Lori and
Michael Hayden's June 19 Request for Rehearing, Docket No. CP16-
9
20180216-0021 FERC PDF (Unofficial) 02/16/2018

240

Record
Item No. Descrintion

1302. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/12/2017
Accession No: 20170712-5126
Description: Algonquin Gas Transmission, LLC submits a variance
request under CP16-9.

1303. Filed By: Lori 8r, Michael Hayden


Filed Date: 7/12/2017
Accession No: 20170712-5211
Description: Request for Rehearing of Intervenors, Lori Hayden and
Michael Hayden, under CP16-9.

1304. Issued By: Oince of Energy Projects


Filed Date: 7/14/2017
Accession No: 20170714-3006
Description: Letter order granting Algonquin Gas Transmission,
LLC's 7/12/17 variance request for the Atlantic Bridge Project under
CP16-9.

1305. Issued By: Secretary of the Commission, FERC


Filed Date: 7/17/2017
Accession No: 20170717-3009
Description: Order Granting Rehearing for Further Consideration re
Algonquin Gas Transmission, LLC under CP16-9.

1306. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/19/2017
Accession No: 20170719-5158
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 7 for the reporting period ending June 9, 2017
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

241

Record
Item No. Descrintion

1307. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/19/2017
Accession No: 20170719-5163
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 8 for the reporting period ending June 16, 2017
under CP16-9.

1308. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/19/2017
Accession No: 20170719-5164
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 9 for the reporting period ending June 23, 2017
under CP16-9.

1309. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/19/2017
Accession No: 20170719-5167
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 10 for the reporting period ending June 30, 2017
under CP16-9.

1310. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/21/2017
Accession No: 20170721-5144
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 11 for the reporting period ending July 7, 2017
under CP16-9.

1311. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/21/2017
Accession No: 20170721-5147
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 12 for the reporting period ending July 14, 2017
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

242

Record
Item No. Descrintion

1312. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/25/2017
Accession No: 20170725-5003
Description: Algonquin Gas Transmission, LLC submits a variance
request under CP16-9.

1313. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/27/2017
Accession No: 20170727-5017
Description: Algonquin Gas Transmission, LLC submits
supplemental information regarding Condition 19 under CP16-9.

1314. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/27/2017
Accession No: 20170727-5126
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 13 for the reporting period ending July 21, 2017
under CP16-9.

1315. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 7/27/2017
Accession No: 20170727-5177
Description: Motion for Leave to Answer and Answer of Algonquin
Gas Transmission, LLC under CP16-9.

1316. Filed By: Lori 8r, Michael Hayden


Filed Date: 7/31/2017
Accession No: 20170731-5269
Description: Request for Rehearing of June 30, 2017 order of
Intervenors, Lori and Michael Hayden under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

243

Record
Item No. Descrintion

1317. Issued By: Energy Projects, Office of


Filed Date: 8/2/2017
Accession No: 20170802-3047
Description: Letter order granting Algonquin Gas Transmission,
LLC's 7/24/17 variance request to use a 373 square foot additional
temporary work space etc re the Atlantic Bridge Project under CP16-
9.
1318. Filed By: Algonquin Gas Transmission, LLC
Filed Date: 8/3/2017
Accession No: 20170803-5128
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 14 for the reporting period ending July 28, 2017
under CP16-9.

1319. Issued By: Secretary of the Commission, FERC


Filed Date: 8/10/2017
Accession No: 20170810-3048
Description: Order Granting Rehearing for Further Consideration re
Algonquin Gas Transmission, LLC under CP16-9.

1320. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 8/15/2017
Accession No: 20170815-5050
Description: Algonquin Gas Transmission, LLC submits a variance
request under CP16-9.

1321. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 8/15/2017
Accession No: 20170815-5157
Description: Algonquin Gas Transmission, LLC - Answer to
Hayden's Request for Rehearing, Docket No. CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

Record
Item No. Descrintion

1322. Issued By: Energy Projects, Office of


Filed Date: 8/17/2017
Accession No: 20170817-3009
Description: Letter order granting Algonquin Gas Transmission,
LLC's 8/15/17 variance request to use an additional temporary work
space located within the existing Oxford Compressor Station fence
. line for the Atlantic Bridge Project under CP16-9.

1323. Issued By: Secretary of the Commission, FERC


Commissioners 4, Immediate Staff (THE COMMISSION)
Filed Date: 8/21/2017
Accession No: 20170821-3022
Description: Order on Rehearing re Algonquin Gas Transmission,
LLC et al under CP16-9.

1324. Issued By: Secretary of the Commission, FERC


Filed Date: 8/21/2017
Accession No: 20170821-3024
Description: Order Denying Stay re Algonquin Gas Transmission,
LLC under CP16-9.

1325. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 8/25/2017
Accession No: 20170825-5124
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 15 for the reporting period ending August 4, 2017
under CP16-9.

1326. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 8/25/2017
Accession No: 20170825-5126
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 16 for the reporting period ending August 11, 2017
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

245

Record
Item No. Descrintion

1327. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 8/25/2017
Accession No: 20170825-5147
Description: Algonquin Gas Transmission, LLC, submits
supplemental information regarding cultural resources under CP16-9.

1328. Filed By: Algonquin Gas Transmission, LLC


Spectra Energy Partners, LP
Filed Date: 8/25/2017
Accession No: 20170825-5148
Description: Algonquin Gas Transmission, LLC, submits
supplemental information regarding cultural resources under CP16-9.

1329. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 8/28/2017
Accession No: 20170828-5130
Description: Algonquin Gas Transmission, LLC hereby submits
supplemental information under CP16-9.

1330. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 8/28/2017
Accession No: 20170828-5131
Description: Algonquin Gas Transmission, LLC hereby submits
supplemental information under CP16-9.

1331. Issued By: Secretary of the Commission, FERC


Filed Date: 8/29/2017
Accession No: 20170829-3030
Description: Order Granting Rehearing for Further Consideration re
Algonquin Gas Transmission, LLC under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

246

Record
Item No. Descrintion

1332. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 8/31/2017
Accession No: 20170831-5228
Description: Algonquin Gas Transmission, LLC submits a variance
request under CP16-9.

1333. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 9/5/2017
Accession No: 20170905-5140
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 17 for the reporting period ending August 18, 2017
under CP16-9.

1334. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 9/5/2017
Accession No: 20170905-5142
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 18 for the reporting period ending August 25, 2017
under CP16-9.

1335. Issued By: Energy Projects, Office of


Filed Date: 9/8/2017
Accession No: 20170908-3028
Description: Letter order granting Algonquin Gas Transmission,
LLC's 8/31/17, as supplemented on 9/7/17, variance request to use
alternative trench excavation protection measures etc re the Atlantic
Bridge Project under CP16-9.

1336. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 9/8/2017
Accession No: 20170908-5053
Description: Algonquin Gas Transmission, LLC submits
supplemental information to its August 31, 2017 filed variance request
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

247

Record
Item No. Descrintion

1337. Issued By: Energy Projects, Office of


Filed Date: 9/14/2017
Accession No: 20171023-3027
Description: Construction Inspection Report for Algonquin Gas
Transmission, L.L.C.'s, et al Atlantic Bridge Project conducted on
September 14, 2017 under CP16-9.

1338. Filed By: Weymouth, Town of


Filed Date: 9/19/2017
Accession No: 20170919-5154
Description: Request for Rehearing and rescission of order denying
stay of Weymouth, Town of under CP16-9.

1339. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 9/20/2017
Accession No: 20170920-5098
Description: Algonquin Gas Transmission, LLC requests
authorization to utilize an approved contractor yard and proceed with
certain pre-construction activities under CP16-9.

1340. Filed By: Miyares and Harrington LLP


Filed Date: 9/25/2017
Accession No: 20170925-0023
Description: Miyares and Harrington LPP submits a request for
Rehearing of Order Denying Stay re the Algonquin Gas Transmission,
LLC Project et al under CP16-9.

1341. Issued By: Office of Energy Projects


Filed Date: 9/25/2017
Accession No: 20170925-3001
Description: Letter order granting Algonquin Gas Transmission,
LLC's 09/20/2017 request to use the Hudson East Contractor Yard in
Montrose New York for the Atlantic Bridge Project under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

248

Record
Item No. Descrintion

1342. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 9/25/2017
Accession No: 20170925-5116
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 19 for the reporting period ending September 1,
2017 under CP16-9.

1343. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 9/25/2017
Accession No: 20170925-5117
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 20 for the reporting period ending September 8,
2017 under CP16-9.

1344. Filed By: Narragansett Indian Tribe


Filed Date: 9/27/2017
Accession No: 20170927-0028
Description: Narragansett Indian Tribal Historic Preservation Office
submits comments re the Atlantic Bridge Project under CP16-9.

1345. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 9/27/2017
Accession No: 20170927-5048
Description: Algonquin Gas Transmission, LLC requests
authorization to commence construction of certain project segments
under CP16-9.

1346. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 9/29/2017
Accession No: 20170929-5073
Description: Algonquin Gas Transmission, LLC submits
supplemental information under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

249

Record
Item No. Descrintion

1347. Filed By: Food 8r, Water Watch Stop the Algonquin Pipeline
Expansion
Filed Date: 10/3/2017
Accession No: 20171003-5163
Description: Protest of Food k Water Watch, et al. (CP16-9-000).
SEnRG, FWW, FRRACS, SAPE and Resist Spectra write to protest
the approval of Spectra's request to proceed with pre-construction
activities in Montrose NY. Spectra has not received all federal
permits.

1348. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 10/3/2017
Accession No: 20171003-5164
Description: Algonquin Gas Transmission, LLC hereby submits
supplemental information under CP16-9.

1349. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 10/3/2017
Accession No: 20171003-5165
Description: Algonquin Gas Transmission, LLC hereby submits
supplemental information under CP16-9.

1350. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 10/4/2017
Accession No: 20171004-5121
Description: Algonquin Gas Transmission, LLC - Answer to
Weymouth's Request for Rehearing, Docket No. CP16-9.

1351. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 10/4/2017
Accession No: 20171004-5171
Description: Algonquin Gas Transmission, LLC submits
supplemental request for authorization to commence construction of
certain project segments under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

250

Record
Item No. Descrintion

1352. Issued By: Office of General Counsel


Filed Date: 10/4/2017
Accession No: 20171005-3050
Description: Memo dated 10/4/17 from Otnce of General Counsel re
the Atlantic Bridge Project under CP16-9.

1353. Issued By: Office of Energy Projects


Filed Date: 10/5/2017
Accession No: 20171005-3057
Description: Memorandum of Understanding between FERC,
Algonquin Gas Transmission, LLC/Maritimes 4
Northeast Pipeline,
LLC and Environmental Resource Management under CP16-9.

1354. Issued By: Office of Energy Projects


Filed Date: 10/5/2017
Accession No: 20171005-3077
Description: Letter order granting Algonquin Gas Transmission,
LLC's 9/27/1 7 request to proceed with construction Atlantic Bridge
Project under CP16-9.

1355. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 10/13/2017
Accession No: 20171013-5173
Description: Algonquin Gas Transmission, LLC hereby submits its
request to place certain project facilities in-service under CP16-9.

1356. Issued By: Secretary of the Commission, FERC


Filed Date: 10/17/2017
Accession No: 20171017-3049
Description: Order Granting Rehearing for Further Consideration re
Algonquin Gas Transmission, LLC et al under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

251

Record
Item No. Descrintion

1357. Issued By: Energy Projects, Office of


Filed Date: 10/17/2017
Accession No: 20171017-3054
Description: Field Inspection Report for Algonquin Gas
Transmission, LLC and Maritimes 8r, Northeast Pipeline LLC's
Atlantic Bridge Project conducted on June 23, 2017 under CP16-9.

1358. Issued By: Energy Projects, Office of


Filed Date: 10/17/2017
Accession No: 20171017-3056
Description: Field Inspection Report for Algonquin Gas
Transmission, LLC and Maritimes 4 NorthEast Pipeline LLC's
Atlantic Bridge Project conducted on July 21, 2017 under CP16-9.

1359. Issued By: Energy Projects, Office of


Filed Date: 10/17/2017
Accession No: 20171017-3057
Description: Field Inspection Report for Algonquin Gas
Transmission, LLC and Maritimes 8r, Northeast Pipeline LLC's
Atlantic Bridge Project conducted on August 15, 2017 under CP16-9.

1360. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 10/18/2017
Accession No: 20171018-5089
Description: Algonquin Gas Transmission, LLC hereby submits
notice of commencement of construction of certain project facilities
under CP16-9.

1361. Issued By: Federal Energy Regulatory Commission


Filed Date: 10/23/2017
Accession No: 20171023-3025
Description: Construction Inspection Report re Algonquin Gas
Transmission, LLC's et al. Atlantic Bridge Project conducted on May
25, 2017 under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

252

Record
Item No. Descrintion

1362. Issued By: Federal Energy Regulatory Commission


Filed Date: 10/23/2017
Accession No: 20171023-3026
Description: Construction Inspection Report re Algonquin Gas
Transmission, LLC's et al. Atlantic Bridge Project conducted on
10/04/17 under CP16-9.

1363. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 10/25/2017
Accession No: 20171025-5237
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 21 for the reporting period ending September 15,
2017 under CP16-9.

1364. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 10/25/2017
Accession No: 20171025-5244
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 22 for the reporting period ending September 22,
2017 under CP16-9.

1365. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 10/26/2017
Accession No: 20171026-5044
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 23 for the reporting period ending September 29,
2017 under CP16-9.

1366. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 10/26/2017
Accession No: 20171026-5045
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 24 for the reporting period ending October 6, 2017
under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

253

Record
Item No. Descrintion

1367. Issued By: Office of Energy Projects


Filed Date: 10/27/2017
Accession No: 20171027-3039
Description: Letter order granting Algonquin Gas Transmission,
LLC's 10/13/2017 request for the Atlantic Bridge Project facilities to
provide 40,000 dekatherms per day incremental firm transportation
service for the Atlantic Bridge Project under CP16-9.

1368. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 10/31/2017
Accession No: 20171031-5329
Description: Algonquin Gas Transmission, LLC requests
authorization to commence construction of certain project segments
under CP16-9.

1369. Issued By: Office of Energy Projects


Filed Date: 11/3/2017
Accession No: 20171103-3005
Description: Letter order granting Algonquin Gas Transmission,
LLC's 10/31/2017 request to proceed with construction of the Stony
Point Discharge Take-up and Relay re the Atlantic Bridge Project
under CP16-9.

1370. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 11/9/2017
Accession No: 20171109-5174
Description: Algonquin Gas Transmission, LLC submits Notice of
Commencement of Service for its Atlantic Bridge Project under
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

254

Record
Item No. Descrintion

1371. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 11/30/2017
Accession No: 20171130-5224
Description: Algonquin Gas Transmission, LLC submits its
affirmative statement signed by a senior company official for the
facilities which were placed into service on November 1, 2017 under
CP16-9.

1372. Issued By: Energy Projects, Office of


Filed Date: 12/1/2017
Accession No: 20171201-3010
Description: Environmental Compliance Monitoring Program:
Weekly Summary Report for the Atlantic Bridge Project re the period
of 10/1 1/2017 through 10/14/2017 under CP16-9.
1373. Issued By: Energy Projects, Once of
Filed Date: 12/1/2017
Accession No: 20171201-3012
Description: Environmental Compliance Monitoring Report for
October 29- November 4, 2017 regarding the Atlantic Bridge Project
under CP16-9.

1374. Issued By: Energy Projects, Office of


Filed Date: 12/1/2017
Accession No: 20171201-3013
Description: Environmental Compliance Monitoring Report for
October 15-21, 2017 regarding the Atlantic Bridge Project under
CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

255

Record
Item No. Descrintion

1375. Issued By: Energy Projects, Office of


Filed Date: 12/1/2017
Accession No: 20171201-3014
Description: Environmental Compliance Monitoring Program:
Weekly Summary Report for Algonquin Gas Transmission, LLC's
Atlantic Bridge Project for the period of 10/22/2017 through
10/28/2017 under CP16-9.

1376. Issued By: Energy Projects, Office of


Filed Date: 12/1/2017
Accession No: 20171201-3015
Description: Environmental Compliance Monitoring Report for
November 5- November 11, 2017 regarding the Atlantic Bridge
Project under CP16-9.

1377. Issued By: Energy Projects, Office of


Filed Date: 12/1/2017
Accession No: 20171201-3016
Description: Environmental Compliance Monitoring Report for
November 12- November 18, 2017 regarding the Atlantic Bridge
Project under CP16-9.

1378. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 12/1/2017
Accession No: 20171201-5051
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 25 for the reporting period ending October 13, 2017
under CP16-9.

1379. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 12/1/2017
Accession No: 20171201-5052
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 26 for the reporting period ending October 20, 2017
under CP16-9
20180216-0021 FERC PDF (Unofficial) 02/16/2018

256

Record
Item No. Descrintion

1380. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 12/1/2017
Accession No: 20171201-5055
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 27 for the reporting period ending October 27, 2017
under CP16-9.

1381. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 12/1/2017
Accession No: 20171201-5057
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 28 for the reporting period ending November 3,
2017 under CP16-9.

1382. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 12/1/2017
Accession No: 20171201-5291
Description; Algonquin Gas Transmission, LLC hereby submits its
notice of abandonment for a section of take-up and relay pipe related
to the Atlantic Bridge Project under CP16-9.

1383. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 12/8/2017
Accession No: 20171208-5148
Description: Algonquin Gas Transmissi on, LLC submits
supplemental information under CP16-9.

1384. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 12/8/2017
Accession No: 20171208-5155
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 29 for the reporting period ending November 10,
2017 under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

258

Record
Item No. Descrintion

1388. Issued By: Secretary of the Commission, FERC


Filed Date: 12/13/2017
Accession No: 20171213-3075
Description: Order on Rehearing re Algonquin Gas Transmission,
LLC et al. under CP16-9.

In witness whereof I have hereunto


subscribed and cause the seal of the Federal
Energy Regulatory Commission to be aflixed this
14th day of December, 2017, at Washington, D.C.

Kim+ly D. Bose
secretary
20180216-0021 FERC PDF (Unofficial) 02/16/2018

257

Record
Item No. Descrintion

1385. Filed By: Algonquin Gas Transmission, LLC


Filed Date: 12/8/2017
Accession No: 20171208-5156
Description: Algonquin Gas Transmission, LLC submits its Weekly
Status Report No. 30 for the reporting period ending November 17,
2017 under CP16-9.

1386. Issued By: Energy Projects, Office of


Filed Date: 12/12/2017
Accession No: 20171212-3019
Description: Construction Inspection Report for Algonquin Gas
Transmission, LLC's et al Atlantic Bridge Project conducted on
10/23/17 under CP16-9.

1387. Issued By: Federal Energy Regulatory Commission


Filed Date: 12/12/2017
Accession No: 20171212-3020
Description: Environmental Compliance Monitoring Weekly
Summary Report re the Atlantic Bridge Project for the period of
November 19, 2017 - November 25, 2017 under CP16-9.
20180216-0021 FERC PDF (Unofficial) 02/16/2018

The Town of fVeytnouth, Massachusetts Docket No. CP16-9


v. FERC
D.C. Cir. No. 17-1135,
17-1139,17-1176,17-1220 (consolidated)

CERTIFICATE OF SERVICE

In accordance with Fed. R. App. P. 25(d), and the Court's Administrative

Order Regarding Electronic Case Filing, I hereby certify that I have, this 14th day

of December 2017, served the foregoing upon the counsel listed in the Service

Preference Report via email through the Court's CM/ECF system.

Is/Nicholas M. Gladd
Nicholas M. Gladd
Attorney

Federal Energy Regulatory


Commission
888 First Street, NE
Washington, DC 20426
Telephone: (202) 502-8836
Fax: (202) 273-0901
Email: nicholas.aladdQferc.aov
20180216-0021 FERC PDF (Unofficial) 02/16/2018
Document Content(s)

14825493.tif..........................................................1-259

S-ar putea să vă placă și