Presentation Outline

 Introduction to CEB
 Transmission Operation and Maintenance – Galle
 System Control Center
 Transmission and Generation Planning Branch
 Project and Heavy Maintenance Section – DD4
 C.E.B. Southern province branch
 Laxapana power station
 Lakvijaya power station
Introduction To Ceylon Electricity Board

 Major Divisions
Generation Transmission Distribution

 Vision
“Enrich Life through Power”

 Mission
“To develop and maintain an efficient, coordinated and economical system of electricity
supply to the whole of Sri Lanka, while adhering to our core values”.
Benefits To
Introduction of Ceylon
Effective Recruiting
Electricity Board
Generation Transmission

Distribution
Transmission Operation and Maintenance - Galle

 Matara Grid Substation


 132 kV/ 33kV , 31.5 MVA Transformers
 The whole Grid Substation can be divided
into Line bay, Transformer bay and Feeder bay
 4 Lines
 12 Feeders
Transmission Operation and Maintenance - Galle
Differential
Protection  High voltage transformers
Restricted Earth  Current transformers
Fault Protection
Electrical
Over Voltage/ Under
 voltage transformers
Voltage protection
 Circuit breakers
Over Fluxing
Transformer
Protection  Surge arresters
Protection
Buchhoz Relay  Isolators
Winding and Oil  Wave traps
Temperature
Mechanical  Earth Switch
Oil level
 Control panels
Tank Pressure
 Protection panels
System Control Center
Major functions
 Frequency controlling (1% tolerance from 50Hz)
 Voltage controlling
 Release lines and machines for maintenance
 Economic Dispatch of Thermal power plants

System operation policy


 System operation priority
Pond Balancing
 Water usage priority
 Spinning Reserve
 Maximum generation unit Release lines and plants for maintenance
 System voltages
Transmission and Generation Planning Branch
Generation Planning
The main function of the generation planning division is to prepare the Long Term Generation
Expansion Plan (LTGEP). Demand forecasting is done for four sectors. They are ,
 1.Domestic
 2.Industrial
 3. Commercial
 4. Other

Transmission Planning

 Main objectives are find out the transmission developments and future Tx network.
 To ensure reliable and stable power system and determine the investment requirement for the
transmission development within the planning horizon

 PSS/E software is used to load flow analysis.


Transmission and Generation Planning Branch

Street
Lighting 1%
General 27% Domestic
37%

Religious 1%
Industrial
34%

Domestic | Industrial | Commercial | Other


Project and Heavy Maintenance – DD4

Major Functions
 Substation Maintenance
 Tower Line Construction and Maintenance
1. Hot line inspection 2. Preparing estimates
3. Hot line maintenance 4. Cold line maintenance

 Replacing of flashover insulators & hardware.  Repairing of stubs.


 Replacing of corroded steel parts  Re-concreting of tower foundation
 Re-tensioning of conductors.  Crimping midspan joints,T- off joints & repair sleeves.
 Re-conducting of conductors.  Applying of anticorrosive paint on towers.
 Re-fixing of number plate, phase plates etc.
Project and Heavy Maintenance – DD4
Tower Type

MAST TYPE TOWER TYPE

SINGLE DOUBLE SINGLE DOUBLE


CIRCUIT CIRCUIT CIRCUIT CIRCUIT

LOW HIGH LOW HIGH

MEDIUM MEDIUM MEDIUM MEDIUM

HIGH HIGH HIGH HIGH

TERMINAL TERMINAL TERMINAL TERMINAL


C.E.B. Southern province – DD4
 Distribution Constructions  Conductors
 Distribution maintenance  Poles
 Call centre  Conductor accessories
 Area office
 Protection devices
Types of Poles  DDLO
 LBS (load break switch)
1. Reinforced Concrete Poles (RC poles)
2. Pre-Stressed Concrete Poles (PS poles)  ABS(air break switch)
3. Wooden Pole
C.E.B. Southern province – DD4
Laxapana Power Station

 Pond Balancing
 Single Phase transformers in both O/L and N/L  Pelton – High heads
 O/L- 9.5 MW *3 + 12.5 MW*2 ( Horizontal axis Pelton Turbine)  Francis – Medium heads
 N/L - 57.5MW *2 (Vertical axis Pelton )  Kaplan –Low heads
 O/L - N/L - Excitation Systems
1. O/L (Stage1) and N/L – Brushless
2. O/L (Stage2) – Brush system
Lakvijaya Power Station

Coal-Thermal power plant


900 MW – 3 * 300MW
220kV transmission lines
Distributed Control System (DCS)
Gas Insulated Switching Yard (GIS)
Conclusion