Sunteți pe pagina 1din 633

Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

1 Earthwork Excavation work 16449 Cft


Worker 247 Nos 6500 Nos 1605500

2 9"Thk compacted Hardcore &


Sand Filling work 1371 Cft
Broken Brick 14 Suds 36000 Suds 504000
Sand 4 Sud 15000 Sud 60000
Worker 14 Nos 6500 Nos 91000
655000

3 Earth Filling Work 1097 Cft


Earth (30%) 11.3 Suds 40000 Suds 452000
Worker 38 Nos 6500 Nos 247000
699000

4 Sand Filling Work 1035 Cft


R/Sand (25%) 13 Suds 15000 Suds 195000
Worker 10 Nos 6500 Nos 65000
260000

5 3"Thk (1:3:6)Lean concrete 451 Cft


Cement 58 Bags 6200 Bags 359600
R/Sand 2.16 Suds 15000 Suds 32400
R/Shingle 4.32 Suds 95000 Suds 410400
Mason 5 Nos 8500 Nos 42500
Worker 27 Nos 6500 Nos 175500
1020400

6(b) Making & Fixing of Formwork


for Strip Footing work 696 Sft
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

J/wood (3times) 0.92 Ton 700000 Ton 644000


5 Ply Wood (8'x4')(3times) 8 Sht 15800 Sht 126400
Wire Nail 21 Lb 650 Lb 13650
Carpenter 42 Nos 8500 Nos 357000
Worker 14 Nos 6500 Nos 91000
1790800

6(c ) Mixing & laying of (1:2:4)


Concreting Work for Strip Footing work 2611.6 Cft
Cement 483 Bags 6200 Bags 2994600
R/Sand 12 Suds 15000 Suds 180000
R/Shingle 24 Suds 95000 Suds 2280000
Vibrator 13 Days 15000 Days 195000
Concrete Mixer 13 Days 15000 Days 195000
HSD 52 Gals 3000 Gals 156000
Mason 52 Nos 8500 Nos 442000
Worker 235 Nos 6500 Nos 1527500
7970100

7(b) Making & Fixing of Formwork


for Strip Footing Beam work 457 Sft
Jwood (3times) 0.6 Ton 700000 Ton 420000
5 Ply Wood (3times) 5 Sht 15800 Sht 79000
Wire Nail 0.76 Suds 95000 Suds 72200
Carpenter 27 Nos 8500 Nos 229500
Worker 9 Nos 6500 Nos 58500
859200

7(c ) Mixing & laying of (1:2:4) Concreting Work


for Strip Footing Beam work 276.8 Cft
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Cement 51 Bags 6200 Bags 316200


R/Sand 1.28 Suds 15000 Suds 19200
R/Shingle 2.66 Suds 95000 Suds 252700
Mason 6 Nos 8500 Nos 51000
Worker 25 Nos 6500 Nos 162500
801600

8 (a) Column ( Up to Plinth )


Cutting & Fitting of Rebar work
for Column

8 (b) Making & Fixing of Formwork


for Column ( up to Plinth) 1112 Sft
Jwood (3times) 1.46 Ton 700000 Ton 1022000
5 Ply Wood (3 tImes) 13 Sht 15800 Sht 205400
Wire Nail 33 Lb 650 Lb 21450
Carpenter 67 Nos 8500 Nos 569500
Worker 22 Nos 6500 Nos 143000
1961350

8(c ) Mixing & laying of (1:2:4) Concreting Work


for Column ( up to Plinth) 394.9 Cft
Cement 73 Bags 6200 Bags 452600
R/Sand 1.81 Suds 15000 Suds 27150
R/Shingle 3.63 Suds 95000 Suds 344850
Vibrator 2 Days 15000 Days 30000
Concrete Mixer 2 Days 15000 Days 30000
HSD 8 Gals 3000 Gals 24000
Mason 8 Nos 8500 Nos 68000
Worker 36 Nos 6500 Nos 234000
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

1210600

9 (a) Column ( GndFloor to 1st Floor Level )


Cutting & Fitting of Rebar work
for Column

9 (b) Making & Fixing of Formwork


for Column ( Gnd to 1st Floor Level) 2394 Cft
Jwood (3Times) 3.19 Ton 700000 Bags 2233000
5 Ply Wood (3times) 29 Sht 15800 Suds 458200
Wire Nail 72 Lb 650 Lb 46800
Carpenter 144 Nos 8500 Nos 1224000
Worker 48 Nos 6500 Nos 312000
4274000

9(c ) Mixing & laying of (1:2:4) Concreting Work


for Column ( Gnd to 1st Floor Level) 850.5 Cft
Cement 157 Bags 6200 Bags 973400
R/Sand 3.91 Suds 15000 Suds 58650
R/Shingle 7.82 Suds 95000 Suds 742900
Vibrator 4 Days 15000 Days 60000
Concrete Mixer 4 Days 15000 Days 60000
HSD 17 Gals 3000 Gals 51000
Mason 17 Nos 8500 Nos 144500
Worker 77 Nos 6500 Nos 500500
2590950

10 (a)Plinth Beam Work


Cutting & Fitting of Rebar work
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

for Plinth Beam

10( b) Making & Fixing of Formwork


for Plinth Beam 1421 Sft
Jwood (3Times) 1.89 Ton 700000 Bags 1323000
5 Ply Wood (3times) 17 Sht 15800 Suds 268600
Wire Nail 43 Lb 650 Lb 27950
Carpenter 85 Nos 8500 Nos 722500
Worker 28 Nos 6500 Nos 182000
2524050

10(c ) Mixing & laying of (1:2:4) Concreting Work


for Plinth Beam 799.3 Cft
Cement 148 Bags 6200 Bags 917600
R/Sand 3.67 Suds 15000 Suds 55050
R/Shingle 7.35 Suds 95000 Suds 698250
Vibrator 4 Days 15000 Days 60000
Concrete Mixer 4 Days 15000 Days 60000
HSD 16 Gals 3000 Gals 48000
Mason 16 Nos 8500 Nos 136000
Worker 72 Nos 6500 Nos 468000
2442900

11 18" thk Brick Retaining Wall with


(1:4) cement motor 2265 Cft
Brick 30577 Nos 115 Nos 3516355
Cement 127 Bags 6200 Bags 787400
R/Sand 6.34 Suds 15000 Suds 95100
Mason 91 Nos 8500 Nos 773500
Worker 136 Nos 6500 Nos 884000
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

6056355

Total 36066818
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

10
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head -

Name Of Work - Up to Plinth

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

bv********"""""""""""""""""""""""""""""""""""""""""""""""""""
************

**** *
***********

4398855 ****
36066818
#REF!

****
4303755 ****

********************
42123173 ****

****
********************

42123173 ****
************

****
********************

#REF! ****

****
********************

**
**

****
********************

36066818 ****
************

****
********************

**
**

****
********************

0 ****

****
********************

**
**
************

****
********************

0 ****

****
********************

**
**
************

****
********************

0 ****

****
********************

**
**

0
0
#REF!
#VALUE! +

************
************

0 0

0 *

*
****
************

3000000000
************
************
************
************
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

1 Earthwork Excavation work


SF1 1 x 1 38' -0'' 6' -0'' 9' -0'' 2052 Cft

SF2 1 x 1 38' -0'' 9' -0'' 9' -0'' 3078 Cft

SF3 1 x 1 38' -0'' 8' -0'' 9' -0'' 2736 Cft

SF4 1 x 1 38' -0'' 7' -0'' 9' -0'' 2394 Cft

SF5 1 x 1 38' -0'' 9' -0'' 9' -0'' 3078 Cft

SF6 1 x 1 35' -7'' 7' -0'' 9' -0'' 2242 Cft

SF7 1 x 1 25' -9'' 3' -9'' 9' -0'' 869 Cft


16449 Cft

2 9"Thk compacted Hardcore &


Sand Filling work
SF1 1 x 1 38' -0'' 6' -0'' 0' -9'' 171 Cft

SF2 1 x 1 38' -0'' 9' -0'' 0' -9'' 257 Cft

SF3 1 x 1 38' -0'' 8' -0'' 0' -9'' 228 Cft

SF4 1 x 1 38' -0'' 7' -0'' 0' -9'' 200 Cft

SF5 1 x 1 38' -0'' 9' -0'' 0' -9'' 257 Cft

SF6 1 x 1 35' -7'' 7' -0'' 0' -9'' 187 Cft

SF7 1 x 1 25' -9'' 3' -9'' 0' -9'' 72 Cft


1371 Cft

3(a) 12" thk earth Filling Work


1 x 1 21' -6'' 32' -6'' 1' -0'' 699 Cft

1 x 1 13' -6'' 29' -6'' 1' -0'' 398 Cft


1097 Cft

(b) 9" thk earth Filling Work


2 x 1 13' -6'' 32' -6'' 0' -9'' 658 Cft

1 x 1 4' -6'' 21' -0'' 0' -9'' 71 Cft


729 Cft

Ttotal 1826 CFt


Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

4(a) 6" thk Sand Filling Work


1 x 1 21' -6'' 32' -6'' 0' -6'' 349 Cft

1 x 1 13' -6'' 29' -6'' 0' -6'' 199 Cft


549 Cft

(b) 6" thk Sand Filling Work


2 x 1 13' -6'' 32' -6'' 0' -6'' 439 Cft

1 x 1 4' -6'' 21' -0'' 0' -6'' 47 Cft


486 Cft

Total 1035 Cft

5(a) 3"Thk (1:3:6)Lean concrete


SF1 1 x 1 37' -6'' 6' -0'' 0' -3'' 56 Cft

SF2 1 x 1 37' -6'' 9' -0'' 0' -3'' 84 Cft

SF3 1 x 1 37' -6'' 8' -0'' 0' -3'' 75 Cft

SF4 1 x 1 37' -6'' 7' -0'' 0' -3'' 66 Cft

SF5 1 x 1 37' -6'' 9' -0'' 0' -3'' 84 Cft

SF6 1 x 1 35' -1'' 7' -0'' 0' -3'' 61 Cft

SF7 1 x 1 25' -3'' 3' -9'' 0' -3'' 24 Cft


451 Cft

(b) 2 x 1 75' -6'' 3' -0'' 0' -3'' 113 Cft

5 x 1 31' -0'' 3' -0'' 0' -3'' 116 Cft

1 1 19' -6'' 3' -0'' 0' -3'' 15 Cft


244 Cft

Total 695 Cft

6(a) Strip Footing work


Cutting & Fixing of
Strip Footing Rebar Work
399 Rft x 0.415 Lb/Ft Lb.
cwt
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

(b) Making & Fixing of Formwork

SF1 2 x 1 37' -0'' 1' -4'' 99 Sft

SF2 2 x 1 38' -0'' 1' -9'' 133 Sft

SF3 2 x 1 38' -0'' 1' -4'' 101 Sft

SF4 2 x 1 38' -0'' 1' -4'' 101 Sft

SF5 2 x 1 38' -0'' 1' -7'' 120 Sft

SF6 2 x 1 34' -7'' 1' -4'' 92 Sft

SF7 2 x 1 24' -9'' 1' -0'' 50 Sft


696 Sft

(c ) Mixing & laying of (1:2:4) concreting work


SF1 1 x 1 37' -0'' 6' -0'' 1' -4'' 296 Cft

SF2 1 x 1 38' -0'' 9' -0'' 1' -9'' 599 Cft

SF3 1 x 1 38' -0'' 8' -0'' 1' -4'' 405 Cft

SF4 1 x 1 38' -0'' 7' -0'' 1' -4'' 355 Cft

SF5 1 x 1 38' -0'' 9' -0'' 1' -7'' 542 Cft

SF6 1 x 1 34' -7'' 7' -0'' 1' -4'' 323 Cft

SF7 1 x 1 24' -9'' 3' -9'' 1' -0'' 93 Cft


2612 Cft

7 (a) Cutting & Fixing of Rebar Work For


Strip Footing Beam

(b) Making & Fixing of Formwork for Strip Footing Beam

SFB1 2 x 1 29' -6'' 0' -8'' 39 Sft

SFB2 2 x 1 38' -0'' 0' -9'' 57 Sft

SFB3 2 x 1 38' -0'' 1' -2'' 89 Sft

SFB4 2 x 1 38' -0'' 1' -2'' 89 Sft

SFB5 2 x 1 38' -0'' 0' -11'' 70 Sft

SFB6 2 x 1 34' -7'' 1' -2'' 81 Sft

SFB7 2 x 1 24' -9'' 0' -8'' 33 Sft


457 Sft
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

(c ) Mixing & laying of (1:2:4) concreting work for Strip Footing Beam
SFB1 1 x 1 29' -6'' 1' -6'' 0' -8'' 30 Cft

SFB2 1 x 1 28' -0'' 1' -6'' 0' -9'' 32 Cft

SFB3 1 x 1 28' -0'' 1' -6'' 1' -2'' 49 Cft

SFB4 1 x 1 28' -0'' 1' -6'' 1' -2'' 49 Cft

SFB5 1 x 1 28' -0'' 1' -6'' 0' -11'' 39 Cft

SFB6 1 x 1 35' -0'' 1' -6'' 1' -2'' 61 Cft

SFB7 1 x 1 18' -0'' 1' -6'' 0' -8'' 18 Cft


277 Cft

8 (a) Column ( Up to Plinth )


Cutting & Fitting of Rebar work
for Column

Footing 1 x 1 6' -0'' 6' -0'' 0' -6'' 18 Cft


18 Cft

(b) Making & Fixing of Formwork


for Column
C 26 x 1 6' -4'' 6' -6'' 1070 Sft
PC 1 x 1 6' -4'' 6' -6'' 41 Sft
1112 Sft

( c) Mixing & Laying of (1:2:4) concreting Work


for Column
C 26 x 1 1' -6'' 1' -6'' 6' -6'' 380 cft
PC 1 x 1 1' -6'' 1' -6'' 6' -6'' 15 cft
395 cft

9(a) Column ( Gnd Floor to 1st Floor Level )


Cutting & Fitting of Rebar work
for Column
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

(b ) Making & Fixing of Formwork


for Column
C 26 x 1 6' -4'' 14' -0'' 2305 Sft
PC 1 x 1 6' -4'' 14' -0'' 89 Sft
2394 Sft

( c ) Mixing & Laying of (1:2:4) concreting Work


for Column
C 26 x 1 1' -6'' 1' -6'' 14' -0'' 819 cft
PC 1 x 1 1' -6'' 1' -6'' 14' -0'' 32 cft
851 cft

10 (a) Plinth Beam Work


Cutting & Fitting of Rebar work
for Plinth Beam

FPB (14 x 20)


Line 1, A-e 2 x 1 14' -9'' 6' -0'' 0' -6'' 89 Cft

10(b) Making & Fixing of Formwork


for Column

PB (14 x 20)
Line 1, A-e 2 x 2 14' -9'' 1' -8'' 98 Sft
Line 2,3,4 , A-e 3 x 2 14' -9'' 1' -8'' 148 Sft

3 x 2 10' -6'' 1' -8'' 105 Sft

3 x 2 3' -6'' 1' -8'' 35 Sft


Line 5 ,A-e 1 x 2 14' -9'' 1' -8'' 49 Sft

1 x 2 12' -6'' 1' -8'' 42 Sft

1 x 2 1' -6'' 1' -8'' 5 Sft


Line 6,7,B-e 2 x 2 12' -6'' 1' -8'' 83 Sft

3 x 2 7' -0'' 1' -8'' 70 Sft


PB (14 x 18)
Bet: d& e ,2-4 10 x 2 13' -6'' 1' -6'' 405 Sft
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Line A-e,1-6 4 x 2 10' -6'' 1' -6'' 126 Sft

3 x 2 9' -6'' 1' -6'' 86 Sft


PB (12x18) Line B,C,d ,6 3 x 2 4' -6'' 1' -6'' 41 Sft

1 x 2 1' -8'' 1' -6'' 5 Sft


PB(9x12)
Line Bet: c&d ,3-6 1 x 2 10' -4'' 1' -0'' 21 Sft

1 x 2 3' -8'' 1' -0'' 7 Sft

1 x 2 4' -8'' 1' -0'' 9 Sft

1 x 2 7' -8'' 1' -0'' 15 Sft

1 x 2 4' -8'' 1' -0'' 9 Sft


Line Bet: 4-5,5-6,c-d 2 x 2 15' -6'' 1' -0'' 62 Sft
1421 Sft

10(c ) Mixing & Laying of (1:2:4) concreting Work


for Column

PB (14 x 20)
Line 1, A-e 2 x 1 14' -9'' 1' -2'' 1' -8'' 57 Cft
Line 2,3,4 , A-e 3 x 1 14' -9'' 1' -2'' 1' -8'' 86 Cft

3 x 1 10' -6'' 1' -2'' 1' -8'' 61 Cft

3 x 1 3' -6'' 1' -2'' 1' -8'' 20 Cft


Line 5 ,A-e 1 x 1 14' -9'' 1' -2'' 1' -8'' 29 Cft

1 x 1 12' -6'' 1' -2'' 1' -8'' 24 Cft

1 x 1 1' -6'' 1' -2'' 1' -8'' 3 Cft


Line 6,7,B-e 2 x 1 12' -6'' 1' -2'' 1' -8'' 49 Cft

3 x 1 7' -0'' 1' -2'' 1' -8'' 41 Cft


PB (14 x 18)
Bet: d& e ,2-4 10 x 1 13' -6'' 1' -2'' 1' -6'' 236 Cft
Line A-e,1-6 4 x 1 10' -6'' 1' -2'' 1' -6'' 74 Cft

3 x 1 9' -6'' 1' -2'' 1' -6'' 50 Cft


PB (12x18) Line B,C,d ,6 3 x 1 4' -6'' 1' -0'' 1' -6'' 20 Cft

1 x 1 1' -8'' 1' -0'' 1' -6'' 3 Cft


PB(9x12)
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Line Bet: c&d ,3-6 1 x 1 10' -4'' 0' -9'' 1' -0'' 8 Cft

1 x 1 3' -8'' 0' -9'' 1' -0'' 3 Cft

1 x 1 4' -8'' 0' -9'' 1' -0'' 4 Cft

1 x 1 7' -8'' 0' -9'' 1' -0'' 6 Cft

1 x 1 4' -8'' 0' -9'' 1' -0'' 4 Cft


Line Bet: 4-5,5-6,c-d 2 x 1 15' -6'' 0' -9'' 1' -0'' 23 Cft
799 Cft

11 18" thk Brick Retaining Wall with


(1:4) cement motor

2 x 1 75' -6'' 2' -0'' 0' -6'' 151 Cft

5 x 1 31' -0'' 2' -0'' 0' -6'' 155 Cft

1 1 19' -6'' 2' -0'' 0' -6'' 20 Cft

2 x 1 75' -6'' 1' -9'' 0' -6'' 132 Cft

5 x 1 31' -0'' 1' -9'' 0' -6'' 136 Cft

1 1 19' -6'' 1' -9'' 0' -6'' 17 Cft

5 1 31' -0'' 1' -6'' 4' -0'' 930 Cft

2 x 1 75' -6'' 1' -6'' 2' -10'' 642 Cft

1 1 19' -6'' 1' -6'' 2' -10'' 83 Cft


2265 Cft
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Line No Between E& F


20mmØ,SB2,Top Bar 1 x 2 23' -3'' 47

Bottom Bar 1 x 2 22' -0'' 44

Lapping 1 x 1 2' -7'' 3

10mmØ Stirrups,SB2 1 x 53 2' -8'' 141.33

Line A & G,FB4


20mmØ,Top Bar 2 x 2 115' -0'' 460

Extra Bar 2 x 2 10' -0'' 40

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 14' -0'' 56

2 x 2 14' -0'' 56

2 x 2 10' -0'' 40

Bottom Bar 2 x 4 113' -6'' 908

Lapping 2 x 12 2' -7'' 62

10mmØ Stirrups,FB4 2 x 270 5' -1'' ###

Line B & E,FB3


20mmØ,Top Bar 2 x 2 115' -0'' 460

Extra Bar 2 x 5 10' -0'' 100

2 x 5 18' -0'' 180

2 x 5 18' -0'' 180

2 x 5 18' -0'' 180

2 x 5 14' -0'' 140

2 x 5 14' -0'' 140

2 x 5 10' -0'' 100

Bottom Bar 2 x 4 113' -6'' 908

Extra Bar 2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 10' -0'' 40

Lapping 2 x 12 2' -7'' 62

Spacer Bar 2 x 45 0' -9'' 68

10mmØ Stirrups,FB3 2 x 264 5' -5'' ###

Line F FB3,FB5
20mmØ,Top Bar 1 x 2 115' -0'' 230

Extra Bar 1 x 6 10' -0'' 60

1 x 5 10' -0'' 50

1 x 5 14' -0'' 70

1 x 5 18' -0'' 90

1 x 5 18' -0'' 90

1 x 5 14' -0'' 70

1 x 5 14' -0'' 70

1 x 5 10' -0'' 50

1 x 1 8' -0'' 8

Bottom Bar 1 x 4 101' -0'' 404

1 x 4 15' -0'' 60

Extra Bar 1 x 2 12' -0'' 24

1 x 2 8' -0'' 16

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 10' -0'' 20

Lapping 1 x 12 2' -7'' 31

Spacer Bar 1 x 47 0' -9'' 35

10mmØ Stirrups,FB3 1 x 242 5' -5'' ###

FB5 1 x 40 5' -5'' 216.67

Line D
FB1,FB3,FB6
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

20mmØ,Top Bar 1 x 2 204' -0'' 408

Extra Bar 1 x 10 10' -0'' 100

1 x 10 18' -0'' 180

1 x 5 18' -0'' 90

1 x 5 18' -0'' 90

1 x 5 14' -0'' 70

1 x 4 10' -0'' 40

1 x 4 10' -0'' 40

25mmØ,FB2,Extra Bar 1 x 4 6' -6'' 26.00


1 x 3 8' -0'' 24

Bottom Bar 1 x 4 85' -0'' 340

1 x 4 14' -0'' 56

1 x 4 20' -0'' 80

1 x 4 95' -6'' 382

Extra Bar 1 x 12 18' -0'' 216

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 10' -0'' 20

25mmØ,FB2,Extra Bar 1 x 4 7' -0'' 28.00


Lapping 1 x 10 2' -7'' 26

Spacer Bar 1 x 54 0' -9'' 41

10mmØ Stirrups,FB3 1 x 284 5' -5'' ###

FB1 1 x 50 5' -10'' 291.67

FB6 1 x 68 5' -10'' 396.67

Line C
FB1,FB6
20mmØ,Top Bar,FB1 1 x 2 50' -6'' 101

Extra Bar,FB1 1 x 8 8' -0'' 64

1 x 4 10' -0'' 40
20mmØ,Extra Bar 1 x 4 10' -0'' 40

1 x 4 8' -0'' 32
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Bottom Bar 1 x 4 14' -0'' 56

1 x 2 20' -0'' 40

Extra Bar,FB1 1 x 2 10' -0'' 20

20mmØ,Extra Bar 1 x 4 8' -0'' 32

Spacer Bar 1 x 45 0' -9'' 34

10mmØ Stirrups,FB1,FB 1 x 68 5' -10'' 396.67

SB2
Bottom Bar 4 x 2 23' -0'' 184

10mmØ Stirrups,SB2 4 x 54 2' -8'' 576.00

54 9324 10473.17

16mmØ 10mmØ
Rebar Work For Stair
2nd Floor to 3rd Floor St 4 x 16 7' -0'' 448.00 Rft

2 x 16 13' -0'' 416.00 Rft

3rd Floor Stair Dowel 2 x 16 13' -0'' 416.00 Rft

2 x 16 12' -0'' 384.00 Rft

Distribution Bar 2 x 14 6' -0'' 168 Rft

2 x 20 12' -6'' 500 Rft

1664.00 668 Rft

Rebar Work For Slab 10mmØ

S3,12-14 Bottom,Main Bar 1 x 25 9' -6'' 238 Rft

Distribution Bar 1 x 11 21' -6'' 237 Rft

Top Bar 1 x 50 11' -0'' 550 Rft

1 x 11 23' -0'' 253 Rft

S2,8-12,Main Bar 1 x 84 9' -6'' 798 Rft

Distribution Bar 1 x 11 72' -6'' 798 Rft

Lapping 1 x 11 1' -4'' 15 Rft

Top Bar 1 x 84 11' -6'' 966 Rft

1 x 10 74' -6'' 745 Rft

Lapping 1 x 10 1' -4'' 13 Rft


Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

OT;S1,Line 12-14
Bottom Bar 1 x 25 13' -6'' 338 Rft

1 x 15 21' -6'' 323 Rft

Top Bar 1 x 50 15' -6'' 775 Rft

1 x 15 23' -69'' 431 Rft

Between Line B &D


S2, Bottom,Main 1 x 9 31' -6'' 284 Rft

Dis; 1 x 25 8' -6'' 213 Rft

S2,Top,Main 1 x 9 33' -6'' 302 Rft

Dis; 1 x 25 10' -6'' 263 Rft

S2, Bottom,Main 1 x 16 21' -6'' 344 Rft

Dis; 1 x 25 14' -0'' 350 Rft

Top Bar 1 x 16 23' -6'' 376 Rft

1 x 25 16' -0'' 400 Rft

S1,S2 Bottom,Main 1 x 30 72' -6'' 2175 Rft

Dis; 1 x 84 26' -0'' 2184 Rft

Top Bar 1 x 30 74' -6'' 2235 Rft

1 x 84 28' -0'' 2352 Rft

S1 Top Bar 1 x 21 53' -6'' 1124 Rft

1 x 60 21' -0'' 1260 Rft

Lapping 1 x 81 1' -6'' 122 Rft

S2 Bottom Bar 1 x 13 92' -6'' 1203 Rft

1 x 108 11' -6'' 1242 Rft

Top Bar 1 x 13 94' -6'' 1229 Rft

1 x 108 13' -6'' 1458 Rft

Lapping 13 x 6 1' -6'' 117 Rft

Line E-F
S3 Bottom Bar 1 x 30 11' -6'' 345 Rft

1 x 10 26' -0'' 260 Rft

Top Bar 1 x 60 13' -6'' 810 Rft

1 x 10 28' -0'' 280 Rft

S3 Bottom Bar 1 x 30 9' -6'' 285 Rft


Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

1 x 8 26' -0'' 208 Rft

Top Bar 1 x 60 11' -6'' 690 Rft

1 x 8 28' -0'' 224 Rft

S2 Bottom Bar 1 x 30 51' -6'' 1545 Rft

1 x 60 26' -0'' 1560 Rft

Top Bar 1 x 30 53' -6'' 1605 Rft

1 x 60 28' -0'' 1680 Rft

Lapping 30 x 2 1' -6'' 90 Rft

S2 Bottom Bar 1 x 30 11' -6'' 345 Rft

1 x 12 26' -0'' 312 Rft

Top Bar 1 x 30 13' -6'' 405 Rft

1 x 12 28' -0'' 336 Rft

Line F & G
S2 Bottom Bar 1 x 10 91' -6'' 915 Rft

1 x 109 9' -6'' 1036 Rft

Top Bar 1 x 10 92' -6'' 925 Rft

1 x 109 11' -6'' 1254 Rft

Lapping 10 x 3 1' -6'' 45 Rft

S3,1-3, Bottom,Main Bar 1 x 25 9' -6'' 238 Rft

Distribution Bar 1 x 11 21' -6'' 237 Rft

Top Bar 1 x 50 11' -0'' 550 Rft

1 x 11 23' -0'' 253 Rft

S2,3-8,Bottom,Main Bar 1 x 111 9' -6'' 1055 Rft

Distribution Bar 1 x 12 91' -6'' 1098 Rft

Lapping 2 x 12 1' -4'' 32 Rft

Top Bar 1 x 88 11' -0'' 968 Rft

1 x 12 93' -0'' 1116 Rft

Lapping 2 x 12 1' -4'' 32 Rft

Line 1-3,S3
Bottom,Main Bar 1 x 26 8' -0'' 208 Rft

Distribution Bar 1 x 10 21' -6'' 215 Rft

Top,Main Bar 1 x 42 9' -6'' 399 Rft


Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Distribution Bar 1 x 17 23' -0'' 391 Rft

S1,Bottom,Main Bar 1 x 25 16' -0'' 400 Rft

Distribution Bar 1 x 20 21' -6'' 430 Rft

Top,Main Bar 1 x 44 17' -6'' 770 Rft

Distribution Bar 1 x 30 23' -0'' 690 Rft

Line 3-5,S3
Bottom,Main Bar 2 x 50 26' -0'' 2600 Rft

Distribution Bar 2 x 30 41' -6'' 2490 Rft

Top,Main Bar 2 x 83 27' -6'' 4565 Rft

Distribution Bar 2 x 60 43' -0'' 5160 Rft

Lapping 2 x 90 1' -4'' 240 Rft

Line 5-6,S2
Bottom,Main Bar 1 x 25 8' -6'' 213 Rft

Distribution Bar 1 x 10 21' -6'' 215 Rft

Top,Main Bar 1 x 21 10' -0'' 210 Rft

Distribution Bar 1 x 8 23' -0'' 184 Rft

Line 5-6,C-D,S1
Bottom,Main Bar 1 x 25 19' -0'' 475 Rft

Distribution Bar 1 x 21 21' -6'' 452 Rft

Top,Main Bar 1 x 45 20' -6'' 923 Rft

Distribution Bar 1 x 35 23' -0'' 805 Rft

Line 6-7,B-C,S2
Bottom,Main Bar 1 x 15 11' -6'' 173 Rft

Distribution Bar 1 x 12 13' -6'' 162 Rft

Top,Main Bar 1 x 13 13' -0'' 169 Rft

Distribution Bar 1 x 11 14' -0'' 154 Rft

Line C-D
Bottom,Main Bar 1 x 15 13' -0'' 195 Rft

Distribution Bar 1 x 14 14' -0'' 196 Rft

Top,Main Bar 1 x 13 14' -6'' 189 Rft

Distribution Bar 1 x 12 15' -6'' 186 Rft

Line D-E,1-3 & 7-8,S3


Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Bottom,Main Bar 2 x 25 11' -6'' 575 Rft

Distribution Bar 2 x 12 21' -6'' 516 Rft

Top,Main Bar 2 x 41 13' -0'' 1066 Rft

Distribution Bar 2 x 21 23' -0'' 966 Rft

Line 3-7,D-E,S2
Bottom,Main Bar 1 x 85 11' -6'' 978 Rft

Distribution Bar 1 x 12 71' -6'' 858 Rft

Top,Main Bar 1 x 73 13' -0'' 949 Rft

Distribution Bar 1 x 11 73' -0'' 803 Rft

Lapping 1 x 23 1' -4'' 31 Rft

Line 2-3,E-F,S2
Bottom,Main Bar 1 x 30 9' -6'' 285 Rft

Distribution Bar 1 x 10 26' -0'' 260 Rft

Top,Main Bar 1 x 50 11' -0'' 550 Rft

Distribution Bar 1 x 17 27' -6'' 468 Rft

Line 5-6,E-F,S2
Bottom,Main Bar 1 x 30 21' -6'' 645 Rft

Distribution Bar 1 x 25 26' -0'' 650 Rft

Top,Main Bar 1 x 50 23' -0'' 1150 Rft

Distribution Bar 1 x 12 27' -6'' 330 Rft

Line 6-8,E-F,S3
Bottom,Main Bar 1 x 37 26' -0'' 962 Rft

Distribution Bar 1 x 30 31' -6'' 945 Rft

Top,Main Bar 1 x 62 27' -6'' 1705 Rft

Distribution Bar 1 x 51 33' -0'' 1683 Rft

Line 1-8,F-G,S2
Bottom,Main Bar 1 x 133 9' -6'' 1264 Rft

Distribution Bar 1 x 10 111' -6'' 1115 Rft

Top,Main Bar 1 x 113 11' -0'' 1243 Rft

Distribution Bar 1 x 9 113' -0'' 1017 Rft

Lapping 2 x 19 1' -4'' 51 Rft

Chair 2 x 320 2' -6'' 1600 Rft


Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

92558 Rft

10mmØ - 131801.11 Rft x0.415 Lb 54697.46 488 Cwt

16mmØ - 1664Rft x1.062 Lb 1767.16 16 Cwt

20mmØ - 32402 Rft x1.66 Lb 53787 480 Cwt

25mmØ - 467.83 Rft x 2.587 Lb 1210.27 11 Cwt

995 Cwt

3 G-30 Ready Mixed Concreting Work


for 3rd Floor Beam & Slab
Line 1
FB1 1 x 1 22' -8'' 1' -0'' 2' -0'' 45 Cft

FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21 Cft

FB2a 1 x 1 8' -2'' 1' -0'' 1' -8'' 14 Cft

FB5 1 x 1 22' -8'' 1' -2'' 2' -0'' 53 Cft

Line 2,3,4,5,6,7
FB1 9 x 1 22' -8'' 1' -0'' 2' -0'' 408 Cft

FB1 1 x 1 10' -2'' 1' -0'' 2' -0'' 20 Cft

FB5 1 x 1 22' -8'' 1' -2'' 2' -0'' 53 Cft

FB6 2 x 1 9' -6'' 1' -0'' 2' -0'' 38 Cft

FB2 11 x 1 6' -4'' 1' -0'' 1' -8'' 116 Cft

FB2a 5 x 1 8' -3'' 1' -0'' 1' -8'' 69 Cft

SB2 3 x 1 70' -0'' 0' -9'' 1' -6'' 236 Cft

SB2 1 x 1 31' -6'' 0' -9'' 1' -6'' 35 Cft

SB1 2 x 1 7' -0'' 0' -9'' 1' -6'' 16 Cft

Line A & G FB4 2 x 1 101' -0'' 1' -0'' 1' -8'' 337 Cft

FB3 1 x 1 99' -0'' 1' -0'' 1' -10'' 182 Cft

1 x 1 97' -3'' 1' -0'' 1' -10'' 178 Cft


Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Line D FB1 1 x 1 10' -8'' 1' -0'' 2' -0'' 21 Cft

FB3 1 x 1 72' -8'' 1' -0'' 1' -10'' 133 Cft

FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28 Cft

Line F
FB3 1 x 1 87' -0'' 1' -0'' 1' -10'' 160 Cft

FB5 1 x 1 10' -3'' 1' -2'' 2' -0'' 24 Cft

Line C
FB1 1 x 1 9' -2'' 1' -0'' 2' -0'' 18 Cft

FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28 Cft

Line Between 1 & 3


SB2 2 x 1 19' -0'' 0' -9'' 1' -6'' 43 Cft

1 x 1 18' -3'' 0' -9'' 1' -6'' 21 Cft

C1,C2 24 x 1 1' -4'' 1' -6'' 2' -0'' 96 Cft

C3,C4 51 x 1 1' -4'' 1' -10'' 2' -0'' 249 Cft

C5 6 x 1 1' -0'' 3' -0'' 2' -0'' 36 Cft

Slab S3 2 x 1 19' -0'' 7' -0'' 0' -5'' 111 Cft

Slab S3 1 x 1 19' -0'' 5' -6'' 0' -5'' 44 Cft

Slab S3 4 x 1 23' -6'' 9' -2'' 0' -5'' 359 Cft

Slab S3 2 x 1 19' -0'' 9' -0'' 0' -5'' 143 Cft

Slab S3 1 x 1 23' -6'' 7' -0'' 0' -5'' 69 Cft

Slab S3 6 x 1 23' -6'' 9' -2'' 0' -5'' 539 Cft

Slab S3 1 x 1 23' -6'' 9' -0'' 0' -5'' 88 Cft

Slab S2 14 x 1 9' -3'' 7' -0'' 0' -5'' 378 Cft

Slab S2 2 x 1 9' -0'' 7' -0'' 0' -5'' 53 Cft

Slab S2 1 x 1 9' -0'' 11' -0'' 0' -5'' 41 Cft

Slab S2 1 x 1 11' -0'' 11' -6'' 0' -5'' 53 Cft

Slab S2 6 x 1 9' -2'' 9' -0'' 0' -5'' 206 Cft

Slab S2 1 x 1 9' -0'' 9' -0'' 0' -5'' 34 Cft

Slab S2 1 x 1 7' -0'' 7' -0'' 0' -5'' 20 Cft

Slab S2 1 x 1 11' -0'' 7' -0'' 0' -5'' 32 Cft

Slab S2 4 x 1 10' -4'' 9' -2'' 0' -5'' 158 Cft

Slab S2 2 x 1 3' -9'' 7' -0'' 0' -5'' 22 Cft


Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Slab S2 2 x 1 5' -3'' 7' -0'' 0' -5'' 31 Cft

Slab S1 1 x 1 15' -0'' 19' -0'' 0' -5'' 119 Cft

Slab S1 2 x 1 9' -3'' 15' -9'' 0' -5'' 121 Cft

Stair Step 12 × 1 5' -3'' 0' -6'' 0' -6'' 16 Cft

Flight 1 × 2 13' -6'' 5' -3'' 0' -9'' 106 Cft

Landing Floor 1 × 1 11' -0'' 6' -2'' 0' -9'' 51 Cft

1 × 1 11' -0'' 2' -2'' 0' -9'' 18 Cft

FB1 1 x 1 22' -8'' 1' -0'' 2' -0'' 45 Cft

FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21 Cft

FB2a 1 x 1 8' -2'' 1' -0'' 1' -8'' 14 Cft

FB6 1 x 1 9' -6'' 1' -0'' 2' -0'' 19 Cft

FB1 1 x 1 10' -2'' 1' -0'' 2' -0'' 20 Cft


Line - 14 FB5 1 × 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
Line - 13, 14 FB1 2 × 1 22' -8'' 1' -0'' 2' -0'' 91 Cft
FB2 3 × 1 6' -4'' 1' -0'' 1' -8'' 32 Cft
FB2a 1 × 1 8' -2'' 1' -0'' 1' -8'' 14 Cft
SB2 1 × 1 22' -8'' 1' -0'' 1' -8'' 38 Cft
Line 9.10.11.12FB1 7 × 1 22' -8'' 1' -0'' 2' -0'' 317 Cft
FB5 1 × 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
Between 9.10.11.12 SB2 3 × 1 73' -6'' 0' -9'' 1' -6'' 248 Cft
Line-13 SB2 1 × 1 17' -3'' 0' -9'' 1' -6'' 19 Cft
SB1 1 × 1 7' -0'' 0' -9'' 1' -6'' 8 Cft
Line 9.10.11.12 FB2 8 × 1 6' -4'' 1' -0'' 1' -8'' 84 Cft
FB 2a 4 × 1 8' -2'' 1' -0'' 1' -8'' 54 Cft
A&G FB4 2 × 1 84' -3'' 1' -0'' 1' -8'' 281 Cft
Line F,FB3 1 × 1 72' -3'' 1' -0'' 1' ### 132 Cft
LineB,D, E,FB3 3 × 1 84' -3'' 1' -0'' 1' ### 463 Cft
FB5 1 × 1 9' -2'' 1' -2'' 2' -0'' 21 Cft
SB2 1 × 1 84' -6'' 0' -9'' 1' -6'' 95 Cft
SB2 1 × 1 44' -6'' 0' -9'' 1' -6'' 50 Cft

2 × 1 74' -0'' 0' -9'' 1' -6'' 167 Cft


SB2 1 × 1 23' -0'' 0' -9'' 1' -6'' 26 Cft
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
SB1 3 × 1 9' -1'' 0' -9'' 1' -6'' 31 Cft
Slab S2 2 × 1 9' -0'' 7' -0'' 0' -5'' 53 Cft
Slab S2 12 × 1 9' -1'' 7' -0'' 0' -5'' 318 Cft
Slab S2 1 × 1 9' -0'' 7' -0'' 0' -5'' 26 Cft
Slab S2 3 × 1 9' -1'' 7' -0'' 0' -5'' 79 Cft
Slab S2` 1 × 1 15' -9'' 9' -0'' 0' -5'' 59 Cft
Slab S2 2 × 1 7' -6'' 9' -1'' 0' -5'' 57 Cft
Slab S2 1 × 1 9' -0'' 9' -0'' 0' -5'' 34 Cft
Slab S2 6 × 1 9' -1'' 9' -0'' 0' -5'' 204 Cft
Slab S2 2 × 1 11' -4'' 9' -0'' 0' -5'' 85 Cft
Slab S2 8 × 1 11' -4'' 9' -1'' 0' -5'' 343 Cft
Slab S2 3 × 1 7' -4'' 9' -1'' 0' -5'' 83 Cft
Slab OT 1 × 1 23' -6'' 7' -0'' 0' -5'' 69 Cft
Slab S1 5 × 1 16' -6'' 9' -2'' 0' -5'' 315 Cft
Slab S3 1 × 1 19' -0'' 7' -0'' 0' -5'' 55 Cft
Slab S1 1 × 1 19' -0'' 11' -1'' 0' -5'' 88 Cft
Slab S2 1 × 1 7' -1'' 11' -1'' 0' -5'' 33 Cft
Slab S2 1 × 1 11' -1'' 11' -1'' 0' -5'' 51 Cft
Slab S2 1 × 1 7' -1'' 9' -0'' 0' -5'' 27 Cft
Slab S2 1 × 1 11' -1'' 9' -0'' 0' -5'' 42 Cft
Slab S2 1 × 1 7' -0'' 7' -0'' 0' -5'' 20 Cft
Slab S2 1 × 1 11' -0'' 7' -0'' 0' -5'' 32 Cft
Stair Step 7 × 1 5' -3'' 0' -6'' 0' -6'' 9 Cft
Flight 1 × 1 8' -0'' 5' -3'' 0' -9'' 32 Cft
Landing Floor 1 × 1 11' -0'' 6' -2'' 0' -9'' 51 Cft

10048 Cft
Location Head -

Name Of Work - Up to Plinth


DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Hire Charges For Concreting Work


4 10089 Cft
Vibrator
25 Day

Curing Work For Concreting


5 For14 Day
For 2nd Floor
1 × 1 204' -0'' 80' -0'' 16320 Sft
Total of ***********
* ***********************************************
**8888888888*888888888888888888888888888888888888888888888888888888888888888888

#REF!

699

658
Total of ***********
* ***********************************************

349

439

15
244
Total of ***********
* ***********************************************

20

17

83
88888888888888888888888888685888888888858585858585858585858585858558855858855858988888
55858855858988888888889898989899889999999999989999999999999999999999888888888888888888
888888888888888888888888888888888888888888
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

1 Shera Board Partition work with


4" x2" hollow Pipe 1372 Sft
(a) Shera Board 8'x4' (8mm thk) 47 Sht 16000 Sht 752000
Shera Screw 1" 40 Doz 252 Doz 10080
Labour Charges 1372 Sft 213.8 Sft 293334
1055414
(b) WI Work with MS Hollow Pipe 1372 sft
MS Hollow 2.96 Ton 780000 Ton 2308800
3/4"Bolts & Nuts 73 No 2500 No 182500
Labour Charges for WI work 1372 Sft 1350 Sft 1852200
4343500
2 Dismentling Work of Existing Door 743 Sft
Labour Charges 743 Sft 457.5 Sft 339923

3 Making and Fixing of Door Work


with 5Ply Wood 322 Sft
(8' x 4 ) 5Ply Wood 12 Sht 17600 Sht 211200
Styles & Rails (25%) 0.18 Ton 750000 Ton 135000
Wire Nails 7 Lb 650 Lb 4550
Butt Hinges 60 Nos 1200 Nos 72000
Trower Bolt 6" 20 Nos 800 Nos 16000
Sliding Bolt 20 Nos 3000 Nos 60000
Door Handle 40 Nos 1200 Nos 48000
Labour Charges 322 Sft 1525 Sft 491050
1037800

4 Dismentaling work for 4" x ½" T & G Work


Labour Charges 734 Sft 152.49 111928
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

5 Making and Fixing work for


1" thk T & G Work 734 Sft
4" x 1" T& G Planks 2880.0 Rft 1800 Rft 5184000
Wire Nail 15 Lb 650 lb 9750
Labour Charges 734 Sft 508.3 Sft 373092
5566842

6 Dismentalling work for


Glass Venetianed Window Work

Labour Charges 655 Sft 900 Sft 589500

7 Making And Fixing of


Glass Venetianed Window Work

M+L 655 Sft 3000 Sft 1965000

8 Dismentaling work of
4" x 2" Wood Braces Work 0.58 Ton 28800 Ton 16704

9 J/Wood Work Wrought & Fixed For


4" x 2" Wood Braces 40 Rft
J/Wood 0.58 Ton 750000 Ton 435000
Wire Nails 7 Lb 650 Lb 4550
Labour Charges 0.58 Ton 96000 Ton 55680
495230

10 Oil Painting Work


(2 Coat) 4155 Sft
Putty 31 Gal 6000 Gal 186000
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Sand paper 21 Doz 500 Doz 10500


Putty Trowels 10 Nos 500 Nos 5000
4" Plastic Brush 20 Nos 700 Nos 14000
Oil Paint 28 Gal 17200 Gal 481600
Labour Charges (Paint) 4155 Sft 6660 Sft 276723
Labour Charges (putty) 4155 Sft 15000 Sft 623250
1597073

Total 17118913
Say 17118000/-
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

(a) Shera Board 8'x4' (8mm thk) 47 Sht 16000 Sht 752000
Shera Screw 1" 40 Doz 252 Doz 10080
MS Hollow 2.96 Ton 780000 Ton 2308800
3/4"Bolts & Nuts 73 No 2500 No 182500
(8' x 4 ) 5Ply Wood 12 Sht 17600 Sht 211200
Styles & Rails (25%) 0.18 Ton 750000 Ton 135000
Wire Nails 7 Lb 650 Lb 4550
Butt Hinges 60 Nos 1200 Nos 72000
Trower Bolt 6" 20 Nos 800 Nos 16000
Sliding Bolt 20 Nos 3000 Nos 60000
Door Handle 40 Nos 1200 Nos 48000
4" x 1" T& G Planks 2880.0 Rft 1800 Rft 5184000
Wire Nail 29 Lb 650 lb 18850
J/Wood 0.58 Ton 750000 Ton 435000
Putty 31 Gal 6000 Gal 186000
Sand paper 21 Doz 500 Doz 10500
Putty Trowels 10 Nos 500 Nos 5000
4" Plastic Brush 20 Nos 700 Nos 14000
Oil Paint 28 Gal 17200 Gal 481600
10135080

Labour Charges
Labour Charges 1372 Sft 213.8 Sft 293334
Labour Charges for WI work 1372 Sft 1350 Sft 1852200
Labour Charges 743 Sft 457.5 Sft 339923
Labour Charges 322 Sft 1525 Sft 491050
Labour Charges 734 Sft 152.49 111928
Labour Charges (Dismentling of Glass 734 Sft 508.3 Sft 373092
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Labour Charges (Dismentling of Glass Venetianed Work) 589500


Labour Charges (Dismentaling work of 4" x 2" Wood Braces Work ) 16704
Labour Charges 0.58 Ton 96000 Ton 55680
Labour Charges (Paint) 4155 Sft 6660 Sft 276723
Labour Charges (putty) 4155 Sft 15000 Sft 623250
5023383

M+L 1965000

Total 17123463
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
#REF!
Location Head - လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

1 Roofing Work 2030 Sft


4 Angle Roofing Sheets (7') 994 Rft 1300 Rft 1292200
Roofing Screw 2" 1064 Nos 40 Nos 42560
Ridging 2' 70 Rf 1300 Rf 91000
Gutter 197 Rft 1500 Rft 295500
Labour Charges for 4Angle 2030 Sft 201.4 Sft 408842
Labour Charges for Ridging & Valley 70 Rft 290 Rft 20300
2150402

2 6"x1" Eave Board Work 197 Rf


1" Plank (J/Wood) 0.20 Ton 750000 150000
Nails 4 Lb 650 2600
labour Charges 197 Rf 170 33490
186090

3 Plywood Ceiling Work with C Channel


Ceiling Joists 655 Sf
Labour Charges (M +L) 655 Sf 2805 Sf 1837275

Total 4173767
Say 4173000/-
Location Head - လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

1 Material Cost
4 Angle Roofing Sheets (7') 994 Rft 1300 Rft 1292200
Roofing Screw 2" 1064 Nos 40 Nos 42560
Ridging 2' 70 Rft 1300 Rft 91000
Gutter 197 Rft 1500 Rft 295500
1" Plank 0.20 Ton 750000 Ton 150000
Nails 4 Lb 650 Lb 2600
1873860

2 Labour Charges
Labour Charges for 4Angle 2030 Sft 201.4 Sft 408842
Labour Charges for Ridging & Valley 70 Rft 290 Rft 20300
labour Charges 197 Rft 170 Rft 33490
462632

3 Material +Labour 1837275

Total 4173767
Say 4173000/-
Location Head - လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - သ

ဆန န ေ ေ င အခ ဖ ဖ ႕စညခင၊ပကေနသ တခပတင၊ ေ ကမ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

1 Material Cost
Cement 44.35 Ton 126000 Ton 5588100
R/Sand 65.9 Suds 18500 Suds 1219150
R/Shingle 52.92 Suds 95000 Suds 5027400
(8' x 4 ) 5Ply Wood 59 Sht 17600 Sht 1038400
Brick 4171 Nos 115 Nos 479665
Shera Board 8'x4' (8mm thk) 47 Sht 16000 Sht 752000
Shera Screw 1" 40 Doz 252 Doz 10080
MS Hollow 2.96 Ton 780000 Ton 2308800
3/4"Bolts & Nuts 73 No 2500 No 182500
J/Wood 1.56 Ton 750000 Ton 1170000
4" x 1" T& G Planks 2880.0 Rft 1800 Rft 5184000
Wire Nail 60 Lb 650 lb 39000
HSD 45 Gal 3000 Gal 135000
4 Angle Roofing Sheets (7') 994 Rft 1300 Rft 1292200
Roofing Screw 2" 1064 Nos 40 Nos 42560
Ridging 2' 70 Rft 1300 Rft 91000
Gutter 197 Rft 1500 Rft 295500
Butt hinges 192 Nos 1200 Nos 230400
Trower Bolt 6" 64 Nos 800 Nos 51200
Sliding Bolt 42 Nos 3000 Nos 126000
Door Handle 84 Nos 1200 Nos 100800
Putty 41 Gal 6000 Gal 246000
Sand paper 28 Doz 500 Doz 14000
Putty Trowels 13 Nos 500 Nos 6500
4" Plastic Brush 27 Nos 700 Nos 18900
Oil Paint 37 Gal 17200 Gal 636400
26285555
Location Head - သ

ဆန န ေ ေ င အခ ဖ ဖ ႕စညခင၊ပကေနသ တခပတင၊ ေ ကမ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

2 Labour Charges
Labour Charges (ရ$ န င အ
& စညေအ၀ခနေမဆင
) 7166518
Labour Charges (သ နပေေဆင
) 5023383
Labour Charges (သ နပေေဆင
Apron & Drain) 1978103
Labour Charges (နေနဆင) 462632
14630636

3 Material +Labour 3802275

4 Hire Charges
Vibrator 20 Days 15000 Days 300000
Concrete Mixer 20 Days 15000 Days 300000
600000

Total 45318466
Say 45310000/-

1 Material Cost
Cement 10.2 Ton 126000 Ton 1285200
R/Sand 7.24 Suds 18500 Suds 133940
R/Shingle 8.3 Suds 95000 Suds 788500
HSD 23 Gal 3000 Gal 69000
Location Head - သ

ဆန န ေ ေ င အခ ဖ ဖ ႕စညခင၊ပကေနသ တခပတင၊ ေ ကမ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Brick 4171 Nos 115 Nos 479665


2756305

2 Labour Charges (Apron & drain) 2265578

3 Hire Charges
Vibrator 9 Days 15000 Days 135000
Concrete Mixer 9 Days 15001 Days 135009
270009

Total 5291892

1 Material Cost

R/Sand 57.28 Sud 18500 Suds 1059680


Cement 31.40 Ton 126000 Ton 3956400
R/Shingle 41.86 Sud 95000 Sud 3976700
HSD 22 Gal 3000 Gal 66000
(8' x 4 ) 5Ply Wood 47 Sht 17600 Sht 827200
Styles & Rails (25%) 0.6 Ton 750000 Ton 450000
Wire Nails 27 Lb 650 Lb 17550
Butt Hinges 132 Nos 1200 Nos 158400
Trower Bolt 6" 44 Nos 800 Nos 35200
Sliding Bolt 22 Nos 3000 Nos 66000
Door Handle 44 Nos 1200 Nos 52800
Putty 0 Gal 6000 Gal 0
Sand paper 0 Doz 500 Doz 0
Putty Trowels 0 Nos 500 Nos 0
4" Plastic Brush 7 Nos 700 Nos 4900
Oil Paint 0 Gal 17200 Gal 0
Location Head - သ

ဆန န ေ ေ င အခ ဖ ဖ ႕စညခင၊ပကေနသ တခပတင၊ ေ ကမ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

10670830

2 Labour Charges 7166518

3 Hire Charges
Vibrator 11 Days 15000 Days 165000
Mixer 11 Days 15000 Days 165000
330000

Total 18167348

1 Material Cost
4 Angle Roofing Sheets (7') 994 Rft 1300 Rft 1292200
Roofing Screw 2" 994 Nos 40 Nos 39760
Ridging 2' 42 Rf 1300 Rf 54418
Roofing Screw 2" 70 Nos 40 Nos 2800
Gutter 47 Rft 1500 Rft 70500
Teak 1" Plank 0.20 Ton 750000 Ton 150000
Nails 0 Lb 650 Lb 0
1609678

2 Labour Charges
Labour Charges for 4Angle 1 Sft 201.4 Sft 121
Labour Charges for Ridging & Valley 42 Rft 290 Rft 12139
labour Charges 0 Rf 170 0
12260
Location Head - သ

ဆန န ေ ေ င အခ ဖ ဖ ႕စညခင၊ပကေနသ တခပတင၊ ေ ကမ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
3 Material +Labour 655 Sf 2805 Sf 1837275

Total 3459213

(a) Shera Board 8'x4' (8mm thk) 47 Sht 16000 Sht 752000
Shera Screw 1" 40 Doz 252 Doz 10080
MS Hollow 2.96 Ton 780000 Ton 2308800
3/4"Bolts & Nuts 73 No 2500 No 182500
(8' x 4 ) 5Ply Wood 12 Sht 17600 Sht 211200
Styles & Rails (25%) 0.18 Ton 750000 Ton 135000
Wire Nails 7 Lb 650 Lb 4550
Butt Hinges 60 Nos 1200 Nos 72000
Trower Bolt 6" 20 Nos 800 Nos 16000
Sliding Bolt 20 Nos 3000 Nos 60000
Door Handle 40 Nos 1200 Nos 48000
4" x 1" T& G Planks 2880.0 Rft 1800 Rft 5184000
Wire Nail 29 Lb 650 lb 18850
J/Wood 0.58 Ton 750000 Ton 435000
Putty #REF! Gal 6000 Gal #REF!
Sand paper #REF! Doz 500 Doz #REF!
Putty Trowels #REF! Nos 500 Nos #REF!
4" Plastic Brush 20 Nos 700 Nos 14000
Oil Paint #REF! Gal 17200 Gal #REF!
Location Head - သ

ဆန န ေ ေ င အခ ဖ ဖ ႕စညခင၊ပကေနသ တခပတင၊ ေ ကမ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

#REF!

Labour Charges
Labour Charges 1372 Sft 213.8 Sft 293334
Labour Charges for WI work 1372 Sft 1350 Sft 1852200
Labour Charges 743 Sft 457.5 Sft 339923
Labour Charges 322 Sft 1525 Sft 491050
Labour Charges 734 Sft 152.49 111928
Labour Charges (Dismentling of Glass #REF! Sft 508.3 Sft #REF!
Labour Charges (Dismentling of Glass Venetianed Work) 589500
Labour Charges (Dismentaling work of 4" x 2" Wood Braces Work ) 16704
Labour Charges 0.58 Ton 96000 Ton 55680
Labour Charges (Paint) 4155 Sft 6660 Sft 276723
Labour Charges (putty) 4155 Sft 15000 Sft 623250
#REF!

M+L 45318466

Total #REF!
Location Head - သ

ဆန န ေ ေ င အခ ဖ ဖ ႕စညခင၊ပကေနသ တခပတင၊ ေ ကမ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - သ

ဆန န ေ ေ င အခ ဖ ဖ ႕စညခင၊ပကေနသ တခပတင၊ ေ ကမ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - သ

ဆန န ေ ေ င အခ ဖ ဖ ႕စညခင၊ပကေနသ တခပတင၊ ေ ကမ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - သ

ဆန န ေ ေ င အခ ဖ ဖ ႕စညခင၊ပကေနသ တခပတင၊ ေ ကမ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - သ

ဆန န ေ ေ င အခ ဖ ဖ ႕စညခင၊ပကေနသ တခပတင၊ ေ ကမ

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
***

8**8***888888888888888*** #REF!

508400

921800
19032911'

1837275

****

***

*
8**8***888888888888888*** #REF!
#REF!
#REF!
7933100
#REF!

1607150

4900
#REF!
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

1 Material Cost

R/Sand 57.28 Sud 18500 Suds 1059680


Cement 31.40 Ton 126000 Ton 3956400
R/Shingle 41.86 Sud 95000 Sud 3976700
HSD 22 Gal 3000 Gal 66000
(8' x 4 ) 5Ply Wood 47 Sht 17600 Sht 827200
J/Wood 0.6 Ton 750000 Ton 450000
Wire Nails 27 Lb 650 Lb 17550
** 132 Nos 1200 Nos 158400
Trower Bolt 6" 44 Nos 800 Nos 35200
Sliding Bolt 22 Nos 3000 Nos 66000
Door Handle 44 Nos 1200 Nos 52800
Putty 10 Gal 6000 Gal 60000
Sand paper 7 Doz 500 Doz 3500
Putty Trowels 3 Nos 500 Nos 1500
4" Plastic Brush 7 Nos 700 Nos 4900
Oil Paint 9 Gal 17200 Gal 154800
10890630

2 Labour Charges 7166518

3 Hire Charges
Vibrator 11 Days 15000 Days 165000
Mixer 11 Days 15000 Days 165000
330000

Total 18387148
Say 18387000/-
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Cement 31.350 Ton 126000 Ton 3950100


R/Sand 57.28 Sud 18500 Sud 1059680
R/Shingle #REF! Sud 95000 Sud #REF!
HSD 22 Gal 3000 Gal 66000
Vibrator 11 Days 15000 Days 165000
Mixer 11 Days 15000 Days 165000
(8' x 4 ) 5Ply Wood 47 Sht 17600 Sht 827200
Styles & Rails (25%) 0.6 Ton 750000 Ton 450000
Wire Nails 27 Lb 650 Lb 17550
Butt Hinges 132 Nos 1200 Nos 158400
Trower Bolt 6" 44 Nos 800 Nos 35200
Sliding Bolt 22 Nos 3000 Nos 66000
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Door Handle 44 Nos 1200 Nos 52800


Putty 10 Gal 6000 Gal 60000
Sand paper 7 Doz 500 Doz 3500
Putty Trowels 3 Nos 500 Nos 1500
4" Plastic Brush 7 Nos 700 Nos 4900
Oil Paint 9 Gal 17200 Gal 154800
#REF!

Labour Charges 2908 Cuft 113.75 Cuft 330785


Labour Charges 3305 Cuft 600 Cuft 1983000
Labour Charges 0 Sft 252.75 Sft 0
Labour Charges 743 Sft 457.5 Sft 339923
Labour Charges 1304 Sft 1525 1988600
Labour Charges (paint) 1304 Sft 77.7 Sft 101321
Labour Charges (putty) 1304 Sft 149.85 Sft 195404
4939033

Total #REF!
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
#REF!
#REF!
7933100
#REF!

1607150

224700

#REF!
#REF!
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

1 (4")thk Sand Filling Work 2908 cuft


R/Sand (25%) 36.35 Sud 18500 Suds 672475
Labour Charges 2908 Cuft 113.75 Cuft 330785
1003260

2 (4½")thk (1:3:6)con Flooring Work 3305 Cuft


Cement 21.25 Ton 126000 Ton 2677500
R/Sand 15.86 Sud 18500 Sud 293410
R/Shingle 31.73 Sud 95000 Sud 3014350
Labour Charges 3305 Cuft 600 Cuft 1983000
7968260

3 (1½")thk (1:2:4)con Floor


Topping Work 8813 Sft
Cement 10.15 Ton 126000 Ton 1278900
R/Sand 5.07 Sud 18500 Sud 93795
R/Shingle 10.13 Sud 95000 Sud 962350
HSD 22 Gal 3000 Gal 66000
Vibrator 11 Days 15000 Days 165000
Mixer 11 Days 15000 Days 165000
Labour Charges 8813 Sft 252.75 Sft 2227486
4958531

4 Dismentling Work of Existing Door 743 Sft


Labour Charges 743 Sft 457.5 Sft 339923

5 Making and Fixing work


for Door with 5Ply Wood 1304 Sft
(8' x 4 ) 5Ply Wood 47 Sht 17600 Sht 827200
J/Wood 0.6 Ton 750000 Ton 450000
Wire Nails 27 Lb 650 Lb 17550
Butt Hinges 132 Nos 1200 Nos 158400
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Trower Bolt 6" 44 Nos 800 Nos 35200


Sliding Bolt 22 Nos 3000 Nos 66000
Door Handle 44 Nos 1200 Nos 52800
Labour Charges 1304 Sft 1525 Sft 1988600
3595750

6 Oil Painting Work For Door 1304 Sft


(2 Coat)
Putty 10 Gal 6000 Gal 60000
Sand paper 7 Doz 500 Doz 3500
Putty Trowels 3 Nos 500 Nos 1500
4" Plastic Brush 7 Nos 700 Nos 4900
Oil Paint 9 Gal 17200 Gal 154800
Labour Charges (paint) 1304 Sft 77.7 Sft 101321
Labour Charges (putty) 1304 Sft 149.85 Sft 195404
521425

Total 18387148
Say 18387000/-
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Cement 31.350 Ton 126000 Ton 3950100


R/Sand 57.28 Sud 18500 Sud 1059680
R/Shingle 41.86 Sud 95000 Sud 3976700
HSD 22 Gal 3000 Gal 66000
Vibrator 11 Days 15000 Days 165000
Mixer 11 Days 15000 Days 165000
(8' x 4 ) 5Ply Wood 47 Sht 17600 Sht 827200
Styles & Rails (25%) 0.6 Ton 750000 Ton 450000
Wire Nails 27 Lb 650 Lb 17550
Butt Hinges 132 Nos 1200 Nos 158400
Trower Bolt 6" 44 Nos 800 Nos 35200
Sliding Bolt 22 Nos 3000 Nos 66000
Door Handle 44 Nos 1200 Nos 52800
Putty 10 Gal 6000 Gal 60000
Sand paper 7 Doz 500 Doz 3500
Putty Trowels 3 Nos 500 Nos 1500
4" Plastic Brush 7 Nos 700 Nos 4900
Oil Paint 9 Gal 17200 Gal 154800
11214330

Labour Charges 2908 Cuft 113.75 Cuft 330785


Labour Charges 3305 Cuft 600 Cuft 1983000
Labour Charges 8813 Sft 252.75 Sft 2227486
Labour Charges 743 Sft 457.5 Sft 339923
Labour Charges 1304 Sft 1525 1988600
Labour Charges (paint) 1304 Sft 77.7 Sft 101321
Labour Charges (putty) 1304 Sft 149.85 Sft 195404
7166518
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Total 18380848
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
7166518

5985260

3956400

2731045

#REF!

7166518
1607150

224700

11220630

18387148
#REF!

*********************************************************************************************
*************************************************************************************************************
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

1 Shera Board Partition work with 4" x2" hollow Pipe


(a) Shera Board Partition work
Ground Floor 1 x 1 29' -6'' 8' -0'' 236 sft

1 x 2 20' -0'' 8' -0'' 320 sft

1st Floor 1 x 4 11' -9'' 8' -0'' 376 sft

1 x 4 13' -9'' 8' -0'' 440 sft

1372 sft

(b) WI Work (4" x 2")MS


Hollow Pipe
Gnd Floor 1 x 10 8' -0'' 80 Rft
1 x 3 29' -6'' 88.5 Rft
2 x 7 8' -0'' 112 Rft
2 x 3 20' -0'' 120 Rft
1st Floor 4 x 4 8' -0'' 128 Rft
4 x 3 11' -9'' 141 Rft
4 x 5 8' -0'' 160 Rft
4 x 3 13' -9'' 165 Rft
826 Rft
826 Rft x 12 " x 7.65 Lb/Sft 6319 Lb
2.82 Ton
5% Watage 2.96 Ton

2 Dismentaling work for Door Work


Ground Floor 1 x 3 3' -6'' 7' -0'' 74 sft
Toilet door 2 x 5 2' -6'' 6' -0'' 150 sft

1st Floor 1 x 4 3' -6'' 7' -0'' 98 sft


322 sft

3 Making and Fixing of Door Work with 5Ply Wood


Ground Floor 1 x 3 3' -6'' 7' -0'' 74 sft
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Toilet door 2 x 5 2' -6'' 6' -0'' 150 sft

1st Floor 1 x 4 3' -6'' 7' -0'' 98 sft


322 sft
x2 644 Sft

4 Dismentaling work for 4" x ½" T & G Work


(a) Walling 1 x 2 2' -0'' 3' -0'' 12 Sft

1 x 3 1' -6'' 5' -0'' 23 Sft

1 x 2 3' -0'' 4' -0'' 24 Sft


59 Sft

(b) Flooring 1 x 1 25' -0'' 19' -6'' 488 Sft

1 x 2 6' -0'' 4' -0'' 48 Sft


1 x 1 14' -0'' 10' -0'' 140 Sft
676 Sft

Total 734 Sft

5 Making and Fixing work for 4" x ½" T & G Work


As per item No.( 3) Walling 59 Sft

Flooring 676 Sft

Total 734 Sft

6 Dismentalling work for


Glass Venetianed Window Work
Gnd Floor 1 x 4 4' -0'' 5' -0'' 80 Sft

1st Floor 1 x 19 4' -0'' 5' -0'' 380 Sft


1 x 13 3' -0'' 5' -0'' 195 Sft
655 Sft

7 Making And Fixing of


Glass Venetianed Window Work
As per item No.( 8) 655 Sft
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

8 Dismentaling work of
4" x 2" Wood Braces Work4 x 1 10' -0'' 40 Rft

9 making and Fixing work of


4" x 2" Wood Braces Work
As per item No.(9) 40 Rft

10 Oil Painting work


As per Item No.1 (a) 1372 Sft

x2 2744 Sft

As per Item No. 2 322 Sft


x2 644 Sft

As per item No.( 4) Walling 59 Sft

Flooring 676 Sft

Total 734 Sft

As per item No.(9) 40 Rft

x 10" 33.2 Sft

Total 4155 Sft


Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Line No Between E& F


20mmØ,SB2,Top Bar 1 x 2 23' -3'' 47

Bottom Bar 1 x 2 22' -0'' 44

Lapping 1 x 1 2' -7'' 3

10mmØ Stirrups,SB2 1 x 53 2' -8'' ###

Line A & G,FB4


20mmØ,Top Bar 2 x 2 115' -0'' 460

Extra Bar 2 x 2 10' -0'' 40

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 14' -0'' 56

2 x 2 14' -0'' 56

2 x 2 10' -0'' 40

Bottom Bar 2 x 4 113' -6'' 908

Lapping 2 x 12 2' -7'' 62

10mmØ Stirrups,FB4 2 x 270 5' -1'' ###

Line B & E,FB3


20mmØ,Top Bar 2 x 2 115' -0'' 460

Extra Bar 2 x 5 10' -0'' 100

2 x 5 18' -0'' 180

2 x 5 18' -0'' 180

2 x 5 18' -0'' 180

2 x 5 14' -0'' 140

2 x 5 14' -0'' 140

2 x 5 10' -0'' 100

Bottom Bar 2 x 4 113' -6'' 908

Extra Bar 2 x 2 18' -0'' 72

2 x 2 18' -0'' 72
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 10' -0'' 40

Lapping 2 x 12 2' -7'' 62

Spacer Bar 2 x 45 0' -9'' 68

10mmØ Stirrups,FB3 2 x 264 5' -5'' ###

Line F FB3,FB5
20mmØ,Top Bar 1 x 2 115' -0'' 230

Extra Bar 1 x 6 10' -0'' 60

1 x 5 10' -0'' 50

1 x 5 14' -0'' 70

1 x 5 18' -0'' 90

1 x 5 18' -0'' 90

1 x 5 14' -0'' 70

1 x 5 14' -0'' 70

1 x 5 10' -0'' 50

1 x 1 8' -0'' 8

Bottom Bar 1 x 4 101' -0'' 404

1 x 4 15' -0'' 60

Extra Bar 1 x 2 12' -0'' 24

1 x 2 8' -0'' 16

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 10' -0'' 20

Lapping 1 x 12 2' -7'' 31

Spacer Bar 1 x 47 0' -9'' 35

10mmØ Stirrups,FB3 1 x 242 5' -5'' ###

FB5 1 x 40 5' -5'' ###


Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Line D
FB1,FB3,FB6
20mmØ,Top Bar 1 x 2 204' -0'' 408

Extra Bar 1 x 10 10' -0'' 100

1 x 10 18' -0'' 180

1 x 5 18' -0'' 90

1 x 5 18' -0'' 90

1 x 5 14' -0'' 70

1 x 4 10' -0'' 40

1 x 4 10' -0'' 40

25mmØ,FB2,Extra Bar 1 x 4 6' -6'' 26.00


1 x 3 8' -0'' 24

Bottom Bar 1 x 4 85' -0'' 340

1 x 4 14' -0'' 56

1 x 4 20' -0'' 80

1 x 4 95' -6'' 382

Extra Bar 1 x 12 18' -0'' 216

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 10' -0'' 20

25mmØ,FB2,Extra Bar 1 x 4 7' -0'' 28.00


Lapping 1 x 10 2' -7'' 26

Spacer Bar 1 x 54 0' -9'' 41

10mmØ Stirrups,FB3 1 x 284 5' -5'' ###

FB1 1 x 50 5' -10'' ###

FB6 1 x 68 5' -10'' ###

Line C
FB1,FB6
20mmØ,Top Bar,FB1 1 x 2 50' -6'' 101

Extra Bar,FB1 1 x 8 8' -0'' 64


Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

1 x 4 10' -0'' 40
20mmØ,Extra Bar 1 x 4 10' -0'' 40

1 x 4 8' -0'' 32

Bottom Bar 1 x 4 14' -0'' 56

1 x 2 20' -0'' 40

Extra Bar,FB1 1 x 2 10' -0'' 20

20mmØ,Extra Bar 1 x 4 8' -0'' 32

Spacer Bar 1 x 45 0' -9'' 34

10mmØ Stirrups,FB1,FB6 1 x 68 5' -10'' ###

SB2
Bottom Bar 4 x 2 23' -0'' 184

10mmØ Stirrups,SB2 4 x 54 2' -8'' ###

54 9324 10473.17

16mmØ 10mmØ
Rebar Work For Stair
2nd Floor to 3rd Floor Sta 4 x 16 7' -0'' 448.00 Rft

2 x 16 13' -0'' 416.00 Rft

3rd Floor Stair Dowel 2 x 16 13' -0'' 416.00 Rft

2 x 16 12' -0'' 384.00 Rft

Distribution Bar 2 x 14 6' -0'' 168 Rft

2 x 20 12' -6'' 500 Rft

1664.00 668 Rft

Rebar Work For Slab 10mmØ

S3,12-14 Bottom,Main Bar 1 x 25 9' -6'' 238 Rft

Distribution Bar 1 x 11 21' -6'' 237 Rft

Top Bar 1 x 50 11' -0'' 550 Rft

1 x 11 23' -0'' 253 Rft

S2,8-12,Main Bar 1 x 84 9' -6'' 798 Rft

Distribution Bar 1 x 11 72' -6'' 798 Rft


Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Lapping 1 x 11 1' -4'' 15 Rft

Top Bar 1 x 84 11' -6'' 966 Rft

1 x 10 74' -6'' 745 Rft

Lapping 1 x 10 1' -4'' 13 Rft

OT;S1,Line 12-14
Bottom Bar 1 x 25 13' -6'' 338 Rft

1 x 15 21' -6'' 323 Rft

Top Bar 1 x 50 15' -6'' 775 Rft

1 x 15 23' -69'' 431 Rft

Between Line B &D


S2, Bottom,Main 1 x 9 31' -6'' 284 Rft

Dis; 1 x 25 8' -6'' 213 Rft

S2,Top,Main 1 x 9 33' -6'' 302 Rft

Dis; 1 x 25 10' -6'' 263 Rft

S2, Bottom,Main 1 x 16 21' -6'' 344 Rft

Dis; 1 x 25 14' -0'' 350 Rft

Top Bar 1 x 16 23' -6'' 376 Rft

1 x 25 16' -0'' 400 Rft

S1,S2 Bottom,Main 1 x 30 72' -6'' 2175 Rft

Dis; 1 x 84 26' -0'' 2184 Rft

Top Bar 1 x 30 74' -6'' 2235 Rft

1 x 84 28' -0'' 2352 Rft

S1 Top Bar 1 x 21 53' -6'' 1124 Rft

1 x 60 21' -0'' 1260 Rft

Lapping 1 x 81 1' -6'' 122 Rft

S2 Bottom Bar 1 x 13 92' -6'' 1203 Rft

1 x 108 11' -6'' 1242 Rft

Top Bar 1 x 13 94' -6'' 1229 Rft

1 x 108 13' -6'' 1458 Rft

Lapping 13 x 6 1' -6'' 117 Rft

Line E-F
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

S3 Bottom Bar 1 x 30 11' -6'' 345 Rft

1 x 10 26' -0'' 260 Rft

Top Bar 1 x 60 13' -6'' 810 Rft

1 x 10 28' -0'' 280 Rft

S3 Bottom Bar 1 x 30 9' -6'' 285 Rft

1 x 8 26' -0'' 208 Rft

Top Bar 1 x 60 11' -6'' 690 Rft

1 x 8 28' -0'' 224 Rft

S2 Bottom Bar 1 x 30 51' -6'' 1545 Rft

1 x 60 26' -0'' 1560 Rft

Top Bar 1 x 30 53' -6'' 1605 Rft

1 x 60 28' -0'' 1680 Rft

Lapping 30 x 2 1' -6'' 90 Rft

S2 Bottom Bar 1 x 30 11' -6'' 345 Rft

1 x 12 26' -0'' 312 Rft

Top Bar 1 x 30 13' -6'' 405 Rft

1 x 12 28' -0'' 336 Rft

Line F & G
S2 Bottom Bar 1 x 10 91' -6'' 915 Rft

1 x 109 9' -6'' 1036 Rft

Top Bar 1 x 10 92' -6'' 925 Rft

1 x 109 11' -6'' 1254 Rft

Lapping 10 x 3 1' -6'' 45 Rft

S3,1-3, Bottom,Main Bar 1 x 25 9' -6'' 238 Rft

Distribution Bar 1 x 11 21' -6'' 237 Rft

Top Bar 1 x 50 11' -0'' 550 Rft

1 x 11 23' -0'' 253 Rft

S2,3-8,Bottom,Main Bar 1 x 111 9' -6'' 1055 Rft

Distribution Bar 1 x 12 91' -6'' 1098 Rft

Lapping 2 x 12 1' -4'' 32 Rft

Top Bar 1 x 88 11' -0'' 968 Rft


Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

1 x 12 93' -0'' 1116 Rft

Lapping 2 x 12 1' -4'' 32 Rft

Line 1-3,S3
Bottom,Main Bar 1 x 26 8' -0'' 208 Rft

Distribution Bar 1 x 10 21' -6'' 215 Rft

Top,Main Bar 1 x 42 9' -6'' 399 Rft

Distribution Bar 1 x 17 23' -0'' 391 Rft

S1,Bottom,Main Bar 1 x 25 16' -0'' 400 Rft

Distribution Bar 1 x 20 21' -6'' 430 Rft

Top,Main Bar 1 x 44 17' -6'' 770 Rft

Distribution Bar 1 x 30 23' -0'' 690 Rft

Line 3-5,S3
Bottom,Main Bar 2 x 50 26' -0'' 2600 Rft

Distribution Bar 2 x 30 41' -6'' 2490 Rft

Top,Main Bar 2 x 83 27' -6'' 4565 Rft

Distribution Bar 2 x 60 43' -0'' 5160 Rft

Lapping 2 x 90 1' -4'' 240 Rft

Line 5-6,S2
Bottom,Main Bar 1 x 25 8' -6'' 213 Rft

Distribution Bar 1 x 10 21' -6'' 215 Rft

Top,Main Bar 1 x 21 10' -0'' 210 Rft

Distribution Bar 1 x 8 23' -0'' 184 Rft

Line 5-6,C-D,S1
Bottom,Main Bar 1 x 25 19' -0'' 475 Rft

Distribution Bar 1 x 21 21' -6'' 452 Rft

Top,Main Bar 1 x 45 20' -6'' 923 Rft

Distribution Bar 1 x 35 23' -0'' 805 Rft

Line 6-7,B-C,S2
Bottom,Main Bar 1 x 15 11' -6'' 173 Rft

Distribution Bar 1 x 12 13' -6'' 162 Rft

Top,Main Bar 1 x 13 13' -0'' 169 Rft


Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Distribution Bar 1 x 11 14' -0'' 154 Rft

Line C-D
Bottom,Main Bar 1 x 15 13' -0'' 195 Rft

Distribution Bar 1 x 14 14' -0'' 196 Rft

Top,Main Bar 1 x 13 14' -6'' 189 Rft

Distribution Bar 1 x 12 15' -6'' 186 Rft

Line D-E,1-3 & 7-8,S3


Bottom,Main Bar 2 x 25 11' -6'' 575 Rft

Distribution Bar 2 x 12 21' -6'' 516 Rft

Top,Main Bar 2 x 41 13' -0'' 1066 Rft

Distribution Bar 2 x 21 23' -0'' 966 Rft

Line 3-7,D-E,S2
Bottom,Main Bar 1 x 85 11' -6'' 978 Rft

Distribution Bar 1 x 12 71' -6'' 858 Rft

Top,Main Bar 1 x 73 13' -0'' 949 Rft

Distribution Bar 1 x 11 73' -0'' 803 Rft

Lapping 1 x 23 1' -4'' 31 Rft

Line 2-3,E-F,S2
Bottom,Main Bar 1 x 30 9' -6'' 285 Rft

Distribution Bar 1 x 10 26' -0'' 260 Rft

Top,Main Bar 1 x 50 11' -0'' 550 Rft

Distribution Bar 1 x 17 27' -6'' 468 Rft

Line 5-6,E-F,S2
Bottom,Main Bar 1 x 30 21' -6'' 645 Rft

Distribution Bar 1 x 25 26' -0'' 650 Rft

Top,Main Bar 1 x 50 23' -0'' 1150 Rft

Distribution Bar 1 x 12 27' -6'' 330 Rft

Line 6-8,E-F,S3
Bottom,Main Bar 1 x 37 26' -0'' 962 Rft

Distribution Bar 1 x 30 31' -6'' 945 Rft

Top,Main Bar 1 x 62 27' -6'' 1705 Rft


Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Distribution Bar 1 x 51 33' -0'' 1683 Rft

Line 1-8,F-G,S2
Bottom,Main Bar 1 x 133 9' -6'' 1264 Rft

Distribution Bar 1 x 10 111' -6'' 1115 Rft

Top,Main Bar 1 x 113 11' -0'' 1243 Rft

Distribution Bar 1 x 9 113' -0'' 1017 Rft

Lapping 2 x 19 1' -4'' 51 Rft

Chair 2 x 320 2' -6'' 1600 Rft

92558 Rft

10mmØ - 131801.11 Rft x0.415 Lb 54697.46 488 Cwt


16mmØ - 1664Rft x1.062 Lb 1767.16 16 Cwt
20mmØ - 32402 Rft x1.66 Lb 53787 480 Cwt
25mmØ - 467.83 Rft x 2.587 Lb 1210.27 11 Cwt
995 Cwt

3 G-30 Ready Mixed Concreting Work


for 3rd Floor Beam & Slab
Line 1
FB1 1 x 1 22' -8'' 1' -0'' 2' -0'' 45 Cft

FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21 Cft

FB2a 1 x 1 8' -2'' 1' -0'' 1' -8'' 14 Cft

FB5 1 x 1 22' -8'' 1' -2'' 2' -0'' 53 Cft

Line 2,3,4,5,6,7
FB1 9 x 1 22' -8'' 1' -0'' 2' -0'' 408 Cft

FB1 1 x 1 10' -2'' 1' -0'' 2' -0'' 20 Cft

FB5 1 x 1 22' -8'' 1' -2'' 2' -0'' 53 Cft

FB6 2 x 1 9' -6'' 1' -0'' 2' -0'' 38 Cft


Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

FB2 11 x 1 6' -4'' 1' -0'' 1' -8'' 116 Cft

FB2a 5 x 1 8' -3'' 1' -0'' 1' -8'' 69 Cft

SB2 3 x 1 70' -0'' 0' -9'' 1' -6'' 236 Cft

SB2 1 x 1 31' -6'' 0' -9'' 1' -6'' 35 Cft

SB1 2 x 1 7' -0'' 0' -9'' 1' -6'' 16 Cft

Line A & G FB4 2 x 1 101' -0'' 1' -0'' 1' -8'' 337 Cft

FB3 1 x 1 99' -0'' 1' -0'' 1' -10'' 182 Cft

1 x 1 97' -3'' 1' -0'' 1' -10'' 178 Cft

Line D FB1 1 x 1 10' -8'' 1' -0'' 2' -0'' 21 Cft

FB3 1 x 1 72' -8'' 1' -0'' 1' -10'' 133 Cft

FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28 Cft

Line F
FB3 1 x 1 87' -0'' 1' -0'' 1' -10'' 160 Cft

FB5 1 x 1 10' -3'' 1' -2'' 2' -0'' 24 Cft

Line C
FB1 1 x 1 9' -2'' 1' -0'' 2' -0'' 18 Cft

FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28 Cft

Line Between 1 & 3


SB2 2 x 1 19' -0'' 0' -9'' 1' -6'' 43 Cft

1 x 1 18' -3'' 0' -9'' 1' -6'' 21 Cft

C1,C2 24 x 1 1' -4'' 1' -6'' 2' -0'' 96 Cft

C3,C4 51 x 1 1' -4'' 1' -10'' 2' -0'' 249 Cft

C5 6 x 1 1' -0'' 3' -0'' 2' -0'' 36 Cft

Slab S3 2 x 1 19' -0'' 7' -0'' 0' -5'' 111 Cft

Slab S3 1 x 1 19' -0'' 5' -6'' 0' -5'' 44 Cft

Slab S3 4 x 1 23' -6'' 9' -2'' 0' -5'' 359 Cft

Slab S3 2 x 1 19' -0'' 9' -0'' 0' -5'' 143 Cft

Slab S3 1 x 1 23' -6'' 7' -0'' 0' -5'' 69 Cft

Slab S3 6 x 1 23' -6'' 9' -2'' 0' -5'' 539 Cft

Slab S3 1 x 1 23' -6'' 9' -0'' 0' -5'' 88 Cft


Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Slab S2 14 x 1 9' -3'' 7' -0'' 0' -5'' 378 Cft

Slab S2 2 x 1 9' -0'' 7' -0'' 0' -5'' 53 Cft

Slab S2 1 x 1 9' -0'' 11' -0'' 0' -5'' 41 Cft

Slab S2 1 x 1 11' -0'' 11' -6'' 0' -5'' 53 Cft

Slab S2 6 x 1 9' -2'' 9' -0'' 0' -5'' 206 Cft

Slab S2 1 x 1 9' -0'' 9' -0'' 0' -5'' 34 Cft

Slab S2 1 x 1 7' -0'' 7' -0'' 0' -5'' 20 Cft

Slab S2 1 x 1 11' -0'' 7' -0'' 0' -5'' 32 Cft

Slab S2 4 x 1 10' -4'' 9' -2'' 0' -5'' 158 Cft

Slab S2 2 x 1 3' -9'' 7' -0'' 0' -5'' 22 Cft

Slab S2 2 x 1 5' -3'' 7' -0'' 0' -5'' 31 Cft

Slab S1 1 x 1 15' -0'' 19' -0'' 0' -5'' 119 Cft

Slab S1 2 x 1 9' -3'' 15' -9'' 0' -5'' 121 Cft

Stair Step 12 × 1 5' -3'' 0' -6'' 0' -6'' 16 Cft

Flight 1 × 2 13' -6'' 5' -3'' 0' -9'' 106 Cft

Landing Floor 1 × 1 11' -0'' 6' -2'' 0' -9'' 51 Cft

1 × 1 11' -0'' 2' -2'' 0' -9'' 18 Cft

FB1 1 x 1 22' -8'' 1' -0'' 2' -0'' 45 Cft

FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21 Cft

FB2a 1 x 1 8' -2'' 1' -0'' 1' -8'' 14 Cft

FB6 1 x 1 9' -6'' 1' -0'' 2' -0'' 19 Cft

FB1 1 x 1 10' -2'' 1' -0'' 2' -0'' 20 Cft


Line - 14 FB5 1 × 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
Line - 13, 14 FB1 2 × 1 22' -8'' 1' -0'' 2' -0'' 91 Cft
FB2 3 × 1 6' -4'' 1' -0'' 1' -8'' 32 Cft
FB2a 1 × 1 8' -2'' 1' -0'' 1' -8'' 14 Cft
SB2 1 × 1 22' -8'' 1' -0'' 1' -8'' 38 Cft
Line 9.10.11.12FB1 7 × 1 22' -8'' 1' -0'' 2' -0'' 317 Cft
FB5 1 × 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
Between 9.10.11.12 SB2 3 × 1 73' -6'' 0' -9'' 1' -6'' 248 Cft
Line-13 SB2 1 × 1 17' -3'' 0' -9'' 1' -6'' 19 Cft
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
SB1 1 × 1 7' -0'' 0' -9'' 1' -6'' 8 Cft
Line 9.10.11.12 FB2 8 × 1 6' -4'' 1' -0'' 1' -8'' 84 Cft
FB 2a 4 × 1 8' -2'' 1' -0'' 1' -8'' 54 Cft
A&G FB4 2 × 1 84' -3'' 1' -0'' 1' -8'' 281 Cft
Line F,FB3 1 × 1 72' -3'' 1' -0'' 1' ### 132 Cft
LineB,D, E,FB3 3 × 1 84' -3'' 1' -0'' 1' ### 463 Cft
FB5 1 × 1 9' -2'' 1' -2'' 2' -0'' 21 Cft
SB2 1 × 1 84' -6'' 0' -9'' 1' -6'' 95 Cft
SB2 1 × 1 44' -6'' 0' -9'' 1' -6'' 50 Cft

2 × 1 74' -0'' 0' -9'' 1' -6'' 167 Cft


SB2 1 × 1 23' -0'' 0' -9'' 1' -6'' 26 Cft
SB1 3 × 1 9' -1'' 0' -9'' 1' -6'' 31 Cft
Slab S2 2 × 1 9' -0'' 7' -0'' 0' -5'' 53 Cft
Slab S2 12 × 1 9' -1'' 7' -0'' 0' -5'' 318 Cft
Slab S2 1 × 1 9' -0'' 7' -0'' 0' -5'' 26 Cft
Slab S2 3 × 1 9' -1'' 7' -0'' 0' -5'' 79 Cft
Slab S2` 1 × 1 15' -9'' 9' -0'' 0' -5'' 59 Cft
Slab S2 2 × 1 7' -6'' 9' -1'' 0' -5'' 57 Cft
Slab S2 1 × 1 9' -0'' 9' -0'' 0' -5'' 34 Cft
Slab S2 6 × 1 9' -1'' 9' -0'' 0' -5'' 204 Cft
Slab S2 2 × 1 11' -4'' 9' -0'' 0' -5'' 85 Cft
Slab S2 8 × 1 11' -4'' 9' -1'' 0' -5'' 343 Cft
Slab S2 3 × 1 7' -4'' 9' -1'' 0' -5'' 83 Cft
Slab OT 1 × 1 23' -6'' 7' -0'' 0' -5'' 69 Cft
Slab S1 5 × 1 16' -6'' 9' -2'' 0' -5'' 315 Cft
Slab S3 1 × 1 19' -0'' 7' -0'' 0' -5'' 55 Cft
Slab S1 1 × 1 19' -0'' 11' -1'' 0' -5'' 88 Cft
Slab S2 1 × 1 7' -1'' 11' -1'' 0' -5'' 33 Cft
Slab S2 1 × 1 11' -1'' 11' -1'' 0' -5'' 51 Cft
Slab S2 1 × 1 7' -1'' 9' -0'' 0' -5'' 27 Cft
Slab S2 1 × 1 11' -1'' 9' -0'' 0' -5'' 42 Cft
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Slab S2 1 × 1 7' -0'' 7' -0'' 0' -5'' 20 Cft
Slab S2 1 × 1 11' -0'' 7' -0'' 0' -5'' 32 Cft
Stair Step 7 × 1 5' -3'' 0' -6'' 0' -6'' 9 Cft
Flight 1 × 1 8' -0'' 5' -3'' 0' -9'' 32 Cft
Landing Floor 1 × 1 11' -0'' 6' -2'' 0' -9'' 51 Cft

10048 Cft

Hire Charges For Concreting Work


4 10089 Cft
Vibrator
25 Day
Curing Work For Concreting
5 For14 Day
For 2nd Floor
1 × 1 204' -0'' 80' -0'' 16320 Sft
Location Head - သ

ဆဖ န ေ ေ င အခ န ဖ႕စညခင၊ပကေနသ တခပတင၊ ေ

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Total of
Total of

643
Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

1 Roofing Work 1 x 1 29' -0'' 70' -0'' 2030 Sft


Ridging 1 x 1 70' -0'' 70 Rft
Guttering work 1 x 1 197' -0'' 197 Rft

2 6"x1" Eave Board Work 1 x 1 197' -0'' 197 Rft

3 Ceiling Work 1 x 1 29' -0'' 69' -6'' 2016 Sft


Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Y5a-8 and X6-8 79 x 1 46' -6'' 3673 Rft


Lapping 79 x 1 1' -0'' 79 Rft
Y5a-7 and X7-8 33 x 1 18' -9'' 619 Rft

Distribution Bar (bottom) 8"c/c


Y5a-7 and X6-8 27 x 1 38' -0'' 1026 Rft
Y6-8 and X6-8 40 x 1 26' -6'' 1060 Rft

Main Bar (Top) 4"c/c


Y 5a and X 6-8 ###x 1 4' -6'' 495 Rft
Y 6 and X 6-8 ###x 1 6' -9'' 743
Bet: Y6-8 and X6-8 3 x 82 6' -9'' 1661 Rft

Y8 and X 6-8 82 x 1 4' -6'' 369 Rft

Distribution Bar (Top) 8"c/c


Y 5a and X 6-8 7 x 1 37' -6'' 263 Rft
Y6 and X 6-8 10 x 1 37' -6'' 375 Rft
Y6-8and X6-8 3 x 10 26' -6'' 795 Rft

Y8 and X 6-8 7 x 1 26' -6'' 186 Rft

Steel Chair 10 x 15 1' -6'' 225


11567 Rft

11342 Rft x 0.415 Lb/ft 4800 Lb

Say 43 Cwt

5 G25 Ready Mixed concrete


Placing Work
Y6 and X6-8 1 x 1 38' -9'' 18' -4'' 0' -5'' 296 Cft
Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Y7-8 and X6-7 1 x 1 28' -6'' 28' -1'' 0' -5'' 333 Cft
630 Cft

Say 18 m3

6 Levelling work of G-25 Concrete


at 1st Floor Slab Concreting
Y6 and X 6-8 1 x 1 38' -9'' 18' -4'' 710 Sft
Y6-8 and X6-7 1 x 1 28' -6'' 28' -1'' 800 Sft
1511 Sft

7 Timber Scaffolding Work for all Dismantling work


and Safety at 1st Floor Slab
Measurements are same as
Item No. (6) 1511 Sft

8 Dismantling Work of Timber Scaffold


After Construction Period
Measurements are same as
Item No. (7) 1511 Sft

9 Dismantling Work of Timber Formwork


at 1st Floor Slab After Setting Time

As per Item No. (2) 1354 Sft

10 1½" thk (1:2:4) Cement Concrete


Topping Work ar 1st floor Slab
As per Item No. (6) 1511 Sft

11 Level & Center Line marking Work


As per Item No. (6) 1511 Sft
Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

12 Curing Work For 14 Days


As per Item No. (6) 1511 Sft

13 Carrying ,Shifting loading and


unloading broken-Concrete within
200' lead
As per Item No. (1) 951 Cft

14 Transporting work of Broken-Concrete


by Truck-Car to outside Downtown
As per Item No. (1) 951 Cft

150 cft Per Trip = 6 Trips


Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

SB2
20mmØ,Top Bar 4 x 2 12' -3'' 98

Extra Bar 4x 1 6' -0'' 24

4x 1 6' -0'' 24

Bottom Bar 4 x 2 10' -0'' 80

Extra Bar 4x 1 6' -2'' 25

10mmØ Stirrups,SB2 4 x 35 2' -8'' 373.33

Line A & G
20mmØ,FB4,Top Bar 2 x 2 93' -8'' 375

Extra Bar 2x 2 8' -9'' 35

2 x 2 15' -3'' 61

2 x 2 17' -3'' 69

2 x 2 17' -3'' 69

2 x 2 17' -3'' 69

2 x 2 10' -8'' 43

Bottom Bar 2 x 4 92' -8'' 741

Lapping 2x 2 2' -7'' 10

10mmØ Stirrups,FB4 2 x### 5' -1'' 2714.5

Line B,G & E


20mmØ,FB3,Top Bar 3 x 2 93' -6'' 561

Extra Bar 3x 5 8' -9'' 131

3 x 5 15' -3'' 229

3 x 5 17' -3'' 259

3 x 5 17' -3'' 259

3 x 5 17' -3'' 259


Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

3 x 5 10' -8'' 160

Bottom Bar 3 x 4 92' -3'' 1107

Extra Bar 3x 2 6' -10'' 41

3 x 2 17' -3'' 104

3 x 2 17' -3'' 104

3 x 3 17' -3'' 155

3 x 3 17' -3'' 155

Lapping 3x 2 2' -7'' 16

Spacer Bar 3 x 68 0' -9'' 153

10mmØ Stirrups,FB3 3 x### 5' -5'' ###

Line No F,FB3,FB5
20mmØ,Top Bar 1 x 2 93' -4'' 187

Extra Bar 1x 5 8' -9'' 44

1 x 5 15' -3'' 76

1 x 5 17' -3'' 86

1 x 10 17' -3'' 173

1x 5 9' -3'' 46

1x 7 7' -3'' 51

Bottom Bar 1 x 4 92' -3'' 369

Extra Bar 1x 2 7' -9'' 16

1 x 2 17' -3'' 35

1 x 2 17' -3'' 35

1 x 2 17' -3'' 35

1x 2 8' -9'' 18

1x 2 8' -9'' 18

Lapping 1 x 2 2' -7'' 5

Spacer Bar 1 x 68 0' -9'' 51

10mmØ Stirrups,FB3,FB5 1 x### 5' -5'' ###

Line No C
20mmØ,SB2,Top Bar 1 x 2 94' -3'' 189

Bottom Bar 1 x 2 93' -0'' 186


Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Lapping 1 x 2 2' -7'' 5

10mmØ Stirrups,SB2 1 x### 2' -8'' 658.67

Line No Between E& F


20mmØ,SB2,Top Bar 1 x 2 23' -3'' 47

Bottom Bar 1 x 2 22' -0'' 44

Lapping 1 x 1 2' -7'' 3

10mmØ Stirrups,SB2 1 x 53 2' -8'' 141.33

Line A & G,FB4


20mmØ,Top Bar 2 x 2 115' -0'' 460

Extra Bar 2 x 2 10' -0'' 40

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 14' -0'' 56

2 x 2 14' -0'' 56

2 x 2 10' -0'' 40

Bottom Bar 2 x 4 113' -6'' 908

Lapping 2 x 12 2' -7'' 62

10mmØ Stirrups,FB4 2 x 270 5' -1'' ###

Line B & E,FB3


20mmØ,Top Bar 2 x 2 115' -0'' 460

Extra Bar 2 x 5 10' -0'' 100

2 x 5 18' -0'' 180

2 x 5 18' -0'' 180

2 x 5 18' -0'' 180

2 x 5 14' -0'' 140

2 x 5 14' -0'' 140

2 x 5 10' -0'' 100

Bottom Bar 2 x 4 113' -6'' 908

Extra Bar 2 x 2 18' -0'' 72

2 x 2 18' -0'' 72
Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 10' -0'' 40

Lapping 2 x 12 2' -7'' 62

Spacer Bar 2 x 45 0' -9'' 68

10mmØ Stirrups,FB3 2 x 264 5' -5'' ###

Line F FB3,FB5
20mmØ,Top Bar 1 x 2 115' -0'' 230

Extra Bar 1 x 6 10' -0'' 60

1 x 5 10' -0'' 50

1 x 5 14' -0'' 70

1 x 5 18' -0'' 90

1 x 5 18' -0'' 90

1 x 5 14' -0'' 70

1 x 5 14' -0'' 70

1 x 5 10' -0'' 50

1 x 1 8' -0'' 8

Bottom Bar 1 x 4 101' -0'' 404

1 x 4 15' -0'' 60

Extra Bar 1 x 2 12' -0'' 24

1 x 2 8' -0'' 16

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 10' -0'' 20

Lapping 1 x 12 2' -7'' 31

Spacer Bar 1 x 47 0' -9'' 35

10mmØ Stirrups,FB3 1 x 242 5' -5'' ###

FB5 1 x 40 5' -5'' 216.67


Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Line D
FB1,FB3,FB6
20mmØ,Top Bar 1 x 2 204' -0'' 408

Extra Bar 1 x 10 10' -0'' 100

1 x 10 18' -0'' 180

1 x 5 18' -0'' 90

1 x 5 18' -0'' 90

1 x 5 14' -0'' 70

1 x 4 10' -0'' 40

1 x 4 10' -0'' 40

25mmØ,FB2,Extra Bar 1 x 4 6' -6'' 26.00


1 x 3 8' -0'' 24

Bottom Bar 1 x 4 85' -0'' 340

1 x 4 14' -0'' 56

1 x 4 20' -0'' 80

1 x 4 95' -6'' 382

Extra Bar 1 x 12 18' -0'' 216

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 10' -0'' 20

25mmØ,FB2,Extra Bar 1 x 4 7' -0'' 28.00


Lapping 1 x 10 2' -7'' 26

Spacer Bar 1 x 54 0' -9'' 41

10mmØ Stirrups,FB3 1 x 284 5' -5'' ###

FB1 1 x 50 5' -10'' 291.67

FB6 1 x 68 5' -10'' 396.67

Line C
FB1,FB6
20mmØ,Top Bar,FB1 1 x 2 50' -6'' 101

Extra Bar,FB1 1 x 8 8' -0'' 64


Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

1 x 4 10' -0'' 40
20mmØ,Extra Bar 1 x 4 10' -0'' 40

1 x 4 8' -0'' 32

Bottom Bar 1 x 4 14' -0'' 56

1 x 2 20' -0'' 40

Extra Bar,FB1 1 x 2 10' -0'' 20

20mmØ,Extra Bar 1 x 4 8' -0'' 32

Spacer Bar 1 x 45 0' -9'' 34

10mmØ Stirrups,FB1,FB6 1 x 68 5' -10'' 396.67

SB2
Bottom Bar 4 x 2 23' -0'' 184

10mmØ Stirrups,SB2 4 x 54 2' -8'' 576.00

54 16359 19950.50

16mmØ 10mmØ
Rebar Work For Stair
2nd Floor to 3rd Floor Stair 4 x 16 7' -0'' 448.00 Rft

2 x 16 13' -0'' 416.00 Rft

3rd Floor Stair Dowel 2 x 16 13' -0'' 416.00 Rft

2 x 16 12' -0'' 384.00 Rft

Distribution Bar 2 x 14 6' -0'' 168 Rft

2 x 20 12' -6'' 500 Rft

1664.00 668 Rft

Rebar Work For Slab 10mmØ

S3,12-14 Bottom,Main Bar 1 x 25 9' -6'' 238 Rft

Distribution Bar 1 x 11 21' -6'' 237 Rft

Top Bar 1 x 50 11' -0'' 550 Rft

1 x 11 23' -0'' 253 Rft

S2,8-12,Main Bar 1 x 84 9' -6'' 798 Rft

Distribution Bar 1 x 11 72' -6'' 798 Rft


Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Lapping 1 x 11 1' -4'' 15 Rft

Top Bar 1 x 84 11' -6'' 966 Rft

1 x 10 74' -6'' 745 Rft

Lapping 1 x 10 1' -4'' 13 Rft

OT;S1,Line 12-14
Bottom Bar 1 x 25 13' -6'' 338 Rft

1 x 15 21' -6'' 323 Rft

Top Bar 1 x 50 15' -6'' 775 Rft

1 x 15 23' -69'' 431 Rft

Between Line B &D


S2, Bottom,Main 1 x 9 31' -6'' 284 Rft

Dis; 1 x 25 8' -6'' 213 Rft

S2,Top,Main 1 x 9 33' -6'' 302 Rft

Dis; 1 x 25 10' -6'' 263 Rft

S2, Bottom,Main 1 x 16 21' -6'' 344 Rft

Dis; 1 x 25 14' -0'' 350 Rft

Top Bar 1 x 16 23' -6'' 376 Rft

1 x 25 16' -0'' 400 Rft

S1,S2 Bottom,Main 1 x 30 72' -6'' 2175 Rft

Dis; 1 x 84 26' -0'' 2184 Rft

Top Bar 1 x 30 74' -6'' 2235 Rft

1 x 84 28' -0'' 2352 Rft

S1 Top Bar 1 x 21 53' -6'' 1124 Rft

1 x 60 21' -0'' 1260 Rft

Lapping 1 x 81 1' -6'' 122 Rft

S2 Bottom Bar 1 x 13 92' -6'' 1203 Rft

1 x 108 11' -6'' 1242 Rft

Top Bar 1 x 13 94' -6'' 1229 Rft

1 x 108 13' -6'' 1458 Rft

Lapping 13 x 6 1' -6'' 117 Rft

Line E-F
Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

S3 Bottom Bar 1 x 30 11' -6'' 345 Rft

1 x 10 26' -0'' 260 Rft

Top Bar 1 x 60 13' -6'' 810 Rft

1 x 10 28' -0'' 280 Rft

S3 Bottom Bar 1 x 30 9' -6'' 285 Rft

1 x 8 26' -0'' 208 Rft

Top Bar 1 x 60 11' -6'' 690 Rft

1 x 8 28' -0'' 224 Rft

S2 Bottom Bar 1 x 30 51' -6'' 1545 Rft

1 x 60 26' -0'' 1560 Rft

Top Bar 1 x 30 53' -6'' 1605 Rft

1 x 60 28' -0'' 1680 Rft

Lapping 30 x 2 1' -6'' 90 Rft

S2 Bottom Bar 1 x 30 11' -6'' 345 Rft

1 x 12 26' -0'' 312 Rft

Top Bar 1 x 30 13' -6'' 405 Rft

1 x 12 28' -0'' 336 Rft

Line F & G
S2 Bottom Bar 1 x 10 91' -6'' 915 Rft

1 x 109 9' -6'' 1036 Rft

Top Bar 1 x 10 92' -6'' 925 Rft

1 x 109 11' -6'' 1254 Rft

Lapping 10 x 3 1' -6'' 45 Rft

S3,1-3, Bottom,Main Bar 1 x 25 9' -6'' 238 Rft

Distribution Bar 1 x 11 21' -6'' 237 Rft

Top Bar 1 x 50 11' -0'' 550 Rft

1 x 11 23' -0'' 253 Rft

S2,3-8,Bottom,Main Bar 1 x 111 9' -6'' 1055 Rft

Distribution Bar 1 x 12 91' -6'' 1098 Rft

Lapping 2 x 12 1' -4'' 32 Rft

Top Bar 1 x 88 11' -0'' 968 Rft


Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

1 x 12 93' -0'' 1116 Rft

Lapping 2 x 12 1' -4'' 32 Rft

Line 1-3,S3
Bottom,Main Bar 1 x 26 8' -0'' 208 Rft

Distribution Bar 1 x 10 21' -6'' 215 Rft

Top,Main Bar 1 x 42 9' -6'' 399 Rft

Distribution Bar 1 x 17 23' -0'' 391 Rft

S1,Bottom,Main Bar 1 x 25 16' -0'' 400 Rft

Distribution Bar 1 x 20 21' -6'' 430 Rft

Top,Main Bar 1 x 44 17' -6'' 770 Rft

Distribution Bar 1 x 30 23' -0'' 690 Rft

Line 3-5,S3
Bottom,Main Bar 2 x 50 26' -0'' 2600 Rft

Distribution Bar 2 x 30 41' -6'' 2490 Rft

Top,Main Bar 2 x 83 27' -6'' 4565 Rft

Distribution Bar 2 x 60 43' -0'' 5160 Rft

Lapping 2 x 90 1' -4'' 240 Rft

Line 5-6,S2
Bottom,Main Bar 1 x 25 8' -6'' 213 Rft

Distribution Bar 1 x 10 21' -6'' 215 Rft

Top,Main Bar 1 x 21 10' -0'' 210 Rft

Distribution Bar 1 x 8 23' -0'' 184 Rft

Line 5-6,C-D,S1
Bottom,Main Bar 1 x 25 19' -0'' 475 Rft

Distribution Bar 1 x 21 21' -6'' 452 Rft

Top,Main Bar 1 x 45 20' -6'' 923 Rft

Distribution Bar 1 x 35 23' -0'' 805 Rft

Line 6-7,B-C,S2
Bottom,Main Bar 1 x 15 11' -6'' 173 Rft

Distribution Bar 1 x 12 13' -6'' 162 Rft

Top,Main Bar 1 x 13 13' -0'' 169 Rft


Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Distribution Bar 1 x 11 14' -0'' 154 Rft

Line C-D
Bottom,Main Bar 1 x 15 13' -0'' 195 Rft

Distribution Bar 1 x 14 14' -0'' 196 Rft

Top,Main Bar 1 x 13 14' -6'' 189 Rft

Distribution Bar 1 x 12 15' -6'' 186 Rft

Line D-E,1-3 & 7-8,S3


Bottom,Main Bar 2 x 25 11' -6'' 575 Rft

Distribution Bar 2 x 12 21' -6'' 516 Rft

Top,Main Bar 2 x 41 13' -0'' 1066 Rft

Distribution Bar 2 x 21 23' -0'' 966 Rft

Line 3-7,D-E,S2
Bottom,Main Bar 1 x 85 11' -6'' 978 Rft

Distribution Bar 1 x 12 71' -6'' 858 Rft

Top,Main Bar 1 x 73 13' -0'' 949 Rft

Distribution Bar 1 x 11 73' -0'' 803 Rft

Lapping 1 x 23 1' -4'' 31 Rft

Line 2-3,E-F,S2
Bottom,Main Bar 1 x 30 9' -6'' 285 Rft

Distribution Bar 1 x 10 26' -0'' 260 Rft

Top,Main Bar 1 x 50 11' -0'' 550 Rft

Distribution Bar 1 x 17 27' -6'' 468 Rft

Line 5-6,E-F,S2
Bottom,Main Bar 1 x 30 21' -6'' 645 Rft

Distribution Bar 1 x 25 26' -0'' 650 Rft

Top,Main Bar 1 x 50 23' -0'' 1150 Rft

Distribution Bar 1 x 12 27' -6'' 330 Rft

Line 6-8,E-F,S3
Bottom,Main Bar 1 x 37 26' -0'' 962 Rft

Distribution Bar 1 x 30 31' -6'' 945 Rft

Top,Main Bar 1 x 62 27' -6'' 1705 Rft


Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Distribution Bar 1 x 51 33' -0'' 1683 Rft

Line 1-8,F-G,S2
Bottom,Main Bar 1 x 133 9' -6'' 1264 Rft

Distribution Bar 1 x 10 111' -6'' 1115 Rft

Top,Main Bar 1 x 113 11' -0'' 1243 Rft

Distribution Bar 1 x 9 113' -0'' 1017 Rft

Lapping 2 x 19 1' -4'' 51 Rft

Chair 2 x 320 2' -6'' 1600 Rft

92558 Rft

10mmØ - 131801.11 Rft x0.415 Lb 54697.46 488 Cwt

16mmØ - 1664Rft x1.062 Lb 1767.16 16 Cwt

20mmØ - 32402 Rft x1.66 Lb 53787 480 Cwt

25mmØ - 467.83 Rft x 2.587 Lb 1210.27 11 Cwt

995 Cwt

3 G-30 Ready Mixed Concreting Work


for 3rd Floor Beam & Slab
Line 1
FB1 1 x 1 22' -8'' 1' -0'' 2' -0'' 45 Cft

FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21 Cft

FB2a 1 x 1 8' -2'' 1' -0'' 1' -8'' 14 Cft

FB5 1 x 1 22' -8'' 1' -2'' 2' -0'' 53 Cft

Line 2,3,4,5,6,7
FB1 9 x 1 22' -8'' 1' -0'' 2' -0'' 408 Cft

FB1 1 x 1 10' -2'' 1' -0'' 2' -0'' 20 Cft

FB5 1 x 1 22' -8'' 1' -2'' 2' -0'' 53 Cft

FB6 2 x 1 9' -6'' 1' -0'' 2' -0'' 38 Cft


Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

FB2 11 x 1 6' -4'' 1' -0'' 1' -8'' 116 Cft

FB2a 5 x 1 8' -3'' 1' -0'' 1' -8'' 69 Cft

SB2 3 x 1 70' -0'' 0' -9'' 1' -6'' 236 Cft

SB2 1 x 1 31' -6'' 0' -9'' 1' -6'' 35 Cft

SB1 2 x 1 7' -0'' 0' -9'' 1' -6'' 16 Cft

Line A & G FB4 2 x 1 101' -0'' 1' -0'' 1' -8'' 337 Cft

FB3 1 x 1 99' -0'' 1' -0'' 1' -10'' 182 Cft

1 x 1 97' -3'' 1' -0'' 1' -10'' 178 Cft

Line D FB1 1 x 1 10' -8'' 1' -0'' 2' -0'' 21 Cft

FB3 1 x 1 72' -8'' 1' -0'' 1' -10'' 133 Cft

FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28 Cft

Line F
FB3 1 x 1 87' -0'' 1' -0'' 1' -10'' 160 Cft

FB5 1 x 1 10' -3'' 1' -2'' 2' -0'' 24 Cft

Line C
FB1 1 x 1 9' -2'' 1' -0'' 2' -0'' 18 Cft

FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28 Cft

Line Between 1 & 3


SB2 2 x 1 19' -0'' 0' -9'' 1' -6'' 43 Cft

1 x 1 18' -3'' 0' -9'' 1' -6'' 21 Cft

C1,C2 24 x 1 1' -4'' 1' -6'' 2' -0'' 96 Cft

C3,C4 51 x 1 1' -4'' 1' -10'' 2' -0'' 249 Cft

C5 6 x 1 1' -0'' 3' -0'' 2' -0'' 36 Cft

Slab S3 2 x 1 19' -0'' 7' -0'' 0' -5'' 111 Cft

Slab S3 1 x 1 19' -0'' 5' -6'' 0' -5'' 44 Cft

Slab S3 4 x 1 23' -6'' 9' -2'' 0' -5'' 359 Cft

Slab S3 2 x 1 19' -0'' 9' -0'' 0' -5'' 143 Cft

Slab S3 1 x 1 23' -6'' 7' -0'' 0' -5'' 69 Cft

Slab S3 6 x 1 23' -6'' 9' -2'' 0' -5'' 539 Cft

Slab S3 1 x 1 23' -6'' 9' -0'' 0' -5'' 88 Cft


Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Slab S2 14 x 1 9' -3'' 7' -0'' 0' -5'' 378 Cft

Slab S2 2 x 1 9' -0'' 7' -0'' 0' -5'' 53 Cft

Slab S2 1 x 1 9' -0'' 11' -0'' 0' -5'' 41 Cft

Slab S2 1 x 1 11' -0'' 11' -6'' 0' -5'' 53 Cft

Slab S2 6 x 1 9' -2'' 9' -0'' 0' -5'' 206 Cft

Slab S2 1 x 1 9' -0'' 9' -0'' 0' -5'' 34 Cft

Slab S2 1 x 1 7' -0'' 7' -0'' 0' -5'' 20 Cft

Slab S2 1 x 1 11' -0'' 7' -0'' 0' -5'' 32 Cft

Slab S2 4 x 1 10' -4'' 9' -2'' 0' -5'' 158 Cft

Slab S2 2 x 1 3' -9'' 7' -0'' 0' -5'' 22 Cft

Slab S2 2 x 1 5' -3'' 7' -0'' 0' -5'' 31 Cft

Slab S1 1 x 1 15' -0'' 19' -0'' 0' -5'' 119 Cft

Slab S1 2 x 1 9' -3'' 15' -9'' 0' -5'' 121 Cft

Stair Step 12 × 1 5' -3'' 0' -6'' 0' -6'' 16 Cft

Flight 1 × 2 13' -6'' 5' -3'' 0' -9'' 106 Cft

Landing Floor 1 × 1 11' -0'' 6' -2'' 0' -9'' 51 Cft

1 × 1 11' -0'' 2' -2'' 0' -9'' 18 Cft

FB1 1 x 1 22' -8'' 1' -0'' 2' -0'' 45 Cft

FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21 Cft

FB2a 1 x 1 8' -2'' 1' -0'' 1' -8'' 14 Cft

FB6 1 x 1 9' -6'' 1' -0'' 2' -0'' 19 Cft

FB1 1 x 1 10' -2'' 1' -0'' 2' -0'' 20 Cft


Line - 14 FB5 1 × 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
Line - 13, 14 FB1 2 × 1 22' -8'' 1' -0'' 2' -0'' 91 Cft
FB2 3 × 1 6' -4'' 1' -0'' 1' -8'' 32 Cft
FB2a 1 × 1 8' -2'' 1' -0'' 1' -8'' 14 Cft
SB2 1 × 1 22' -8'' 1' -0'' 1' -8'' 38 Cft
Line 9.10.11.12FB1 7 × 1 22' -8'' 1' -0'' 2' -0'' 317 Cft
FB5 1 × 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
Between 9.10.11.12 SB2 3 × 1 73' -6'' 0' -9'' 1' -6'' 248 Cft
Line-13 SB2 1 × 1 17' -3'' 0' -9'' 1' -6'' 19 Cft
Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
SB1 1 × 1 7' -0'' 0' -9'' 1' -6'' 8 Cft
Line 9.10.11.12 FB2 8 × 1 6' -4'' 1' -0'' 1' -8'' 84 Cft
FB 2a 4 × 1 8' -2'' 1' -0'' 1' -8'' 54 Cft
A&G FB4 2 × 1 84' -3'' 1' -0'' 1' -8'' 281 Cft
Line F,FB3 1 × 1 72' -3'' 1' -0'' 1' ### 132 Cft
LineB,D, E,FB3 3 × 1 84' -3'' 1' -0'' 1' ### 463 Cft
FB5 1 × 1 9' -2'' 1' -2'' 2' -0'' 21 Cft
SB2 1 × 1 84' -6'' 0' -9'' 1' -6'' 95 Cft
SB2 1 × 1 44' -6'' 0' -9'' 1' -6'' 50 Cft

2 × 1 74' -0'' 0' -9'' 1' -6'' 167 Cft


SB2 1 × 1 23' -0'' 0' -9'' 1' -6'' 26 Cft
SB1 3 × 1 9' -1'' 0' -9'' 1' -6'' 31 Cft
Slab S2 2 × 1 9' -0'' 7' -0'' 0' -5'' 53 Cft
Slab S2 12 × 1 9' -1'' 7' -0'' 0' -5'' 318 Cft
Slab S2 1 × 1 9' -0'' 7' -0'' 0' -5'' 26 Cft
Slab S2 3 × 1 9' -1'' 7' -0'' 0' -5'' 79 Cft
Slab S2` 1 × 1 15' -9'' 9' -0'' 0' -5'' 59 Cft
Slab S2 2 × 1 7' -6'' 9' -1'' 0' -5'' 57 Cft
Slab S2 1 × 1 9' -0'' 9' -0'' 0' -5'' 34 Cft
Slab S2 6 × 1 9' -1'' 9' -0'' 0' -5'' 204 Cft
Slab S2 2 × 1 11' -4'' 9' -0'' 0' -5'' 85 Cft
Slab S2 8 × 1 11' -4'' 9' -1'' 0' -5'' 343 Cft
Slab S2 3 × 1 7' -4'' 9' -1'' 0' -5'' 83 Cft
Slab OT 1 × 1 23' -6'' 7' -0'' 0' -5'' 69 Cft
Slab S1 5 × 1 16' -6'' 9' -2'' 0' -5'' 315 Cft
Slab S3 1 × 1 19' -0'' 7' -0'' 0' -5'' 55 Cft
Slab S1 1 × 1 19' -0'' 11' -1'' 0' -5'' 88 Cft
Slab S2 1 × 1 7' -1'' 11' -1'' 0' -5'' 33 Cft
Slab S2 1 × 1 11' -1'' 11' -1'' 0' -5'' 51 Cft
Slab S2 1 × 1 7' -1'' 9' -0'' 0' -5'' 27 Cft
Slab S2 1 × 1 11' -1'' 9' -0'' 0' -5'' 42 Cft
Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Slab S2 1 × 1 7' -0'' 7' -0'' 0' -5'' 20 Cft
Slab S2 1 × 1 11' -0'' 7' -0'' 0' -5'' 32 Cft
Stair Step 7 × 1 5' -3'' 0' -6'' 0' -6'' 9 Cft
Flight 1 × 1 8' -0'' 5' -3'' 0' -9'' 32 Cft
Landing Floor 1 × 1 11' -0'' 6' -2'' 0' -9'' 51 Cft

10048 Cft

Hire Charges For Concreting Work


4 10089 Cft
Vibrator
25 Day

Curing Work For Concreting


5 For14 Day
For 2nd Floor
1 × 1 204' -0'' 80' -0'' 16320 Sft
Location Head- လ

&ေ
ဆ န င န န ငအမ$'နင႔မကကကလလယ ခငလ$ ပ% န

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Total of
Total of

111
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

1 (4")thk Sand Filling Work


Floor Area
1 x 1 89' -0'' 49' -0'' 4361 Sft

1 x 1 115' -0'' 42' -0'' 4830 Sft


9191 Sft

Deduction 1 x 1 9' -0'' 42' -0'' 378 Sft

8813 Sft

(4")thk Sand Filling Work x 4" 2908 Cuft

2 (4½")thk (1:3:6)con Flooring Work


As per Item No (1) 8813 Sft

x 4½" 3305 Cuft

3 (1½")thk (1:2:4)con Floor Topping Work


As per Item No (1) 8813 Sft

4 Dismentling work of Existing Door


D1 22 x 1 7' -6'' 4' -6'' 743 Sft

5 Making and Fixing work **


for Door with 5Ply wood 22 x 1 6' -7'' 4' -6'' 652 Sft

x2 1304 Sft

6 Painting Work For Door


As Per Item No. (6) 652 Sft

x2 1304 Sft
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

As per Item No. (1) 951 Cft

14 Transporting work of Broken-Concrete


by Truck-Car to outside Downtown
As per Item No. (1) 951 Cft

150 cft Per Trip = 6 Trips


Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

SB2
20mmØ,Top Bar 4 x 2 12' -3'' 98

Extra Bar 4x 1 6' -0'' 24

4x 1 6' -0'' 24

Bottom Bar 4 x 2 10' -0'' 80

Extra Bar 4x 1 6' -2'' 25

10mmØ Stirrups,SB2 4 x 35 2' -8'' ###

Line A & G
20mmØ,FB4,Top Bar 2 x 2 93' -8'' 375

Extra Bar 2x 2 8' -9'' 35

2 x 2 15' -3'' 61

2 x 2 17' -3'' 69

2 x 2 17' -3'' 69

2 x 2 17' -3'' 69

2 x 2 10' -8'' 43
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Bottom Bar 2 x 4 92' -8'' 741

Lapping 2x 2 2' -7'' 10

10mmØ Stirrups,FB4 2 x### 5' -1'' ###

Line B,G & E


20mmØ,FB3,Top Bar 3 x 2 93' -6'' 561

Extra Bar 3x 5 8' -9'' 131

3 x 5 15' -3'' 229

3 x 5 17' -3'' 259

3 x 5 17' -3'' 259

3 x 5 17' -3'' 259

3 x 5 10' -8'' 160

Bottom Bar 3 x 4 92' -3'' 1107

Extra Bar 3x 2 6' -10'' 41

3 x 2 17' -3'' 104

3 x 2 17' -3'' 104

3 x 3 17' -3'' 155

3 x 3 17' -3'' 155

Lapping 3x 2 2' -7'' 16

Spacer Bar 3 x 68 0' -9'' 153

10mmØ Stirrups,FB3 3 x### 5' -5'' ###

Line No F,FB3,FB5
20mmØ,Top Bar 1 x 2 93' -4'' 187

Extra Bar 1x 5 8' -9'' 44

1 x 5 15' -3'' 76

1 x 5 17' -3'' 86

1 x 10 17' -3'' 173

1x 5 9' -3'' 46

1x 7 7' -3'' 51

Bottom Bar 1 x 4 92' -3'' 369

Extra Bar 1x 2 7' -9'' 16

1 x 2 17' -3'' 35

1 x 2 17' -3'' 35
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

1 x 2 17' -3'' 35

1x 2 8' -9'' 18

1x 2 8' -9'' 18

Lapping 1 x 2 2' -7'' 5

Spacer Bar 1 x 68 0' -9'' 51

10mmØ Stirrups,FB3,FB5 1 x### 5' -5'' ###

Line No C
20mmØ,SB2,Top Bar 1 x 2 94' -3'' 189

Bottom Bar 1 x 2 93' -0'' 186

Lapping 1 x 2 2' -7'' 5

10mmØ Stirrups,SB2 1 x### 2' -8'' ###

Line No Between E& F


20mmØ,SB2,Top Bar 1 x 2 23' -3'' 47

Bottom Bar 1 x 2 22' -0'' 44

Lapping 1 x 1 2' -7'' 3

10mmØ Stirrups,SB2 1 x 53 2' -8'' ###

Line A & G,FB4


20mmØ,Top Bar 2 x 2 115' -0'' 460

Extra Bar 2 x 2 10' -0'' 40

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 14' -0'' 56

2 x 2 14' -0'' 56

2 x 2 10' -0'' 40

Bottom Bar 2 x 4 113' -6'' 908

Lapping 2 x 12 2' -7'' 62

10mmØ Stirrups,FB4 2 x 270 5' -1'' ###

Line B & E,FB3


20mmØ,Top Bar 2 x 2 115' -0'' 460

Extra Bar 2 x 5 10' -0'' 100

2 x 5 18' -0'' 180


Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

2 x 5 18' -0'' 180

2 x 5 18' -0'' 180

2 x 5 14' -0'' 140

2 x 5 14' -0'' 140

2 x 5 10' -0'' 100

Bottom Bar 2 x 4 113' -6'' 908

Extra Bar 2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 18' -0'' 72

2 x 2 10' -0'' 40

Lapping 2 x 12 2' -7'' 62

Spacer Bar 2 x 45 0' -9'' 68

10mmØ Stirrups,FB3 2 x 264 5' -5'' ###

Line F FB3,FB5
20mmØ,Top Bar 1 x 2 115' -0'' 230

Extra Bar 1 x 6 10' -0'' 60

1 x 5 10' -0'' 50

1 x 5 14' -0'' 70

1 x 5 18' -0'' 90

1 x 5 18' -0'' 90

1 x 5 14' -0'' 70

1 x 5 14' -0'' 70

1 x 5 10' -0'' 50

1 x 1 8' -0'' 8

Bottom Bar 1 x 4 101' -0'' 404

1 x 4 15' -0'' 60

Extra Bar 1 x 2 12' -0'' 24

1 x 2 8' -0'' 16

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 10' -0'' 20

Lapping 1 x 12 2' -7'' 31

Spacer Bar 1 x 47 0' -9'' 35

10mmØ Stirrups,FB3 1 x 242 5' -5'' ###

FB5 1 x 40 5' -5'' ###

Line D
FB1,FB3,FB6
20mmØ,Top Bar 1 x 2 204' -0'' 408

Extra Bar 1 x 10 10' -0'' 100

1 x 10 18' -0'' 180

1 x 5 18' -0'' 90

1 x 5 18' -0'' 90

1 x 5 14' -0'' 70

1 x 4 10' -0'' 40

1 x 4 10' -0'' 40

25mmØ,FB2,Extra Bar 1 x 4 6' -6'' 26.00


1 x 3 8' -0'' 24

Bottom Bar 1 x 4 85' -0'' 340

1 x 4 14' -0'' 56

1 x 4 20' -0'' 80

1 x 4 95' -6'' 382

Extra Bar 1 x 12 18' -0'' 216

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 18' -0'' 36

1 x 2 10' -0'' 20

25mmØ,FB2,Extra Bar 1 x 4 7' -0'' 28.00


Lapping 1 x 10 2' -7'' 26

Spacer Bar 1 x 54 0' -9'' 41

10mmØ Stirrups,FB3 1 x 284 5' -5'' ###


Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

FB1 1 x 50 5' -10'' ###

FB6 1 x 68 5' -10'' ###

Line C
FB1,FB6
20mmØ,Top Bar,FB1 1 x 2 50' -6'' 101

Extra Bar,FB1 1 x 8 8' -0'' 64

1 x 4 10' -0'' 40
20mmØ,Extra Bar 1 x 4 10' -0'' 40

1 x 4 8' -0'' 32

Bottom Bar 1 x 4 14' -0'' 56

1 x 2 20' -0'' 40

Extra Bar,FB1 1 x 2 10' -0'' 20

20mmØ,Extra Bar 1 x 4 8' -0'' 32

Spacer Bar 1 x 45 0' -9'' 34

10mmØ Stirrups,FB1,FB6 1 x 68 5' -10'' ###

SB2
Bottom Bar 4 x 2 23' -0'' 184

10mmØ Stirrups,SB2 4 x 54 2' -8'' ###

54 16359 19950.50

16mmØ 10mmØ
Rebar Work For Stair
2nd Floor to 3rd Floor Stair 4 x 16 7' -0'' 448.00 Rft

2 x 16 13' -0'' 416.00 Rft

3rd Floor Stair Dowel 2 x 16 13' -0'' 416.00 Rft

2 x 16 12' -0'' 384.00 Rft

Distribution Bar 2 x 14 6' -0'' 168 Rft

2 x 20 12' -6'' 500 Rft

1664.00 668 Rft

Rebar Work For Slab 10mmØ

S3,12-14 Bottom,Main Bar 1 x 25 9' -6'' 238 Rft


Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Distribution Bar 1 x 11 21' -6'' 237 Rft

Top Bar 1 x 50 11' -0'' 550 Rft

1 x 11 23' -0'' 253 Rft

S2,8-12,Main Bar 1 x 84 9' -6'' 798 Rft

Distribution Bar 1 x 11 72' -6'' 798 Rft

Lapping 1 x 11 1' -4'' 15 Rft

Top Bar 1 x 84 11' -6'' 966 Rft

1 x 10 74' -6'' 745 Rft

Lapping 1 x 10 1' -4'' 13 Rft

OT;S1,Line 12-14
Bottom Bar 1 x 25 13' -6'' 338 Rft

1 x 15 21' -6'' 323 Rft

Top Bar 1 x 50 15' -6'' 775 Rft

1 x 15 23' -69'' 431 Rft

Between Line B &D


S2, Bottom,Main 1 x 9 31' -6'' 284 Rft

Dis; 1 x 25 8' -6'' 213 Rft

S2,Top,Main 1 x 9 33' -6'' 302 Rft

Dis; 1 x 25 10' -6'' 263 Rft

S2, Bottom,Main 1 x 16 21' -6'' 344 Rft

Dis; 1 x 25 14' -0'' 350 Rft

Top Bar 1 x 16 23' -6'' 376 Rft

1 x 25 16' -0'' 400 Rft

S1,S2 Bottom,Main 1 x 30 72' -6'' 2175 Rft

Dis; 1 x 84 26' -0'' 2184 Rft

Top Bar 1 x 30 74' -6'' 2235 Rft

1 x 84 28' -0'' 2352 Rft

S1 Top Bar 1 x 21 53' -6'' 1124 Rft

1 x 60 21' -0'' 1260 Rft

Lapping 1 x 81 1' -6'' 122 Rft

S2 Bottom Bar 1 x 13 92' -6'' 1203 Rft

1 x 108 11' -6'' 1242 Rft


Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Top Bar 1 x 13 94' -6'' 1229 Rft

1 x 108 13' -6'' 1458 Rft

Lapping 13 x 6 1' -6'' 117 Rft

Line E-F
S3 Bottom Bar 1 x 30 11' -6'' 345 Rft

1 x 10 26' -0'' 260 Rft

Top Bar 1 x 60 13' -6'' 810 Rft

1 x 10 28' -0'' 280 Rft

S3 Bottom Bar 1 x 30 9' -6'' 285 Rft

1 x 8 26' -0'' 208 Rft

Top Bar 1 x 60 11' -6'' 690 Rft

1 x 8 28' -0'' 224 Rft

S2 Bottom Bar 1 x 30 51' -6'' 1545 Rft

1 x 60 26' -0'' 1560 Rft

Top Bar 1 x 30 53' -6'' 1605 Rft

1 x 60 28' -0'' 1680 Rft

Lapping 30 x 2 1' -6'' 90 Rft

S2 Bottom Bar 1 x 30 11' -6'' 345 Rft

1 x 12 26' -0'' 312 Rft

Top Bar 1 x 30 13' -6'' 405 Rft

1 x 12 28' -0'' 336 Rft

Line F & G
S2 Bottom Bar 1 x 10 91' -6'' 915 Rft

1 x 109 9' -6'' 1036 Rft

Top Bar 1 x 10 92' -6'' 925 Rft

1 x 109 11' -6'' 1254 Rft

Lapping 10 x 3 1' -6'' 45 Rft

S3,1-3, Bottom,Main Bar 1 x 25 9' -6'' 238 Rft

Distribution Bar 1 x 11 21' -6'' 237 Rft

Top Bar 1 x 50 11' -0'' 550 Rft

1 x 11 23' -0'' 253 Rft

S2,3-8,Bottom,Main Bar 1 x 111 9' -6'' 1055 Rft


Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Distribution Bar 1 x 12 91' -6'' 1098 Rft

Lapping 2 x 12 1' -4'' 32 Rft

Top Bar 1 x 88 11' -0'' 968 Rft

1 x 12 93' -0'' 1116 Rft

Lapping 2 x 12 1' -4'' 32 Rft

Line 1-3,S3
Bottom,Main Bar 1 x 26 8' -0'' 208 Rft

Distribution Bar 1 x 10 21' -6'' 215 Rft

Top,Main Bar 1 x 42 9' -6'' 399 Rft

Distribution Bar 1 x 17 23' -0'' 391 Rft

S1,Bottom,Main Bar 1 x 25 16' -0'' 400 Rft

Distribution Bar 1 x 20 21' -6'' 430 Rft

Top,Main Bar 1 x 44 17' -6'' 770 Rft

Distribution Bar 1 x 30 23' -0'' 690 Rft

Line 3-5,S3
Bottom,Main Bar 2 x 50 26' -0'' 2600 Rft

Distribution Bar 2 x 30 41' -6'' 2490 Rft

Top,Main Bar 2 x 83 27' -6'' 4565 Rft

Distribution Bar 2 x 60 43' -0'' 5160 Rft

Lapping 2 x 90 1' -4'' 240 Rft

Line 5-6,S2
Bottom,Main Bar 1 x 25 8' -6'' 213 Rft

Distribution Bar 1 x 10 21' -6'' 215 Rft

Top,Main Bar 1 x 21 10' -0'' 210 Rft

Distribution Bar 1 x 8 23' -0'' 184 Rft

Line 5-6,C-D,S1
Bottom,Main Bar 1 x 25 19' -0'' 475 Rft

Distribution Bar 1 x 21 21' -6'' 452 Rft

Top,Main Bar 1 x 45 20' -6'' 923 Rft

Distribution Bar 1 x 35 23' -0'' 805 Rft

Line 6-7,B-C,S2
Bottom,Main Bar 1 x 15 11' -6'' 173 Rft
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Distribution Bar 1 x 12 13' -6'' 162 Rft

Top,Main Bar 1 x 13 13' -0'' 169 Rft

Distribution Bar 1 x 11 14' -0'' 154 Rft

Line C-D
Bottom,Main Bar 1 x 15 13' -0'' 195 Rft

Distribution Bar 1 x 14 14' -0'' 196 Rft

Top,Main Bar 1 x 13 14' -6'' 189 Rft

Distribution Bar 1 x 12 15' -6'' 186 Rft

Line D-E,1-3 & 7-8,S3


Bottom,Main Bar 2 x 25 11' -6'' 575 Rft

Distribution Bar 2 x 12 21' -6'' 516 Rft

Top,Main Bar 2 x 41 13' -0'' 1066 Rft

Distribution Bar 2 x 21 23' -0'' 966 Rft

Line 3-7,D-E,S2
Bottom,Main Bar 1 x 85 11' -6'' 978 Rft

Distribution Bar 1 x 12 71' -6'' 858 Rft

Top,Main Bar 1 x 73 13' -0'' 949 Rft

Distribution Bar 1 x 11 73' -0'' 803 Rft

Lapping 1 x 23 1' -4'' 31 Rft

Line 2-3,E-F,S2
Bottom,Main Bar 1 x 30 9' -6'' 285 Rft

Distribution Bar 1 x 10 26' -0'' 260 Rft

Top,Main Bar 1 x 50 11' -0'' 550 Rft

Distribution Bar 1 x 17 27' -6'' 468 Rft

Line 5-6,E-F,S2
Bottom,Main Bar 1 x 30 21' -6'' 645 Rft

Distribution Bar 1 x 25 26' -0'' 650 Rft

Top,Main Bar 1 x 50 23' -0'' 1150 Rft

Distribution Bar 1 x 12 27' -6'' 330 Rft

Line 6-8,E-F,S3
Bottom,Main Bar 1 x 37 26' -0'' 962 Rft

Distribution Bar 1 x 30 31' -6'' 945 Rft


Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Top,Main Bar 1 x 62 27' -6'' 1705 Rft

Distribution Bar 1 x 51 33' -0'' 1683 Rft

Line 1-8,F-G,S2
Bottom,Main Bar 1 x 133 9' -6'' 1264 Rft

Distribution Bar 1 x 10 111' -6'' 1115 Rft

Top,Main Bar 1 x 113 11' -0'' 1243 Rft

Distribution Bar 1 x 9 113' -0'' 1017 Rft

Lapping 2 x 19 1' -4'' 51 Rft

Chair 2 x 320 2' -6'' 1600 Rft

92558 Rft

10mmØ - 131801.11 Rft x0.415 Lb 54697.46 488 Cwt


16mmØ - 1664Rft x1.062 Lb 1767.16 16 Cwt
20mmØ - 32402 Rft x1.66 Lb 53787 480 Cwt
25mmØ - 467.83 Rft x 2.587 Lb 1210.27 11 Cwt
995 Cwt

3 G-30 Ready Mixed Concreting Work


for 3rd Floor Beam & Slab
Line 1
FB1 1 x 1 22' -8'' 1' -0'' 2' -0'' 45 Cft

FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21 Cft

FB2a 1 x 1 8' -2'' 1' -0'' 1' -8'' 14 Cft

FB5 1 x 1 22' -8'' 1' -2'' 2' -0'' 53 Cft

Line 2,3,4,5,6,7
FB1 9 x 1 22' -8'' 1' -0'' 2' -0'' 408 Cft

FB1 1 x 1 10' -2'' 1' -0'' 2' -0'' 20 Cft

FB5 1 x 1 22' -8'' 1' -2'' 2' -0'' 53 Cft

FB6 2 x 1 9' -6'' 1' -0'' 2' -0'' 38 Cft


Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

FB2 11 x 1 6' -4'' 1' -0'' 1' -8'' 116 Cft

FB2a 5 x 1 8' -3'' 1' -0'' 1' -8'' 69 Cft

SB2 3 x 1 70' -0'' 0' -9'' 1' -6'' 236 Cft

SB2 1 x 1 31' -6'' 0' -9'' 1' -6'' 35 Cft

SB1 2 x 1 7' -0'' 0' -9'' 1' -6'' 16 Cft

Line A & G FB4 2 x 1 101' -0'' 1' -0'' 1' -8'' 337 Cft

FB3 1 x 1 99' -0'' 1' -0'' 1' -10'' 182 Cft

1 x 1 97' -3'' 1' -0'' 1' -10'' 178 Cft

Line D FB1 1 x 1 10' -8'' 1' -0'' 2' -0'' 21 Cft

FB3 1 x 1 72' -8'' 1' -0'' 1' -10'' 133 Cft

FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28 Cft

Line F
FB3 1 x 1 87' -0'' 1' -0'' 1' -10'' 160 Cft

FB5 1 x 1 10' -3'' 1' -2'' 2' -0'' 24 Cft

Line C
FB1 1 x 1 9' -2'' 1' -0'' 2' -0'' 18 Cft

FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28 Cft

Line Between 1 & 3


SB2 2 x 1 19' -0'' 0' -9'' 1' -6'' 43 Cft

1 x 1 18' -3'' 0' -9'' 1' -6'' 21 Cft

C1,C2 24 x 1 1' -4'' 1' -6'' 2' -0'' 96 Cft

C3,C4 51 x 1 1' -4'' 1' -10'' 2' -0'' 249 Cft

C5 6 x 1 1' -0'' 3' -0'' 2' -0'' 36 Cft

Slab S3 2 x 1 19' -0'' 7' -0'' 0' -5'' 111 Cft

Slab S3 1 x 1 19' -0'' 5' -6'' 0' -5'' 44 Cft

Slab S3 4 x 1 23' -6'' 9' -2'' 0' -5'' 359 Cft

Slab S3 2 x 1 19' -0'' 9' -0'' 0' -5'' 143 Cft

Slab S3 1 x 1 23' -6'' 7' -0'' 0' -5'' 69 Cft

Slab S3 6 x 1 23' -6'' 9' -2'' 0' -5'' 539 Cft

Slab S3 1 x 1 23' -6'' 9' -0'' 0' -5'' 88 Cft

Slab S2 14 x 1 9' -3'' 7' -0'' 0' -5'' 378 Cft


Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Slab S2 2 x 1 9' -0'' 7' -0'' 0' -5'' 53 Cft

Slab S2 1 x 1 9' -0'' 11' -0'' 0' -5'' 41 Cft

Slab S2 1 x 1 11' -0'' 11' -6'' 0' -5'' 53 Cft

Slab S2 6 x 1 9' -2'' 9' -0'' 0' -5'' 206 Cft

Slab S2 1 x 1 9' -0'' 9' -0'' 0' -5'' 34 Cft

Slab S2 1 x 1 7' -0'' 7' -0'' 0' -5'' 20 Cft

Slab S2 1 x 1 11' -0'' 7' -0'' 0' -5'' 32 Cft

Slab S2 4 x 1 10' -4'' 9' -2'' 0' -5'' 158 Cft

Slab S2 2 x 1 3' -9'' 7' -0'' 0' -5'' 22 Cft

Slab S2 2 x 1 5' -3'' 7' -0'' 0' -5'' 31 Cft

Slab S1 1 x 1 15' -0'' 19' -0'' 0' -5'' 119 Cft

Slab S1 2 x 1 9' -3'' 15' -9'' 0' -5'' 121 Cft

Stair Step 12 × 1 5' -3'' 0' -6'' 0' -6'' 16 Cft

Flight 1 × 2 13' -6'' 5' -3'' 0' -9'' 106 Cft

Landing Floor 1 × 1 11' -0'' 6' -2'' 0' -9'' 51 Cft

1 × 1 11' -0'' 2' -2'' 0' -9'' 18 Cft

FB1 1 x 1 22' -8'' 1' -0'' 2' -0'' 45 Cft

FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21 Cft

FB2a 1 x 1 8' -2'' 1' -0'' 1' -8'' 14 Cft

FB6 1 x 1 9' -6'' 1' -0'' 2' -0'' 19 Cft

FB1 1 x 1 10' -2'' 1' -0'' 2' -0'' 20 Cft


Line - 14 FB5 1 × 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
Line - 13, 14 FB1 2 × 1 22' -8'' 1' -0'' 2' -0'' 91 Cft
FB2 3 × 1 6' -4'' 1' -0'' 1' -8'' 32 Cft
FB2a 1 × 1 8' -2'' 1' -0'' 1' -8'' 14 Cft
SB2 1 × 1 22' -8'' 1' -0'' 1' -8'' 38 Cft
Line 9.10.11.12FB1 7 × 1 22' -8'' 1' -0'' 2' -0'' 317 Cft
FB5 1 × 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
Between 9.10.11.12 SB2 3 × 1 73' -6'' 0' -9'' 1' -6'' 248 Cft
Line-13 SB2 1 × 1 17' -3'' 0' -9'' 1' -6'' 19 Cft
SB1 1 × 1 7' -0'' 0' -9'' 1' -6'' 8 Cft
Line 9.10.11.12 FB2 8 × 1 6' -4'' 1' -0'' 1' -8'' 84 Cft
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
FB 2a 4 × 1 8' -2'' 1' -0'' 1' -8'' 54 Cft
A&G FB4 2 × 1 84' -3'' 1' -0'' 1' -8'' 281 Cft
Line F,FB3 1 × 1 72' -3'' 1' -0'' 1' ### 132 Cft
LineB,D, E,FB3 3 × 1 84' -3'' 1' -0'' 1' ### 463 Cft
FB5 1 × 1 9' -2'' 1' -2'' 2' -0'' 21 Cft
SB2 1 × 1 84' -6'' 0' -9'' 1' -6'' 95 Cft
SB2 1 × 1 44' -6'' 0' -9'' 1' -6'' 50 Cft

2 × 1 74' -0'' 0' -9'' 1' -6'' 167 Cft


SB2 1 × 1 23' -0'' 0' -9'' 1' -6'' 26 Cft
SB1 3 × 1 9' -1'' 0' -9'' 1' -6'' 31 Cft
Slab S2 2 × 1 9' -0'' 7' -0'' 0' -5'' 53 Cft
Slab S2 12 × 1 9' -1'' 7' -0'' 0' -5'' 318 Cft
Slab S2 1 × 1 9' -0'' 7' -0'' 0' -5'' 26 Cft
Slab S2 3 × 1 9' -1'' 7' -0'' 0' -5'' 79 Cft
Slab S2` 1 × 1 15' -9'' 9' -0'' 0' -5'' 59 Cft
Slab S2 2 × 1 7' -6'' 9' -1'' 0' -5'' 57 Cft
Slab S2 1 × 1 9' -0'' 9' -0'' 0' -5'' 34 Cft
Slab S2 6 × 1 9' -1'' 9' -0'' 0' -5'' 204 Cft
Slab S2 2 × 1 11' -4'' 9' -0'' 0' -5'' 85 Cft
Slab S2 8 × 1 11' -4'' 9' -1'' 0' -5'' 343 Cft
Slab S2 3 × 1 7' -4'' 9' -1'' 0' -5'' 83 Cft
Slab OT 1 × 1 23' -6'' 7' -0'' 0' -5'' 69 Cft
Slab S1 5 × 1 16' -6'' 9' -2'' 0' -5'' 315 Cft
Slab S3 1 × 1 19' -0'' 7' -0'' 0' -5'' 55 Cft
Slab S1 1 × 1 19' -0'' 11' -1'' 0' -5'' 88 Cft
Slab S2 1 × 1 7' -1'' 11' -1'' 0' -5'' 33 Cft
Slab S2 1 × 1 11' -1'' 11' -1'' 0' -5'' 51 Cft
Slab S2 1 × 1 7' -1'' 9' -0'' 0' -5'' 27 Cft
Slab S2 1 × 1 11' -1'' 9' -0'' 0' -5'' 42 Cft
Slab S2 1 × 1 7' -0'' 7' -0'' 0' -5'' 20 Cft
Slab S2 1 × 1 11' -0'' 7' -0'' 0' -5'' 32 Cft
Stair Step 7 × 1 5' -3'' 0' -6'' 0' -6'' 9 Cft
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Flight 1 × 1 8' -0'' 5' -3'' 0' -9'' 32 Cft
Landing Floor 1 × 1 11' -0'' 6' -2'' 0' -9'' 51 Cft

10048 Cft

Hire Charges For Concreting Work


4 10089 Cft
Vibrator
25 Day
Curing Work For Concreting
5 For14 Day
For 2nd Floor
1 × 1 204' -0'' 80' -0'' 16320 Sft
Location Head - ရ
ေ $ င &အစညေအ၀ခနေမဆင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
otal of

#REF!
p

3304.88

1303.5
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

1 Material Cost
J Wood (2Times) 4.16 Ton 680000 Ton 2828800
8'x4' 5ply wood (2Times) 24 Sht 15800 Sht 379200
Wire Nail 83 Lbs 650 Lbs 53950
MS Flat 1.33 Ton 780000 Ton 1037400
Welding Rod No(10) 65 Pkt 8000 Pkt 520000
MS Rod (10mm Ø) 2.25 Ton 700000 Ton 1575000
14G B/ wire 43 Lbs 650 Lbs 27950
Ready Mixed Concrete 18 m3 77000 m3 1386000
Cement ( ေ က႕န) 35 Bags 6300 Bags 220500
Sand 0.87 Sud 18500 Sud 16095
R/Shingle 1.74 Sud 95000 Sud 165300
8210195

2 Labour Charges
Labour Charges (Dismentling Work of Existing Concrete ) 313450
Labour Charges (Timber Formwork) 864000
Labour Charges (Cutting & Wedding MS Shear Connectors) 867000
Labour Charges (10mm Rebar Work ) 975000
Labour Charges (Ready Mixed Concrete ) 144000
Labour Charges (Levelling Work ) 113703
Labour Charges (Timber Scaffolding ) 272000
Labour Charges (Dismantling work of Timber Scaffolding ) 76500
Labour Charges (Dismantling work of Timber Formwork ) 256000
Labour Charges (1½" thk (1:2:4) Cement Concrete ) 144500
Labour ( Carrying , loading Unloading Broken-Concrete) 71230
Labour Charges ( Level & Center Line marking Work ) 195000
Labour Charges (Curing ) 97500
4389882
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

3 Hiring Charges
Vibrator 75000

4 Transporting Charges 300000

Total 12975077

Total ( 2nd Floor + 3rd Floor ) Total 25950155


Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

2 Labour charges (G-30) Concreting


Work For 2nd Floor Beam&Slab
(10278 Cft)
Labour For (G-30) Concreting 10278 Cft 625 Cft 6423750

Analysis of Rate
From Yellow Book Pg (33 ) item (6-2a )
Mason 2 Nox8500/- 17000/-
Worker7 Nox6500/- 45500/-
Total 62500/- per %Cft

4 Labour Charges For Curing Work


14 Day For Concreting 16320 Sft 65 Sft 1060800
Analysis of Rate
From Yellow Book Pg (32 ) item (10 ) worker 1 x 6500 /- =6500 /-per %Sft
TOTAL Ks #REF!

1 Labour Charges For Rebar Work For 3rd


Floor Beam & Slab (995.18 Cwt)
Labour (25mm) 10.8 Cwt 16245 Cwt 175446
Labour (20mm) 480.24 Cwt 16245 Cwt 7801499
Labour (16mm) 15.77 Cwt 16245 Cwt 256184
Labour (10mm) 488.37 Cwt 27495 Cwt 13427733
21660862
Analysis of Rate For 1Cwt For Beam&Slab
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

For16mm; 20mm Ø + 25mm Ø , YB Pg 133 Item (9)


Steel Fixer 0.75 Nox8500/- 6375/-
Worker 0.75 Nox6500/- 4875/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 )x3 4995/-
Total 16245/- per Cwt
For 10mm Ø, From Yellow Book Pg (135 ) item ( 14 )
Steel Fixer 1.5 x 8500 /- 12750/-
worker 1.5 x 6500 /- 9750/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 )x3 4995/-
Total 27495/- per Cwt

MATERIAL ISSUE
12/2017 M.S ACCOUNT

10mmØ - M.S Rod 25.63 Ton


16mmØ - M.S Rod 0.82 Ton
20mmØ - M.S Rod 25.21 Ton
25mmØ - M.S Rod 0.56 Ton
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Binding Wire 995 Lb


Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

1 Material Cost
J Wood (2Times) 4.16 Ton 680000 Ton 2828800
8'x4' 5ply wood (2Times) 24 Sht 15800 Sht 379200
Wire Nail 83 Lbs 650 Lbs 53950
MS Flat 1.33 Ton 780000 Ton 1037400
Welding Rod No(10) 65 Pkt 8000 Pkt 520000
MS Rod (10mm Ø) 2.25 Ton 700000 Ton 1575000
14G B/ wire 43 Lbs 650 Lbs 27950
Ready Mixed Concrete 18 m3 77000 m3 1386000
Cement ( ေ က႕န) 35 Bags 6300 Bags 220500
Sand 0.87 Sud 18500 Sud 16095
R/Shingle 1.74 Sud 95000 Sud 165300
8210195

2 Labour Charges
Labour Charges (Dismentling Work of Existing Concrete ) 313450
Labour Charges (Timber Formwork) 864000
Labour Charges (Cutting & Wedding MS Shear Connectors) 867000
Labour Charges (10mm Rebar Work ) 975000
Labour Charges (Ready Mixed Concrete ) 144000
Labour Charges (Levelling Work ) 113703
Labour Charges (Timber Scaffolding ) 272000
Labour Charges (Dismantling work of Timber Scaffolding ) 76500
Labour Charges (Dismantling work of Timber Formwork ) 256000
Labour Charges (1½" thk (1:2:4) Cement Concrete ) 144500
Labour ( Carrying , loading Unloading Broken-Concrete) 71230
Labour Charges ( Level & Center Line marking Work ) 195000
Labour Charges (Curing ) 97500
4389882
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

3 Hiring Charges
Vibrator 75000

4 Transporting Charges 300000

Total 12975077

Total ( 2nd Floor + 3rd Floor ) Total 25950155


Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

2 Labour charges (G-30) Concreting


Work For 2nd Floor Beam&Slab
(10278 Cft)
Labour For (G-30) Concreting 10278 Cft 625 Cft 6423750

Analysis of Rate
From Yellow Book Pg (33 ) item (6-2a )
Mason 2 Nox8500/- 17000/-
Worker7 Nox6500/- 45500/-
Total 62500/- per %Cft

4 Labour Charges For Curing Work


14 Day For Concreting 16320 Sft 65 Sft 1060800
Analysis of Rate
From Yellow Book Pg (32 ) item (10 ) worker 1 x 6500 /- =6500 /-per %Sft
TOTAL Ks #REF!

1 Labour Charges For Rebar Work For 3rd


Floor Beam & Slab (995.18 Cwt)
Labour (25mm) 10.8 Cwt 16245 Cwt 175446
Labour (20mm) 480.24 Cwt 16245 Cwt 7801499
Labour (16mm) 15.77 Cwt 16245 Cwt 256184
Labour (10mm) 488.37 Cwt 27495 Cwt 13427733
21660862
Analysis of Rate For 1Cwt For Beam&Slab
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

For16mm; 20mm Ø + 25mm Ø , YB Pg 133 Item (9)


Steel Fixer 0.75 Nox8500/- 6375/-
Worker 0.75 Nox6500/- 4875/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 )x3 4995/-
Total 16245/- per Cwt
For 10mm Ø, From Yellow Book Pg (135 ) item ( 14 )
Steel Fixer 1.5 x 8500 /- 12750/-
worker 1.5 x 6500 /- 9750/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 )x3 4995/-
Total 27495/- per Cwt

MATERIAL ISSUE
12/2017 M.S ACCOUNT

10mmØ - M.S Rod 25.63 Ton


16mmØ - M.S Rod 0.82 Ton
20mmØ - M.S Rod 25.21 Ton
25mmØ - M.S Rod 0.56 Ton
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Binding Wire 995 Lb


Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

A.1 Material Cost 8210195

2 Labour Charges 4389882

3 Hiring Charges 75000

4 Transporting Charges 300000


12975077
B Miscellaneous (3%) 389252
Total 13364330

C QA/QC (2%) 267287


13631616

D ၀န ေ ဆင( လ$ ပ% နမ
(1.5%)
(Structural Design , Geometric Design , 200465
Estimates )
Total 13832081
Say 13830000/-

13.830 Million

Total ( 2nd Floor + 3rd Floor ) 27.66 Million


Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

2 Labour charges (G-30) Concreting


Work For 2nd Floor Beam&Slab
(10278 Cft)
Labour For (G-30) Concreting 10278 Cft 625 Cft 6423750

Analysis of Rate
From Yellow Book Pg (33 ) item (6-2a )
Mason 2 Nox8500/- 17000/-
Worker7 Nox6500/- 45500/-
Total 62500/- per %Cft

4 Labour Charges For Curing Work


14 Day For Concreting 16320 Sft 65 Sft 1060800
Analysis of Rate
From Yellow Book Pg (32 ) item (10 ) worker 1 x 6500 /- =6500 /-per %Sft
TOTAL Ks #REF!

1 Labour Charges For Rebar Work For 3rd


Floor Beam & Slab (995.18 Cwt)
Labour (25mm) 10.8 Cwt 16245 Cwt 175446
Labour (20mm) 480.24 Cwt 16245 Cwt 7801499
Labour (16mm) 15.77 Cwt 16245 Cwt 256184
Labour (10mm) 488.37 Cwt 27495 Cwt 13427733
21660862
Analysis of Rate For 1Cwt For Beam&Slab
For16mm; 20mm Ø + 25mm Ø , YB Pg 133 Item (9)
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Steel Fixer 0.75 Nox8500/- 6375/-


Worker 0.75 Nox6500/- 4875/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 )x3 4995/-
Total 16245/- per Cwt
For 10mm Ø, From Yellow Book Pg (135 ) item ( 14 )
Steel Fixer 1.5 x 8500 /- 12750/-
worker 1.5 x 6500 /- 9750/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 )x3 4995/-
Total 27495/- per Cwt

MATERIAL ISSUE
12/2017 M.S ACCOUNT

10mmØ - M.S Rod 25.63 Ton


16mmØ - M.S Rod 0.82 Ton
20mmØ - M.S Rod 25.21 Ton
25mmØ - M.S Rod 0.56 Ton
Binding Wire 995 Lb
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
27.66
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
1 Dismantling Work of
Existing First Floor Concrete (951Cft)
Labour Charges 951 Cft 329.6 Cft 313450

2 Timber Formwork Wrougt &


Fix work for First Floor concrete Slab
(1354Sft)
J Wood (2Times) 2.7 Ton 680000 Ton 1836000
8'x4' 5ply wood (2Times) 24 Sht 15800 Sht 379200
Wire Nail 41 Lb 650 Lb 26650
Carpenter 81 Nos 8500 Nos 688500
Worker 27 Nos 6500 Nos 175500
3105850

3 Cutting & Welding MS Shear Connectors


with 2.5" x 8mm MS Flat 1'c/c on
existing MS H Beam (25.3Cwt )
MS Flat 1.33 Ton 780000 Ton 1037400
Wedding Rod No(10) 65 Pkt 8000 Pkt 520000
Smith 63 Nos 8500 Nos 535500
Worker 51 Nos 6500 Nos 331500
2424400

4 10mm Ø Rebar Work cut,bent and Fixed Work


(43 Cwt)
MS Rod (10mm Ø) 2.25 Ton 700000 Ton 1575000
14G B/ wire 43 Lbs 650 Lbs 27950
Smith 65 Nos 8500 Nos 552500
Worker 65 Nos 6500 Nos 422500
2577950
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

5 G25 Ready Mixed concrete


Placing Work (18 m3)
Ready Mixed Concrete 18 m3 77000 m3 1386000
Labour Charges 18 m3 8000 m3 144000
Vibrator 5 Day 15000 Day 75000
1605000

6 Levelling work of G-25 Concrete


at 1st Floor Slab Concreting
(1511 Sft)
Labour Charges 1511 Sqf 75.25 Sqft 113703

7 Timber Scaffolding Work for all Dismantling work


and Safety at 1st Floor Slab
(1511 Sft)
J Wood (2Times) 1.46 Tons 680000 Tons 992800
Wire Nail 42 Lbs 650 Lbs 27300
Carpenter 32 Nos 8500 Nos 272000
1292100

8 Dismantling Work of Timber


Scaffold After Construction
Period (1511Sft)
Carpenter 9 Nos 8500 Nos 76500

9 Dismantling work of timber formwork


at 1st floor Slab After Setting time
(1354 Sft)
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Carpenter 24 Nos 8500 Nos 204000


Worker 8 Nos 6500 Nos 52000
256000
10 1½" thk (1:2:4) Cement Concrete
Topping Work ar 1st floor Slab
(1511 Sft)
Cement ( ေ က႕န) 35 Bags 6300 Bags 220500
Sand 0.87 Sud 18500 Sud 16095
R/Shingle 1.74 Sud 95000 Sud 165300
Mason 4 Nos 8500 Nos 34000
Worker 17 Nos 6500 Nos 110500
546395

11 Level & Center Line marking Work


(1511 Sft)
Labour Charges 30 Nos 6500 Nos 195000

12 Curing Work For 14 Days


(1511 Sft)
Labour Charges 15 Nos 6500 Nos 97500

13 Carrying ,Shifting loading and


unloading broken-Concrete within
100' lead (951 Cuft)
Labour (Carrying ) 951 Cf 10.7 Cf 10176
Labour (loading , unloading ) 951 Cf 64.2 Cf 61054
71230

14 Transporting work of Broken-Concrete


by Truck-Car to outside Downtown
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

(6trips)
Transporting Charges 6 Trips 50000 Trips 300000

Total 12975077

Total ( 2nd Floor + 3rd Floor ) Total 25950155


Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

2 Labour charges (G-30) Concreting


Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Work For 2nd Floor Beam&Slab


(10278 Cft)
Labour For (G-30) Concreting 10278 Cft 625 Cft 6423750

Analysis of Rate
From Yellow Book Pg (33 ) item (6-2a )
Mason 2 Nox8500/- 17000/-
Worker7 Nox6500/- 45500/-
Total 62500/- per %Cft

4 Labour Charges For Curing Work


14 Day For Concreting 16320 Sft 65 Sft 1060800
Analysis of Rate
From Yellow Book Pg (32 ) item (10 ) worker 1 x 6500 /- =6500 /-per %Sft
TOTAL Ks 7484550

1 Labour Charges For Rebar Work For 3rd


Floor Beam & Slab (995.18 Cwt)
Labour (25mm) 10.8 Cwt 16245 Cwt 175446
Labour (20mm) 480.24 Cwt 16245 Cwt 7801499
Labour (16mm) 15.77 Cwt 16245 Cwt 256184
Labour (10mm) 488.37 Cwt 27495 Cwt 13427733
21660862
Analysis of Rate For 1Cwt For Beam&Slab
For16mm; 20mm Ø + 25mm Ø , YB Pg 133 Item (9)
Steel Fixer 0.75 Nox8500/- 6375/-
Worker 0.75 Nox6500/- 4875/-
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

2017-18 YGN Rate Book Pg (19 ) item ( 14-6 )x3 4995/-


Total 16245/- per Cwt
For 10mm Ø, From Yellow Book Pg (135 ) item ( 14 )
Steel Fixer 1.5 x 8500 /- 12750/-
worker 1.5 x 6500 /- 9750/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 )x3 4995/-
Total 27495/- per Cwt

MATERIAL ISSUE
12/2017 M.S ACCOUNT

10mmØ - M.S Rod 25.63 Ton


16mmØ - M.S Rod 0.82 Ton
20mmØ - M.S Rod 25.21 Ton
25mmØ - M.S Rod 0.56 Ton
Binding Wire 995 Lb
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor And 3rd Floor RCC Concrete ေေဆငငက
က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
864000

867000

975000
144500
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 Dismantling Work of Sft
Existing 2nd Floor Concrete
X6 and X 6-8 1 x 1 38' -0'' 17' -7'' 0' -8'' 445 Cft
Y7-8 and X6-7 1 x 1 27' -9'' 27' -4'' 0' -8'' 506 Cft
951 Cft

2 Timber Formwork Wrougt &


Fix work for 2nd Floor
Concrete Slab
Y6 and X6-8 1 x 1 38' -0'' 17' -7'' 668 Sft
Y7-8 and X6-7 1 x 1 27' -9'' 27' -4'' 759 Sft
1427 Sft
Deduction
Y Direction 1 x 1 38' -0'' 0' -5'' 15.8 Sft
Y Direction 1 x 3 27' -4'' 0' -5'' 34.2 Sft
X Direction 1 x 1 45' -4'' 0' -6'' 22.7 Sft

72.67 Sft
1354 Sft

3 Cutting & Wedding MS Shear Connectors


with 2.5" x 8mm MS Flat 1'c/c on
existing MS H Beam
Y Direction 1 x 38 38 Nos
3 x 27 81 Nos
X Direction 1 x 45 45 Nos
164 Nos
2.5" x 8mm MS Flat 164 x 6.5" = 1066 Rft x 2.661 Lb/ft 2836.6 Lb
25.3 Cwt
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

4 10mm Ø Rebar Work cut,bent


and Fixed Work
Main Bar (Bottom) 4" c/c
Y5a-8 and X6-8 79 x 1 46' -6'' 3673 Rft
Lapping 79 x 1 1' -0'' 79 Rft
Y5a-7 and X7-8 33 x 1 18' -9'' 619 Rft
Distribution Bar (bottom) 8"c/c
Y5a-7 and X6-8 27 x 1 38' -0'' 1026 Rft
Y6-8 and X6-8 40 x 1 26' -6'' 1060 Rft
Main Bar (Top) 4"c/c
Y 5a and X 6-8 110 x 1 4' -6'' 495 Rft
Y 6 and X 6-8 110 x 1 6' -9'' 743
Bet: Y6-8 and X6-8 3 x 82 6' -9'' 1661 Rft
Y8 and X 6-8 82 x 1 4' -6'' 369 Rft
Distribution Bar (Top) 8"c/c
Y 5a and X 6-8 7 x 1 37' -6'' 263 Rft
Y6 and X 6-8 10 x 1 37' -6'' 375 Rft
Y6-8and X6-8 3 x 10 26' -6'' 795 Rft
Y8 and X 6-8 7 x 1 26' -6'' 186 Rft
Steel Chair 10 x 15 1' -6'' 225
11567 Rft
11342 Rft x 0.415 Lb/ft 4800 Lb

Say 43 Cwt

5 G25 Ready Mixed concrete


Placing Work
Y6 and X6-8 1 x 1 38' -9'' 18' -4'' 0' -5'' 296 Cft
Y7-8 and X6-7 1 x 1 28' -6'' 28' -1'' 0' -5'' 333 Cft
630 Cft

Say 18 m3
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

6 Levelling work of G-25 Concrete


at 1st Floor Slab Concreting
Y6 and X 6-8 1 x 1 38' -9'' 18' -4'' 710 Sft
Y6-8 and X6-7 1 x 1 28' -6'' 28' -1'' 800 Sft
1511 Sft

7 Timber Scaffolding Work for all Dismantling work


and Safety at 1st Floor Slab
Measurements are same as
Item No. (6) 1511 Sft

8 Dismantling Work of Timber Scaffold


After Construction Period
Measurements are same as
Item No. (7) 1511 Sft

9 Dismantling Work of Timber Formwork


at 1st Floor Slab After Setting Time
As per Item No. (2) 1354 Sft

10 1½" thk (1:2:4) Cement Concrete


Topping Work ar 1st floor Slab
As per Item No. (6) 1511 Sft

11 Level & Center Line marking Work


As per Item No. (6) 1511 Sft

12 Curing Work For 14 Days


As per Item No. (6) 1511 Sft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

13 Carrying ,Shifting loading and


unloading broken-Concrete within
100' lead
As per Item No. (1) 951 Cft

14 Transporting work of Broken-Concrete


by Truck-Car to outside Downtown
As per Item No. (1) 951 Cft
150 cft Per Trip = 6 Trips
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

SB2
20mmØ,Top Bar 4 x 2 12' -3'' 98
Extra Bar 4x 1 6' -0'' 24
4x 1 6' -0'' 24
Bottom Bar 4 x 2 10' -0'' 80
Extra Bar 4x 1 6' -2'' 25
10mmØ Stirrups,SB2 4 x 35 2' -8'' 373.33
Line A & G
20mmØ,FB4,Top Bar 2 x 2 93' -8'' 375
Extra Bar 2x 2 8' -9'' 35
2 x 2 15' -3'' 61
2 x 2 17' -3'' 69
2 x 2 17' -3'' 69
2 x 2 17' -3'' 69
2 x 2 10' -8'' 43
Bottom Bar 2 x 4 92' -8'' 741
Lapping 2x 2 2' -7'' 10
10mmØ Stirrups,FB4 2 x 267 5' -1'' 2714.5
Line B,G & E
20mmØ,FB3,Top Bar 3 x 2 93' -6'' 561
Extra Bar 3x 5 8' -9'' 131
3 x 5 15' -3'' 229
3 x 5 17' -3'' 259
3 x 5 17' -3'' 259
3 x 5 17' -3'' 259
3 x 5 10' -8'' 160
Bottom Bar 3 x 4 92' -3'' 1107
Extra Bar 3x 2 6' -10'' 41
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
3 x 2 17' -3'' 104
3 x 2 17' -3'' 104
3 x 3 17' -3'' 155
3 x 3 17' -3'' 155
Lapping 3x 2 2' -7'' 16
Spacer Bar 3 x 68 0' -9'' 153
10mmØ Stirrups,FB3 3 x 267 5' -5'' 4338.75

Line No F,FB3,FB5
20mmØ,Top Bar 1 x 2 93' -4'' 187
Extra Bar 1x 5 8' -9'' 44
1 x 5 15' -3'' 76
1 x 5 17' -3'' 86
1 x 10 17' -3'' 173
1x 5 9' -3'' 46
1x 7 7' -3'' 51
Bottom Bar 1 x 4 92' -3'' 369
Extra Bar 1x 2 7' -9'' 16
1 x 2 17' -3'' 35
1 x 2 17' -3'' 35
1 x 2 17' -3'' 35
1x 2 8' -9'' 18
1x 2 8' -9'' 18
Lapping 1 x 2 2' -7'' 5
Spacer Bar 1 x 68 0' -9'' 51
10mmØ Stirrups,FB3,FB5 1 x 257 5' -5'' 1392.08

Line No C
20mmØ,SB2,Top Bar 1 x 2 94' -3'' 189
Bottom Bar 1 x 2 93' -0'' 186
Lapping 1 x 2 2' -7'' 5
10mmØ Stirrups,SB2 1 x 247 2' -8'' 658.67
Line No Between E& F
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
20mmØ,SB2,Top Bar 1 x 2 23' -3'' 47
Bottom Bar 1 x 2 22' -0'' 44
Lapping 1 x 1 2' -7'' 3
10mmØ Stirrups,SB2 1 x 53 2' -8'' 141.33

Line A & G,FB4


20mmØ,Top Bar 2 x 2 115' -0'' 460
Extra Bar 2 x 2 10' -0'' 40
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 14' -0'' 56
2 x 2 14' -0'' 56
2 x 2 10' -0'' 40
Bottom Bar 2 x 4 113' -6'' 908
Lapping 2 x 12 2' -7'' 62
10mmØ Stirrups,FB4 2 x 270 5' -1'' 2745.00

Line B & E,FB3


20mmØ,Top Bar 2 x 2 115' -0'' 460
Extra Bar 2 x 5 10' -0'' 100
2 x 5 18' -0'' 180
2 x 5 18' -0'' 180
2 x 5 18' -0'' 180
2 x 5 14' -0'' 140
2 x 5 14' -0'' 140
2 x 5 10' -0'' 100
Bottom Bar 2 x 4 113' -6'' 908
Extra Bar 2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
2 x 2 10' -0'' 40
Lapping 2 x 12 2' -7'' 62
Spacer Bar 2 x 45 0' -9'' 68
10mmØ Stirrups,FB3 2 x 264 5' -5'' 2860.00

Line F FB3,FB5
20mmØ,Top Bar 1 x 2 115' -0'' 230
Extra Bar 1 x 6 10' -0'' 60
1 x 5 10' -0'' 50
1 x 5 14' -0'' 70
1 x 5 18' -0'' 90
1 x 5 18' -0'' 90
1 x 5 14' -0'' 70
1 x 5 14' -0'' 70
1 x 5 10' -0'' 50
1 x 1 8' -0'' 8
Bottom Bar 1 x 4 101' -0'' 404
1 x 4 15' -0'' 60
Extra Bar 1 x 2 12' -0'' 24
1 x 2 8' -0'' 16
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 10' -0'' 20
Lapping 1 x 12 2' -7'' 31
Spacer Bar 1 x 47 0' -9'' 35
10mmØ Stirrups,FB3 1 x 242 5' -5'' 1310.83

FB5 1 x 40 5' -5'' 216.67


Line D
FB1,FB3,FB6
20mmØ,Top Bar 1 x 2 204' -0'' 408
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Extra Bar 1 x 10 10' -0'' 100
1 x 10 18' -0'' 180
1 x 5 18' -0'' 90
1 x 5 18' -0'' 90
1 x 5 14' -0'' 70
1 x 4 10' -0'' 40
1 x 4 10' -0'' 40
25mmØ,FB2,Extra Bar 1 x 4 6' -6'' 26.00
1 x 3 8' -0'' 24
Bottom Bar 1 x 4 85' -0'' 340
1 x 4 14' -0'' 56
1 x 4 20' -0'' 80
1 x 4 95' -6'' 382
Extra Bar 1 x 12 18' -0'' 216
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 10' -0'' 20
25mmØ,FB2,Extra Bar 1 x 4 7' -0'' 28.00
Lapping 1 x 10 2' -7'' 26
Spacer Bar 1 x 54 0' -9'' 41
10mmØ Stirrups,FB3 1 x 284 5' -5'' 1538.33

FB1 1 x 50 5' -10'' 291.67


FB6 1 x 68 5' -10'' 396.67
Line C
FB1,FB6
20mmØ,Top Bar,FB1 1 x 2 50' -6'' 101
Extra Bar,FB1 1 x 8 8' -0'' 64
1 x 4 10' -0'' 40
20mmØ,Extra Bar 1 x 4 10' -0'' 40
1 x 4 8' -0'' 32
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Bottom Bar 1 x 4 14' -0'' 56
1 x 2 20' -0'' 40
Extra Bar,FB1 1 x 2 10' -0'' 20
20mmØ,Extra Bar 1 x 4 8' -0'' 32
Spacer Bar 1 x 45 0' -9'' 34
10mmØ Stirrups,FB1,FB6 1 x 68 5' -10'' 396.67
SB2
Bottom Bar 4 x 2 23' -0'' 184
10mmØ Stirrups,SB2 4 x 54 2' -8'' 576.00
54 16359 19950.50

16mmØ 10mmØ
Rebar Work For Stair
2nd Floor to 3rd Floor Stair 4 x 16 7' -0'' 448.00 Rft
2 x 16 13' -0'' 416.00 Rft
3rd Floor Stair Dowel 2 x 16 13' -0'' 416.00 Rft
2 x 16 12' -0'' 384.00 Rft
Distribution Bar 2 x 14 6' -0'' 168 Rft
2 x 20 12' -6'' 500 Rft
1664.00 668 Rft

Rebar Work For Slab 10mmØ

S3,12-14 Bottom,Main Bar 1 x 25 9' -6'' 238 Rft


Distribution Bar 1 x 11 21' -6'' 237 Rft
Top Bar 1 x 50 11' -0'' 550 Rft
1 x 11 23' -0'' 253 Rft
S2,8-12,Main Bar 1 x 84 9' -6'' 798 Rft
Distribution Bar 1 x 11 72' -6'' 798 Rft
Lapping 1 x 11 1' -4'' 15 Rft
Top Bar 1 x 84 11' -6'' 966 Rft
1 x 10 74' -6'' 745 Rft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Lapping 1 x 10 1' -4'' 13 Rft
OT;S1,Line 12-14
Bottom Bar 1 x 25 13' -6'' 338 Rft
1 x 15 21' -6'' 323 Rft
Top Bar 1 x 50 15' -6'' 775 Rft
1 x 15 23' -69'' 431 Rft
Between Line B &D
S2, Bottom,Main 1 x 9 31' -6'' 284 Rft
Dis; 1 x 25 8' -6'' 213 Rft
S2,Top,Main 1 x 9 33' -6'' 302 Rft
Dis; 1 x 25 10' -6'' 263 Rft
S2, Bottom,Main 1 x 16 21' -6'' 344 Rft
Dis; 1 x 25 14' -0'' 350 Rft
Top Bar 1 x 16 23' -6'' 376 Rft
1 x 25 16' -0'' 400 Rft
S1,S2 Bottom,Main 1 x 30 72' -6'' 2175 Rft
Dis; 1 x 84 26' -0'' 2184 Rft
Top Bar 1 x 30 74' -6'' 2235 Rft
1 x 84 28' -0'' 2352 Rft
S1 Top Bar 1 x 21 53' -6'' 1124 Rft
1 x 60 21' -0'' 1260 Rft
Lapping 1 x 81 1' -6'' 122 Rft
S2 Bottom Bar 1 x 13 92' -6'' 1203 Rft
1 x 108 11' -6'' 1242 Rft
Top Bar 1 x 13 94' -6'' 1229 Rft
1 x 108 13' -6'' 1458 Rft
Lapping 13 x 6 1' -6'' 117 Rft
Line E-F
S3 Bottom Bar 1 x 30 11' -6'' 345 Rft
1 x 10 26' -0'' 260 Rft
Top Bar 1 x 60 13' -6'' 810 Rft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 10 28' -0'' 280 Rft
S3 Bottom Bar 1 x 30 9' -6'' 285 Rft
1 x 8 26' -0'' 208 Rft
Top Bar 1 x 60 11' -6'' 690 Rft
1 x 8 28' -0'' 224 Rft
S2 Bottom Bar 1 x 30 51' -6'' 1545 Rft
1 x 60 26' -0'' 1560 Rft
Top Bar 1 x 30 53' -6'' 1605 Rft
1 x 60 28' -0'' 1680 Rft
Lapping 30 x 2 1' -6'' 90 Rft
S2 Bottom Bar 1 x 30 11' -6'' 345 Rft
1 x 12 26' -0'' 312 Rft
Top Bar 1 x 30 13' -6'' 405 Rft
1 x 12 28' -0'' 336 Rft
Line F & G
S2 Bottom Bar 1 x 10 91' -6'' 915 Rft
1 x 109 9' -6'' 1036 Rft
Top Bar 1 x 10 92' -6'' 925 Rft
1 x 109 11' -6'' 1254 Rft
Lapping 10 x 3 1' -6'' 45 Rft
S3,1-3, Bottom,Main Bar 1 x 25 9' -6'' 238 Rft
Distribution Bar 1 x 11 21' -6'' 237 Rft
Top Bar 1 x 50 11' -0'' 550 Rft
1 x 11 23' -0'' 253 Rft
S2,3-8,Bottom,Main Bar 1 x 111 9' -6'' 1055 Rft
Distribution Bar 1 x 12 91' -6'' 1098 Rft
Lapping 2 x 12 1' -4'' 32 Rft
Top Bar 1 x 88 11' -0'' 968 Rft
1 x 12 93' -0'' 1116 Rft
Lapping 2 x 12 1' -4'' 32 Rft
Line 1-3,S3
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Bottom,Main Bar 1 x 26 8' -0'' 208 Rft
Distribution Bar 1 x 10 21' -6'' 215 Rft
Top,Main Bar 1 x 42 9' -6'' 399 Rft
Distribution Bar 1 x 17 23' -0'' 391 Rft
S1,Bottom,Main Bar 1 x 25 16' -0'' 400 Rft
Distribution Bar 1 x 20 21' -6'' 430 Rft
Top,Main Bar 1 x 44 17' -6'' 770 Rft
Distribution Bar 1 x 30 23' -0'' 690 Rft
Line 3-5,S3
Bottom,Main Bar 2 x 50 26' -0'' 2600 Rft
Distribution Bar 2 x 30 41' -6'' 2490 Rft
Top,Main Bar 2 x 83 27' -6'' 4565 Rft
Distribution Bar 2 x 60 43' -0'' 5160 Rft
Lapping 2 x 90 1' -4'' 240 Rft
Line 5-6,S2
Bottom,Main Bar 1 x 25 8' -6'' 213 Rft
Distribution Bar 1 x 10 21' -6'' 215 Rft
Top,Main Bar 1 x 21 10' -0'' 210 Rft
Distribution Bar 1 x 8 23' -0'' 184 Rft
Line 5-6,C-D,S1
Bottom,Main Bar 1 x 25 19' -0'' 475 Rft
Distribution Bar 1 x 21 21' -6'' 452 Rft
Top,Main Bar 1 x 45 20' -6'' 923 Rft
Distribution Bar 1 x 35 23' -0'' 805 Rft
Line 6-7,B-C,S2
Bottom,Main Bar 1 x 15 11' -6'' 173 Rft
Distribution Bar 1 x 12 13' -6'' 162 Rft
Top,Main Bar 1 x 13 13' -0'' 169 Rft
Distribution Bar 1 x 11 14' -0'' 154 Rft
Line C-D
Bottom,Main Bar 1 x 15 13' -0'' 195 Rft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Distribution Bar 1 x 14 14' -0'' 196 Rft
Top,Main Bar 1 x 13 14' -6'' 189 Rft
Distribution Bar 1 x 12 15' -6'' 186 Rft
Line D-E,1-3 & 7-8,S3
Bottom,Main Bar 2 x 25 11' -6'' 575 Rft
Distribution Bar 2 x 12 21' -6'' 516 Rft
Top,Main Bar 2 x 41 13' -0'' 1066 Rft
Distribution Bar 2 x 21 23' -0'' 966 Rft
Line 3-7,D-E,S2
Bottom,Main Bar 1 x 85 11' -6'' 978 Rft
Distribution Bar 1 x 12 71' -6'' 858 Rft
Top,Main Bar 1 x 73 13' -0'' 949 Rft
Distribution Bar 1 x 11 73' -0'' 803 Rft
Lapping 1 x 23 1' -4'' 31 Rft
Line 2-3,E-F,S2
Bottom,Main Bar 1 x 30 9' -6'' 285 Rft
Distribution Bar 1 x 10 26' -0'' 260 Rft
Top,Main Bar 1 x 50 11' -0'' 550 Rft
Distribution Bar 1 x 17 27' -6'' 468 Rft
Line 5-6,E-F,S2
Bottom,Main Bar 1 x 30 21' -6'' 645 Rft
Distribution Bar 1 x 25 26' -0'' 650 Rft
Top,Main Bar 1 x 50 23' -0'' 1150 Rft
Distribution Bar 1 x 12 27' -6'' 330 Rft
Line 6-8,E-F,S3
Bottom,Main Bar 1 x 37 26' -0'' 962 Rft
Distribution Bar 1 x 30 31' -6'' 945 Rft
Top,Main Bar 1 x 62 27' -6'' 1705 Rft
Distribution Bar 1 x 51 33' -0'' 1683 Rft
Line 1-8,F-G,S2
Bottom,Main Bar 1 x 133 9' -6'' 1264 Rft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Distribution Bar 1 x 10 111' -6'' 1115 Rft
Top,Main Bar 1 x 113 11' -0'' 1243 Rft
Distribution Bar 1 x 9 113' -0'' 1017 Rft
Lapping 2 x 19 1' -4'' 51 Rft
Chair 2 x 320 2' -6'' 1600 Rft
92558 Rft

10mmØ - 131801.11 Rf x0.415 Lb 54697.46 488 Cwt


16mmØ - 1664Rf x1.062 Lb 1767.16 16 Cwt
20mmØ - 32402 Rf x1.66 Lb 53787 480 Cwt
25mmØ - 467.83 Rf x 2.587 Lb 1210.27 11 Cwt
995 Cwt

3 G-30 Ready Mixed Concreting Work


for 3rd Floor Beam & Slab
Line 1
FB1 1 x 1 22' -8'' 1' -0'' 2' -0'' 45 Cft
FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21 Cft
FB2a 1 x 1 8' -2'' 1' -0'' 1' -8'' 14 Cft
FB5 1 x 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
Line 2,3,4,5,6,7
FB1 9 x 1 22' -8'' 1' -0'' 2' -0'' 408 Cft
FB1 1 x 1 10' -2'' 1' -0'' 2' -0'' 20 Cft
FB5 1 x 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
FB6 2 x 1 9' -6'' 1' -0'' 2' -0'' 38 Cft
FB2 11 x 1 6' -4'' 1' -0'' 1' -8'' 116 Cft
FB2a 5 x 1 8' -3'' 1' -0'' 1' -8'' 69 Cft
SB2 3 x 1 70' -0'' 0' -9'' 1' -6'' 236 Cft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
SB2 1 x 1 31' -6'' 0' -9'' 1' -6'' 35 Cft
SB1 2 x 1 7' -0'' 0' -9'' 1' -6'' 16 Cft
Line A & G FB4 2 x 1 101' -0'' 1' -0'' 1' -8'' 337 Cft

FB3 1 x 1 99' -0'' 1' -0'' 1' -10'' 182 Cft


1 x 1 97' -3'' 1' -0'' 1' -10'' 178 Cft
Line D FB1 1 x 1 10' -8'' 1' -0'' 2' -0'' 21 Cft
FB3 1 x 1 72' -8'' 1' -0'' 1' -10'' 133 Cft
FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28 Cft
Line F
FB3 1 x 1 87' -0'' 1' -0'' 1' -10'' 160 Cft
FB5 1 x 1 10' -3'' 1' -2'' 2' -0'' 24 Cft
Line C
FB1 1 x 1 9' -2'' 1' -0'' 2' -0'' 18 Cft
FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28 Cft
Line Between 1 & 3
SB2 2 x 1 19' -0'' 0' -9'' 1' -6'' 43 Cft
1 x 1 18' -3'' 0' -9'' 1' -6'' 21 Cft
C1,C2 24 x 1 1' -4'' 1' -6'' 2' -0'' 96 Cft
C3,C4 51 x 1 1' -4'' 1' -10'' 2' -0'' 249 Cft
C5 6 x 1 1' -0'' 3' -0'' 2' -0'' 36 Cft
Slab S3 2 x 1 19' -0'' 7' -0'' 0' -5'' 111 Cft
Slab S3 1 x 1 19' -0'' 5' -6'' 0' -5'' 44 Cft
Slab S3 4 x 1 23' -6'' 9' -2'' 0' -5'' 359 Cft
Slab S3 2 x 1 19' -0'' 9' -0'' 0' -5'' 143 Cft
Slab S3 1 x 1 23' -6'' 7' -0'' 0' -5'' 69 Cft
Slab S3 6 x 1 23' -6'' 9' -2'' 0' -5'' 539 Cft
Slab S3 1 x 1 23' -6'' 9' -0'' 0' -5'' 88 Cft
Slab S2 14 x 1 9' -3'' 7' -0'' 0' -5'' 378 Cft
Slab S2 2 x 1 9' -0'' 7' -0'' 0' -5'' 53 Cft
Slab S2 1 x 1 9' -0'' 11' -0'' 0' -5'' 41 Cft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Slab S2 1 x 1 11' -0'' 11' -6'' 0' -5'' 53 Cft
Slab S2 6 x 1 9' -2'' 9' -0'' 0' -5'' 206 Cft
Slab S2 1 x 1 9' -0'' 9' -0'' 0' -5'' 34 Cft
Slab S2 1 x 1 7' -0'' 7' -0'' 0' -5'' 20 Cft
Slab S2 1 x 1 11' -0'' 7' -0'' 0' -5'' 32 Cft
Slab S2 4 x 1 10' -4'' 9' -2'' 0' -5'' 158 Cft
Slab S2 2 x 1 3' -9'' 7' -0'' 0' -5'' 22 Cft
Slab S2 2 x 1 5' -3'' 7' -0'' 0' -5'' 31 Cft
Slab S1 1 x 1 15' -0'' 19' -0'' 0' -5'' 119 Cft
Slab S1 2 x 1 9' -3'' 15' -9'' 0' -5'' 121 Cft
Stair Step 12 × 1 5' -3'' 0' -6'' 0' -6'' 16 Cft
Flight 1 × 2 13' -6'' 5' -3'' 0' -9'' 106 Cft
Landing Floor 1 × 1 11' -0'' 6' -2'' 0' -9'' 51 Cft
1 × 1 11' -0'' 2' -2'' 0' -9'' 18 Cft
FB1 1 x 1 22' -8'' 1' -0'' 2' -0'' 45 Cft
FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21 Cft
FB2a 1 x 1 8' -2'' 1' -0'' 1' -8'' 14 Cft
FB6 1 x 1 9' -6'' 1' -0'' 2' -0'' 19 Cft
FB1 1 x 1 10' -2'' 1' -0'' 2' -0'' 20 Cft
Line - 14 FB5 1 × 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
Line - 13, 14 FB1 2 × 1 22' -8'' 1' -0'' 2' -0'' 91 Cft
FB2 3 × 1 6' -4'' 1' -0'' 1' -8'' 32 Cft
FB2a 1 × 1 8' -2'' 1' -0'' 1' -8'' 14 Cft
SB2 1 × 1 22' -8'' 1' -0'' 1' -8'' 38 Cft
Line 9.10.11.12FB1 7 × 1 22' -8'' 1' -0'' 2' -0'' 317 Cft
FB5 1 × 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
Between 9.10.11.12 SB2 3 × 1 73' -6'' 0' -9'' 1' -6'' 248 Cft
Line-13 SB2 1 × 1 17' -3'' 0' -9'' 1' -6'' 19 Cft
SB1 1 × 1 7' -0'' 0' -9'' 1' -6'' 8 Cft
Line 9.10.11.12 FB2 8 × 1 6' -4'' 1' -0'' 1' -8'' 84 Cft
FB 2a 4 × 1 8' -2'' 1' -0'' 1' -8'' 54 Cft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
A&G FB4 2 × 1 84' -3'' 1' -0'' 1' -8'' 281 Cft
Line F,FB3 1 × 1 72' -3'' 1' -0'' 1' -10'' 132 Cft
LineB,D, E,FB3 3 × 1 84' -3'' 1' -0'' 1' -10'' 463 Cft
FB5 1 × 1 9' -2'' 1' -2'' 2' -0'' 21 Cft
SB2 1 × 1 84' -6'' 0' -9'' 1' -6'' 95 Cft
SB2 1 × 1 44' -6'' 0' -9'' 1' -6'' 50 Cft
2 × 1 74' -0'' 0' -9'' 1' -6'' 167 Cft
SB2 1 × 1 23' -0'' 0' -9'' 1' -6'' 26 Cft
SB1 3 × 1 9' -1'' 0' -9'' 1' -6'' 31 Cft
Slab S2 2 × 1 9' -0'' 7' -0'' 0' -5'' 53 Cft
Slab S2 12 × 1 9' -1'' 7' -0'' 0' -5'' 318 Cft
Slab S2 1 × 1 9' -0'' 7' -0'' 0' -5'' 26 Cft
Slab S2 3 × 1 9' -1'' 7' -0'' 0' -5'' 79 Cft
Slab S2` 1 × 1 15' -9'' 9' -0'' 0' -5'' 59 Cft
Slab S2 2 × 1 7' -6'' 9' -1'' 0' -5'' 57 Cft
Slab S2 1 × 1 9' -0'' 9' -0'' 0' -5'' 34 Cft
Slab S2 6 × 1 9' -1'' 9' -0'' 0' -5'' 204 Cft
Slab S2 2 × 1 11' -4'' 9' -0'' 0' -5'' 85 Cft
Slab S2 8 × 1 11' -4'' 9' -1'' 0' -5'' 343 Cft
Slab S2 3 × 1 7' -4'' 9' -1'' 0' -5'' 83 Cft
Slab OT 1 × 1 23' -6'' 7' -0'' 0' -5'' 69 Cft
Slab S1 5 × 1 16' -6'' 9' -2'' 0' -5'' 315 Cft
Slab S3 1 × 1 19' -0'' 7' -0'' 0' -5'' 55 Cft
Slab S1 1 × 1 19' -0'' 11' -1'' 0' -5'' 88 Cft
Slab S2 1 × 1 7' -1'' 11' -1'' 0' -5'' 33 Cft
Slab S2 1 × 1 11' -1'' 11' -1'' 0' -5'' 51 Cft
Slab S2 1 × 1 7' -1'' 9' -0'' 0' -5'' 27 Cft
Slab S2 1 × 1 11' -1'' 9' -0'' 0' -5'' 42 Cft
Slab S2 1 × 1 7' -0'' 7' -0'' 0' -5'' 20 Cft
Slab S2 1 × 1 11' -0'' 7' -0'' 0' -5'' 32 Cft
Stair Step 7 × 1 5' -3'' 0' -6'' 0' -6'' 9 Cft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Flight 1 × 1 8' -0'' 5' -3'' 0' -9'' 32 Cft
Landing Floor 1 × 1 11' -0'' 6' -2'' 0' -9'' 51 Cft
10048 Cft

Hire Charges For Concreting Work


4 10089 Cft
Vibrator
25 Day
Curing Work For Concreting
5 For14 Day
For 2nd Floor
1 × 1 204' -0'' 80' -0'' 16320 Sft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 2nd Floor and 3rd Floor RCC Concreteလ$ ပ% န ေေဆ
ငငက က ခင

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
111
ေေတင

က
လ ( ပ ၊မ' ခ(၂၀၀'
ငငေ& ကလဆရ$
x ၇၅') (၄)ထပ ေ ဆင ေေဆကုပ ခငလ$ ပ% န

ထပ( လ$'အပေသ မလတင2 အင မင 3ည႕


စဥ ပစၥညအမည မတ4 က
ေအရအတတက ေေစန

1 ေေတသစ (အင/ကညင) 680000 /-


2 Ready Mixed Concrete 84900 /-
3 M S Rod
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

A.1 Material Cost 30715700

2 Labour Charges 16726303

3 Hiring Charges 150000

4 Transporting Charges 1400000


48992003
B Miscellaneous (3%) 1469760
Total 50461763

C QA/QC (2%) 1009235


51470998

D ၀န ေ ဆင( လ$ ပ% နမ
(1.5%)
(Structural Design , Geometric Design , 756926
Estimates )
Total 52227925
Say 52220000/-

52.220 Million
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

2 Labour charges (G-30) Concreting


Work For 2nd Floor Beam&Slab
(10278 Cft)
Labour For (G-30) Concreting 10278 Cft 625 Cft 6423750

Analysis of Rate
From Yellow Book Pg (33 ) item (6-2a )
Mason 2 Nox8500/- 17000/-
Worker7 Nox6500/- 45500/-
Total 62500/- per %Cft

4 Labour Charges For Curing Work


14 Day For Concreting 16320 Sft 65 Sft 1060800
Analysis of Rate
From Yellow Book Pg (32 ) item (10 ) worker 1 x 6500 /- =6500 /-per %Sft
TOTAL Ks #REF!

1 Labour Charges For Rebar Work For 3rd


Floor Beam & Slab (995.18 Cwt)
Labour (25mm) 10.8 Cwt 16245 Cwt 175446
Labour (20mm) 480.24 Cwt 16245 Cwt 7801499
Labour (16mm) 15.77 Cwt 16245 Cwt 256184
Labour (10mm) 488.37 Cwt 27495 Cwt 13427733
21660862
Analysis of Rate For 1Cwt For Beam&Slab
For16mm; 20mm Ø + 25mm Ø , YB Pg 133 Item (9)
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Steel Fixer 0.75 Nox8500/- 6375/-


Worker 0.75 Nox6500/- 4875/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 )x3 4995/-
Total 16245/- per Cwt
For 10mm Ø, From Yellow Book Pg (135 ) item ( 14 )
Steel Fixer 1.5 x 8500 /- 12750/-
worker 1.5 x 6500 /- 9750/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 )x3 4995/-
Total 27495/- per Cwt

MATERIAL ISSUE
12/2017 M.S ACCOUNT

10mmØ - M.S Rod 25.63 Ton


16mmØ - M.S Rod 0.82 Ton
20mmØ - M.S Rod 25.21 Ton
25mmØ - M.S Rod 0.56 Ton
Binding Wire 995 Lb
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

1 Material Cost
J Wood (2Times) 18.23 Ton 680000 Ton 12396400
8'x4' 5ply wood (2Times) 106 Sht 15800 Sht 1674800
Wire Nail 360 Lbs 650 Lbs 234000
MS Flat 0.59 Ton 780000 Ton 460200
Welding Rod No(10) 30 Pkt 8000 Pkt 240000
MS Rod (10mm Ø) 11.28 Ton 700000 Ton 7896000
14G B/ wire 215 Lbs 650 Lbs 139750
Ready Mixed Concrete 77 m3 77000 m3 5929000
Cement ( ေ က႕န) 148 Bags 6300 Bags 932400
Sand 3.9 Sud 18500 Sud 72150
R/Shingle 7.8 Sud 95000 Sud 741000
30715700

2 Labour Charges
Labour Charges (Dismentling Work of Existing Concrete ) 1386957
Labour Charges (Timber Formwork) 3784500
Labour Charges (Cutting & Wedding MS Shear Connectors) 387500
Labour Charges (10mm Rebar Work ) 4830000
Labour Charges (Ready Mixed Concrete ) 616000
Labour Charges (Levelling Work ) 494167
Labour Charges (Timber Scaffolding ) 1164500
Labour Charges (Dismantling work of Timber Scaffolding ) 348500
Labour Charges (Dismantling work of Timber Formwork ) 1128500
Labour Charges (1½" thk (1:2:4) Cement Concrete ) 990000
Labour ( Carrying , loading Unloading Broken-Concrete) 315179
Labour Charges ( Level & Center Line marking Work ) 851500
Labour Charges (Curing ) 429000
16726303
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

3 Hiring Charges
Vibrator 150000

4 Transporting Charges 1400000

Total 48992003
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

2 Labour charges (G-30) Concreting


Work For 2nd Floor Beam&Slab
(10278 Cft)
Labour For (G-30) Concreting 10278 Cft 625 Cft 6423750

Analysis of Rate
From Yellow Book Pg (33 ) item (6-2a )
Mason 2 Nox8500/- 17000/-
Worker7 Nox6500/- 45500/-
Total 62500/- per %Cft

4 Labour Charges For Curing Work


14 Day For Concreting 16320 Sft 65 Sft 1060800
Analysis of Rate
From Yellow Book Pg (32 ) item (10 ) worker 1 x 6500 /- =6500 /-per %Sft
TOTAL Ks #REF!

1 Labour Charges For Rebar Work For 3rd


Floor Beam & Slab (995.18 Cwt)
Labour (25mm) 10.8 Cwt 16245 Cwt 175446
Labour (20mm) 480.24 Cwt 16245 Cwt 7801499
Labour (16mm) 15.77 Cwt 16245 Cwt 256184
Labour (10mm) 488.37 Cwt 27495 Cwt 13427733
21660862
Analysis of Rate For 1Cwt For Beam&Slab
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

For16mm; 20mm Ø + 25mm Ø , YB Pg 133 Item (9)


Steel Fixer 0.75 Nox8500/- 6375/-
Worker 0.75 Nox6500/- 4875/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 )x3 4995/-
Total 16245/- per Cwt
For 10mm Ø, From Yellow Book Pg (135 ) item ( 14 )
Steel Fixer 1.5 x 8500 /- 12750/-
worker 1.5 x 6500 /- 9750/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 )x3 4995/-
Total 27495/- per Cwt

MATERIAL ISSUE
12/2017 M.S ACCOUNT

10mmØ - M.S Rod 25.63 Ton


16mmØ - M.S Rod 0.82 Ton
20mmØ - M.S Rod 25.21 Ton
25mmØ - M.S Rod 0.56 Ton
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Binding Wire 995 Lb


Location Head - Electical Workshop ( Test Lab)

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

1 Material Cost
MS Hollow 2.1 Ton 780000 Ton 1638000
3/4"Bolts & Nuts 52 No 2500 No 130000
Four Angle 378 Rft 1300 Rft 491400
Roofing Screw 2" 209 Nos 40 Nos 8360
Ridging & Valley 2' 33 Rf 1300 Rf 42900
Shera Board (6mm thk) 43 Sht 12000 Sht 516000
Shera Screw 1" 36 Doz 252 Doz 9072
GI Valley Guttering 116 Rft 1500 Rft 174000
Wire Nail 14 lb 650 lb 9100
Red Oxide 2.4 Gal 7300 Gal 17520
4" Paint Brush 6 Nos 700 Nos 4200
Plastic Paint 7 Gal 15500 Gal 108500
Putty 7 Gal 6000 Gal 42000
Sand Paper 5 doz 500 doz 2500
Putty Trowel 2 nos 500 nos 1000
PKD 0.88 Ton 1700000 Ton 1496000
4" x 1" T& G Planks 2844 Rf 870 Rf 2474280
Betex 5 Gal 28000 Gal 140000
Filler 5 Gal 36000 Gal 180000
Urethane 5 Gal 39000 Gal 195000
Thinner 11 Gal 6500 Gal 71500
Sand Paper 57 Sht 500 Sht 28500
Paint Brush (4") 4 No 2500 No 10000
Coarse Cloth 14 Yds 830 Yds 11620
p40 Grinding Sand Paper 36 Rft 1150 Rft 41400
7842852

2 M+L 8163644
Location Head - Electical Workshop ( Test Lab)

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

3 Labour Charges 2396703


4 Hiring Charges
Grinding Machine 4 Day 15000 Day 60000

Total 18463199
Say 18460000
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
1 Dismantling Work of
Existing First Floor Concrete (4208 Cft)
Labour Charges 4208 Cft 329.6 Cft 1386957

2 Timber Formwork Wrougt &


Fix work for First Floor concrete Slab
(5924 Sft)
J Wood (2Times) 11.85 Ton 680000 Ton 8058000
8'x4' 5ply wood (2Times) 106 Sht 15800 Sht 1674800
Wire Nail 178 Lb 650 Lb 115700
Carpenter 355 Nos 8500 Nos 3017500
Worker 118 Nos 6500 Nos 767000
13633000

3 Cutting & Welding MS Shear Connectors


with 2.5" x 8mm MS Flat 1'c/c on
existing MS H Beam (11.3 Cwt )
MS Flat 0.59 Ton 780000 Ton 460200
Wedding Rod No(10) 30 Pkt 8000 Pkt 240000
Smith 28 Nos 8500 Nos 238000
Worker 23 Nos 6500 Nos 149500
1087700

4 10mm Ø Rebar Work cut,bent


and Fixed Work
(215 Cwt)
MS Rod (10mm Ø) 11.28 Ton 700000 Ton 7896000
14G B/ wire 215 Lbs 650 Lbs 139750
Smith 322 Nos 8500 Nos 2737000
Worker 322 Nos 6500 Nos 2093000
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

12865750

5 G25 Ready Mixed concrete


Placing Work (77 m3)
Ready Mixed Concrete 77 m3 77000 m3 5929000
Labour Charges 77 m3 8000 m3 616000
Vibrator 10 Day 15000 Day 150000
6695000

6 Levelling work of G-25 Concrete


at 1st Floor Slab Concreting
(6567 Sft)
Labour Charges 6567 Sqf 75.25 Sqft 494167

7 Timber Scaffolding Work


for all Dismantling work
and Safety at 1st Floor Slab
(6567 Sft)
J Wood (2Times) 6.38 Tons 680000 Tons 4338400
Wire Nail 182 Lbs 650 Lbs 118300
Carpenter 137 Nos 8500 Nos 1164500
5621200

8 Dismantling Work of Timber


Scaffold After Construction
Period (6567 Sft)
Carpenter 41 Nos 8500 Nos 348500

9 Dismantling work of timber formwork


at 1st floor Slab After Setting time
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

(5924 Sft)
Carpenter 106 Nos 8500 Nos 901000
Worker 35 Nos 6500 227500
1128500

10 1½" thk (1:2:4) Cement Concrete


Topping Work ar 1st floor Slab
(6567 Sft)
Cement ( ေ က႕န) 148 Bags 6300 Bags 932400
Sand 3.9 Sud 18500 Sud 72150
R/Shingle 7.8 Sud 95000 Sud 741000
Mason 66 Nos 8500 Nos 561000
Worker 66 Nos 6500 Nos 429000
2735550

11 Level & Center Line marking Work


(6567 Sft)
Labour Charges 131 Nos 6500 Nos 851500

12 Curing Work For 14 Days


(6567 Sft)
Labour Charges 66 Nos 6500 Nos 429000

13 Carrying ,Shifting loading and


unloading broken-Concrete within
100' lead (4208 Cuft)
Labour (Carrying ) 4208 Cf 10.7 Cf 45026
Labour (loading , unloading ) 4208 Cf 64.2 Cf 270154
315179
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

14 Transporting work of Broken-Concrete


by Truck-Car to outside Downtown
(28 trips)
Transporting Charges 28 Trips 50000 Trips 1400000

Total 48992003
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

2 Labour charges (G-30) Concreting


Work For 2nd Floor Beam&Slab
(10278 Cft)
Labour For (G-30) Concreting 10278 Cft 625 Cft 6423750

Analysis of Rate
From Yellow Book Pg (33 ) item (6-2a )
Mason 2 Nox8500/- 17000/-
Worker7 Nox6500/- 45500/-
Total 62500/- per %Cft

4 Labour Charges For Curing Work


14 Day For Concreting 16320 Sft 65 Sft 1060800
Analysis of Rate
From Yellow Book Pg (32 ) item (10 ) worker 1 x 6500 /- =6500 /-per %Sft
TOTAL Ks 7484550

1 Labour Charges For Rebar Work For 3rd


Floor Beam & Slab (995.18 Cwt)
Labour (25mm) 10.8 Cwt 16245 Cwt 175446
Labour (20mm) 480.24 Cwt 16245 Cwt 7801499
Labour (16mm) 15.77 Cwt 16245 Cwt 256184
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Labour (10mm) 488.37 Cwt 27495 Cwt 13427733


21660862
Analysis of Rate For 1Cwt For Beam&Slab
For16mm; 20mm Ø + 25mm Ø , YB Pg 133 Item (9)
Steel Fixer 0.75 Nox8500/- 6375/-
Worker 0.75 Nox6500/- 4875/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 )x3 4995/-
Total 16245/- per Cwt
For 10mm Ø, From Yellow Book Pg (135 ) item ( 14 )
Steel Fixer 1.5 x 8500 /- 12750/-
worker 1.5 x 6500 /- 9750/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 )x3 4995/-
Total 27495/- per Cwt

MATERIAL ISSUE
12/2017 M.S ACCOUNT

10mmØ - M.S Rod 25.63 Ton


Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

16mmØ - M.S Rod 0.82 Ton


20mmØ - M.S Rod 25.21 Ton
25mmØ - M.S Rod 0.56 Ton
Binding Wire 995 Lb
3784500

387500

4830000
990000
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 Dismantling Work of Sft
Existing First Floor Concrete
Y5-7 and X1-6 1 x 1 95' -9'' 36' -6'' 0' -8'' 2330 Cft
Y7-8 and X2-6 1 x 1 76' -2'' 18' -3'' 0' -8'' 927 Cft
Y6 and X6-8 1 x 1 38' -0'' 17' -7'' 0' -8'' 445 Cft
Y7-8 and X6-7 1 x 1 27' -9'' 27' -4'' 0' -8'' 506 Cft
4208 Cft
Say 4208 Cft

2 Timber Formwork Wrougt &


Fix work for First Floor
Concrete Slab
Y5-7 and X1-6 1 x 1 95' -9'' 36' -6'' 3495 Sft
Y7-8 and X2-6 1 x 1 76' -2'' 18' -3'' 1390 Sft
Y6 and X6-8 1 x 1 38' -0'' 17' -7'' 668 Sft
Y7-8 and X6-7 1 x 1 27' -9'' 27' -4'' 759 Sft
6312 Sft
Deduction
Y Direction 1 x 3 95' -9'' 0' -5'' 119.7 Sft
Y Direction 1 x 3 76' -2'' 0' -5'' 95.2 Sft
Y Direction 1 x 1 38' -0'' 0' -5'' 15.8 Sft
Y Direction 1 x 3 27' -4'' 0' -5'' 34.2 Sft
X Direction 1 x 1 36' -6'' 0' -6'' 18.3 Sft
X Direction 1 x 3 54' -9'' 0' -6'' 82.1 Sft
X Direction 1 x 1 45' -4'' 0' -6'' 22.7 Sft

387.95 Sft
5924 Sft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

3 Cutting & Wedding MS Shear Connectors


with 2.5" x 8mm MS Flat 1'c/c on
existing MS H Beam

Y Direction 3 x 95 285 Nos


3 x 76 228 Nos
1 x 38 38 Nos
3 x 27 81 Nos
X Direction 1 x 36 36 Nos
3 x 54 162 Nos
1 x 45 45 Nos
875 Nos
2.5" x 8mm MS Flat 875 x 6.5" = 474 Rft x 2.661 Lb/ft 1261 Lb
Say 11.3 Cwt

4 10mm Ø Rebar Work cut,bent


and Fixed Work
Main Bar (Bottom) 4" c/c
Y6-7 and X1-2 64 x 1 19' -0'' 1216 Rft
Y4-8 and X 2-6 229 x 1 56' -9'' 12996 Rft
Lapping 229 x 1 1' -0'' 229 Rft
Y5a-7 and X7-8 79 x 1 46' -6'' 3673 Rft
Lapping 79 x 1 1' -0'' 79 Rft
Y5a-7 and X7-8 33 x 1 18' -9'' 619 Rft
Distribution Bar (bottom) 8"c/c
Y4-6 and X 2-6 60 x 1 77' -6'' 4650 Rft
Lapping 60 x 1 1' -0'' 60 Rft
Y6-7 and X 1-6 54 x 1 97' -3'' 5251 Rft
Lapping 54 x 2 1' -0'' 108 Rft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Y7-8 and X 2-6 60 x 1 77' -6'' 4650 Rft
Lapping 60 x 1 1' -0'' 60 Rft
Bet Y5a-7 , X6-8 27 x 1 38' -0'' 1026 Rft
Bet Y6-8 , X6-8 40 x 1 26' -6'' 1060 Rft
Main Bar (Top) 4"c/c
Y 5 and X 2-6 228 x 1 4' -6'' 1026 Rft
Bet: Y5-6 and X2-6 228 x 1 6' -9'' 1539 Rft
Y6 and X 1-6 287 x 1 6' -9'' 1937 Rft
Bet: Y6-7and X 1-6 287 x 1 6' -9'' 1937 Rft
Y7 and X1-6 287 x 1 6' -9'' 1937 Rft
Bet: Y7-8and X2-6 228 x 1 6' -9'' 1539 Rft
Y8 and X 2-6 228 x 1 4' -6'' 1026 Rft
Y5a and X 6-8 110 x 1 4' -6'' 495 Rft
Y6 and X 6-8 110 x 1 6' -9'' 742 Rft
Bet: Y6-8and X6-8 3 x 82 6' -9'' 1661 Rft
Y8 and X 6-8 82 x 1 4' -6'' 369 Rft
Distribution Bar (Top) 8"c/c
Y 5 and X 2-6 7 x 1 77' -6'' 543 Rft
Y 5 and X 2-6 (lapping) 7 x 1 1' -0'' 7 Rft
Bet: Y5-6 and X2-6 10 x 1 77' -6'' 775 Rft
Bet: Y5-6 and X2-6 (lapping) 10 x 2 1' -0'' 20 Rft
Y6 and X 1-6 10 x 1 97' -3'' 973 Rft
Y6 and X 1-6 (lapping) 10 x 2 1' -0'' 20 Rft
Bet: Y6-7and X 1-6 10 x 1 97' -3'' 972 Rft
Bet: Y6-7and X 1-6 (lapping) 10 x 2 1' -0'' 20 Rft
Y7 and X1-6 10 x 1 97' -3'' 972 Rft
Y7 and X1-6 (lapping) 10 x 2 1' -0'' 20 Rft
Bet: Y7-8and X2-6 10 x 1 77' -6'' 775 Rft
Bet: Y7-8and X2-6 (lapping) 10 x 1 1' -0'' 10 Rft
Y8 and X 2-6 7 x 1 77' -6'' 542 Rft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Y8 and X 2-6 (lapping) 7 x 1 1' -0'' 7 Rft
Y5a and X 6-8 7 x 1 37' -6'' 262 Rft
Y6 and X 6-8 10 x 1 37' -6'' 375 Rft
Bet: Y6-8and X6-8 3 x 10 26' -6'' 795 Rft
Y8 and X 6-8 7 x 1 26' -6'' 186 Rft
Steel Chair 10 x 59 1' -6'' 885 Rft
58042 Rft
57157 Rft x 0.415 Lb/ft 24088 Lb

Say 215 Cwt

5 G25 Ready Mixed concrete


Placing Work
Y5-7 and X1-6 1 x 1 96' -6'' 37' -3'' 0' -5'' 1498 Cft
Y7-8 and X2-6 1 x 1 76' -11'' 19' -0'' 0' -5'' 609 Cft
Y6 and X6-8 1 x 1 38' -9'' 18' -4'' 0' -5'' 296 Cft
Y7-8 and X6-7 1 x 1 28' -6'' 28' -1'' 0' -5'' 333 Cft
2736 Cft

Say 77 m3

6 Levelling work of G-25


Concrete at 1st Floor Slab
Concreting
Y5-7 and X1-6 1 x 1 96' -6'' 37' -3'' 3595 Sft
Y4-8 and X 2-6 1 x 1 76' -11'' 19' -0'' 1461 Sft
Y6 and X 6-8 1 x 1 38' -9'' 18' -4'' 710 Sft
Y6-8 and X6-7 1 x 1 28' -6'' 28' -1'' 800 Sft
6567 Sft

7 Timber Scaffolding Work


for all Dismantling work
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
and Safety at 1st Floor Slab
Measurements are same as
Item No. (6) 6567 Sft

8 Dismantling Work of Timber


Scaffold After Construction
Period
Measurements are same as
Item No. (6) 6567 Sft

9 Dismantling Work of
Timber Formwork at 1st
Floor Slab After Setting Time
As per Item No. (2) 5924 Sft

10 1½" thk (1:2:4) Cement Concrete


Topping Work ar 1st floor Slab
As per Item No. (6) 6567 Sft

11 Level & Center Line marking Work


As per Item No. (6) 6567 Sft

12 Curing Work For 14 Days


As per Item No. (6) 6567 Sft

13 Carrying ,Shifting loading and


unloading broken-Concrete within
100' lead
As per Item No. (1) 4208 Cft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
14 Transporting work of Broken-Concrete
by Truck-Car to outside Downtown
As per Item No. (1) 4208 Cft
150 cft Per Trip = 28 Trips
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

SB2
20mmØ,Top Bar 4 x 2 12' -3'' 98
Extra Bar 4x 1 6' -0'' 24
4x 1 6' -0'' 24
Bottom Bar 4 x 2 10' -0'' 80
Extra Bar 4x 1 6' -2'' 25
10mmØ Stirrups,SB2 4 x 35 2' -8'' 373.33
Line A & G
20mmØ,FB4,Top Bar 2 x 2 93' -8'' 375
Extra Bar 2x 2 8' -9'' 35
2 x 2 15' -3'' 61
2 x 2 17' -3'' 69
2 x 2 17' -3'' 69
2 x 2 17' -3'' 69
2 x 2 10' -8'' 43
Bottom Bar 2 x 4 92' -8'' 741
Lapping 2x 2 2' -7'' 10
10mmØ Stirrups,FB4 2 x 267 5' -1'' 2714.5
Line B,G & E
20mmØ,FB3,Top Bar 3 x 2 93' -6'' 561
Extra Bar 3x 5 8' -9'' 131
3 x 5 15' -3'' 229
3 x 5 17' -3'' 259
3 x 5 17' -3'' 259
3 x 5 17' -3'' 259
3 x 5 10' -8'' 160
Bottom Bar 3 x 4 92' -3'' 1107
Extra Bar 3x 2 6' -10'' 41
3 x 2 17' -3'' 104
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
3 x 2 17' -3'' 104
3 x 3 17' -3'' 155
3 x 3 17' -3'' 155
Lapping 3x 2 2' -7'' 16
Spacer Bar 3 x 68 0' -9'' 153
10mmØ Stirrups,FB3 3 x 267 5' -5'' 4338.75

Line No F,FB3,FB5
20mmØ,Top Bar 1 x 2 93' -4'' 187
Extra Bar 1x 5 8' -9'' 44
1 x 5 15' -3'' 76
1 x 5 17' -3'' 86
1 x 10 17' -3'' 173
1x 5 9' -3'' 46
1x 7 7' -3'' 51
Bottom Bar 1 x 4 92' -3'' 369
Extra Bar 1x 2 7' -9'' 16
1 x 2 17' -3'' 35
1 x 2 17' -3'' 35
1 x 2 17' -3'' 35
1x 2 8' -9'' 18
1x 2 8' -9'' 18
Lapping 1 x 2 2' -7'' 5
Spacer Bar 1 x 68 0' -9'' 51
10mmØ Stirrups,FB3,FB5 1 x 257 5' -5'' 1392.08

Line No C
20mmØ,SB2,Top Bar 1 x 2 94' -3'' 189
Bottom Bar 1 x 2 93' -0'' 186
Lapping 1 x 2 2' -7'' 5
10mmØ Stirrups,SB2 1 x 247 2' -8'' 658.67
Line No Between E& F
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
20mmØ,SB2,Top Bar 1 x 2 23' -3'' 47
Bottom Bar 1 x 2 22' -0'' 44
Lapping 1 x 1 2' -7'' 3
10mmØ Stirrups,SB2 1 x 53 2' -8'' 141.33

Line A & G,FB4


20mmØ,Top Bar 2 x 2 115' -0'' 460
Extra Bar 2 x 2 10' -0'' 40
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 14' -0'' 56
2 x 2 14' -0'' 56
2 x 2 10' -0'' 40
Bottom Bar 2 x 4 113' -6'' 908
Lapping 2 x 12 2' -7'' 62
10mmØ Stirrups,FB4 2 x 270 5' -1'' 2745.00

Line B & E,FB3


20mmØ,Top Bar 2 x 2 115' -0'' 460
Extra Bar 2 x 5 10' -0'' 100
2 x 5 18' -0'' 180
2 x 5 18' -0'' 180
2 x 5 18' -0'' 180
2 x 5 14' -0'' 140
2 x 5 14' -0'' 140
2 x 5 10' -0'' 100
Bottom Bar 2 x 4 113' -6'' 908
Extra Bar 2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
2 x 2 18' -0'' 72
2 x 2 10' -0'' 40
Lapping 2 x 12 2' -7'' 62
Spacer Bar 2 x 45 0' -9'' 68
10mmØ Stirrups,FB3 2 x 264 5' -5'' 2860.00

Line F FB3,FB5
20mmØ,Top Bar 1 x 2 115' -0'' 230
Extra Bar 1 x 6 10' -0'' 60
1 x 5 10' -0'' 50
1 x 5 14' -0'' 70
1 x 5 18' -0'' 90
1 x 5 18' -0'' 90
1 x 5 14' -0'' 70
1 x 5 14' -0'' 70
1 x 5 10' -0'' 50
1 x 1 8' -0'' 8
Bottom Bar 1 x 4 101' -0'' 404
1 x 4 15' -0'' 60
Extra Bar 1 x 2 12' -0'' 24
1 x 2 8' -0'' 16
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 10' -0'' 20
Lapping 1 x 12 2' -7'' 31
Spacer Bar 1 x 47 0' -9'' 35
10mmØ Stirrups,FB3 1 x 242 5' -5'' 1310.83

FB5 1 x 40 5' -5'' 216.67


Line D
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
FB1,FB3,FB6
20mmØ,Top Bar 1 x 2 204' -0'' 408
Extra Bar 1 x 10 10' -0'' 100
1 x 10 18' -0'' 180
1 x 5 18' -0'' 90
1 x 5 18' -0'' 90
1 x 5 14' -0'' 70
1 x 4 10' -0'' 40
1 x 4 10' -0'' 40
25mmØ,FB2,Extra Bar 1 x 4 6' -6'' 26.00
1 x 3 8' -0'' 24
Bottom Bar 1 x 4 85' -0'' 340
1 x 4 14' -0'' 56
1 x 4 20' -0'' 80
1 x 4 95' -6'' 382
Extra Bar 1 x 12 18' -0'' 216
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 10' -0'' 20
25mmØ,FB2,Extra Bar 1 x 4 7' -0'' 28.00
Lapping 1 x 10 2' -7'' 26
Spacer Bar 1 x 54 0' -9'' 41
10mmØ Stirrups,FB3 1 x 284 5' -5'' 1538.33

FB1 1 x 50 5' -10'' 291.67


FB6 1 x 68 5' -10'' 396.67
Line C
FB1,FB6
20mmØ,Top Bar,FB1 1 x 2 50' -6'' 101
Extra Bar,FB1 1 x 8 8' -0'' 64
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 4 10' -0'' 40
20mmØ,Extra Bar 1 x 4 10' -0'' 40
1 x 4 8' -0'' 32
Bottom Bar 1 x 4 14' -0'' 56
1 x 2 20' -0'' 40
Extra Bar,FB1 1 x 2 10' -0'' 20
20mmØ,Extra Bar 1 x 4 8' -0'' 32
Spacer Bar 1 x 45 0' -9'' 34
10mmØ Stirrups,FB1,FB6 1 x 68 5' -10'' 396.67
SB2
Bottom Bar 4 x 2 23' -0'' 184
10mmØ Stirrups,SB2 4 x 54 2' -8'' 576.00
54 16359 19950.50

16mmØ 10mmØ
Rebar Work For Stair
2nd Floor to 3rd Floor Stair 4 x 16 7' -0'' 448.00 Rft
2 x 16 13' -0'' 416.00 Rft
3rd Floor Stair Dowel 2 x 16 13' -0'' 416.00 Rft
2 x 16 12' -0'' 384.00 Rft
Distribution Bar 2 x 14 6' -0'' 168 Rft
2 x 20 12' -6'' 500 Rft
1664.00 668 Rft

Rebar Work For Slab 10mmØ

S3,12-14 Bottom,Main Bar 1 x 25 9' -6'' 238 Rft


Distribution Bar 1 x 11 21' -6'' 237 Rft
Top Bar 1 x 50 11' -0'' 550 Rft
1 x 11 23' -0'' 253 Rft
S2,8-12,Main Bar 1 x 84 9' -6'' 798 Rft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Distribution Bar 1 x 11 72' -6'' 798 Rft
Lapping 1 x 11 1' -4'' 15 Rft
Top Bar 1 x 84 11' -6'' 966 Rft
1 x 10 74' -6'' 745 Rft
Lapping 1 x 10 1' -4'' 13 Rft
OT;S1,Line 12-14
Bottom Bar 1 x 25 13' -6'' 338 Rft
1 x 15 21' -6'' 323 Rft
Top Bar 1 x 50 15' -6'' 775 Rft
1 x 15 23' -69'' 431 Rft
Between Line B &D
S2, Bottom,Main 1 x 9 31' -6'' 284 Rft
Dis; 1 x 25 8' -6'' 213 Rft
S2,Top,Main 1 x 9 33' -6'' 302 Rft
Dis; 1 x 25 10' -6'' 263 Rft
S2, Bottom,Main 1 x 16 21' -6'' 344 Rft
Dis; 1 x 25 14' -0'' 350 Rft
Top Bar 1 x 16 23' -6'' 376 Rft
1 x 25 16' -0'' 400 Rft
S1,S2 Bottom,Main 1 x 30 72' -6'' 2175 Rft
Dis; 1 x 84 26' -0'' 2184 Rft
Top Bar 1 x 30 74' -6'' 2235 Rft
1 x 84 28' -0'' 2352 Rft
S1 Top Bar 1 x 21 53' -6'' 1124 Rft
1 x 60 21' -0'' 1260 Rft
Lapping 1 x 81 1' -6'' 122 Rft
S2 Bottom Bar 1 x 13 92' -6'' 1203 Rft
1 x 108 11' -6'' 1242 Rft
Top Bar 1 x 13 94' -6'' 1229 Rft
1 x 108 13' -6'' 1458 Rft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Lapping 13 x 6 1' -6'' 117 Rft
Line E-F
S3 Bottom Bar 1 x 30 11' -6'' 345 Rft
1 x 10 26' -0'' 260 Rft
Top Bar 1 x 60 13' -6'' 810 Rft
1 x 10 28' -0'' 280 Rft
S3 Bottom Bar 1 x 30 9' -6'' 285 Rft
1 x 8 26' -0'' 208 Rft
Top Bar 1 x 60 11' -6'' 690 Rft
1 x 8 28' -0'' 224 Rft
S2 Bottom Bar 1 x 30 51' -6'' 1545 Rft
1 x 60 26' -0'' 1560 Rft
Top Bar 1 x 30 53' -6'' 1605 Rft
1 x 60 28' -0'' 1680 Rft
Lapping 30 x 2 1' -6'' 90 Rft
S2 Bottom Bar 1 x 30 11' -6'' 345 Rft
1 x 12 26' -0'' 312 Rft
Top Bar 1 x 30 13' -6'' 405 Rft
1 x 12 28' -0'' 336 Rft
Line F & G
S2 Bottom Bar 1 x 10 91' -6'' 915 Rft
1 x 109 9' -6'' 1036 Rft
Top Bar 1 x 10 92' -6'' 925 Rft
1 x 109 11' -6'' 1254 Rft
Lapping 10 x 3 1' -6'' 45 Rft
S3,1-3, Bottom,Main Bar 1 x 25 9' -6'' 238 Rft
Distribution Bar 1 x 11 21' -6'' 237 Rft
Top Bar 1 x 50 11' -0'' 550 Rft
1 x 11 23' -0'' 253 Rft
S2,3-8,Bottom,Main Bar 1 x 111 9' -6'' 1055 Rft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Distribution Bar 1 x 12 91' -6'' 1098 Rft
Lapping 2 x 12 1' -4'' 32 Rft
Top Bar 1 x 88 11' -0'' 968 Rft
1 x 12 93' -0'' 1116 Rft
Lapping 2 x 12 1' -4'' 32 Rft
Line 1-3,S3
Bottom,Main Bar 1 x 26 8' -0'' 208 Rft
Distribution Bar 1 x 10 21' -6'' 215 Rft
Top,Main Bar 1 x 42 9' -6'' 399 Rft
Distribution Bar 1 x 17 23' -0'' 391 Rft
S1,Bottom,Main Bar 1 x 25 16' -0'' 400 Rft
Distribution Bar 1 x 20 21' -6'' 430 Rft
Top,Main Bar 1 x 44 17' -6'' 770 Rft
Distribution Bar 1 x 30 23' -0'' 690 Rft
Line 3-5,S3
Bottom,Main Bar 2 x 50 26' -0'' 2600 Rft
Distribution Bar 2 x 30 41' -6'' 2490 Rft
Top,Main Bar 2 x 83 27' -6'' 4565 Rft
Distribution Bar 2 x 60 43' -0'' 5160 Rft
Lapping 2 x 90 1' -4'' 240 Rft
Line 5-6,S2
Bottom,Main Bar 1 x 25 8' -6'' 213 Rft
Distribution Bar 1 x 10 21' -6'' 215 Rft
Top,Main Bar 1 x 21 10' -0'' 210 Rft
Distribution Bar 1 x 8 23' -0'' 184 Rft
Line 5-6,C-D,S1
Bottom,Main Bar 1 x 25 19' -0'' 475 Rft
Distribution Bar 1 x 21 21' -6'' 452 Rft
Top,Main Bar 1 x 45 20' -6'' 923 Rft
Distribution Bar 1 x 35 23' -0'' 805 Rft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Line 6-7,B-C,S2
Bottom,Main Bar 1 x 15 11' -6'' 173 Rft
Distribution Bar 1 x 12 13' -6'' 162 Rft
Top,Main Bar 1 x 13 13' -0'' 169 Rft
Distribution Bar 1 x 11 14' -0'' 154 Rft
Line C-D
Bottom,Main Bar 1 x 15 13' -0'' 195 Rft
Distribution Bar 1 x 14 14' -0'' 196 Rft
Top,Main Bar 1 x 13 14' -6'' 189 Rft
Distribution Bar 1 x 12 15' -6'' 186 Rft
Line D-E,1-3 & 7-8,S3
Bottom,Main Bar 2 x 25 11' -6'' 575 Rft
Distribution Bar 2 x 12 21' -6'' 516 Rft
Top,Main Bar 2 x 41 13' -0'' 1066 Rft
Distribution Bar 2 x 21 23' -0'' 966 Rft
Line 3-7,D-E,S2
Bottom,Main Bar 1 x 85 11' -6'' 978 Rft
Distribution Bar 1 x 12 71' -6'' 858 Rft
Top,Main Bar 1 x 73 13' -0'' 949 Rft
Distribution Bar 1 x 11 73' -0'' 803 Rft
Lapping 1 x 23 1' -4'' 31 Rft
Line 2-3,E-F,S2
Bottom,Main Bar 1 x 30 9' -6'' 285 Rft
Distribution Bar 1 x 10 26' -0'' 260 Rft
Top,Main Bar 1 x 50 11' -0'' 550 Rft
Distribution Bar 1 x 17 27' -6'' 468 Rft
Line 5-6,E-F,S2
Bottom,Main Bar 1 x 30 21' -6'' 645 Rft
Distribution Bar 1 x 25 26' -0'' 650 Rft
Top,Main Bar 1 x 50 23' -0'' 1150 Rft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Distribution Bar 1 x 12 27' -6'' 330 Rft
Line 6-8,E-F,S3
Bottom,Main Bar 1 x 37 26' -0'' 962 Rft
Distribution Bar 1 x 30 31' -6'' 945 Rft
Top,Main Bar 1 x 62 27' -6'' 1705 Rft
Distribution Bar 1 x 51 33' -0'' 1683 Rft
Line 1-8,F-G,S2
Bottom,Main Bar 1 x 133 9' -6'' 1264 Rft
Distribution Bar 1 x 10 111' -6'' 1115 Rft
Top,Main Bar 1 x 113 11' -0'' 1243 Rft
Distribution Bar 1 x 9 113' -0'' 1017 Rft
Lapping 2 x 19 1' -4'' 51 Rft
Chair 2 x 320 2' -6'' 1600 Rft
92558 Rft

10mmØ - 131801.11 Rf x0.415 Lb 54697.46 488 Cwt


16mmØ - 1664Rf x1.062 Lb 1767.16 16 Cwt
20mmØ - 32402 Rf x1.66 Lb 53787 480 Cwt
25mmØ - 467.83 Rf x 2.587 Lb 1210.27 11 Cwt
995 Cwt

3 G-30 Ready Mixed Concreting Work


for 3rd Floor Beam & Slab
Line 1
FB1 1 x 1 22' -8'' 1' -0'' 2' -0'' 45 Cft
FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21 Cft
FB2a 1 x 1 8' -2'' 1' -0'' 1' -8'' 14 Cft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
FB5 1 x 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
Line 2,3,4,5,6,7
FB1 9 x 1 22' -8'' 1' -0'' 2' -0'' 408 Cft
FB1 1 x 1 10' -2'' 1' -0'' 2' -0'' 20 Cft
FB5 1 x 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
FB6 2 x 1 9' -6'' 1' -0'' 2' -0'' 38 Cft
FB2 11 x 1 6' -4'' 1' -0'' 1' -8'' 116 Cft
FB2a 5 x 1 8' -3'' 1' -0'' 1' -8'' 69 Cft
SB2 3 x 1 70' -0'' 0' -9'' 1' -6'' 236 Cft
SB2 1 x 1 31' -6'' 0' -9'' 1' -6'' 35 Cft
SB1 2 x 1 7' -0'' 0' -9'' 1' -6'' 16 Cft
Line A & G FB4 2 x 1 101' -0'' 1' -0'' 1' -8'' 337 Cft

FB3 1 x 1 99' -0'' 1' -0'' 1' -10'' 182 Cft


1 x 1 97' -3'' 1' -0'' 1' -10'' 178 Cft
Line D FB1 1 x 1 10' -8'' 1' -0'' 2' -0'' 21 Cft
FB3 1 x 1 72' -8'' 1' -0'' 1' -10'' 133 Cft
FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28 Cft
Line F
FB3 1 x 1 87' -0'' 1' -0'' 1' -10'' 160 Cft
FB5 1 x 1 10' -3'' 1' -2'' 2' -0'' 24 Cft
Line C
FB1 1 x 1 9' -2'' 1' -0'' 2' -0'' 18 Cft
FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28 Cft
Line Between 1 & 3
SB2 2 x 1 19' -0'' 0' -9'' 1' -6'' 43 Cft
1 x 1 18' -3'' 0' -9'' 1' -6'' 21 Cft
C1,C2 24 x 1 1' -4'' 1' -6'' 2' -0'' 96 Cft
C3,C4 51 x 1 1' -4'' 1' -10'' 2' -0'' 249 Cft
C5 6 x 1 1' -0'' 3' -0'' 2' -0'' 36 Cft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Slab S3 2 x 1 19' -0'' 7' -0'' 0' -5'' 111 Cft
Slab S3 1 x 1 19' -0'' 5' -6'' 0' -5'' 44 Cft
Slab S3 4 x 1 23' -6'' 9' -2'' 0' -5'' 359 Cft
Slab S3 2 x 1 19' -0'' 9' -0'' 0' -5'' 143 Cft
Slab S3 1 x 1 23' -6'' 7' -0'' 0' -5'' 69 Cft
Slab S3 6 x 1 23' -6'' 9' -2'' 0' -5'' 539 Cft
Slab S3 1 x 1 23' -6'' 9' -0'' 0' -5'' 88 Cft
Slab S2 14 x 1 9' -3'' 7' -0'' 0' -5'' 378 Cft
Slab S2 2 x 1 9' -0'' 7' -0'' 0' -5'' 53 Cft
Slab S2 1 x 1 9' -0'' 11' -0'' 0' -5'' 41 Cft
Slab S2 1 x 1 11' -0'' 11' -6'' 0' -5'' 53 Cft
Slab S2 6 x 1 9' -2'' 9' -0'' 0' -5'' 206 Cft
Slab S2 1 x 1 9' -0'' 9' -0'' 0' -5'' 34 Cft
Slab S2 1 x 1 7' -0'' 7' -0'' 0' -5'' 20 Cft
Slab S2 1 x 1 11' -0'' 7' -0'' 0' -5'' 32 Cft
Slab S2 4 x 1 10' -4'' 9' -2'' 0' -5'' 158 Cft
Slab S2 2 x 1 3' -9'' 7' -0'' 0' -5'' 22 Cft
Slab S2 2 x 1 5' -3'' 7' -0'' 0' -5'' 31 Cft
Slab S1 1 x 1 15' -0'' 19' -0'' 0' -5'' 119 Cft
Slab S1 2 x 1 9' -3'' 15' -9'' 0' -5'' 121 Cft
Stair Step 12 × 1 5' -3'' 0' -6'' 0' -6'' 16 Cft
Flight 1 × 2 13' -6'' 5' -3'' 0' -9'' 106 Cft
Landing Floor 1 × 1 11' -0'' 6' -2'' 0' -9'' 51 Cft
1 × 1 11' -0'' 2' -2'' 0' -9'' 18 Cft
FB1 1 x 1 22' -8'' 1' -0'' 2' -0'' 45 Cft
FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21 Cft
FB2a 1 x 1 8' -2'' 1' -0'' 1' -8'' 14 Cft
FB6 1 x 1 9' -6'' 1' -0'' 2' -0'' 19 Cft
FB1 1 x 1 10' -2'' 1' -0'' 2' -0'' 20 Cft
Line - 14 FB5 1 × 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Line - 13, 14 FB1 2 × 1 22' -8'' 1' -0'' 2' -0'' 91 Cft
FB2 3 × 1 6' -4'' 1' -0'' 1' -8'' 32 Cft
FB2a 1 × 1 8' -2'' 1' -0'' 1' -8'' 14 Cft
SB2 1 × 1 22' -8'' 1' -0'' 1' -8'' 38 Cft
Line 9.10.11.12FB1 7 × 1 22' -8'' 1' -0'' 2' -0'' 317 Cft
FB5 1 × 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
Between 9.10.11.12 SB2 3 × 1 73' -6'' 0' -9'' 1' -6'' 248 Cft
Line-13 SB2 1 × 1 17' -3'' 0' -9'' 1' -6'' 19 Cft
SB1 1 × 1 7' -0'' 0' -9'' 1' -6'' 8 Cft
Line 9.10.11.12 FB2 8 × 1 6' -4'' 1' -0'' 1' -8'' 84 Cft
FB 2a 4 × 1 8' -2'' 1' -0'' 1' -8'' 54 Cft
A&G FB4 2 × 1 84' -3'' 1' -0'' 1' -8'' 281 Cft
Line F,FB3 1 × 1 72' -3'' 1' -0'' 1' -10'' 132 Cft
LineB,D, E,FB3 3 × 1 84' -3'' 1' -0'' 1' -10'' 463 Cft
FB5 1 × 1 9' -2'' 1' -2'' 2' -0'' 21 Cft
SB2 1 × 1 84' -6'' 0' -9'' 1' -6'' 95 Cft
SB2 1 × 1 44' -6'' 0' -9'' 1' -6'' 50 Cft
2 × 1 74' -0'' 0' -9'' 1' -6'' 167 Cft
SB2 1 × 1 23' -0'' 0' -9'' 1' -6'' 26 Cft
SB1 3 × 1 9' -1'' 0' -9'' 1' -6'' 31 Cft
Slab S2 2 × 1 9' -0'' 7' -0'' 0' -5'' 53 Cft
Slab S2 12 × 1 9' -1'' 7' -0'' 0' -5'' 318 Cft
Slab S2 1 × 1 9' -0'' 7' -0'' 0' -5'' 26 Cft
Slab S2 3 × 1 9' -1'' 7' -0'' 0' -5'' 79 Cft
Slab S2` 1 × 1 15' -9'' 9' -0'' 0' -5'' 59 Cft
Slab S2 2 × 1 7' -6'' 9' -1'' 0' -5'' 57 Cft
Slab S2 1 × 1 9' -0'' 9' -0'' 0' -5'' 34 Cft
Slab S2 6 × 1 9' -1'' 9' -0'' 0' -5'' 204 Cft
Slab S2 2 × 1 11' -4'' 9' -0'' 0' -5'' 85 Cft
Slab S2 8 × 1 11' -4'' 9' -1'' 0' -5'' 343 Cft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Slab S2 3 × 1 7' -4'' 9' -1'' 0' -5'' 83 Cft
Slab OT 1 × 1 23' -6'' 7' -0'' 0' -5'' 69 Cft
Slab S1 5 × 1 16' -6'' 9' -2'' 0' -5'' 315 Cft
Slab S3 1 × 1 19' -0'' 7' -0'' 0' -5'' 55 Cft
Slab S1 1 × 1 19' -0'' 11' -1'' 0' -5'' 88 Cft
Slab S2 1 × 1 7' -1'' 11' -1'' 0' -5'' 33 Cft
Slab S2 1 × 1 11' -1'' 11' -1'' 0' -5'' 51 Cft
Slab S2 1 × 1 7' -1'' 9' -0'' 0' -5'' 27 Cft
Slab S2 1 × 1 11' -1'' 9' -0'' 0' -5'' 42 Cft
Slab S2 1 × 1 7' -0'' 7' -0'' 0' -5'' 20 Cft
Slab S2 1 × 1 11' -0'' 7' -0'' 0' -5'' 32 Cft
Stair Step 7 × 1 5' -3'' 0' -6'' 0' -6'' 9 Cft
Flight 1 × 1 8' -0'' 5' -3'' 0' -9'' 32 Cft
Landing Floor 1 × 1 11' -0'' 6' -2'' 0' -9'' 51 Cft
10048 Cft
Location Head - အမ' ေသ စကည႔တ$ 'က
Building (B) 1st Floor RCC Concrete ေေဆငငက က ခငလ$ ပ% န

Name Of Work

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Hire Charges For Concreting Work


4 10089 Cft
Vibrator
25 Day
Curing Work For Concreting
5 For14 Day
For 2nd Floor
1 × 1 204' -0'' 80' -0'' 16320 Sft
111
Location Head - Electical Workshop ( Test Lab)

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

1 WI Work with MS Hollow Pipe 720 sft


MS Hollow 2.1 Ton 780000 1638000
3/4"Bolts & Nuts 52 No 2500 130000
Labour Charges for WI work 720 Sft 1350 972000
2740000

2 Roofing Work 777 Sft


Four Angle 378 Rft 1300 Rft 491400
Roofing Screw 2" 176 Nos 40 Nos 7040
Ridging & Valley 2' ( 31 Rft) 33 Rf 1300 Rf 42900
Roofing Screw 2" 33 Nos 40 Nos 1320
GI Valley Guttering 116 Rft 1500 Rft 174000
Labour Charges for Four Angle 777 Sft 19250 %sft 149573
Labour Charges for Ridging & Valley 31 Rft 290 Rft 8990
875223

3 Walling Work 1248 Sft


Shera Board (6mm thk) 43 Sht 12000 516000
Shera Screw 1" 36 Doz 252 9072
Labour Charges 1248 Sft 213.8 266822
791894

4 Aluminium Frame Walling with Glass 480 Sft


Aluminium Walling (M+L) 480 Sft 9800 Sft 4704000

5 Composit Parapet Work (M+L) 232 Sf 9800 Sft 2273600

6 Aluminium Door Work (M+L) 84 Sft 11435 Sft 960540

7 Ceiling Work (M+L) 720 Sf 313.2 Sft 225504


Location Head - Electical Workshop ( Test Lab)

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

8(a) Painting Work 795.30 Sft


Red Oxide 2.4 Gal 7300 Gal 17520
4" Paint Brush 2 Nos 700 Nos 1400
Labour Charges 795.3 Sft 149.85 Sft 119176
(b) Plastic Painting (3Coat) (984Sft)
Plastic Paint 7 Gal 15500 Gal 108500
4" Paint Brush 4 Nos 700 Nos 2800
Putty 7 Gal 6000 Gal 42000
Sand Paper 5 doz 500 doz 2500
Putty Trowel 2 nos 500 nos 1000
Labour Charges 984 Sft 6660 %Sft 65534
Labour Charges (putty) 984 Sft 15000 %Sft 147600
508030

9 PKD & TG Flooring 720 Sft


PKD 0.88 Ton 1700000 Ton 1496000
4" x 1" T& G Planks 2844 Rf 870 Rf 2474280
Wire Nail 14 Lb 650 lb 9100
Labour Charges 720 Sft 30240 %Sft 217728
Labour Charges 0.84 ton 102000 Ton 85680
4282788

10 Polising Work (720 Sft)


Betex 5 Gal 28000 Gal 140000
Filler 5 Gal 36000 Gal 180000
Urethane 5 Gal 39000 Gal 195000
Thinner 11 Gal 6500 Gal 71500
Sand Paper 57 Sht 500 Sht 28500
Paint Brush (4") 4 No 2500 No 10000
Location Head - Electical Workshop ( Test Lab)

Name of work-

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Coarse Cloth 14 Yds 830 Yds 11620


Grinding Machine 4 Day 15000 Day 60000
p40 Grinding Sand Paper 36 Rft 1150 Rft 41400
Labour (Polishing) 720 Sft 505 Sft 363600
1101620

Total 18463199
Say 18460000
2396703
8163644
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 WI Work (4" x 4") Channel

FB1 2 x 1 22' -8'' 5' -4'' 241.78 Sft


FB2 2 x 2 6' -4'' 4' -3'' 107.67 Sft
FB2a 2 x 1 8' -2'' 4' -3'' 69.42 Sft
FB5 2 x 1 22' -8'' 5' -1'' 230.44 Sft
Line 2 , 13
FB1 2 x 1 22' -8'' 5' -1'' 230.44 Sft
FB2 2 x 1 6' -4'' 3' -10'' 48.56 Sft
Line 3 - 12
FB1 16 x 1 22' -8'' 4' -6'' 1632.00 Sft
FB1 2 x 1 10' -6'' 4' -11'' 103.25 Sft
FB5 2 x 1 22' -8'' 4' -8'' 211.56 Sft
FB6 3 x 1 9' -6'' 4' -11'' 140.13 Sft
FB2 20 x 1 6' -4'' 3' -10'' 485.56 Sft
FB2a 10 x 1 8' -3'' 3' -10'' 316.25 Sft
SB2 6 x 1 70' -0'' 3' -3'' 1365 Sft
SB2 1 x 1 31' -6'' 3' -3'' 102.38 Sft
SB2 1 x 1 23' -6'' 3' -3'' 76.38 Sft
SB1 4 x 1 7' -0'' 3' -3'' 91 Sft
Line A & G
FB4 2 x 1 185' -4'' 4' -3'' 1575.33 Sft
Line B & E
FB3 1 x 1 167' -8'' 4' -2'' 698.61 Sft
FB3 1 x 1 164' -0'' 4' -2'' 683.33 Sft
FB1 2 x 1 18' -8'' 4' -6'' 168.00 Sft
Line D
FB1 1 x 1 10' -8'' 4' -6'' 48.00 Sft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
FB1 1 x 1 18' -8'' 4' -6'' 84.00 Sft
FB3 1 x 1 139' -6'' 4' -2'' 581.25 Sft
FB6 2 x 1 7' -0'' 4' -11'' 68.83 Sft
Line F
FB3 1 x 1 142' -8'' 4' -2'' 594.44 Sft
FB5 2 x 1 10' -3'' 5' -1'' 104.21 Sft
FB1 1 x 1 18' -8'' 4' -6'' 84.00 Sft
Line C
FB1 1 x 1 9' -2'' 4' -6'' 41.25 Sft
FB6 2 x 1 7' -0'' 4' -6'' 63.00 Sft
Line Between 1 & 3
SB2 2 x 1 19' -0'' 3' -3'' 123.50 Sft
SB2 6 x 1 18' -3'' 3' -3'' 355.88 Sft
SB2 3 x 1 9' -2'' 3' -3'' 89.38 Sft
Pocket Beam 1 x 1 140' -0'' 3' -4'' 466.67 Sft
Column; C1;C2 24 × 1 6' -0'' 2' -0'' 288.00 Sft
C3;C4 51 × 1 6' -8'' 2' -0'' 680.00 Sft
C5 6 x 1 9' -0'' 2' -0'' 108.00 Sft
Toilet Cover 1 x 1 98' -6'' 0' -4'' 32.83 Sft
Slab S3 3 x 1 19' -0'' 7' -0'' 399.00 Sft
Slab S3 3 x 1 19' -0'' 9' -0'' 513.00 Sft
Slab S3 1 x 1 19' -0'' 5' -6'' 104.50 Sft
Slab S3 10 x 1 23' -6'' 9' -2'' 2154.17 Sft
Slab S3 2 x 1 23' -6'' 7' -0'' 329.00 Sft
Slab S2 26 x 1 9' -2'' 7' -0'' 1668.33 Sft
Slab S2 4 x 1 9' -0'' 7' -0'' 252.00 Sft
Slab S2 2 x 1 7' -0'' 11' -0'' 154.00 Sft
Slab S2 2 x 1 7' -0'' 7' -0'' 98.00 Sft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Slab S2 12 x 1 9' -2'' 9' -0'' 990.00 Sft
Slab S2 2 x 1 9' -0'' 9' -0'' 162.00 Sft
Slab S2 6 x 1 9' -2'' 22' -9'' 1251.25 Sft
Slab S2 1 x 1 9' -0'' 22' -9'' 204.75 Sft
Slab S2, 1 x 1 11' -0'' 11' -0'' 121.00 Sft
Slab S2, 1 x 1 9' -0'' 11' -0'' 99.00 Sft
Slab S1, 1 x 1 15' -0'' 19' -0'' 285.00 Sft
Slab S1,S2 7 x 1 9' -2'' 22' -9'' 1459.79 Sft
Slab S1,S2 1 x 1 9' -0'' 22' -9'' 204.75 Sft
OT 6 x 1 9' -2'' 23' -6'' 1292.50 Sft
Step 36 × 1 5' -3'' 0' -6'' 94.50 Sft
Landing 2 × 1 6' -7'' 11' -0'' 144.83 Sft
Landing 1 × 1 2' -2'' 11' -0'' 23.83 Sft
Flight 3 × 1 14' -0'' 5' -3'' 220.50 Sft
Side Cover 3 × 2 14' -0'' 1' -6'' 126.00 Sft
24742.03 Sft
2 Labour Charges For G-30 Ready Mixed Concreting Work
for 3rd Floor Beam & Slab
Line 1,14
FB1 2 x 1 22' -8'' 1' -0'' 2' -0'' 90.67 Cft
FB2 2 x 2 6' -4'' 1' -0'' 1' -8'' 42.22 Cft
FB2a 2 x 1 8' -2'' 1' -0'' 1' -8'' 27.22 Cft
FB5 2 x 1 22' -8'' 1' -2'' 2' -0'' 105.78 Cft
Line 2 , 13
FB1 2 x 1 22' -8'' 1' -0'' 2' -0'' 90.67 Cft
FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21.11 Cft
Line 3 - 12
FB1 16 x 1 22' -8'' 1' -0'' 2' -0'' 725.33 Cft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
FB1 2 x 1 10' -6'' 1' -0'' 2' -0'' 42.00 Cft
FB5 2 x 1 22' -8'' 1' -2'' 2' -0'' 105.78 Cft
FB6 3 x 1 9' -6'' 1' -0'' 2' -0'' 57.00 Cft
FB2 20 x 1 6' -4'' 1' -0'' 1' -8'' 211.11 Cft
FB2a 10 x 1 8' -3'' 1' -0'' 1' -8'' 137.5 Cft
SB2 6 x 1 70' -0'' 0' -9'' 1' -6'' 472.5 Cft
SB2 1 x 1 31' -6'' 0' -9'' 1' -6'' 35.44 Cft
SB2 1 x 1 23' -6'' 0' -9'' 1' -6'' 26.44 Cft
SB1 4 x 1 7' -0'' 0' -9'' 1' -6'' 31.5 Cft
Line A & G
FB4 2 x 1 185' -4'' 1' -0'' 1' -8'' 617.78 Cft
Line B & E Cft
FB3 1 x 1 166' -8'' 1' -0'' 1' -10'' 305.56 Cft
1 x 1 164' -0'' 1' -0'' 1' -10'' 300.67 Cft
FB1 2 x 1 18' -8'' 1' -0'' 2' -0'' 74.67 Cft
Line D
FB1 1 x 1 10' -8'' 1' -0'' 2' -0'' 21.33 Cft
FB1 1 x 1 18' -8'' 1' -0'' 2' -0'' 37.33 Cft
FB3 1 x 1 139' -6'' 1' -0'' 1' -10'' 255.75 Cft
FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28.00 Cft
Line F
FB3 1 x 1 142' -8'' 1' -0'' 1' -10'' 261.56 Cft
FB5 2 x 1 10' -3'' 1' -2'' 2' -0'' 47.83 Cft
FB1 1 x 1 18' -8'' 1' -0'' 2' -0'' 37.33 Cft
Line C
FB1 1 x 1 9' -2'' 1' -0'' 2' -0'' 18.33 Cft
FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28.00 Cft
Line Between 1 & 3
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
SB2 2 x 1 19' -0'' 0' -9'' 1' -6'' 42.75 Cft
SB2 6 x 1 18' -3'' 0' -9'' 1' -6'' 123.19 Cft
SB2 3 x 1 9' -2'' 0' -9'' 1' -6'' 30.94 Cft
Pocket Beam 1 x 1 140' -0'' 1' -0'' 1' -0'' 140.00 Cft
1 x 1 72' -0'' 1' -0'' 1' -0'' 72.00 Cft
Column; C1;C2 24 × 1 1' -4'' 1' -6'' 2' -0'' 96.00 Cft
C3;C4 51 × 1 1' -4'' 1' -10'' 2' -0'' 249.33 Cft
C5 6 x 1 3' -0'' 1' -0'' 2' -0'' 36.00 Cft
Slab S3 3 x 1 19' -0'' 7' -0'' 0' -5'' 166.25 Cft
Slab S3 3 x 1 19' -0'' 9' -0'' 0' -5'' 213.75 Cft
Slab S3 1 x 1 19' -0'' 5' -6'' 0' -5'' 43.54 Cft
Slab S3 10 x 1 23' -6'' 9' -2'' 0' -5'' 897.57 Cft
Slab S3 2 x 1 23' -6'' 7' -0'' 0' -5'' 137.08 Cft
Slab S2 26 x 1 9' -2'' 7' -0'' 0' -5'' 695.14 Cft
Slab S2 4 x 1 9' -0'' 7' -0'' 0' -5'' 105.00 Cft
Slab S2 2 x 1 7' -0'' 11' -0'' 0' -5'' 64.17 Cft
Slab S2 2 x 1 7' -0'' 7' -0'' 0' -5'' 40.83 Cft
Slab S2 12 x 1 9' -2'' 9' -0'' 0' -5'' 412.5 Cft
Slab S2 2 x 1 9' -0'' 9' -0'' 0' -5'' 67.5 Cft
Slab S2 6 x 1 9' -2'' 22' -9'' 0' -5'' 521.35 Cft
Slab S2 1 x 1 9' -0'' 22' -9'' 0' -5'' 85.31 Cft
Slab S2, 1 x 1 11' -0'' 11' -0'' 0' -5'' 50.42 Cft
Slab S2, 1 x 1 9' -0'' 11' -0'' 0' -5'' 41.25 Cft
Slab S1, 1 x 1 15' -0'' 19' -0'' 0' -5'' 118.75 Cft
Slab S1,S2 7 x 1 9' -2'' 22' -9'' 0' -5'' 608.25 Cft
Slab S1,S2 1 x 1 9' -0'' 22' -9'' 0' -5'' 85.31 Cft
OT 6 x 1 9' -2'' 23' -6'' 0' -5'' 538.54 Cft
Step 36 × 1 5' -3'' 0' -6'' 0' -6'' 47.25 Cft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Landing 2 × 1 6' -7'' 11' -0'' 0' -9'' 108.63 Cft
Landing 1 × 1 2' -2'' 11' -0'' 0' -9'' 17.88 Cft
Flight 3 × 1 14' -0'' 5' -3'' 0' -9'' 165.38 Cft
10278.27 Cft
3 Labour Charges For Curing Work
For 3rd Floor Concreting Work

For 14 Days 1 × 1 204' -0'' 80' -0'' 16320 Sft


Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Re-Bar Work for 3rd Floor Beam. & Slab & Stair
2 Line 1 & 3
FB1,FB2,FB2a,FB5 25mmØ 20mmØ 10mmØ
20mmØ,Top Bar
25mmØ,FB2,Extra Bar 2 x 2 80' -0'' 320
Extra Bar,FB1 2 x 2 6' -0'' 24
2 x 2 17' -0'' 56
2 x 4 17' -0'' 84
20mmØ,Extra Bar 2 x 6 17' -0'' 112
2 x 8 15' -0'' 240
2 x 6 12' -0'' 144
25mmØ,FB2,Extra Bar 2 x 2 14' -0'' 53
20mmØ,Bottom Bar 2 x 2 6' -0'' 24
2 x 3 12' -6'' 75
2 x 4 40' -0'' 320
2 x 4 15' -0'' 120
2 x 4 40' -0'' 320
Extra Bar,FB1 2 x 3 12' -0'' 72
20mmØ,Extra Bar,FB5 2 x 2 20' -0'' 72
Lapping 2 x 2 20' -0'' 80
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Spacer Bar 2 x 1 2' -7'' 5
10mmØ Stirrups,FB1 2 x 58 0' -9'' 87
FB2 2 x 94 5' -10'' 1097
FB2a 2 x 44 5' -2'' 455
FB5 2 x 30 5' -2'' 310
Line 4,5,6 2 x 60 5' -5'' 650

FB1,FB2,FB2a
20mmØ,Top Bar
25mmØ,FB2,Extra Bar 3 x 2 80' -0'' 480
3 x 2 6' -0'' 36
3 x 4 15' -6'' 186
3 x 2 14' -0'' 84
25mmØ,FB2,Extra Bar 3 x 8 12' -0'' 288
Extra Bar,FB1 3 x 2 6' -0'' 36
3 x 2 14' -0'' 84
3 x 4 15' -6'' 186
20mmØ,Bottom Bar 3 x 4 12' -0'' 144
3 x 3 11' -0'' 99
3 x 4 28' -0'' 336
3 x 6 14' -0'' 252
3 x 4 28' -0'' 336
Extra Bar,FB1 3 x 3 11' -0'' 99
Lapping 3 x 4 20' -0'' 240
Spacer Bar 3 x 2 2' -7'' 16
10mmØ Stirrups,FB1 3 x 68 0' -9'' 153
FB2,FB2a 2 x 128 5' -10'' 1493
Line 7,FB1,FB2,FB2a 2 x 98 5' -2'' 1013
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
20mmØ,Top Bar
1 x 2 46' -6'' 93
25mmØ,FB2,Extra Bar 1 x 2 14' -0'' 28
1 x 2 6' -0'' 12
1 x 4 6' -6'' 26
Extra Bar,FB1 1 x 2 6' -0'' 12
1 x 4 15' -6'' 62
1 x 4 13' -9'' 55
1 x 16 12' -0'' 192
20mmØ,Bottom Bar 1 x 2 13' -3'' 27
1 x 3 11' -0'' 33
1 x 4 28' -0'' 112
1 x 6 14' -0'' 84
1 x 4 28' -0'' 112
Extra Bar,FB1 1 x 3 11' -0'' 33
Lapping 1 x 4 20' -0'' 160
Spacer Bar 1 x 2 2' -7'' 5
10mmØ Stirrups,FB1 1 x 65 0' -9'' 49
FB2,FB2a 2 x 118 5' -10'' 1377
Line 2,FB1,FB2 2 x 78 5' -2'' 806
20mmØ,Top Bar
25mmØ,FB2,Extra Bar 1 x 2 40' -0'' 80
1 x 2 6' -0'' 12
1 x 2 14' -0'' 28
Bottom Bar 1 x 10 12' -0'' 110
1 x 3 12' -0'' 36
Extra Bar,FB1 1 x 4 28' -0'' 112
Spacer Bar 1 x 2 20' -0'' 36
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
10mmØ Stirrups,FB1 1 x 38 0' -9'' 29
FB2 1 x 98 5' -10'' 572
FB6,20mmØ,Top Bar 1 x 45 5' -2'' 233
Extra Bar 2 x 2 20' -0'' 80
Bottom Bar 2 x 8 10' -0'' 160
2 x 4 15' -6'' 124
Spacer Bar 2 x 2 10' -6'' 42
10mmØ Stirrups,FB6 2 x 28 0' -9'' 42
SB1,20mmØ,Top Bar 2 x 54 5' -10'' 630
Extra Bar 2 x 2 15' -0'' 60
Bottom Bar 2 x 2 8' -0'' 32
2 x 2 14' -6'' 58
10mmØ Stirrups,SB1 2 x 1 10' -0'' 20
Line Between 3&4,4&5,5&6 2 x 28 2' -8'' 149
SB2,20mmØ,Top Bar
Bottom Bar 3 x 2 90' -0'' 540
Lapping 3 x 2 88' -6'' 531
10mmØ Stirrups,SB2 3 x 4 2' -7'' 31
Line No 9.10.11.12.14 3 x 98 2' -8'' 784
FB1,FB2,FB2a;FB5
20mmØ ,Top Bar
FB2,25mmØ ,Extra Bar 5 x 2 79' -0'' 790
5 x 2 8' -9'' 87.50
20mmØ ,Extra Bar 5 x 2 12' -10'' 128.33
5 x 4 10' -9'' 215
5 x 4 13' -8'' 273.33
5 x 2 10' -9'' 107.50
5 x 4 13' -8'' 273.33
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
5 x 2 10' -9'' 107.50
FB2,25mmØ ,Extra Bar 5 x 4 10' -9'' 215.00
5 x 2 12' -10'' 128.33
Bottom Bar,FB2 5 x 2 8' -9'' 87.50
FB1,Extra Bar 5 x 6 9' -3'' 277.50
5 x 8 28' -9'' 1150
5 x 6 14' -3'' 427.50
Lapping 5 x 4 17' -10'' 356.67
Spacer Bar 5 x 2 2' -7'' 25.83
10mmØ Stirrups,FB1 5 x 96 0' -9'' 360
FB5 4 x 128 5' -10'' 2986.67

FB2 2 x 61 6' -1'' 742.17

FB2a 5 x 38 5' -2'' 981.67

Line No 8 5 x 27 5' -2'' 697.50


FB1,FB2,FB2a,FB6
20mmØ,Top Bar
FB2,25mmØ ,Extra Bar 1 x 2 78' -8'' 157.33
1 x 2 8' -9'' 17.50
20mmØ ,Extra Bar 1 x 2 12' -10'' 25.67
1 x 4 10' -9'' 43.00
1 x 4 13' -8'' 54.67
1 x 2 10' -9'' 21.50
1 x 4 10' -8'' 42.67
1 x 4 11' -4'' 45.33
1 x 2 7' -3'' 14.50
FB2,25mmØ ,Extra Bar 1 x 4 7' -3'' 29.00
1 x 2 9' -8'' 19.33
Bottom Bar 1 x 2 6' -0'' 12.00
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 3 12' -3'' 36.75
1 x 4 28' -9'' 115
1 x 4 14' -3'' 57
1 x 4 17' -0'' 68
1 x 4 16' -4'' 65.33
1 x 3 12' -3'' 36.75
1 x 2 19' -4'' 38.67
1 x 4 6' -9'' 27
1 x 2 7' -3'' 14.5
1 x 2 9' -8'' 19.33
Lapping 1 x 2 9' -6'' 19
Spacer Bar 1 x 2 2' -7'' 5.17
10mmØ Stirrups,FB1 1 x 116 0' -9'' 87
FB2 1 x 103 5' -10'' 600.83
FB2a 1 x 38 5' -2'' 196.33
FB6 1 x 27 5' -2'' 139.5
Line No 13 1 x 39 5' -10'' 227.5
FB1,FB2,SB2
20mmØ,Top Bar
FB2,25mmØ ,Extra Bar 1 x 2 59' -3'' 118.5
1 x 2 6' -0'' 12.00
20mmØ ,Extra Bar 1 x 2 12' -10'' 25.67
1 x 4 10' -9'' 43
1 x 2 13' -8'' 27.33
1 x 4 10' -9'' 43
1 x 2 10' -2'' 20.33
FB2,25mmØ ,Extra Bar 1 x 2 7' -4'' 14.67
Bottom Bar,20mmØ 1 x 1 10' -7'' 10.58
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 3 12' -3'' 36.75
1 x 4 28' -9'' 115
1 x 2 17' -10'' 35.67
Lapping 1 x 2 79' -0'' 158
Spacer Bar 1 x 4 2' -7'' 10.33
10mmØ Stirrups,FB1 1 x 68 0' -9'' 51
FB2 1 x 65 5' -10'' 379.17
SB2 1 x 19 5' -2'' 98.17
Between9&10,10&11,11&12 1 x 189 2' -8'' 504
SB2
20mmØ,Top Bar
Bottom Bar 3 x 2 79' -3'' 475.5
Lapping 3 x 2 78' -0'' 468
10mmØ Stirrups,SB2 3 x 1 2' -7'' 7.75
SB2 3 x 188 2' -8'' 1504
20mmØ,Top Bar
Extra Bar 4 x 2 12' -3'' 98
4 x 1 6' -0'' 24
Bottom Bar 4 x 1 6' -0'' 24
Extra Bar 4 x 2 10' -0'' 80
10mmØ Stirrups,SB2 4 x 1 6' -2'' 24.67
Line A & G 4 x 35 2' -8'' 373.33
20mmØ,FB4,Top Bar
Extra Bar 2 x 2 93' -8'' 374.67
2 x 2 8' -9'' 35
2 x 2 15' -3'' 61
2 x 2 17' -3'' 69
2 x 2 17' -3'' 69
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
2 x 2 17' -3'' 69
Bottom Bar 2 x 2 10' -8'' 42.67
Lapping 2 x 4 92' -8'' 741.33
10mmØ Stirrups,FB4 2 x 2 2' -7'' 10.33
Line B,G & E 2 x 267 5' -1'' 2714.5
20mmØ,FB3,Top Bar
Extra Bar 3 x 2 93' -6'' 561
3 x 5 8' -9'' 131.25
3 x 5 15' -3'' 228.75
3 x 5 17' -3'' 258.75
3 x 5 17' -3'' 258.75
3 x 5 17' -3'' 258.75
Bottom Bar 3 x 5 10' -8'' 160
Extra Bar 3 x 4 92' -3'' 1107
3 x 2 6' -10'' 41
3 x 2 17' -3'' 103.5
3 x 2 17' -3'' 103.5
3 x 3 17' -3'' 155.25
Lapping 3 x 3 17' -3'' 155.25
Spacer Bar 3 x 2 2' -7'' 15.5
10mmØ Stirrups,FB3 3 x 68 0' -9'' 153
Line No F,FB3,FB5 3 x 267 5' -5'' 4338.75

20mmØ,Top Bar
Extra Bar 1 x 2 93' -4'' 186.67
1 x 5 8' -9'' 43.75
1 x 5 15' -3'' 76.25
1 x 5 17' -3'' 86.25
1 x 10 17' -3'' 172.5
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 5 9' -3'' 46.25
Bottom Bar 1 x 7 7' -3'' 50.75
Extra Bar 1 x 4 92' -3'' 369
1 x 2 7' -9'' 15.5
1 x 2 17' -3'' 34.5
1 x 2 17' -3'' 34.5
1 x 2 17' -3'' 34.5
1 x 2 8' -9'' 17.5
Lapping 1 x 2 8' -9'' 17.5
Spacer Bar 1 x 2 2' -7'' 5.17
10mmØ Stirrups,FB3,FB5 1 x 68 0' -9'' 51
Line No C 1 x 257 5' -5'' 1392.08

20mmØ,SB2,Top Bar
Bottom Bar 1 x 2 94' -3'' 188.5
Lapping 1 x 2 93' -0'' 186
10mmØ Stirrups,SB2 1 x 2 2' -7'' 5.17
Line No Between E& F 1 x 247 2' -8'' 658.67
20mmØ,SB2,Top Bar
Bottom Bar 1 x 2 23' -3'' 46.5
Lapping 1 x 2 22' -0'' 44
10mmØ Stirrups,SB2 1 x 1 2' -7'' 2.58
Line A & G,FB4 1 x 53 2' -8'' 141

20mmØ,Top Bar
Extra Bar 2 x 2 115' -0'' 460
2 x 2 10' -0'' 40
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
2 x 2 14' -0'' 56
2 x 2 14' -0'' 56
Bottom Bar 2 x 2 10' -0'' 40
Lapping 2 x 4 113' -6'' 908
10mmØ Stirrups,FB4 2 x 12 2' -7'' 62
Line B & E,FB3 2 x 270 5' -1'' 2745
20mmØ,Top Bar
Extra Bar 2 x 2 115' -0'' 460
2 x 5 10' -0'' 100
2 x 5 18' -0'' 180
2 x 5 18' -0'' 180
2 x 5 18' -0'' 180
2 x 5 14' -0'' 140
2 x 5 14' -0'' 140
Bottom Bar 2 x 5 10' -0'' 100
Extra Bar 2 x 4 113' -6'' 908
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
Lapping 2 x 2 10' -0'' 40
Spacer Bar 2 x 12 2' -7'' 62
10mmØ Stirrups,FB3 2 x 45 0' -9'' 68
Line F FB3,FB5 2 x 264 5' -5'' 2860
20mmØ,Top Bar
Extra Bar 1 x 2 115' -0'' 230
1 x 6 10' -0'' 60
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 5 10' -0'' 50
1 x 5 14' -0'' 70
1 x 5 18' -0'' 90
1 x 5 18' -0'' 90
1 x 5 14' -0'' 70
1 x 5 14' -0'' 70
1 x 5 10' -0'' 50
Bottom Bar 1 x 1 8' -0'' 8
1 x 4 101' -0'' 404
Extra Bar 1 x 4 15' -0'' 60
1 x 2 12' -0'' 24
1 x 2 8' -0'' 16
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
Lapping 1 x 2 10' -0'' 20
Spacer Bar 1 x 12 2' -7'' 31
10mmØ Stirrups,FB3 1 x 47 0' -9'' 35
FB5 1 x 242 5' -5'' 1311
Line D 1 x 40 5' -5'' 217
FB1,FB3,FB6
20mmØ,Top Bar
Extra Bar 1 x 2 204' -0'' 408
1 x 10 10' -0'' 100
1 x 10 18' -0'' 180
1 x 5 18' -0'' 90
1 x 5 18' -0'' 90
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 5 14' -0'' 70
1 x 4 10' -0'' 40
25mmØ,FB2,Extra Bar 1 x 4 10' -0'' 40
1 x 4 6' -6'' 26
Bottom Bar 1 x 3 8' -0'' 24
1 x 4 85' -0'' 340
1 x 4 14' -0'' 56
1 x 4 20' -0'' 80
Extra Bar 1 x 4 95' -6'' 382
1 x 12 18' -0'' 216
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
25mmØ,FB2,Extra Bar 1 x 2 10' -0'' 18
Lapping 1 x 4 8' -0'' 28
Spacer Bar 1 x 10 2' -7'' 26
10mmØ Stirrups,FB3 1 x 54 0' -9'' 41
FB1 1 x 284 5' -5'' 1538
FB6 1 x 50 5' -10'' 292
Line C 1 x 68 5' -10'' 397
FB1,FB6
20mmØ,Top Bar,FB1
Extra Bar,FB1 1 x 2 50' -0'' 100
1 x 8 8' -0'' 56
20mmØ,Extra Bar 1 x 4 10' -0'' 40
1 x 4 10' -0'' 40
Bottom Bar 1 x 4 8' -0'' 32
1 x 4 14' -0'' 56
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Extra Bar,FB1 1 x 2 20' -0'' 40
20mmØ,Extra Bar 1 x 2 10' -0'' 20
Spacer Bar 1 x 4 8' -0'' 32
10mmØ Stirrups,FB1,FB6 1 x 45 0' -9'' 34
SB2 1 x 68 5' -10'' 397
20mmØ,Top Bar
Bottom Bar 4 x 2 24' -0'' 192
10mmØ Stirrups,SB2 4 x 2 23' -0'' 184
4 x 54 2' -8'' 576
790.41 32080 38576
Rebar Work For Stair 16mmØ 10mmØ
1st Floor to 2nd Floor Stair
2 x 16 7' -0'' 224 Rft
2nd Floor Stair Dowel 1 x 16 13' -0'' 208 Rft
1 x 16 13' -0'' 208 Rft
Distribution Bar 1 x 16 12' -0'' 192 Rft
1 x 14 6' -0'' 84 Rft
1st Floor to 2nd Floor Stair 1 x 20 12' -6'' 250 Rft
2 x 16 7' -0'' 224 Rft
2nd Floor Stair Dowel 1 x 16 10' -0'' 160 Rft
1 x 16 10' -0'' 160 Rft
Distribution Bar 1 x 16 12' -0'' 192 Rft
1 x 14 6' -0'' 84 Rft
1st Floor to 2nd Floor Stair 1 x 8 12' -0'' 100 Rft
2 x 16 7' -0'' 224 Rft
2nd Floor Stair Dowel 1 x 16 13' -0'' 208 Rft
1 x 16 13' -0'' 208 Rft
Distribution Bar 1 x 16 12' -0'' 192 Rft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 14 6' -0'' 84 Rft
1 x 20 12' -6'' 250 Rft
Rebar Work For Slab 2400 852 Rft
S3,12-14 Bottom,Main Bar 10mmØ

Distribution Bar 1 x 25 9' -6'' 237.5 Rft


Top Bar 1 x 11 21' -6'' 236.5 Rft
1 x 50 11' -0'' 550 Rft
S2,8-12,Main Bar 1 x 11 23' -0'' 253 Rft
Distribution Bar 1 x 84 9' -6'' 798 Rft
Lapping 1 x 11 72' -6'' 797.5 Rft
Top Bar 1 x 11 1' -4'' 14.67 Rft
1 x 84 11' -6'' 966 Rft
Lapping 1 x 10 74' -6'' 745 Rft
OT;S1,Line 12-14 1 x 10 1' -4'' 13.33 Rft
Bottom Bar
1 x 25 13' -6'' 337.5 Rft
Top Bar 1 x 15 21' -6'' 322.5 Rft
1 x 50 15' -6'' 775 Rft
Between Line B &D 1 x 15 23' -69'' 431.25 Rft
S2, Bottom,Main
Dis; 1 x 9 31' -6'' 283.5 Rft
S2,Top,Main 1 x 25 8' -6'' 212.5 Rft
Dis; 1 x 9 33' -6'' 301.5 Rft
S2, Bottom,Main 1 x 25 10' -6'' 262.5 Rft
Dis; 1 x 16 21' -6'' 344 Rft
Top Bar 1 x 25 14' -0'' 350 Rft
1 x 16 23' -6'' 376 Rft
S1,S2 Bottom,Main 1 x 25 16' -0'' 400 Rft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Dis; 1 x 30 72' -6'' 2175 Rft
Top Bar 1 x 84 26' -0'' 2184 Rft
1 x 30 74' -6'' 2235 Rft
S1 Top Bar 1 x 84 28' -0'' 2352 Rft
1 x 21 53' -6'' 1123.5 Rft
Lapping 1 x 60 21' -0'' 1260 Rft
S2 Bottom Bar 1 x 81 1' -6'' 121.5 Rft
1 x 13 92' -6'' 1202.5 Rft
Top Bar 1 x 108 11' -6'' 1242 Rft
1 x 13 94' -6'' 1228.5 Rft
Lapping 1 x 108 13' -6'' 1458 Rft
Line E-F 13 x 6 1' -6'' 117 Rft
S3 Bottom Bar
1 x 30 11' -6'' 345 Rft
Top Bar 1 x 10 26' -0'' 260 Rft
1 x 60 13' -6'' 810 Rft
S3 Bottom Bar 1 x 10 28' -0'' 280 Rft
1 x 30 9' -6'' 285 Rft
Top Bar 1 x 8 26' -0'' 208 Rft
1 x 60 11' -6'' 690 Rft
S2 Bottom Bar 1 x 8 28' -0'' 224 Rft
1 x 30 51' -6'' 1545 Rft
Top Bar 1 x 60 26' -0'' 1560 Rft
1 x 30 53' -6'' 1605 Rft
Lapping 1 x 60 28' -0'' 1680 Rft
S2 Bottom Bar 30 x 2 1' -6'' 90 Rft
1 x 30 11' -6'' 345 Rft
Top Bar 1 x 12 26' -0'' 312 Rft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 30 13' -6'' 405 Rft
Line F & G 1 x 12 28' -0'' 336 Rft
S2 Bottom Bar
1 x 10 91' -6'' 915 Rft
Top Bar 1 x 109 9' -6'' 1035.5 Rft
1 x 10 92' -6'' 925 Rft
Lapping 1 x 109 11' -6'' 1253.5 Rft
S3,1-3, Bottom,Main Bar 10 x 3 1' -6'' 45 Rft
Distribution Bar 1 x 25 9' -6'' 237.5 Rft
Top Bar 1 x 11 21' -6'' 236.5 Rft
1 x 50 11' -0'' 550 Rft
S2,3-8,Bottom,Main Bar 1 x 11 23' -0'' 253 Rft
Distribution Bar 1 x 111 9' -6'' 1054.5 Rft
Lapping 1 x 12 91' -6'' 1098 Rft
Top Bar 2 x 12 1' -4'' 32 Rft
1 x 88 11' -0'' 968 Rft
Lapping 1 x 12 93' -0'' 1116 Rft
Line 1-3,S3 2 x 12 1' -4'' 32 Rft
Bottom,Main Bar
Distribution Bar 1 x 26 8' -0'' 208 Rft
Top,Main Bar 1 x 10 21' -6'' 215 Rft
Distribution Bar 1 x 42 9' -6'' 399 Rft
S1,Bottom,Main Bar 1 x 17 23' -0'' 391 Rft
Distribution Bar 1 x 25 16' -0'' 400 Rft
Top,Main Bar 1 x 20 21' -6'' 430 Rft
Distribution Bar 1 x 44 17' -6'' 770 Rft
Line 3-5,S3 1 x 30 23' -0'' 690 Rft
Bottom,Main Bar
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Distribution Bar 2 x 50 26' -0'' 2600 Rft
Top,Main Bar 2 x 30 41' -6'' 2490 Rft
Distribution Bar 2 x 83 27' -6'' 4565 Rft
Lapping 2 x 60 43' -0'' 5160 Rft
Line 5-6,S2 2 x 90 1' -4'' 240 Rft
Bottom,Main Bar
Distribution Bar 1 x 25 8' -6'' 212.5 Rft
Top,Main Bar 1 x 10 21' -6'' 215 Rft
Distribution Bar 1 x 21 10' -0'' 210 Rft
Line 5-6,C-D,S1 1 x 8 23' -0'' 184 Rft
Bottom,Main Bar
Distribution Bar 1 x 25 19' -0'' 475 Rft
Top,Main Bar 1 x 21 21' -6'' 451.5 Rft
Distribution Bar 1 x 45 20' -6'' 922.5 Rft
Line 6-7,B-C,S2 1 x 35 23' -0'' 805 Rft
Bottom,Main Bar
Distribution Bar 1 x 15 11' -6'' 172.5 Rft
Top,Main Bar 1 x 12 13' -6'' 162 Rft
Distribution Bar 1 x 13 13' -0'' 169 Rft
Line C-D 1 x 11 14' -0'' 154 Rft
Bottom,Main Bar
Distribution Bar 1 x 15 13' -0'' 195 Rft
Top,Main Bar 1 x 14 14' -0'' 196 Rft
Distribution Bar 1 x 13 14' -6'' 188.5 Rft
Line D-E,1-3 & 7-8,S3 1 x 12 15' -6'' 186 Rft
Bottom,Main Bar
Distribution Bar 2 x 25 11' -6'' 575 Rft
Top,Main Bar 2 x 12 21' -6'' 516 Rft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Distribution Bar 2 x 41 13' -0'' 1066 Rft
Line 3-7,D-E,S2 2 x 21 23' -0'' 966 Rft
Bottom,Main Bar
Distribution Bar 1 x 85 11' -6'' 977.5 Rft
Top,Main Bar 1 x 12 71' -6'' 858 Rft
Distribution Bar 1 x 73 13' -0'' 949 Rft
Lapping 1 x 11 73' -0'' 803 Rft
Line 2-3,E-F,S2 1 x 23 1' -4'' 30.67 Rft
Bottom,Main Bar
Distribution Bar 1 x 30 9' -6'' 285 Rft
Top,Main Bar 1 x 10 26' -0'' 260 Rft
Distribution Bar 1 x 50 11' -0'' 550 Rft
Line 5-6,E-F,S2 1 x 17 27' -6'' 467.5 Rft
Bottom,Main Bar
Distribution Bar 1 x 30 21' -6'' 645 Rft
Top,Main Bar 1 x 25 26' -0'' 650 Rft
Distribution Bar 1 x 50 23' -0'' 1150 Rft
Line 6-8,E-F,S3 1 x 12 27' -6'' 330 Rft
Bottom,Main Bar
Distribution Bar 1 x 37 26' -0'' 962 Rft
Top,Main Bar 1 x 30 31' -6'' 945 Rft
Distribution Bar 1 x 62 27' -6'' 1705 Rft
Line 1-8,F-G,S2 1 x 51 33' -0'' 1683 Rft
Bottom,Main Bar
Distribution Bar 1 x 133 9' -6'' 1263.5 Rft
Top,Main Bar 1 x 10 111' -6'' 1115 Rft
Distribution Bar 1 x 113 11' -0'' 1243 Rft
Lapping 1 x 9 113' -0'' 1017 Rft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Chair 2 x 19 1' -4'' 50.67 Rft
2 x 320 2' -6'' 1600 Rft
10mmØ - 131985.59 Rf x0.415 Lb 92557.59 Rft
16mmØ - 2400Rf x1.062 Lb 54774 489.05 Cwt
20mmØ - 32080 Rf x1.66 Lb 2548.8 22.75 Cwt
25mmØ - 790.41 Rf x 2.587 Lb 53253 475.47 Cwt
2044.79 18.25 Cwt
G-30 Ready Mixed Concreting Work 1005.52 Cwt
3 for 3rd Floor Beam & Slab
Line 1
FB1
FB2 1 x 1 22' -8'' 1' -0'' 2' -0'' 45.33 Cft
FB2a 2 x 1 6' -4'' 1' -0'' 1' -8'' 21.11 Cft
FB5 1 x 1 8' -2'' 1' -0'' 1' -8'' 13.61 Cft
Line 2,3,4,5,6,7 1 x 1 22' -8'' 1' -2'' 2' -0'' 52.89 Cft
FB1
FB1 9 x 1 22' -8'' 1' -0'' 2' -0'' 408 Cft
FB5 1 x 1 10' -2'' 1' -0'' 2' -0'' 20 Cft
FB6 1 x 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
FB2 2 x 1 9' -6'' 1' -0'' 2' -0'' 38 Cft
FB2a 11 x 1 6' -4'' 1' -0'' 1' -8'' 116 Cft
SB2 5 x 1 8' -3'' 1' -0'' 1' -8'' 69 Cft
SB2 3 x 1 70' -0'' 0' -9'' 1' -6'' 236 Cft
SB1 1 x 1 31' -6'' 0' -9'' 1' -6'' 35 Cft
Line A & G FB4 2 x 1 7' -0'' 0' -9'' 1' -6'' 16 Cft
2 x 1 101' -0'' 1' -0'' 1' -8'' 337 Cft
FB3
1 x 1 99' -0'' 1' -0'' 1' -10'' 182 Cft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Line D FB1 1 x 1 97' -3'' 1' -0'' 1' -10'' 178 Cft
FB3 1 x 1 10' -8'' 1' -0'' 2' -0'' 21 Cft
FB6 1 x 1 72' -8'' 1' -0'' 1' -10'' 133 Cft
Line F 2 x 1 7' -0'' 1' -0'' 2' -0'' 28 Cft
FB3
FB5 1 x 1 87' -0'' 1' -0'' 1' -10'' 160 Cft
Line C 1 x 1 10' -3'' 1' -2'' 2' -0'' 24 Cft
FB1
FB6 1 x 1 9' -2'' 1' -0'' 2' -0'' 18 Cft
Line Between 1 & 3 2 x 1 7' -0'' 1' -0'' 2' -0'' 28 Cft
SB2
2 x 1 19' -0'' 0' -9'' 1' -6'' 43 Cft
C1,C2 1 x 1 18' -3'' 0' -9'' 1' -6'' 21 Cft
C3,C4 24 x 1 1' -4'' 1' -6'' 2' -0'' 96 Cft
C5 51 x 1 1' -4'' 1' -10'' 2' -0'' 249 Cft
Slab S3 6 x 1 1' -0'' 3' -0'' 2' -0'' 36 Cft
Slab S3 2 x 1 19' -0'' 7' -0'' 0' -5'' 111 Cft
Slab S3 1 x 1 19' -0'' 5' -6'' 0' -5'' 44 Cft
Slab S3 4 x 1 23' -6'' 9' -2'' 0' -5'' 359 Cft
Slab S3 2 x 1 19' -0'' 9' -0'' 0' -5'' 143 Cft
Slab S3 1 x 1 23' -6'' 7' -0'' 0' -5'' 69 Cft
Slab S3 6 x 1 23' -6'' 9' -2'' 0' -5'' 539 Cft
Slab S2 1 x 1 23' -6'' 9' -0'' 0' -5'' 88 Cft
Slab S2 14 x 1 9' -3'' 7' -0'' 0' -5'' 378 Cft
Slab S2 2 x 1 9' -0'' 7' -0'' 0' -5'' 53 Cft
Slab S2 1 x 1 9' -0'' 11' -0'' 0' -5'' 41 Cft
Slab S2 1 x 1 11' -0'' 11' -6'' 0' -5'' 53 Cft
Slab S2 6 x 1 9' -2'' 9' -0'' 0' -5'' 206 Cft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Slab S2 1 x 1 9' -0'' 9' -0'' 0' -5'' 34 Cft
Slab S2 1 x 1 7' -0'' 7' -0'' 0' -5'' 20 Cft
Slab S2 1 x 1 11' -0'' 7' -0'' 0' -5'' 32 Cft
Slab S2 4 x 1 10' -4'' 9' -2'' 0' -5'' 158 Cft
Slab S2 2 x 1 3' -9'' 7' -0'' 0' -5'' 22 Cft
Slab S1 2 x 1 5' -3'' 7' -0'' 0' -5'' 31 Cft
Slab S1 1 x 1 15' -0'' 19' -0'' 0' -5'' 119 Cft
Stair Step 2 x 1 9' -3'' 15' -9'' 0' -5'' 121 Cft
Flight 12 × 1 5' -3'' 0' -6'' 0' -6'' 15.8 Cft
Landing Floor 1 × 2 13' -6'' 5' -3'' 0' -9'' 106.31 Cft
1 × 1 11' -0'' 6' -2'' 0' -9'' 50.88 Cft
FB1 1 × 1 11' -0'' 2' -2'' 0' -9'' 17.88 Cft
FB2 1 x 1 22' -8'' 1' -0'' 2' -0'' 45.33 Cft
FB2a 2 x 1 6' -4'' 1' -0'' 1' -8'' 21.11 Cft
FB6 1 x 1 8' -2'' 1' -0'' 1' -8'' 13.61 Cft
FB1 1 x 1 9' -6'' 1' -0'' 2' -0'' 19.00 Cft
Line - 14 FB5 1 x 1 10' -2'' 1' -0'' 2' -0'' 20 Cft
Line - 13, 14 FB1 1 × 1 22' -8'' 1' -2'' 2' -0'' 52.89 Cft
FB2 2 × 1 22' -8'' 1' -0'' 2' -0'' 90.67 Cft
FB2a 3 × 1 6' -4'' 1' -0'' 1' -8'' 31.67 Cft
SB2 1 × 1 8' -2'' 1' -0'' 1' -8'' 13.61 Cft
Line 9.10.11.12FB1 1 × 1 22' -8'' 1' -0'' 1' -8'' 37.78 Cft
FB5 7 × 1 22' -8'' 1' -0'' 2' -0'' 317.33 Cft
Between 9.10.11.12 SB2 1 × 1 22' -8'' 1' -2'' 2' -0'' 52.89 Cft
Line-13 SB2 3 × 1 73' -6'' 0' -9'' 1' -6'' 248.06 Cft
SB1 1 × 1 17' -3'' 0' -9'' 1' -6'' 19.41 Cft
Line 9.10.11.12 FB2 1 × 1 7' -0'' 0' -9'' 1' -6'' 7.88 Cft
FB 2a 8 × 1 6' -4'' 1' -0'' 1' -8'' 84.44 Cft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
A&G FB4 4 × 1 8' -2'' 1' -0'' 1' -8'' 54.44 Cft
Line F,FB3 2 × 1 84' -3'' 1' -0'' 1' -8'' 280.83 Cft
LineB,D, E,FB3 1 × 1 72' -3'' 1' -0'' 1' -10'' 132.46 Cft
FB5 3 × 1 84' -3'' 1' -0'' 1' -10'' 463.38 Cft
SB2 1 × 1 9' -2'' 1' -2'' 2' -0'' 21.39 Cft
SB2 1 × 1 84' -6'' 0' -9'' 1' -6'' 95.06 Cft
1 × 1 44' -6'' 0' -9'' 1' -6'' 50.06 Cft
SB2 2 × 1 74' -0'' 0' -9'' 1' -6'' 166.50 Cft
SB1 1 × 1 23' -0'' 0' -9'' 1' -6'' 25.88 Cft
Slab S2 3 × 1 9' -1'' 0' -9'' 1' -6'' 30.66 Cft
Slab S2 2 × 1 9' -0'' 7' -0'' 0' -5'' 52.50 Cft
Slab S2 12 × 1 9' -1'' 7' -0'' 0' -5'' 317.92 Cft
Slab S2 1 × 1 9' -0'' 7' -0'' 0' -5'' 26.25 Cft
Slab S2` 3 × 1 9' -1'' 7' -0'' 0' -5'' 79.48 Cft
Slab S2 1 × 1 15' -9'' 9' -0'' 0' -5'' 59.06 Cft
Slab S2 2 × 1 7' -6'' 9' -1'' 0' -5'' 56.77 Cft
Slab S2 1 × 1 9' -0'' 9' -0'' 0' -5'' 33.75 Cft
Slab S2 6 × 1 9' -1'' 9' -0'' 0' -5'' 204.38 Cft
Slab S2 2 × 1 11' -4'' 9' -0'' 0' -5'' 85.00 Cft
Slab S2 8 × 1 11' -4'' 9' -1'' 0' -5'' 343.15 Cft
Slab OT 3 × 1 7' -4'' 9' -1'' 0' -5'' 83.26 Cft
Slab S1 1 × 1 23' -6'' 7' -0'' 0' -5'' 68.54 Cft
Slab S3 5 × 1 16' -6'' 9' -2'' 0' -5'' 315.10 Cft
Slab S1 1 × 1 19' -0'' 7' -0'' 0' -5'' 55.42 Cft
Slab S2 1 × 1 19' -0'' 11' -1'' 0' -5'' 87.74 Cft
Slab S2 1 × 1 7' -1'' 11' -1'' 0' -5'' 32.71 Cft
Slab S2 1 × 1 11' -1'' 11' -1'' 0' -5'' 51.18 Cft
Slab S2 1 × 1 7' -1'' 9' -0'' 0' -5'' 26.56 Cft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Slab S2 1 × 1 11' -1'' 9' -0'' 0' -5'' 41.56 Cft
Slab S2 1 × 1 7' -0'' 7' -0'' 0' -5'' 20.42 Cft
Stair Step 1 × 1 11' -0'' 7' -0'' 0' -5'' 32.08 Cft
Flight 7 × 1 5' -3'' 0' -6'' 0' -6'' 9.19 Cft
Landing Floor 1 × 1 8' -0'' 5' -3'' 0' -9'' 31.50 Cft
1 × 1 11' -0'' 6' -2'' 0' -9'' 50.88 Cft
10048 Cft

Hire Charges For Concreting Work


10089 Cft
4 Vibrator

Curing Work For Concreting 25 Day


Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
For14 Day
5 For 2nd Floor

1 × 1 204' -0'' 80' -0'' 16320 Sft


Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1(a) WI Work (4" x 4") MS Hollow Pipe
4" x4" x 3/16 " MS 13 x 1 9' -6'' 123.5 Rft
123.5 Rft x 16 " x 7.65 Lb/Sft 1259.7 lb

(b) WI Work (4" x 2")MS 2 x 4 30' -0'' 240 Rft


Hollow Pipe 2 x 4 26' -0'' 208 Rft
1 x 4 20' -0'' 80 Rft
Ded: D1 1 x 1 6' -0'' 6 Rft
Ded: D2 2 x 1 3' -0'' 6 Rft
12 528 Rft
516 Rft
516 Rft x 12 " x 7.65 Lb/Sft 3947 Lb

Post Plate 13 x 1 0' -9'' 0' -9'' 7.31 Sft


Post Plate 7.31 Sft x 10.20Lb/Sft 73.542 Lb

( c) (3" x 2 x 3/16")MS Hollow Frame Work


Main Rafter 1 x 1 31' -0'' 31 Rft
Common Rafter 2 x 1 21' -0'' 42 Rft
4 x 1 27' -0'' 108 Rft
Purlin 8 x 1 31' -0'' 248 Rft
3 x 1 21' -0'' 63 Rft
492 Rft
492' x 10" x 7.65 Lb/Sft 3136 lb

Total 4469.242 Lb
2 Ton

5% 2.1 Ton

2 Roofing Work
Lab 2 x 1 10' -6'' 31' -0'' 651 Sft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Office 1 x 1 6' -0'' 21' -0'' 126 Sft
777 Sft
Ridging Work 1 x 1 31' -0'' 31 Rft

Valley Guttering work 2 x 1 27' -0'' 54 Rft


2 x 1 31' -0'' 62 Rft
116 Rft
3 Walling Work
Shera Board 2 x 1 30' -0'' 3' -0'' 180 Sft
2 x 1 26' -0'' 3' -0'' 156 Sft
1 x 1 20' -0'' 3' -0'' 60 Sft
2 x 1 30' -0'' 2' -0'' 120 Sft
2 x 1 26' -0'' 2' -0'' 104 Sft
1 x 1 20' -0'' 2' -0'' 40 Sft
Ded; D1 1 x 1 6' -0'' 3' -0'' 18 Sft
D2 2 x 1 3' -0'' 3' -0'' 18 Sft

36 660 Sft

2x 624 Sft
1248 Sft

4 Aluminium Walling with Glass 2 x 1 30' -0'' 4' -0'' 240 Sft
2 x 1 26' -0'' 4' -0'' 208 Sft
1 x 1 20' -0'' 4' -0'' 80 Sft
Ded; D1 1 x 1 6' -0'' 4' -0'' 24 Sft
D2 2 x 1 3' -0'' 4' -0'' 24 Sft

48 528 Sft
480 Sft

5 Composit ParapetWork
2 x 1 27' -0'' 2' -0'' 108 Sft
2 x 1 31' -0'' 2' -0'' 124 Sft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
2 x 1 27' -0'' 1' -6'' 81 Sft
2 x 1 31' -0'' 1' -6'' 93 Sft
232 Sft

6 Aluminium Door Work


D1 1 1 6' -0'' 7' -0'' 42 Sft
D2 2 1 3' -0'' 7' -0'' 42 Sft
84 Sft

7 Ceiling Work (Lip C Frame &


Shera Board Ceiling )
Test Lab Room 1 x 1 20' -0'' 30' -0'' 600 Sft
Office 1 x 1 6' -0'' 20' -0'' 120 Sft
720 Sft

8 Painting Work
(a) Red Oxide Painting Work
As per Item No. 1 (a) 1 1 110' 6" 1' -4'' 543.3 Sft
As per Item No. 1 (b) 1 1 516' -0'' 1' -0'' 252 Sft
795.30 Sft

(b) Plastic Painting Work


As Per Item No(4) (a) 984 Sft

9 PKD & TG Flooring


4"x 2" PKD (1' c/c Spacing ) 21 x 1 30' -0'' 630 Rft
7 x 1 20' -0'' 140 Rft
770 Rft
42 Cuft
0.84 Ton
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
10 Polishing Work
Test Lab Room 1 x 1 20' -0'' 30' -0'' 600 Sft
Office 1 x 1 6' -0'' 20' -0'' 120 Sft
720 Sft

2 Re-Bar Work for 3rd Floor Beam. & Slab & Stair
Line 1 & 3 25mmØ 20mmØ 10mmØ
FB1,FB2,FB2a,FB5
20mmØ,Top Bar 2 x 2 80' -0'' 320
25mmØ,FB2,Extra Bar 2 x 2 6' -0'' 24
Extra Bar,FB1 2 x 2 17' -0'' 56
2 x 4 17' -0'' 84
2 x 6 17' -0'' 112
20mmØ,Extra Bar 2 x 8 15' -0'' 240
2 x 6 12' -0'' 144
2 x 2 14' -0'' 53
25mmØ,FB2,Extra Bar 2 x 2 6' -0'' 24
20mmØ,Bottom Bar 2 x 3 12' -6'' 75
2 x 4 40' -0'' 320
2 x 4 15' -0'' 120
2 x 4 40' -0'' 320
2 x 3 12' -0'' 72
Extra Bar,FB1 2 x 2 20' -0'' 72
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
20mmØ,Extra Bar,FB5 2 x 2 20' -0'' 80
Lapping 2 x 1 2' -7'' 5
Spacer Bar 2 x 58 0' -9'' 87
10mmØ Stirrups,FB1 2 x 94 5' -10'' 1097
FB2 2 x 44 5' -2'' 455
FB2a 2 x 30 5' -2'' 310
FB5 2 x 60 5' -5'' 650
Line 4,5,6

FB1,FB2,FB2a
20mmØ,Top Bar 3 x 2 80' -0'' 480
25mmØ,FB2,Extra Bar 3 x 2 6' -0'' 36
3 x 4 15' -6'' 186
3 x 2 14' -0'' 84
3 x 8 12' -0'' 288
25mmØ,FB2,Extra Bar 3 x 2 6' -0'' 36
Extra Bar,FB1 3 x 2 14' -0'' 84
3 x 4 15' -6'' 186
3 x 4 12' -0'' 144
20mmØ,Bottom Bar 3 x 3 11' -0'' 99
3 x 4 28' -0'' 336
3 x 6 14' -0'' 252
3 x 4 28' -0'' 336
3 x 3 11' -0'' 99
Extra Bar,FB1 3 x 4 20' -0'' 240
Lapping 3 x 2 2' -7'' 16
Spacer Bar 3 x 68 0' -9'' 153
10mmØ Stirrups,FB1 2 x 128 5' -10'' 1493
FB2,FB2a 2 x 98 5' -2'' 1013
Line 7,FB1,FB2,FB2a
20mmØ,Top Bar 1 x 2 46' -6'' 93
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 2 14' -0'' 28
25mmØ,FB2,Extra Bar 1 x 2 6' -0'' 12
1 x 4 6' -6'' 26
1 x 2 6' -0'' 12
Extra Bar,FB1 1 x 4 15' -6'' 62
1 x 4 13' -9'' 55
1 x 16 12' -0'' 192
1 x 2 13' -3'' 27
20mmØ,Bottom Bar 1 x 3 11' -0'' 33
1 x 4 28' -0'' 112
1 x 6 14' -0'' 84
1 x 4 28' -0'' 112
1 x 3 11' -0'' 33
Extra Bar,FB1 1 x 4 20' -0'' 160
Lapping 1 x 2 2' -7'' 5
Spacer Bar 1 x 65 0' -9'' 49
10mmØ Stirrups,FB1 2 x 118 5' -10'' 1377
FB2,FB2a 2 x 78 5' -2'' 806
Line 2,FB1,FB2
20mmØ,Top Bar 1 x 2 40' -0'' 80
25mmØ,FB2,Extra Bar 1 x 2 6' -0'' 12
1 x 2 14' -0'' 28
1 x 10 12' -0'' 110
Bottom Bar 1 x 3 12' -0'' 36
1 x 4 28' -0'' 112
Extra Bar,FB1 1 x 2 20' -0'' 36
Spacer Bar 1 x 38 0' -9'' 29
10mmØ Stirrups,FB1 1 x 98 5' -10'' 572
FB2 1 x 45 5' -2'' 233
FB6,20mmØ,Top Bar 2 x 2 20' -0'' 80
Extra Bar 2 x 8 10' -0'' 160
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Bottom Bar 2 x 4 15' -6'' 124
2 x 2 10' -6'' 42
Spacer Bar 2 x 28 0' -9'' 42
10mmØ Stirrups,FB6 2 x 54 5' -10'' 630
SB1,20mmØ,Top Bar 2 x 2 15' -0'' 60
Extra Bar 2 x 2 8' -0'' 32
Bottom Bar 2 x 2 14' -6'' 58
2 x 1 10' -0'' 20
10mmØ Stirrups,SB1 2 x 28 2' -8'' 149
Line Between 3&4,4&5,5&6
SB2,20mmØ,Top Bar 3 x 2 90' -0'' 540
Bottom Bar 3 x 2 88' -6'' 531
Lapping 3 x 4 2' -7'' 31
10mmØ Stirrups,SB2 3 x 98 2' -8'' 784
Line No 9.10.11.12.14
FB1,FB2,FB2a;FB5
20mmØ ,Top Bar 5 x 2 79' -0'' 790
FB2,25mmØ ,Extra Bar 5 x 2 8' -9'' 87.50
5 x 2 12' -10'' 128.33
20mmØ ,Extra Bar 5 x 4 10' -9'' 215
5 x 4 13' -8'' 273.33
5 x 2 10' -9'' 107.50
5 x 4 13' -8'' 273.33
5 x 2 10' -9'' 107.50
5 x 4 10' -9'' 215.00
FB2,25mmØ ,Extra Bar 5 x 2 12' -10'' 128.33
5 x 2 8' -9'' 87.50
Bottom Bar,FB2 5 x 6 9' -3'' 277.50
FB1,Extra Bar 5 x 8 28' -9'' 1150
5 x 6 14' -3'' 427.50
5 x 4 17' -10'' 356.67
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Lapping 5 x 2 2' -7'' 25.83
Spacer Bar 5 x 96 0' -9'' 360
10mmØ Stirrups,FB1 4 x 128 5' -10'' 2986.67

FB5 2 x 61 6' -1'' 742.17

FB2 5 x 38 5' -2'' 981.67

FB2a 5 x 27 5' -2'' 697.50

Line No 8
FB1,FB2,FB2a,FB6
20mmØ,Top Bar 1 x 2 78' -8'' 157.33
FB2,25mmØ ,Extra Bar 1 x 2 8' -9'' 17.50
1 x 2 12' -10'' 25.67
20mmØ ,Extra Bar 1 x 4 10' -9'' 43.00
1 x 4 13' -8'' 54.67
1 x 2 10' -9'' 21.50
1 x E 10' -8'' ###
1 x 4 11' -4'' 45.33
1 x 2 7' -3'' 14.50
1 x 4 7' -3'' 29.00
FB2,25mmØ ,Extra Bar 1 x 2 9' -8'' 19.33
1 x 2 6' -0'' 12.00
Bottom Bar 1 x 3 12' -3'' 36.75
1 x 4 28' -9'' 115
1 x 4 14' -3'' 57
1 x 4 17' -0'' 68
1 x 4 16' -4'' 65.33
1 x 3 12' -3'' 36.75
1 x 2 19' -4'' 38.67
1 x 4 6' -9'' 27
1 x 2 7' -3'' 14.5
1 x 2 9' -8'' 19.33
1 x 2 9' -6'' 19
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Lapping 1 x 2 2' -7'' 5.17
Spacer Bar 1 x 116 0' -9'' 87
10mmØ Stirrups,FB1 1 x 103 5' -10'' 600.83
FB2 1 x 38 5' -2'' 196.33
FB2a 1 x 27 5' -2'' 139.5
FB6 1 x 39 5' -10'' 227.5
Line No 13
FB1,FB2,SB2
20mmØ,Top Bar 1 x 2 59' -3'' 118.5
FB2,25mmØ ,Extra Bar 1 x 2 6' -0'' 12.00
1 x 2 12' -10'' 25.67
20mmØ ,Extra Bar 1 x 4 10' -9'' 43
1 x 2 13' -8'' 27.33
1 x 4 10' -9'' 43
1 x 2 10' -2'' 20.33
1 x 2 7' -4'' 14.67
FB2,25mmØ ,Extra Bar 1 x 1 10' -7'' 10.58
Bottom Bar,20mmØ 1 x 3 12' -3'' 36.75
1 x 4 28' -9'' 115
1 x 2 17' -10'' 35.67
1 x 2 79' -0'' 158
Lapping 1 x 4 2' -7'' 10.33
Spacer Bar 1 x 68 0' -9'' 51
10mmØ Stirrups,FB1 1 x 65 5' -10'' 379.17
FB2 1 x 19 5' -2'' 98.17
SB2 1 x 189 2' -8'' 504
Between9&10,10&11,11&12
SB2
20mmØ,Top Bar 3 x 2 79' -3'' 475.5
Bottom Bar 3 x 2 78' -0'' 468
Lapping 3 x 1 2' -7'' 7.75
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
10mmØ Stirrups,SB2 3 x 188 2' -8'' 1504
SB2
20mmØ,Top Bar 4 x 2 12' -3'' 98
Extra Bar 4 x 1 6' -0'' 24
4 x 1 6' -0'' 24
Bottom Bar 4 x 2 10' -0'' 80
Extra Bar 4 x 1 6' -2'' 24.67
10mmØ Stirrups,SB2 4 x 35 2' -8'' 373.33
Line A & G
20mmØ,FB4,Top Bar 2 x 2 93' -8'' 374.67
Extra Bar 2 x 2 8' -9'' 35
2 x 2 15' -3'' 61
2 x 2 17' -3'' 69
2 x 2 17' -3'' 69
2 x 2 17' -3'' 69
2 x 2 10' -8'' 42.67
Bottom Bar 2 x 4 92' -8'' 741.33
Lapping 2 x 2 2' -7'' 10.33
10mmØ Stirrups,FB4 2 x 267 5' -1'' 2714.5
Line B,G & E
20mmØ,FB3,Top Bar 3 x 2 93' -6'' 561
Extra Bar 3 x 5 8' -9'' 131.25
3 x 5 15' -3'' 228.75
3 x 5 17' -3'' 258.75
3 x 5 17' -3'' 258.75
3 x 5 17' -3'' 258.75
3 x 5 10' -8'' 160
Bottom Bar 3 x 4 92' -3'' 1107
Extra Bar 3 x 2 6' -10'' 41
3 x 2 17' -3'' 103.5
3 x 2 17' -3'' 103.5
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
3 x 3 17' -3'' 155.25
3 x 3 17' -3'' 155.25
Lapping 3 x 2 2' -7'' 15.5
Spacer Bar 3 x 68 0' -9'' 153
10mmØ Stirrups,FB3 3 x 267 5' -5'' 4338.75

Line No F,FB3,FB5
20mmØ,Top Bar 1 x 2 93' -4'' 186.67
Extra Bar 1 x 5 8' -9'' 43.75
1 x 5 15' -3'' 76.25
1 x 5 17' -3'' 86.25
1 x 10 17' -3'' 172.5
1 x 5 9' -3'' 46.25
1 x 7 7' -3'' 50.75
Bottom Bar 1 x 4 92' -3'' 369
Extra Bar 1 x 2 7' -9'' 15.5
1 x 2 17' -3'' 34.5
1 x 2 17' -3'' 34.5
1 x 2 17' -3'' 34.5
1 x 2 8' -9'' 17.5
1 x 2 8' -9'' 17.5
Lapping 1 x 2 2' -7'' 5.17
Spacer Bar 1 x 68 0' -9'' 51
10mmØ Stirrups,FB3,FB5 1 x 257 5' -5'' 1392.08

Line No C
20mmØ,SB2,Top Bar 1 x 2 94' -3'' 188.5
Bottom Bar 1 x 2 93' -0'' 186
Lapping 1 x 2 2' -7'' 5.17
10mmØ Stirrups,SB2 1 x 247 2' -8'' 658.67
Line No Between E& F
20mmØ,SB2,Top Bar 1 x 2 23' -3'' 46.5
Bottom Bar 1 x 2 22' -0'' 44
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Lapping 1 x 1 2' -7'' 2.58
10mmØ Stirrups,SB2 1 x 53 2' -8'' 141

Line A & G,FB4


20mmØ,Top Bar 2 x 2 115' -0'' 460
Extra Bar 2 x 2 10' -0'' 40
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 14' -0'' 56
2 x 2 14' -0'' 56
2 x 2 10' -0'' 40
Bottom Bar 2 x 4 113' -6'' 908
Lapping 2 x 12 2' -7'' 62
10mmØ Stirrups,FB4 2 x 270 5' -1'' 2745
Line B & E,FB3
20mmØ,Top Bar 2 x 2 115' -0'' 460
Extra Bar 2 x 5 10' -0'' 100
2 x 5 18' -0'' 180
2 x 5 18' -0'' 180
2 x 5 18' -0'' 180
2 x 5 14' -0'' 140
2 x 5 14' -0'' 140
2 x 5 10' -0'' 100
Bottom Bar 2 x 4 113' -6'' 908
Extra Bar 2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 10' -0'' 40
Lapping 2 x 12 2' -7'' 62
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Spacer Bar 2 x 45 0' -9'' 68
10mmØ Stirrups,FB3 2 x 264 5' -5'' 2860
Line F FB3,FB5
20mmØ,Top Bar 1 x 2 115' -0'' 230
Extra Bar 1 x 6 10' -0'' 60
1 x 5 10' -0'' 50
1 x 5 14' -0'' 70
1 x 5 18' -0'' 90
1 x 5 18' -0'' 90
1 x 5 14' -0'' 70
1 x 5 14' -0'' 70
1 x 5 10' -0'' 50
1 x 1 8' -0'' 8
Bottom Bar 1 x 4 101' -0'' 404
1 x 4 15' -0'' 60
Extra Bar 1 x 2 12' -0'' 24
1 x 2 8' -0'' 16
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 10' -0'' 20
Lapping 1 x 12 2' -7'' 31
Spacer Bar 1 x 47 0' -9'' 35
10mmØ Stirrups,FB3 1 x 242 5' -5'' 1311
FB5 1 x 40 5' -5'' 217
Line D
FB1,FB3,FB6
20mmØ,Top Bar 1 x 2 204' -0'' 408
Extra Bar 1 x 10 10' -0'' 100
1 x 10 18' -0'' 180
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 5 18' -0'' 90
1 x 5 18' -0'' 90
1 x 5 14' -0'' 70
1 x 4 10' -0'' 40
1 x 4 10' -0'' 40
25mmØ,FB2,Extra Bar 1 x 4 6' -6'' 26
1 x 3 8' -0'' 24
Bottom Bar 1 x 4 85' -0'' 340
1 x 4 14' -0'' 56
1 x 4 20' -0'' 80
1 x 4 95' -6'' 382
Extra Bar 1 x 12 18' -0'' 216
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 10' -0'' 18
25mmØ,FB2,Extra Bar 1 x 4 8' -0'' 28
Lapping 1 x 10 2' -7'' 26
Spacer Bar 1 x 54 0' -9'' 41
10mmØ Stirrups,FB3 1 x 284 5' -5'' 1538
FB1 1 x 50 5' -10'' 292
FB6 1 x 68 5' -10'' 397
Line C
FB1,FB6
20mmØ,Top Bar,FB1 1 x 2 50' -0'' 100
Extra Bar,FB1 1 x 8 8' -0'' 56
1 x 4 10' -0'' 40
20mmØ,Extra Bar 1 x 4 10' -0'' 40
1 x 4 8' -0'' 32
Bottom Bar 1 x 4 14' -0'' 56
1 x 2 20' -0'' 40
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Extra Bar,FB1 1 x 2 10' -0'' 20
20mmØ,Extra Bar 1 x 4 8' -0'' 32
Spacer Bar 1 x 45 0' -9'' 34
10mmØ Stirrups,FB1,FB6 1 x 68 5' -10'' 397
SB2
20mmØ,Top Bar 4 x 2 24' -0'' 192
Bottom Bar 4 x 2 23' -0'' 184
10mmØ Stirrups,SB2 4 x 54 2' -8'' 576
790.41 #VALUE! 38576
16mmØ 10mmØ
Rebar Work For Stair
1st Floor to 2nd Floor Stair 2 x 16 7' -0'' 224 Rft
1 x 16 13' -0'' 208 Rft
2nd Floor Stair Dowel 1 x 16 13' -0'' 208 Rft
1 x 16 12' -0'' 192 Rft
Distribution Bar 1 x 14 6' -0'' 84 Rft
1 x 20 12' -6'' 250 Rft
1st Floor to 2nd Floor Stair 2 x 16 7' -0'' 224 Rft
1 x 16 10' -0'' 160 Rft
2nd Floor Stair Dowel 1 x 16 10' -0'' 160 Rft
1 x 16 12' -0'' 192 Rft
Distribution Bar 1 x 14 6' -0'' 84 Rft
1 x 8 12' -0'' 100 Rft
1st Floor to 2nd Floor Stair 2 x 16 7' -0'' 224 Rft
1 x 16 13' -0'' 208 Rft
2nd Floor Stair Dowel 1 x 16 13' -0'' 208 Rft
1 x 16 12' -0'' 192 Rft
Distribution Bar 1 x 14 6' -0'' 84 Rft
1 x 20 12' -6'' 250 Rft
2400 852 Rft
Rebar Work For Slab 10mmØ
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
S3,12-14 Bottom,Main Bar 1 x 25 9' -6'' 237.5 Rft
Distribution Bar 1 x 11 21' -6'' 236.5 Rft
Top Bar 1 x 50 11' -0'' 550 Rft
1 x 11 23' -0'' 253 Rft
S2,8-12,Main Bar 1 x 84 9' -6'' 798 Rft
Distribution Bar 1 x 11 72' -6'' 797.5 Rft
Lapping 1 x 11 1' -4'' 14.67 Rft
Top Bar 1 x 84 11' -6'' 966 Rft
1 x 10 74' -6'' 745 Rft
Lapping 1 x 10 1' -4'' 13.33 Rft
OT;S1,Line 12-14
Bottom Bar 1 x 25 13' -6'' 337.5 Rft
1 x 15 21' -6'' 322.5 Rft
Top Bar 1 x 50 15' -6'' 775 Rft
1 x 15 23' -69'' 431.25 Rft
Between Line B &D
S2, Bottom,Main 1 x 9 31' -6'' 283.5 Rft
Dis; 1 x 25 8' -6'' 212.5 Rft
S2,Top,Main 1 x 9 33' -6'' 301.5 Rft
Dis; 1 x 25 10' -6'' 262.5 Rft
S2, Bottom,Main 1 x 16 21' -6'' 344 Rft
Dis; 1 x 25 14' -0'' 350 Rft
Top Bar 1 x 16 23' -6'' 376 Rft
1 x 25 16' -0'' 400 Rft
S1,S2 Bottom,Main 1 x 30 72' -6'' 2175 Rft
Dis; 1 x 84 26' -0'' 2184 Rft
Top Bar 1 x 30 74' -6'' 2235 Rft
1 x 84 28' -0'' 2352 Rft
S1 Top Bar 1 x 21 53' -6'' 1123.5 Rft
1 x 60 21' -0'' 1260 Rft
Lapping 1 x 81 1' -6'' 121.5 Rft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
S2 Bottom Bar 1 x 13 92' -6'' 1202.5 Rft
1 x 108 11' -6'' 1242 Rft
Top Bar 1 x 13 94' -6'' 1228.5 Rft
1 x 108 13' -6'' 1458 Rft
Lapping 13 x 6 1' -6'' 117 Rft
Line E-F
S3 Bottom Bar 1 x 30 11' -6'' 345 Rft
1 x 10 26' -0'' 260 Rft
Top Bar 1 x 60 13' -6'' 810 Rft
1 x 10 28' -0'' 280 Rft
S3 Bottom Bar 1 x 30 9' -6'' 285 Rft
1 x 8 26' -0'' 208 Rft
Top Bar 1 x 60 11' -6'' 690 Rft
1 x 8 28' -0'' 224 Rft
S2 Bottom Bar 1 x 30 51' -6'' 1545 Rft
1 x 60 26' -0'' 1560 Rft
Top Bar 1 x 30 53' -6'' 1605 Rft
1 x 60 28' -0'' 1680 Rft
Lapping 30 x 2 1' -6'' 90 Rft
S2 Bottom Bar 1 x 30 11' -6'' 345 Rft
1 x 12 26' -0'' 312 Rft
Top Bar 1 x 30 13' -6'' 405 Rft
1 x 12 28' -0'' 336 Rft
Line F & G
S2 Bottom Bar 1 x 10 91' -6'' 915 Rft
1 x 109 9' -6'' 1035.5 Rft
Top Bar 1 x 10 92' -6'' 925 Rft
1 x 109 11' -6'' 1253.5 Rft
Lapping 10 x 3 1' -6'' 45 Rft
S3,1-3, Bottom,Main Bar 1 x 25 9' -6'' 237.5 Rft
Distribution Bar 1 x 11 21' -6'' 236.5 Rft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Top Bar 1 x 50 11' -0'' 550 Rft
1 x 11 23' -0'' 253 Rft
S2,3-8,Bottom,Main Bar 1 x 111 9' -6'' 1054.5 Rft
Distribution Bar 1 x 12 91' -6'' 1098 Rft
Lapping 2 x 12 1' -4'' 32 Rft
Top Bar 1 x 88 11' -0'' 968 Rft
1 x 12 93' -0'' 1116 Rft
Lapping 2 x 12 1' -4'' 32 Rft
Line 1-3,S3
Bottom,Main Bar 1 x 26 8' -0'' 208 Rft
Distribution Bar 1 x 10 21' -6'' 215 Rft
Top,Main Bar 1 x 42 9' -6'' 399 Rft
Distribution Bar 1 x 17 23' -0'' 391 Rft
S1,Bottom,Main Bar 1 x 25 16' -0'' 400 Rft
Distribution Bar 1 x 20 21' -6'' 430 Rft
Top,Main Bar 1 x 44 17' -6'' 770 Rft
Distribution Bar 1 x 30 23' -0'' 690 Rft
Line 3-5,S3
Bottom,Main Bar 2 x 50 26' -0'' 2600 Rft
Distribution Bar 2 x 30 41' -6'' 2490 Rft
Top,Main Bar 2 x 83 27' -6'' 4565 Rft
Distribution Bar 2 x 60 43' -0'' 5160 Rft
Lapping 2 x 90 1' -4'' 240 Rft
Line 5-6,S2
Bottom,Main Bar 1 x 25 8' -6'' 212.5 Rft
Distribution Bar 1 x 10 21' -6'' 215 Rft
Top,Main Bar 1 x 21 10' -0'' 210 Rft
Distribution Bar 1 x 8 23' -0'' 184 Rft
Line 5-6,C-D,S1
Bottom,Main Bar 1 x 25 19' -0'' 475 Rft
Distribution Bar 1 x 21 21' -6'' 451.5 Rft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Top,Main Bar 1 x 45 20' -6'' 922.5 Rft
Distribution Bar 1 x 35 23' -0'' 805 Rft
Line 6-7,B-C,S2
Bottom,Main Bar 1 x 15 11' -6'' 172.5 Rft
Distribution Bar 1 x 12 13' -6'' 162 Rft
Top,Main Bar 1 x 13 13' -0'' 169 Rft
Distribution Bar 1 x 11 14' -0'' 154 Rft
Line C-D
Bottom,Main Bar 1 x 15 13' -0'' 195 Rft
Distribution Bar 1 x 14 14' -0'' 196 Rft
Top,Main Bar 1 x 13 14' -6'' 188.5 Rft
Distribution Bar 1 x 12 15' -6'' 186 Rft
Line D-E,1-3 & 7-8,S3
Bottom,Main Bar 2 x 25 11' -6'' 575 Rft
Distribution Bar 2 x 12 21' -6'' 516 Rft
Top,Main Bar 2 x 41 13' -0'' 1066 Rft
Distribution Bar 2 x 21 23' -0'' 966 Rft
Line 3-7,D-E,S2
Bottom,Main Bar 1 x 85 11' -6'' 977.5 Rft
Distribution Bar 1 x 12 71' -6'' 858 Rft
Top,Main Bar 1 x 73 13' -0'' 949 Rft
Distribution Bar 1 x 11 73' -0'' 803 Rft
Lapping 1 x 23 1' -4'' 30.67 Rft
Line 2-3,E-F,S2
Bottom,Main Bar 1 x 30 9' -6'' 285 Rft
Distribution Bar 1 x 10 26' -0'' 260 Rft
Top,Main Bar 1 x 50 11' -0'' 550 Rft
Distribution Bar 1 x 17 27' -6'' 467.5 Rft
Line 5-6,E-F,S2
Bottom,Main Bar 1 x 30 21' -6'' 645 Rft
Distribution Bar 1 x 25 26' -0'' 650 Rft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Top,Main Bar 1 x 50 23' -0'' 1150 Rft
Distribution Bar 1 x 12 27' -6'' 330 Rft
Line 6-8,E-F,S3
Bottom,Main Bar 1 x 37 26' -0'' 962 Rft
Distribution Bar 1 x 30 31' -6'' 945 Rft
Top,Main Bar 1 x 62 27' -6'' 1705 Rft
Distribution Bar 1 x 51 33' -0'' 1683 Rft
Line 1-8,F-G,S2
Bottom,Main Bar 1 x 133 9' -6'' 1263.5 Rft
Distribution Bar 1 x 10 111' -6'' 1115 Rft
Top,Main Bar 1 x 113 11' -0'' 1243 Rft
Distribution Bar 1 x 9 113' -0'' 1017 Rft
Lapping 2 x 19 1' -4'' 50.67 Rft
Chair 2 x 320 2' -6'' 1600 Rft
92557.59 Rft
10mmØ - 131985.59 Rf x0.415 Lb 54774 489.05 Cwt
16mmØ - 2400Rf x1.062 Lb 2548.8 22.75 Cwt
20mmØ - 32080 Rf x1.66 Lb 53253 475.47 Cwt
25mmØ - 790.41 Rf x 2.587 Lb 2044.79 18.25 Cwt
1005.52 Cwt
3 G-30 Ready Mixed Concreting Work
for 3rd Floor Beam & Slab
Line 1
FB1 1 x 1 22' -8'' 1' -0'' 2' -0'' 45.33 Cft
FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21.11 Cft
FB2a 1 x 1 8' -2'' 1' -0'' 1' -8'' 13.61 Cft
FB5 1 x 1 22' -8'' 1' -2'' 2' -0'' 52.89 Cft
Line 2,3,4,5,6,7
FB1 9 x 1 22' -8'' 1' -0'' 2' -0'' 408 Cft
FB1 1 x 1 10' -2'' 1' -0'' 2' -0'' 20 Cft
FB5 1 x 1 22' -8'' 1' -2'' 2' -0'' 53 Cft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
FB6 2 x 1 9' -6'' 1' -0'' 2' -0'' 38 Cft
FB2 11 x 1 6' -4'' 1' -0'' 1' -8'' 116 Cft
FB2a 5 x 1 8' -3'' 1' -0'' 1' -8'' 69 Cft
SB2 3 x 1 70' -0'' 0' -9'' 1' -6'' 236 Cft
SB2 1 x 1 31' -6'' 0' -9'' 1' -6'' 35 Cft
SB1 2 x 1 7' -0'' 0' -9'' 1' -6'' 16 Cft
Line A & G FB4 2 x 1 101' -0'' 1' -0'' 1' -8'' 337 Cft

FB3 1 x 1 99' -0'' 1' -0'' 1' -10'' 182 Cft


1 x 1 97' -3'' 1' -0'' 1' -10'' 178 Cft
Line D FB1 1 x 1 10' -8'' 1' -0'' 2' -0'' 21 Cft
FB3 1 x 1 72' -8'' 1' -0'' 1' -10'' 133 Cft
FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28 Cft
Line F
FB3 1 x 1 87' -0'' 1' -0'' 1' -10'' 160 Cft
FB5 1 x 1 10' -3'' 1' -2'' 2' -0'' 24 Cft
Line C
FB1 1 x 1 9' -2'' 1' -0'' 2' -0'' 18 Cft
FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28 Cft
Line Between 1 & 3
SB2 2 x 1 19' -0'' 0' -9'' 1' -6'' 43 Cft
1 x 1 18' -3'' 0' -9'' 1' -6'' 21 Cft
C1,C2 24 x 1 1' -4'' 1' -6'' 2' -0'' 96 Cft
C3,C4 51 x 1 1' -4'' 1' -10'' 2' -0'' 249 Cft
C5 6 x 1 1' -0'' 3' -0'' 2' -0'' 36 Cft
Slab S3 2 x 1 19' -0'' 7' -0'' 0' -5'' 111 Cft
Slab S3 1 x 1 19' -0'' 5' -6'' 0' -5'' 44 Cft
Slab S3 4 x 1 23' -6'' 9' -2'' 0' -5'' 359 Cft
Slab S3 2 x 1 19' -0'' 9' -0'' 0' -5'' 143 Cft
Slab S3 1 x 1 23' -6'' 7' -0'' 0' -5'' 69 Cft
Slab S3 6 x 1 23' -6'' 9' -2'' 0' -5'' 539 Cft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Slab S3 1 x 1 23' -6'' 9' -0'' 0' -5'' 88 Cft
Slab S2 14 x 1 9' -3'' 7' -0'' 0' -5'' 378 Cft
Slab S2 2 x 1 9' -0'' 7' -0'' 0' -5'' 53 Cft
Slab S2 1 x 1 9' -0'' 11' -0'' 0' -5'' 41 Cft
Slab S2 1 x 1 11' -0'' 11' -6'' 0' -5'' 53 Cft
Slab S2 6 x 1 9' -2'' 9' -0'' 0' -5'' 206 Cft
Slab S2 1 x 1 9' -0'' 9' -0'' 0' -5'' 34 Cft
Slab S2 1 x 1 7' -0'' 7' -0'' 0' -5'' 20 Cft
Slab S2 1 x 1 11' -0'' 7' -0'' 0' -5'' 32 Cft
Slab S2 4 x 1 10' -4'' 9' -2'' 0' -5'' 158 Cft
Slab S2 2 x 1 3' -9'' 7' -0'' 0' -5'' 22 Cft
Slab S2 2 x 1 5' -3'' 7' -0'' 0' -5'' 31 Cft
Slab S1 1 x 1 15' -0'' 19' -0'' 0' -5'' 119 Cft
Slab S1 2 x 1 9' -3'' 15' -9'' 0' -5'' 121 Cft
Stair Step 12 × 1 5' -3'' 0' -6'' 0' -6'' 15.8 Cft
Flight 1 × 2 13' -6'' 5' -3'' 0' -9'' 106.31 Cft
Landing Floor 1 × 1 11' -0'' 6' -2'' 0' -9'' 50.88 Cft
1 × 1 11' -0'' 2' -2'' 0' -9'' 17.88 Cft
FB1 1 x 1 22' -8'' 1' -0'' 2' -0'' 45.33 Cft
FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21.11 Cft
FB2a 1 x 1 8' -2'' 1' -0'' 1' -8'' 13.61 Cft
FB6 1 x 1 9' -6'' 1' -0'' 2' -0'' 19.00 Cft
FB1 1 x 1 10' -2'' 1' -0'' 2' -0'' 20 Cft
Line - 14 FB5 1 × 1 22' -8'' 1' -2'' 2' -0'' 52.89 Cft
Line - 13, 14 FB1 2 × 1 22' -8'' 1' -0'' 2' -0'' 90.67 Cft
FB2 3 × 1 6' -4'' 1' -0'' 1' -8'' 31.67 Cft
FB2a 1 × 1 8' -2'' 1' -0'' 1' -8'' 13.61 Cft
SB2 1 × 1 22' -8'' 1' -0'' 1' -8'' 37.78 Cft
Line 9.10.11.12FB1 7 × 1 22' -8'' 1' -0'' 2' -0'' 317.33 Cft
FB5 1 × 1 22' -8'' 1' -2'' 2' -0'' 52.89 Cft
Between 9.10.11.12 SB2 3 × 1 73' -6'' 0' -9'' 1' -6'' 248.06 Cft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Line-13 SB2 1 × 1 17' -3'' 0' -9'' 1' -6'' 19.41 Cft
SB1 1 × 1 7' -0'' 0' -9'' 1' -6'' 7.88 Cft
Line 9.10.11.12 FB2 8 × 1 6' -4'' 1' -0'' 1' -8'' 84.44 Cft
FB 2a 4 × 1 8' -2'' 1' -0'' 1' -8'' 54.44 Cft
A&G FB4 2 × 1 84' -3'' 1' -0'' 1' -8'' 280.83 Cft
Line F,FB3 1 × 1 72' -3'' 1' -0'' 1' -10'' 132.46 Cft
LineB,D, E,FB3 3 × 1 84' -3'' 1' -0'' 1' -10'' 463.38 Cft
FB5 1 × 1 9' -2'' 1' -2'' 2' -0'' 21.39 Cft
SB2 1 × 1 84' -6'' 0' -9'' 1' -6'' 95.06 Cft
SB2 1 × 1 44' -6'' 0' -9'' 1' -6'' 50.06 Cft
2 × 1 74' -0'' 0' -9'' 1' -6'' 166.50 Cft
SB2 1 × 1 23' -0'' 0' -9'' 1' -6'' 25.88 Cft
SB1 3 × 1 9' -1'' 0' -9'' 1' -6'' 30.66 Cft
Slab S2 2 × 1 9' -0'' 7' -0'' 0' -5'' 52.50 Cft
Slab S2 12 × 1 9' -1'' 7' -0'' 0' -5'' 317.92 Cft
Slab S2 1 × 1 9' -0'' 7' -0'' 0' -5'' 26.25 Cft
Slab S2 3 × 1 9' -1'' 7' -0'' 0' -5'' 79.48 Cft
Slab S2` 1 × 1 15' -9'' 9' -0'' 0' -5'' 59.06 Cft
Slab S2 2 × 1 7' -6'' 9' -1'' 0' -5'' 56.77 Cft
Slab S2 1 × 1 9' -0'' 9' -0'' 0' -5'' 33.75 Cft
Slab S2 6 × 1 9' -1'' 9' -0'' 0' -5'' 204.38 Cft
Slab S2 2 × 1 11' -4'' 9' -0'' 0' -5'' 85.00 Cft
Slab S2 8 × 1 11' -4'' 9' -1'' 0' -5'' 343.15 Cft
Slab S2 3 × 1 7' -4'' 9' -1'' 0' -5'' 83.26 Cft
Slab OT 1 × 1 23' -6'' 7' -0'' 0' -5'' 68.54 Cft
Slab S1 5 × 1 16' -6'' 9' -2'' 0' -5'' 315.10 Cft
Slab S3 1 × 1 19' -0'' 7' -0'' 0' -5'' 55.42 Cft
Slab S1 1 × 1 19' -0'' 11' -1'' 0' -5'' 87.74 Cft
Slab S2 1 × 1 7' -1'' 11' -1'' 0' -5'' 32.71 Cft
Slab S2 1 × 1 11' -1'' 11' -1'' 0' -5'' 51.18 Cft
Slab S2 1 × 1 7' -1'' 9' -0'' 0' -5'' 26.56 Cft
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Slab S2 1 × 1 11' -1'' 9' -0'' 0' -5'' 41.56 Cft
Slab S2 1 × 1 7' -0'' 7' -0'' 0' -5'' 20.42 Cft
Slab S2 1 × 1 11' -0'' 7' -0'' 0' -5'' 32.08 Cft
Stair Step 7 × 1 5' -3'' 0' -6'' 0' -6'' 9.19 Cft
Flight 1 × 1 8' -0'' 5' -3'' 0' -9'' 31.50 Cft
Landing Floor 1 × 1 11' -0'' 6' -2'' 0' -9'' 50.88 Cft
10048 Cft

Hire Charges For Concreting Work


4 10089 Cft
Vibrator
25 Day
Curing Work For Concreting
5 For14 Day
For 2nd Floor
Location Head - Electrical Workshop (Test Lab)

Name Of Work
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 × 1 204' -0'' 80' -0'' 16320 Sft
73.542
984
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd Floor Beam Slab

BILL OF QUANTITY

Sr.
Particular Quantity Unit Rate Per Amount
No

1 Rebar work for 3rd Floor Column


(412.74 Cwt)
25mm Ø M.S Rod 9.97 Ton 797000 Ton 7946090
20mm Ø M.S Rod 3.1 Ton 797000 Ton 2470700
10mm Ø M.S Rod 8.6 Ton 695000 Ton 5977000
B/wire 412 Lb 650 Lb 267800
Labour (25mm) 189.94 Cwt 19995 Cwt 3797850
Labour (20mm) 59.05 Cwt 19995 Cwt 1180705
Labour (10mm) 163.75 Cwt 27495 Cwt 4502306
26142451
1a Rebar work for 2nd Floor Stair
(70.87 Cwt)
25mm Ø M.S Rod 0.39 Ton 797000 Ton 310830
20mm Ø M.S Rod 0.25 Ton 797000 Ton 199250
16mm Ø M.S Rod 2.2 Ton 695000 Ton 1529000
10mm Ø M.S Rod 0.88 Ton 695000 Ton 611600
B/Wire 71 Lb 650 Lb 46150
Labour (25mm To 16mm) 54.15 Cwt 16245 Cwt 879667
Labour (10mm) 16.72 Cwt 27495 Cwt 459716
4036213
2 Formwork For 3rd Floor Column
(8996 Sft)
J / wood (3 times) 12 Ton 680000 Ton 8160000
5 plywood 107 Shts 15800 Shts 1690600
Wire Nail 270 Lb 600 Lb 162000
3/8"Ø Separater 4098 Rft 195 Rft 799110
Labour 8996 Sft 83200 %Sft 7484672
18296382
3 (G-30) Concreting Work For
2nd Floor Column ( 3268.04Cft)
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd Floor Beam Slab

BILL OF QUANTITY

Sr.
Particular Quantity Unit Rate Per Amount
No

Ready Mixed Concrete 92.5 m3 84900 m3 7853250


H.S.D 16 Gal 3000 Gal 48000
Vibrator 8 Day 15000 Day 120000
Labour For Column 2817.19 Cft 820 Cft 2310096
Labour For Stair 450.85 Cft 625 Cft 281781
Curing Work 7467 Sft 65 Sft 485355
11098482

4 16'ht Arm Frame (င ရမခ) 81 Days 16000 Days 1296000


Labour Charges 12960 Sft 21.1 Sft 273456
1569456
Total 61142985
Say 61143000/-

MATERIAL COST
25mm Ø M.S Rod 10.36 Ton 797000 Ton 8256920
20mm Ø M.S Rod 3.35 Ton 797000 Ton 2669950
16mm Ø M.S Rod 2.2 Ton 695000 Ton 1529000
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd Floor Beam Slab

BILL OF QUANTITY

Sr.
Particular Quantity Unit Rate Per Amount
No

10mm Ø M.S Rod 9.48 Ton 695000 Ton 6588600


B/wire 483 Lb 650 Lb 313950
J / wood (3 times) 12 Ton 680000 Ton 8160000
5 plywood 107 Shts 15800 Shts 1690600
Wire Nail 270 Lb 600 Lb 162000
3/8"Ø Separater 4098 Rft 195 Rft 799110
Ready Mixed Concrete 92.5 m3 84900 m3 7853250
H.S.D 16 Gal 3000 Gal 48000
38071380
Hire Charges For Vibrator 8 Day 15000 Day 120000
16'ht Arm Frame (င ရမခ) 81 Days 16000 Days 1296000
1416000
LABOUR CHARGES
Labour (25-20mm) 248.99 Cwt 19995 Cwt 4978555
Labour (25-16mm) 54.15 Cwt 16245 Cwt 879667
Labour (10mm) 180.47 Cwt 27495 Cwt 4962023
Labour 8996 Sft 83200 %Sft 7484672
Labour 2817.19 Cft 820 Cft 2310096
Labour 450.85 Cft 625 Cft 281781
Curing Work 7467 Sft 65 Sft 485355
4 Labour Charges 12960 Sft 21.1 Sft 273456
21655605
61142985
Say 61143000/-
1 Formwork For 2nd Floor Beam & Slab 23841Sft
J / wood (3 times) 31.79 Ton 680000 Ton 21617200
5 plywood 285 Shts 15800 Shts 4503000
Wire Nail 715 Lb 600 Lb 429000
Labour 23841 Sft 83200 %Sft 19835712
46384912
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd Floor Beam Slab

BILL OF QUANTITY

Sr.
Particular Quantity Unit Rate Per Amount
No

2 Rebar work for 2nd Floor Beam & Slab


(1009.87 Cwt)
25mm Ø M.S Rod 0.96 Ton 797000 Ton 765120
20mm Ø M.S Rod 25.12 Ton 797000 Ton 20020640
16mm Ø M.S Rod 1.19 Ton 695000 Ton 827050
10mm Ø M.S Rod 25.74 Ton 695000 Ton 17889300
B/Wire 1009 Lb 650 Lb 655850
Labour (25mm ) 18.25 Cwt 14580 Cwt 266085
Labour (20mm ) 478.49 Cwt 14580 Cwt 6976384
Labour (16mm ) 22.75 Cwt 14580 Cwt 331695
Labour (10mm) 490.38 Cwt 25830 Cwt 12666515
60398640
3 (G-30) Concreting Work For
2nd Floor Beam& Slab (10089Cft)
Ready Mixed Concrete 285 m3 84900 m3 24196500
H.S.D 50 Gal 3000 Gal 150000
Vibrator 25 Day 15000 Day 375000
Labour For Beam&Slab 10089 Cft 625 Cft 6305625
Curing Work 16320 Sft 65 Sft 1060800
32087925
138871477
Say138870000/-
MATERIAL COST
J / wood (3 times) 31.79 Ton 680000 Ton 21617200
5 plywood 285 Shts 15800 Shts 4503000
Wire Nail 715 Lb 600 Lb 429000
25mm Ø M.S Rod 0.96 Ton 797000 Ton 765120
20mm Ø M.S Rod 25.12 Ton 797000 Ton 20020640
16mm Ø M.S Rod 1.19 Ton 695000 Ton 827050
10mm Ø M.S Rod 25.74 Ton 695000 Ton 17889300
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd Floor Beam Slab

BILL OF QUANTITY

Sr.
Particular Quantity Unit Rate Per Amount
No

B/Wire 1009 Lb 650 Lb 655850


Ready Mixed Concrete 285 m3 84900 m3 24196500
H.S.D 50 Gal 3000 Gal 150000
91053660

LABOUR CHARGES
Labour 23841 Sft 83200 %Sft 19835712
Labour (25mm ) 18.25 Cwt 14580 Cwt 266085
Labour (20mm ) 478.49 Cwt 14580 Cwt 6976384
Labour (16mm ) 22.75 Cwt 14580 Cwt 331695
Labour (10mm) 490.38 Cwt 25830 Cwt 12666515
Labour For Beam&Slab 10089 Cft 625 Cft 6305625
Curing Work 16320 Sft 65 Sft 1060800
Vibrator Hire Charges 25 Day 15000 Day 375000

47817817
138871477
Say 138870000/-

1 Formwork For 3rd Floor Beam & Slab 23637Sft


J / wood (3 times) 31.52 Ton 680000 Ton 21433600
5 plywood 283 Shts 15800 Shts 4471400
Wire Nail 709 Lb 600 Lb 425400
Labour 23637 Sft 83200 %Sft 19665984
45996384
2 Rebar work for 3rd Floor Beam & Slab
(1005.52 Cwt)
25mm Ø M.S Rod 0.96 Ton 797000 Ton 765120
20mm Ø M.S Rod 24.96 Ton 797000 Ton 19893120
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd Floor Beam Slab

BILL OF QUANTITY

Sr.
Particular Quantity Unit Rate Per Amount
No

16mm Ø M.S Rod 1.19 Ton 695000 Ton 827050


10mm Ø M.S Rod 25.68 Ton 695000 Ton 17847600
B/Wire 1005 Lb 650 Lb 653250
Labour (25mm ) 18.25 Cwt 16245 Cwt 296471
Labour (20mm ) 475.47 Cwt 16245 Cwt 7724010
Labour (16mm ) 22.75 Cwt 16245 Cwt 369574
Labour (10mm) 489.05 Cwt 27495 Cwt 13446430
61822625
3 (G-30) Concreting Work For
3rd Floor Beam& Slab (10048Cft)
Ready Mixed Concrete 284.5 m3 84900 m3 24154050
H.S.D 50 Gal 3000 Gal 150000
Vibrator 25 Day 15000 Day 375000
Labour For Beam&Slab 10048 Cft 625 Cft 6280000
Curing Work 16320 Sft 65 Sft 1060800
32019850
139838859
Say139839000/-
MATERIAL COST
J / wood (3 times) 31.52 Ton 680000 Ton 21433600
5 plywood 283 Shts 15800 Shts 4471400
Wire Nail 709 Lb 600 Lb 425400
25mm Ø M.S Rod 0.96 Ton 797000 Ton 765120
20mm Ø M.S Rod 24.96 Ton 797000 Ton 19893120
16mm Ø M.S Rod 1.19 Ton 695000 Ton 827050
10mm Ø M.S Rod 25.68 Ton 695000 Ton 17847600
B/Wire 1005 Lb 650 Lb 653250
Ready Mixed Concrete 284.5 m3 84900 m3 24154050
H.S.D 50 Gal 3000 Gal 150000
90620590
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd Floor Beam Slab

BILL OF QUANTITY

Sr.
Particular Quantity Unit Rate Per Amount
No

LABOUR CHARGES
Labour 23637 Sft 83200 %Sft 19665984
Labour (25mm ) 18.25 Cwt 16245 Cwt 296471
Labour (20mm ) 475.47 Cwt 16245 Cwt 7724010
Labour (16mm ) 22.75 Cwt 16245 Cwt 369574
Labour (10mm) 489.05 Cwt 27495 Cwt 13446430
Labour For Beam&Slab 10048 Cft 625 Cft 6280000
Curing Work 16320 Sft 65 Sft 1060800
Vibrator Hire Charges 25 Day 15000 Day 375000

49218269
139838859
Say 139839000/-

1 Formwork For MF Floor Beam & Slab 22495Sft


J / wood (3 times) 31.52 Ton 680000 Ton 21433600
5 plywood 283 Shts 15800 Shts 4471400
Wire Nail 709 Lb 600 Lb 425400
Labour 23637 Sft 83200 %Sft 19665984
45996384
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd Floor Beam Slab

BILL OF QUANTITY

Sr.
Particular Quantity Unit Rate Per Amount
No

2 Rebar work for 3rd Floor Beam & Slab


(937.85 Cwt)
25mm Ø M.S Rod 0.96 Ton 797000 Ton 765120
20mm Ø M.S Rod 24.96 Ton 797000 Ton 19893120
16mm Ø M.S Rod 1.19 Ton 695000 Ton 827050
10mm Ø M.S Rod 25.68 Ton 695000 Ton 17847600
B/Wire 1005 Lb 650 Lb 653250
Labour (25mm ) 18.25 Cwt 16245 Cwt 296471
Labour (20mm ) 475.47 Cwt 16245 Cwt 7724010
Labour (16mm ) 22.75 Cwt 16245 Cwt 369574
Labour (10mm) 489.05 Cwt 27495 Cwt 13446430
61822625
3 (G-30) Concreting Work For
3rd Floor Beam& Slab (Cft)
Ready Mixed Concrete 284.5 m3 84900 m3 24154050
H.S.D 50 Gal 3000 Gal 150000
Vibrator 25 Day 15000 Day 375000
Labour For Beam&Slab 10048 Cft 625 Cft 6280000
Curing Work 16320 Sft 65 Sft 1060800
32019850
139838859
Say139839000/-
MATERIAL COST
J / wood (3 times) 31.52 Ton 680000 Ton 21433600
5 plywood 283 Shts 15800 Shts 4471400
Wire Nail 709 Lb 600 Lb 425400
25mm Ø M.S Rod 0.96 Ton 797000 Ton 765120
20mm Ø M.S Rod 24.96 Ton 797000 Ton 19893120
16mm Ø M.S Rod 1.19 Ton 695000 Ton 827050
10mm Ø M.S Rod 25.68 Ton 695000 Ton 17847600
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd Floor Beam Slab

BILL OF QUANTITY

Sr.
Particular Quantity Unit Rate Per Amount
No

B/Wire 1005 Lb 650 Lb 653250


Ready Mixed Concrete 284.5 m3 84900 m3 24154050
H.S.D 50 Gal 3000 Gal 150000
90620590

LABOUR CHARGES
Labour 23637 Sft 83200 %Sft 19665984
Labour (25mm ) 18.25 Cwt 16245 Cwt 296471
Labour (20mm ) 475.47 Cwt 16245 Cwt 7724010
Labour (16mm ) 22.75 Cwt 16245 Cwt 369574
Labour (10mm) 489.05 Cwt 27495 Cwt 13446430
Labour For Beam&Slab 10048 Cft 625 Cft 6280000
Curing Work 16320 Sft 65 Sft 1060800
Vibrator Hire Charges 25 Day 15000 Day 375000

49218269
139838859
Say 139839000/-
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 2nd FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No
1 Labour Charges For Rebar work for
2nd Floor Column (375.31 Cwt)
Labour (25mm) 187.42 Cwt 18330 Cwt 3435409
Labour (20mm) 57.63 Cwt 18330 Cwt 1056358
Labour (10mm) 130.26 Cwt 25830 Cwt 3364616
7856382
Analysis of Rate For 1Cwt For Column
For 20mm Ø + 25mm Ø , Yellow Book Pg (134 ) item ( 12 )
Steel Fixer 1 x 8500 /- 8500/-
worker 1 x 6500 /- 6500/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 ) x2 3330/-
Total 18330/- per cwt
For 10mm Ø, From Yellow Book Pg (135 ) item ( 14 )
Steel Fixer 1.5 x 8500 /- 12750/-
worker 1.5 x 6500 /- 9750/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 ) x2 3330/-
Total 25830/- per cwt
2 Labour Charges For Rebar work for
2nd Floor Stair (70.87 Cwt)
Labour (16mm;20mm;25mm) 54.15 Cwt 14580 Cwt 789507
Labour (10mm) 16.72 Cwt 25830 Cwt 431878
1221385
Analysis of Rate For 1Cwt For Column
For16mm; 20mm Ø + 25mm Ø , YB Pg 133 Item (9) TOTAL Ks 9077767
Steel Fixer 0.75 Nox8500/- 6375/-
Worker 0.75 Nox6500/- 4875
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 ) x2 3330/-
Total 14580/- per cwt

For 10mm Ø, From Yellow Book Pg (135 ) item ( 14 )


Steel Fixer 1.5 x 8500 /- 12750/-
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 2nd FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No
worker 1.5 x 6500 /- 9750/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 ) x2 3330/-
Total 25830 per cwt

Materials Issued (11/2017 M.S Account )


25mm Ø M.S Rod 10.23 Ton
20mm Ø M.S Rod 3.28 Ton
16mm Ø M.S Rod 2.2 Ton
10mm Ø M.S Rod 7.72 Ton
B/wire 446 Lb

1 Labour Charges for 2nd Floor Column Formwork


(6233 Sft)
Labour 6233 Sft 83200 %Sft 5185856
Analysis of Rate For Column Formwork For 100 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 2nd FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No
From Yellow Book Pg (124 ) item (1 )
Carpenter 6 Nox8500/- 51000/-
Worker2 Nox6500/- 13000/-
64000/-
Dismentling Work (30%) 19200/-
Total 83200/- per % Sft

2 Labour Charges For Ready Mixed G30 concreting work for


2nd Floor Column (1906.67 Cft)
Labour 1906.67 Cft 820 Cft 1563469

Analysis of Rate
From Yellow Book Pg (31 ) item (6-2c )
Mason 2 Nox8500/- 17000/-
Worker10 Nox6500/- 65000/-
Total 82000/- per %Cft
3 Labour Charges For Ready Mixed G30 concreting work for
Stair (450.85 Cft)
Labour 450.85 Cft 625 Cft 281781
Analysis of Rate
From Yellow Book Pg (30 ) item (6-2a )
Mason 2 Nox8500/- 17000/-
Worker7 Nox6500/- 45500/-
Total 62500/- per %Cft

4 Labour Charges for Curing work


(4900 sft) 4900 sft 65 sft 318500
Analysis of Rate
From Yellow Book Pg (32 ) item (10 ) worker 1 x 6500 /- =6500 /-per %Sft
5 Labour charges for Arm Frame Scaffolding Work for
Column (12960 Sft)
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 2nd FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No
Labour Charges 12960 Sft 21.1 Sft 273456
YGN Rate Book Pg (22 ) item 16-11 )

6 Hire Charges
Vibrator 6 Day 15000 Day 90000
16'ht Arm Frame 81 Days 16000 Days 1296000
1386000
YGN Rate Book Pg (68 ) Item(2,4 ) , Pg (69) Item (20)
Total Ks 9009063

Materials Issued (9/2017 M.S Account )


J / wood (3 times) 8.31 Ton
5 plywood 74 Shts
Wire Nail 187 Lb
3/8"Ø Separater 4098 Rft
Ready Mix Concrete G-30 67 m3
H.S.D 12 Gal
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 2nd FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No

MATERIAL COST
25mm Ø M.S Rod 7.09 Ton 719000 Ton 5097710
20mm Ø M.S Rod 1.3 Ton 719000 Ton 934700
10mm Ø M.S Rod 4.56 Ton 695000 Ton 3169200
B/wire 246 Lb 650 Lb 159900
J / wood (3 times) 4.5 Ton 680000 Ton 3060000
5 plywood 40 Shts 15800 Shts 632000
Wire Nail 101 Lb 600 Lb 60600
3/8"Ø Separater 2574 Rft 195 Rft 501930
Ready Mix Concrete G-30 46 m3 84900 m3 3905400
Cement 24 bag 5700 bag 136800
R/Sand 0.44 sud 18000 Sud 7920
R/Shingle 0.89 sud 94000 Sud 83660
H.S.D 18 Gal 3000 Gal 54000
Concrete Admixture 12 Lit 1700 Lit 20400
17824220
HIRE CHARGES
Vibrator 9 Day 15000 Day 135000
Mixer 1 Day 15000 Day 15000
16'ht Arm Frame (င ရမခ) 49 Days 16000 Days 784000
934000
LABOUR CHARGES
Labour (25mm) 135.22 Cwt 16665 Cwt 2253441
Labour (20mm) 24.66 Cwt 16665 Cwt 410959
Labour (10mm) 86.97 Cwt 24165 Cwt 2101630
Labour For Formwork 3366.66 Sft 83200 %Sft 2801061
Labour For Concrete 1676.72 Cft 820 Cft 1374910.4
Curing Work 3756.77 Sft 65 Sft 244190.05
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 2nd FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No
Labour Charges For Scaffolding 7840 Sft 21.1 Sft 165424
9351616

TOTAL 28109836
Say 28102000/-
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 2nd FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No

B/wire 246 Lb 650 Lb 159900


Wire Nail 99 Lb 600 Lb 59400
3/8"Ø Separater 2000 Rft 195 Rft 390000
H.S.D 6 Gal 3000 Gal 18000
627300
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 2nd FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No
1 Labour Charges For Rebar work for
3rd Floor Column (422.86 Cwt)
Labour (25mm) 200.06 Cwt 19995 Cwt 4000200
Labour (20mm) 59.05 Cwt 19995 Cwt 1180705
Labour (10mm) 163.75 Cwt 27495 Cwt 4502306
9683211
Analysis of Rate For 1Cwt For Column
For 20mm Ø + 25mm Ø , Yellow Book Pg (134 ) item ( 12 )
Steel Fixer 1 x 8500 /- 8500/-
worker 1 x 6500 /- 6500/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 ) x3 4995/-
Total 19995/- per cwt
For 10mm Ø, From Yellow Book Pg (135 ) item ( 14 )
Steel Fixer 1.5 x 8500 /- 12750/-
worker 1.5 x 6500 /- 9750/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 ) x3 4995/-
Total 27495/- per cwt
1a Labour Charges For Rebar work for
3rd Floor Stair (49.43 Cwt)
Labour (16mm;20mm;25mm) 36.8 Cwt 16245 Cwt 597816
Labour (10mm) 12.63 Cwt 27495 Cwt 347262
945078
Analysis of Rate For 1Cwt For Column
For16mm; 20mm Ø + 25mm Ø , YB Pg 133 Item (9)
Steel Fixer 0.75 Nox8500/- 6375/-
Worker 0.75 Nox6500/- 4875
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 ) x3 4995/-
Total 16245/- per cwt
For 10mm Ø, From Yellow Book Pg (135 ) item ( 14 )
Steel Fixer 1.5 x 8500 /- 12750/-
worker 1.5 x 6500 /- 9750/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 ) x3 4995/-
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No
Total 27495/- per cwt
2 Labour Charges for 3rd Floor Column Formwork
(7002 Sft)
Labour 7002 Sft 83200 %Sft 5825664
Analysis of Rate For Column Formwork For 100 Sft
From Yellow Book Pg (124 ) item (1 )
Carpenter 6 Nox8500/- 51000/-
Worker2 Nox6500/- 13000/-
64000/-
Dismentling Work (30%) 19200/-
Total 83200/- per % Sft
3 Labour Charges For Ready Mixed G30 concreting work for
3rd Floor Column (2578.00 Cft)
Labour 2288 Cft 820 Cft 1876160
Analysis of Rate
From Yellow Book Pg (31 ) item (6-2c )
Mason 2 Nox8500/- 17000/-
Worker10 Nox6500/- 65000/-
Total 82000/- per %Cft

3a Labour Charges For Ready Mixed G30 concreting work for


Stair (290.28 Cft)
Labour 290.28 Cft 625 Cft 181425
Analysis of Rate
From Yellow Book Pg (30 ) item (6-2a )
Mason 2 Nox8500/- 17000/-
Worker7 Nox6500/- 45500/-
Total 62500/- per %Cft

4 Labour Charges for Curing work


(6275 sft) 6275 sft 65 sft 407875
Analysis of Rate
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No
From Yellow Book Pg (32 ) item (10 ) worker 1 x 6500 /- =6500 /- per %Sft

5 Labour charges for Arm Frame Scaffolding Work for


Column (12960 Sft)
Labour Charges 12960 Sft 21.1 Sft 273456
YGN Rate Book Pg (22 ) item 16-11 )

Total 19192869
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No

Materials Issued (12/2017 M.S Account )


J / wood (3 times) 9.34 Ton
5 plywood 84 Shts
Wire Nail 210 Lb
3/8"Ø Separater 4098 Rft
Ready Mix Concrete G-30 73 m3
H.S.D 16 Gal
25mm Ø M.S Rod 10.76 Ton
20mm Ø M.S Rod 3.27 Ton
16mm Ø M.S Rod 1.5 Ton
10mm Ø M.S Rod 9.26 Ton
B/wire 472 Lb
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No

MATERIAL COST 7.09 Ton 719000 Ton 5097710


25mm Ø M.S Rod 1.3 Ton 719000 Ton 934700
20mm Ø M.S Rod 4.56 Ton 695000 Ton 3169200
10mm Ø M.S Rod 246 Lb 650 Lb 159900
B/wire 4.5 Ton 680000 Ton 3060000
J / wood (3 times) 40 Shts 15800 Shts 632000
5 plywood 101 Lb 600 Lb 60600
Wire Nail 2574 Rft 195 Rft 501930
3/8"Ø Separater 46 m3 84900 m3 3905400
Ready Mix Concrete G-30 24 bag 5700 bag 136800
Cement 0.44 sud 18000 Sud 7920
R/Sand 0.89 sud 94000 Sud 83660
R/Shingle 18 Gal 3000 Gal 54000
H.S.D 12 Lit 1700 Lit 20400
Concrete Admixture 17824220

HIRE CHARGES 9 Day 15000 Day 135000


Vibrator 1 Day 15000 Day 15000
Mixer 49 Days 16000 Days 784000
16'ht Arm Frame (င ရမခ) 934000

LABOUR CHARGES 135.22 Cwt 16665 Cwt 2253441


Labour (25mm) 24.66 Cwt 16665 Cwt 410959
Labour (20mm) 86.97 Cwt 24165 Cwt 2101630
Labour (10mm) 3366.66 Sft 83200 %Sft 2801061
Labour For Formwork 1676.72 Cft 820 Cft 1374910.4
Labour For Concrete 3756.77 Sft 65 Sft 244190.05
Curing Work 7840 Sft 21.1 Sft 165424
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No
Labour Charges For Scaffolding 9351616

TOTAL 28109836
Say 28102000/-
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No

246 Lb 650 Lb 159900


B/wire 99 Lb 600 Lb 59400
Wire Nail 2000 Rft 195 Rft 390000
3/8"Ø Separater 6 Gal 3000 Gal 18000
H.S.D 627300
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 3rd FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 Labour Charges For Re Bar Work For 3rd 10mmØ 25mmØ 20mm
Floor Column
C1 (16 Nos)
Main (20mm) 16 × 8 13' -3'' 1696.00
Stirrup (10mm) 16 × 35 5' -6'' 3080.00
16 × 35 1' -10'' 1026.67
16 × 35 2' -0'' 1120.00
C2 (8Nos)
Main (20mm) 8 × 8 13' -3'' 848.00
Stirrup (10mm) 8 × 35 5' -6'' 1540.00
8 × 35 1' -10'' 513.33
8 × 35 2' -0'' 560.00
C3 (31 Nos)
Main (25mm) 29 × 8 20' -0'' 4640.00
Main (25mm) 1 × 8 10' -9'' 86.00
Main (25mm) 1 × 8 13' -3'' 106.00
Stirrup (10mm) 31 × 62 5' -2'' 9930.33
31 × 96 1' -7'' 4712.00
29 × 17 5' -1'' 2506.08
29 × 34 1' -7'' 1561.17
C4 (20 Nos)
Main (25mm) 11 × 8 21' -0'' 1848.00
Main (25mm) 11 × 4 13' -0'' 572.00
Main (25mm) 1 × 12 13' -0'' 156.00
Main (25mm) 1 × 12 8' -0'' 96.00
Main (25mm) 7 × 8 16' -8'' 933.33
Main (25mm) 7 × 4 8' -0'' 224.00
Stirrup (10mm) 20 × 35 6' -2'' 4316.67
Stirrup (10mm) 20 × 35 5' -2'' 3616.67
20 × 35 4' -2'' 2916.67
18 × 17 5' -1'' 1555.50
18 × 34 1' -7'' 969.00
C5 (6 Nos)
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Main (20mm) 6 × 12 20' -0'' 1440.00
Stirrup (10mm) 6 × 88 6' -10'' 3608.00
Stirrup (10mm) 6 × 88 1' -3'' 660.00
44192.09 8661.33 3984.00

25mm=8661.33Rft x 2.587Lb/Ft 22406Lb 200.06 Cwt


20mm=3984Rft x 1.66Lb/Ft 6613Lb 59.05 Cwt
10mm=44192Rft x 0.415Lb/Ft 18340Lb 163.75 Cwt
422.86 Cwt
1a Re Bar Work For Stair
16mmØ 10mmØ
Side Stair, 3rd Floor 2 x 16 13' -3'' 424 Rft
Side Stair, 3rd Floor 2 x 16 17' -0'' 544 Rft
Side Stair, 3rd Floor 2 x 16 7' -0'' 224 Rft
Landing 2 x 16 13' -0'' 416 Rft
Landing 2 x 16 28' -0'' 896 Rft
Landing 4 x 16 7' -0'' 448 Rft
Landing 4 x 2 8' -0'' 64 Rft
Distribution Bar 4 × 52 6' -0'' 1248 Rft
Distribution Bar 2 x 20 12' -6'' 500 Rft

Landing Beam 20mm 25mm


10mmØ Stirrup 2 x 44 5' -9'' 506 Rft

Top 25mm 2 x 2 15' -6'' 62' Rft


2 x 10 7' -3'' 145' Rft
Spacer Bar 2 x 6 0' -9'' 9' Rft
Bottom Bar 20mm 2 x 7 15' -6'' 217' Rft
10mmØ Dowel Col&Ver; 55 x 14 1' -6'' 1155 Rft
217' 216' 3016 3409 Rft
10mm Ø 3409 Rft×0.415 Lb 1414.74 12.63 Cwt
16mm Ø 3016 Rft×1.062 Lb 3203 28.6 Cwt
20mm Ø 217 Rft×1.66 Lb 360.22 3.21 Cwt
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
25mm Ø 216 Rft×2.587 Lb 558.8 4.99 Cwt
49.43 Cwt
2 Labour Charges For Form Work For 3rd Floor
Column

C1 16 × 1 6' -0'' 12' -0'' 1152.00 Sft


C2 8 × 1 6' -0'' 12' -0'' 576.00 Sft
C3 31 × 1 6' -8'' 12' -0'' 2480.00 Sft
C4 20 × 1 6' -8'' 12' -0'' 1600.00 Sft
C5 6 × 1 9' -0'' 12' -0'' 648.00 Sft
Formwork For Stair
Flight 2 x 1 14' -0'' 5' -3'' 147.00 Sft
Step 28 x 1 5' -3'' 0' -6'' 73.50 Sft
landing 2 x 1 6' -3'' 11' -0'' 137.50 Sft
LB 2 x 1 4' -8'' 11' -0'' 102.67 Sft
Side Cover 2 x 2 14' -3'' 1' -6'' 85.50 Sft
7002.17 Sft
3 Labour Charges For Ready mixed G30 Concreting Work
For 3rd Floor Column
C1 16 × 1 1' -4'' 1' -6'' 12' -0'' 384.00 Cft
C2 8 × 1 1' -4'' 1' -6'' 12' -0'' 192.00 Cft
C3 31 × 1 1' -4'' 1' -10'' 12' -0'' 909.33 Cft
C4 20 × 1 1' -4'' 1' -10'' 12' -0'' 586.67 Cft
C5 6 × 1 3' -0'' 1' -0'' 12' -0'' 216.00 Cft
2288.00 Cft
For Stair (2 nos) 2 x 1 15' -1'' 5' -3'' 0' -9'' 118.78
step 28 x 1 5' -3'' 0' -6'' 0' -6'' 36.75
landing 2 x 1 5' -6'' 11' -0'' 0' -9'' 90.75
LB 2 x 1 11' -0'' 1' -0'' 2' -0'' 44.00
290.28 Cft
Total 2578.28 Cft
Say 2578.00 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

6 Labour Charges For Curing Work For Column


C1 16 × 1 5' -8'' 12' -0'' 1088.00 Sft
C2 8 × 1 5' -8'' 12' -0'' 544.00 Sft
C3 31 × 1 6' -0'' 12' -0'' 2232.00 Sft
C4 20 × 1 6' -0'' 12' -0'' 1440.00 Sft
C5 6 × 1 8' -0'' 12' -0'' 576.00 Sft
For Stair
2 x 1 5' -3'' 17' -9'' 186.38 sft
landing 2 x 1 5' -6'' 11' -0'' 121.00 sft
LB 2 x 1 11' -0'' 4' -0'' 88.00 sft
6275.38 sft
Say 6275.00 sft
4 Labour Charges For Arm Frame Scaffolding Work
For Column
81 × 2 5' -0'' 16' -0'' 12960.00 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

3 (1:1½:3) Concreting Work


For Ground Floor Column
C1 16 × 1 1' -4'' 1' -6'' 10' -0'' 320.00 Cft
C2 8 × 1 1' -4'' 1' -6'' 10' -0'' 160.00 Cft
C3 31 × 1 1' -4'' 1' -10'' 10' -0'' 757.78 Cft
C3 29 × 1 1' -4'' 1' -10'' 6' -4'' 448.96 Cft
C4 20 × 1 1' -4'' 1' -10'' 10' -0'' 488.89 Cft
C4 18 × 1 1' -4'' 1' -10'' 6' -4'' 278.67 Cft
C5 6 × 1 3' -0'' 1' -0'' 10' -0'' 180.00 Cft
C5 6 × 1 3' -0'' 1' -0'' 6' -4'' 114.00 Cft
2748.30 Cft

4 Curing Work For Column


C1 16 × 1 5' -8'' 12' -0'' 1088.00 Sft
C2 8 × 1 5' -8'' 12' -0'' 544.00 Sft
C3 31 × 1 6' -0'' 12' -0'' 2232.00 Sft
C3 29 × 1 5' -4'' 6' -4'' 979.56 Sft
C4 20 × 1 6' -0'' 12' -0'' 1440.00 Sft
C4 18 × 1 5' -4'' 6' -4'' 608.00 Sft
C5 6 × 1 8' -0'' 12' -0'' 576.00 Sft
7467.56 Sft

4 Curing Work For Column


C1 16 × 1 5' -8'' 10' -0'' 906.67 Sft
C2 8 × 1 5' -8'' 10' -0'' 453.33 Sft
C3 31 × 1 6' -0'' 10' -0'' 1860.00 Sft
C4 20 × 1 6' -0'' 10' -0'' 1200.00 Sft
C5 6 × 1 8' -0'' 10' -0'' 480.00 Sft
81 4900.00 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

×
×
×
×
×
×
×
×
×
×
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING
Name of work - 3rd Floor To Roof Column
DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
Total of

c
Total of
Total of

2578.28
Total of

#REF!
Total of
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 3rd Floor To Roof Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 Re Bar Work For 3rd 10mmØ 25mmØ 20mm
Floor Column
C1 (16 Nos)
Main (20mm) 16 × 8 13' -3'' 1696.00
Stirrup (10mm) 16 × 35 5' -6'' 3080.00
16 × 35 1' -10'' 1026.67
16 × 35 2' -0'' 1120.00

C2 (8Nos)
Main (20mm) 8 × 8 13' -3'' 848.00
Stirrup (10mm) 8 × 35 5' -6'' 1540.00
8 × 35 1' -10'' 513.33
8 × 35 2' -0'' 560.00

C3 (31 Nos)
Main (25mm) 29 × 8 20' -0'' 4640.00
Main (25mm) 1 × 8 10' -9'' 86.00
Main (25mm) 1 × 8 13' -3'' 106.00
Stirrup (10mm) 31 × 62 5' -2'' 9930.33
31 × 96 1' -7'' 4712.00
29 × 17 5' -1'' 2506.08
29 × 34 1' -7'' 1561.17
C4 (20 Nos)
Main (25mm) 11 × 8 21' -0'' 1848.00
Main (25mm) 11 × 4 13' -0'' 572.00
Main (25mm) 1 × 12 13' -0'' 156.00
Main (25mm) 1 × 12 8' -0'' 96.00
Main (25mm) 7 × 8 16' -8'' 933.33
Main (25mm) 7 × 4 8' -0'' 224.00
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 3rd Floor To Roof Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Stirrup (10mm) 20 × 35 6' -2'' 4316.67
Stirrup (10mm) 20 × 35 5' -2'' 3616.67
20 × 35 4' -2'' 2916.67
18 × 17 5' -1'' 1555.50
18 × 34 1' -7'' 969.00
C5 (6 Nos)
Main (20mm) 6 × 12 20' -0'' 1440.00
Stirrup (10mm) 6 × 88 6' -10'' 3608.00
Stirrup (10mm) 6 × 88 1' -3'' 660.00
44192.09 8661.33 3984.00

25mm=8661.33Rft x 2.587Lb/Ft 22406Lb 200.06 Cwt


20mm=3984Rft x 1.66Lb/Ft 6613Lb 59.05 Cwt
10mm=44192Rft x 0.415Lb/Ft 18340Lb 163.75 Cwt
422.86 Cwt
1a Re Bar Work For Stair
16mmØ 10mmØ
Side Stair, 3rd Floor 2 x 16 13' -3'' 424 Rft
Side Stair, 3rd Floor 2 x 16 17' -0'' 544 Rft
Side Stair, 3rd Floor 2 x 16 7' -0'' 224 Rft
Landing 2 x 16 13' -0'' 416 Rft
Landing 2 x 16 28' -0'' 896 Rft
Landing 4 x 16 7' -0'' 448 Rft
Landing 4 x 2 8' -0'' 64 Rft
Distribution Bar 4 × 52 6' -0'' 1248 Rft
Distribution Bar 2 x 20 12' -6'' 500 Rft

Landing Beam 20mm 25mm


10mmØ Stirrup 2 x 44 5' -9'' 506 Rft

Top 25mm 2 x 2 15' -6'' 62' Rft


2 x 10 7' -3'' 145' Rft
Spacer Bar 2 x 6 0' -9'' 9' Rft
Bottom Bar 20mm 2 x 7 15' -6'' 217' Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 3rd Floor To Roof Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

10mmØ Dowel Col&Ver; 55 x 14 1' -6'' 1155 Rft


217' 216' 3016 3409 Rft

10mm Ø 3409 Rft×0.415 Lb 1414.74 12.63 Cwt


16mm Ø 3016 Rft×1.062 Lb 3203 28.6 Cwt
20mm Ø 217 Rft×1.66 Lb 360.22 3.21 Cwt
25mm Ø 216 Rft×2.587 Lb 558.8 4.99 Cwt
49.43 Cwt

2 Form Work For 3rd Floor To


Roof Column

C1 16 × 1 6' -0'' 12' -0'' 1152.00 Sft


C2 8 × 1 6' -0'' 12' -0'' 576.00 Sft
C3 31 × 1 6' -8'' 12' -0'' 2480.00 Sft
C3 29 × 1 5' -8'' 6' -4'' 1040.78 Sft
C4 20 × 1 6' -8'' 12' -0'' 1600.00 Sft
C4 18 × 1 5' -8'' 6' -4'' 646.00 Sft
C5 6 × 1 9' -0'' 12' -0'' 648.00 Sft
Formwork For Stair
Flight 3 x 1 14' -0'' 5' -3'' 220.50 Sft
Step 36 x 1 5' -3'' 0' -6'' 94.50 Sft
landing 3 x 1 6' -3'' 11' -0'' 206.25 Sft
2 x 1 4' -0'' 5' -3'' 42.00 Sft
1 x 1 2' -6'' 5' -3'' 13.13 Sft
LB 3 x 1 4' -7'' 11' -0'' 151.25 Sft
Side Cover 3 x 2 14' -0'' 1' -6'' 126.00
8996.41 Sft
8996 Sft

3/8" Seperator For Formwork


C1 16 x 14 0' -20'' 373 Ft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 3rd Floor To Roof Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
16 x 14 0' -22'' 411 Ft
C2 8 x 14 0' -20'' 187 Ft
8 x 14 0' -22'' 205.33 ft
C3 31 x 14 0' -20'' 723.33 ft
31 x 14 0' -24'' 868.00 ft
C4 14 x 14 0' -20'' 326.67 ft
14 x 14 0' -24'' 392.00 ft
6 x 10 0' -20'' 100.00 ft
6 x 10 0' -24'' 120.00 ft
C5 6 x 14 0' -40'' 280.00 ft
6 x 14 0' -16'' 112.00 ft
4098.00 ft

3 Ready mixed G30 Concreting Work


For 3rd Floor Column
C1 16 × 1 1' -4'' 1' -6'' 12' -0'' 384.00 Cft
C2 8 × 1 1' -4'' 1' -6'' 12' -0'' 192.00 Cft
C3 31 × 1 1' -4'' 1' -10'' 12' -0'' 909.33 Cft
C3 29 × 1 1' -4'' 1' -4'' 6' -4'' 326.52 Cft
C4 18 × 1 1' -4'' 1' -4'' 6' -4'' 202.67 Cft
C4 20 × 1 1' -4'' 1' -10'' 12' -0'' 586.67 Cft
C5 6 × 1 3' -0'' 1' -0'' 12' -0'' 216.00 Cft
2817.19 Cft
Ready mixed G30 Concreting Work
For Stair (3 nos) 2 x 1 14' -0'' 5' -3'' 0' -9'' 110.25
step 36 x 1.0 5' -3'' 0' -6'' 0' -6'' 47.25
landing 2 x 1 5' -6'' 11' -0'' 0' -9'' 90.75
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 3rd Floor To Roof Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
LB 2 x 1 11' -0'' 1' -0'' 2' -0'' 44.00
292.25 Cft
Total 3109.44 Cft
4 Arm Frame Scaffolding Work For Column
81 × 2 5' -0'' 16' -0'' 12960.00 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 3rd Floor To Roof Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 3rd Floor To Roof Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 3rd Floor To Roof Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 3rd Floor To Roof Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 3rd Floor To Roof Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

3 (1:1½:3) Concreting Work


For Ground Floor Column
C1 16 × 1 1' -4'' 1' -6'' 10' -0'' 320.00 Cft
C2 8 × 1 1' -4'' 1' -6'' 10' -0'' 160.00 Cft
C3 31 × 1 1' -4'' 1' -10'' 10' -0'' 757.78 Cft
C3 29 × 1 1' -4'' 1' -10'' 6' -4'' 448.96 Cft
C4 20 × 1 1' -4'' 1' -10'' 10' -0'' 488.89 Cft
C4 18 × 1 1' -4'' 1' -10'' 6' -4'' 278.67 Cft
C5 6 × 1 3' -0'' 1' -0'' 10' -0'' 180.00 Cft
C5 6 × 1 3' -0'' 1' -0'' 6' -4'' 114.00 Cft
2748.30 Cft

4 Curing Work For Column


C1 16 × 1 5' -8'' 12' -0'' 1088.00 Sft
C2 8 × 1 5' -8'' 12' -0'' 544.00 Sft
C3 31 × 1 6' -0'' 12' -0'' 2232.00 Sft
C3 29 × 1 5' -4'' 6' -4'' 979.56 Sft
C4 20 × 1 6' -0'' 12' -0'' 1440.00 Sft
C4 18 × 1 5' -4'' 6' -4'' 608.00 Sft
C5 6 × 1 8' -0'' 12' -0'' 576.00 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 3rd Floor To Roof Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
7467.56 Sft

4 Curing Work For Column


C1 16 × 1 5' -8'' 10' -0'' 906.67 Sft
C2 8 × 1 5' -8'' 10' -0'' 453.33 Sft
C3 31 × 1 6' -0'' 10' -0'' 1860.00 Sft
C4 20 × 1 6' -0'' 10' -0'' 1200.00 Sft
C5 6 × 1 8' -0'' 10' -0'' 480.00 Sft
81 4900.00 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 3rd Floor To Roof Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 2nd FLOOR COLUMN

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

1 Rebar work for 2nd Floor Column


(375.31 Cwt)
25mm Ø M.S Rod 9.84 Ton 797000 Ton 7842480
20mm Ø M.S Rod 3.03 Ton 797000 Ton 2414910
10mm Ø M.S Rod 6.84 Ton 695000 Ton 4753800
B/Wire 375 Lb 650 Lb 243750
Labour (25mm) 187.42 Cwt 18330 Cwt 3435409
Labour (20mm) 57.63 Cwt 18330 Cwt 1056358
Labour (10mm) 130.26 Cwt 25830 Cwt 3364616
23111322
1a Rebar work for 2nd Floor Stair
(70.87 Cwt)
25mm Ø M.S Rod 0.39 Ton 797000 Ton 310830
20mm Ø M.S Rod 0.25 Ton 797000 Ton 199250
16mm Ø M.S Rod 2.2 Ton 695000 Ton 1529000
10mm Ø M.S Rod 0.88 Ton 695000 Ton 611600
B/Wire 71 Lb 650 Lb 46150
Labour (25mm To 16mm) 54.15 Cwt 14580 Cwt 789507
Labour (10mm) 16.72 Cwt 25830 Cwt 431878
3918215
2 Formwork For 2nd Floor Column
(6233 Sft)
J / wood (3 times) 8.31 Ton 680000 Ton 5650800
5 plywood 74 Shts 15800 Shts 1169200
Wire Nail 187 Lb 600 Lb 112200
3/8"Ø Separater 4098 Rft 195 Rft 799110
Labour 6233 Sft 83200 %Sft 5185856
12917166
3 (G-30) Concreting Work For
2nd Floor Column ( 2357.52Cft)
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 2nd FLOOR COLUMN

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

Ready Mixed Concrete 67 m3 84900 m3 5688300


H.S.D 12 Gal 3000 Gal 36000
Vibrator 6 Day 15000 Day 90000
Labour For Column 1906.67 Cft 820 Cft 1563469
Labour For Stair 450.85 Cft 625 Cft 281781
Curing Work 4900 Sft 65 Sft 318500
7978051
4 Arm Frame Scaffolding Work for
Column Fixing Work (12960 Sft)
16'ht Arm Frame (င ရမခ) 81 Days 16000 Days 1296000
Labour Charges 12960 Sft 21.1 Sft 273456
1569456
Total 49494210
Say 49494000/-

MATERIAL COST
25mm Ø M.S Rod 10.23 Ton 797000 Ton 8153310
20mm Ø M.S Rod 3.28 Ton 797000 Ton 2614160
16mm Ø M.S Rod 2.2 Ton 695000 Ton 1529000
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 2nd FLOOR COLUMN

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

10mm Ø M.S Rod 7.72 Ton 695000 Ton 5365400


B/Wire 446 Lb 650 Lb 289900
J / wood (3 times) 8.31 Ton 680000 Ton 5650800
5 plywood 74 Shts 15800 Shts 1169200
Wire Nail 187 Lb 600 Lb 112200
3/8"Ø Separater 4098 Rft 195 Rft 799110
Ready Mixed Concrete 67 m3 84900 m3 5688300
H.S.D 12 Gal 3000 Gal 36000
31407380
Hire Charg For Vibrator 6 Day 15000 Day 90000
16'ht Arm Frame (င ရမခ) 81 Days 16000 Days 1296000
1386000
LABOUR CHARGES
Labour (25mm-20mm) 245.05 Cwt 18330 Cwt 4491767
Labour (25mm -16mm) 54.15 Cwt 14580 Cwt 789507
Labour (10mm) 146.98 Cwt 25830 Cwt 3796493
Labour For Form Work 6233 Sft 83200 %Sft 5185856
Labour For Concreting 1906.67 Cft 820 Cft 1563469
Labour For Stair 450.85 Cft 625 Cft 281781
Curing Work 4900 Sft 65 Sft 318500
Labour Charges For Scaffolding 12960 Sft 21.1 Sft 273456
16700830
49494210
Say 49494000/-
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 2nd Floor To 3rd Floor Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 Re Bar Work For 2nd 10mmØ 25mmØ 20mm
Floor To 3rd Floor Column
C1 (16 Nos)
Main (20mm) 16 × 8 13' -8'' 1749.33
Stirrup (10mm) 16 × 32 5' -6'' 2816.00
16 × 32 1' -10'' 938.67
16 × 32 2' -0'' 1024.00

C2 (8Nos)
Main (20mm) 8 × 8 13' -8'' 874.67
8 × 4 8' -0'' 256.00
Stirrup (10mm) 8 × 32 5' -6'' 1408.00
8 × 32 1' -10'' 469.33
8 × 32 2' -0'' 512.00

C3 (31 Nos)
Main (25mm) 17 × 8 14' -3'' 1938.00
14 × 8 20' -0'' 2240.00
Stirrup (10mm) 31 × 64 5' -2'' 10250.67

31 × 96 1' -7'' 4712.00


C4 (20 Nos)
Main (25mm) 12 × 12 14' -0'' 2016.00
8 × 12 20' -0'' 1920.00
Stirrup (10mm) 20 × 32 6' -2'' 3946.67
20 × 32 5' -2'' 3306.67
20 × 32 4' -2'' 2666.67

C5 (6 Nos)
Main (20mm) 6 × 12 14' -0'' 1008.00
Stirrup (10mm) 6 × 64 6' -10'' 2624.00
6 × 64 1' -3'' 480.00
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 2nd Floor To 3rd Floor Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

35154.68 8114 3888.00

25mm=8114Rft x 2.587Lb/Ft 20991Lb 187.42 Cwt


20mm=3888Rft x 1.66Lb/Ft 6454Lb 57.63 Cwt
10mm=35154Rft x 0.415Lb/Ft 14589Lb 130.26 Cwt
375.31 Cwt
1a Re Bar Work For Stair
16mmØ 10mmØ

Side Stair, 2nd Floor 2 x 16 13' -3'' 424 Rft


Side Stair, 2nd Floor 2 x 16 17' -0'' 544 Rft
Side Stair, 2nd Floor 2 x 16 7' -0'' 224 Rft
Landing 2 x 16 13' -0'' 416 Rft
Landing 2 x 16 28' -0'' 896 Rft
Landing 4 x 16 7' -0'' 448 Rft
Landing 4 x 2 8' -0'' 64 Rft
Distribution Bar 4 × 52 6' -0'' 1248 Rft
Distribution Bar 2 x 20 12' -6'' 500 Rft
Main Stair
First Floor 1 x 16 13' -3'' 212 Rft
First Floor 1 x 16 17' -0'' 272 Rft
Landing 1 x 16 13' -0'' 208 Rft
Landing 1 x 16 28' -0'' 448 Rft
Landing 2 x 16 7' -0'' 224 Rft
Landing 2 x 2 8' -0'' 32 Rft
Distribution Bar 2 x 48 6' -0'' 576 Rft
Distribution Bar 2 x 11 12' -6'' 275 Rft
Landing Beam 20mm 25mm

10mmØ Stirrup 3 x 44 5' -9'' 759 Rft

Top 25mm 3 x 2 15' -6'' 93' Rft


Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 2nd Floor To 3rd Floor Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
3 x 10 7' -3'' 218' Rft
Bottom Bar 20mm 3 x 7 15' -6'' 326' Rft
10mmØ Dowel Col&Ver; 55 x 14 1' -6'' 1155 Rft

326' 311' 4412 4513 Rft

10mm Ø 4513 Rft×0.415 Lb 1782.9 16.72 Cwt


16mm Ø 4412 Rft×1.062 Lb 4685.54 41.84 Cwt
20mm Ø 326 Rft×1.66 Lb 541 4.83 Cwt
25mm Ø 324 Rft×2.587 Lb 838 7.48 Cwt
70.87 Cwt
2 Form Work For 2nd Floor To
3rd Floor Column

C1 16 × 1 6' -0'' 10' -0'' 960.00 Sft


C2 8 × 1 6' -0'' 10' -0'' 480.00 Sft
C3 31 × 1 6' -8'' 10' -0'' 2066.67 Sft
C4 20 × 1 6' -8'' 10' -0'' 1333.33 Sft
C5 6 × 1 9' -0'' 10' -0'' 540.00 Sft
Formwork For Stair
Flight 3 x 1 14' -0'' 5' -3'' 220.50 Sft
Step 36 x 1 5' -3'' 0' -6'' 94.50 Sft
landing 3 x 1 6' -3'' 11' -0'' 206.25 Sft
2 x 1 4' -0'' 5' -3'' 42.00 Sft
1 x 1 2' -6'' 5' -3'' 13.13 Sft
LB 3 x 1 4' -7'' 11' -0'' 151.25 Sft
Side Cover 3 x 2 14' -0'' 1' -6'' 126.00
6233.63 Sft
6233 Sft
3/8" Seperator For Formwork
C1 16 x 14 0' -20'' 373 Ft
16 x 14 0' -22'' 411 Ft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 2nd Floor To 3rd Floor Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
C2 8 x 14 0' -20'' 187 Ft
8 x 14 0' -22'' 205.33 ft
C3 31 x 14 0' -20'' 723.33 ft
31 x 14 0' -24'' 868.00 ft
C4 14 x 14 0' -20'' 326.67 ft
14 x 14 0' -24'' 392.00 ft
6 x 10 0' -20'' 100.00 ft
6 x 10 0' -24'' 120.00 ft
C5 6 x 14 0' -40'' 280.00 ft
6 x 14 0' -16'' 112.00 ft
4098.00 ft
3 Ready mixed G30 Concreting Work
For 2nd Floor Column
C1 16 × 1 1' -4'' 1' -6'' 10' -0'' 320.00 Cft
C2 8 × 1 1' -4'' 1' -6'' 10' -0'' 160.00 Cft
C3 31 × 1 1' -4'' 1' -10'' 10' -0'' 757.78 Cft
C4 20 × 1 1' -4'' 1' -10'' 10' -0'' 488.89 Cft
C5 6 × 1 3' -0'' 1' -0'' 10' -0'' 180.00 Cft
1906.67 Cft
Ready mixed G30 Concreting Work
For Stair (3 nos) 3 x 1 14' -0'' 5' -3'' 0' -9'' 165.38
step 36 x 0.5 5' -3'' 1' -0'' 0' -6'' 47.25
landing 3 x 1 5' -6'' 11' -0'' 0' -9'' 136.13
2 x 1 3' -6'' 5' -3'' 0' -9'' 27.56
1 x 1 2' -2'' 5' -3'' 0' -9'' 8.53
LB 3 x 1 11' -0'' 1' -0'' 2' -0'' 66.00
450.85 Cft
Total 2357.52 Cft
4 Arm Frame Scaffolding Work For Column
81 × 2 5' -0'' 16' -0'' 12960.00 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 2nd Floor To 3rd Floor Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

1 Labour Charges For Re Bar Work For 2nd 10mmØ 25mmØ 20mm
Floor To 3rd Floor Column
C1 (16 Nos)
Main (20mm) 16 × 8 13' -8'' 1749.33
Stirrup (10mm) 16 × 32 5' -6'' 2816.00
16 × 32 1' -10'' 938.67
16 × 32 2' -0'' 1024.00
C2 (8Nos)
Main (20mm) 8 × 8 13' -8'' 874.67
8 × 4 8' -0'' 256.00
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 2nd Floor To 3rd Floor Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Stirrup (10mm) 8 × 32 5' -6'' 1408.00
8 × 32 1' -10'' 469.33
8 × 32 2' -0'' 512.00
C3 (31 Nos)
Main (25mm) 17 × 8 14' -3'' 1938.00
14 × 8 20' -0'' 2240.00
Stirrup (10mm) 31 × 64 5' -2'' 10250.67

31 × 96 1' -7'' 4712.00


C4 (20 Nos)
Main (25mm) 12 × 12 14' -0'' 2016.00
8 × 12 20' -0'' 1920.00
Stirrup (10mm) 20 × 32 6' -2'' 3946.67
20 × 32 5' -2'' 3306.67
20 × 32 4' -2'' 2666.67
C5 (6 Nos)
Main (20mm) 6 × 12 14' -0'' 1008.00
Stirrup (10mm) 6 × 64 6' -10'' 2624.00
6 × 64 1' -3'' 480.00
35154.68 8114 3888.00
25mm=8114Rft x 2.587Lb/Ft 20991Lb 187.42 Cwt
20mm=3888Rft x 1.66Lb/Ft 6454Lb 57.63 Cwt
10mm=35154Rft x 0.415Lb/Ft 14589Lb 130.26 Cwt
375.31 Cwt
2 Labour Charges For Re Bar Work For Stair
16mmØ 10mmØ

Side Stair, 2nd Floor 2 x 16 13' -3'' 424 Rft


Side Stair, 2nd Floor 2 x 16 17' -0'' 544 Rft
Side Stair, 2nd Floor 2 x 16 7' -0'' 224 Rft
Landing 2 x 16 13' -0'' 416 Rft
Landing 2 x 16 28' -0'' 896 Rft
Landing 4 x 16 7' -0'' 448 Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 2nd Floor To 3rd Floor Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Landing 4 x 2 8' -0'' 64 Rft
Distribution Bar 4 × 52 6' -0'' 1248 Rft
Distribution Bar 2 x 20 12' -6'' 500 Rft
Main Stair
First Floor 1 x 16 13' -3'' 212 Rft
First Floor 1 x 16 17' -0'' 272 Rft
Landing 1 x 16 13' -0'' 208 Rft
Landing 1 x 16 28' -0'' 448 Rft
Landing 2 x 16 7' -0'' 224 Rft
Landing 2 x 2 8' -0'' 32 Rft
Distribution Bar 2 x 48 6' -0'' 576 Rft
Distribution Bar 2 x 11 12' -6'' 275 Rft
Landing Beam 20mm 25mm

10mmØ Stirrup 3 x 44 5' -9'' 759 Rft

Top 25mm 3 x 2 15' -6'' 93' Rft


3 x 10 7' -3'' 218' Rft
Spacer Bar 3 x 6 0' -9'' 14' Rft
Bottom Bar 20mm 3 x 7 15' -6'' 326' Rft
10mmØ Dowel Col&Ver; 55 x 14 1' -6'' 1155 Rft

326' 324' 4412 4513 Rft

10mm Ø 4513 Rft×0.415 Lb 1782.9 16.72 Cwt


16mm Ø 4412 Rft×1.062 Lb 4685.54 41.84 Cwt
20mm Ø 326 Rft×1.66 Lb 541 4.83 Cwt
25mm Ø 324 Rft×2.587 Lb 838 7.48 Cwt
70.87 Cwt
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 2nd Floor To 3rd Floor Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

1 Labour Charges For Form Work For 2nd Floor To


3rd Floor Column
C1 16 × 1 6' -0'' 10' -0'' 960.00 Sft
C2 8 × 1 6' -0'' 10' -0'' 480.00 Sft
C3 31 × 1 6' -8'' 10' -0'' 2066.67 Sft
C4 20 × 1 6' -8'' 10' -0'' 1333.33 Sft
C5 6 × 1 9' -0'' 10' -0'' 540.00 Sft
Formwork For Stair
Flight 3 x 1 14' -0'' 5' -3'' 220.50 Sft
Step 36 x 1 5' -3'' 0' -6'' 94.50 Sft
landing 3 x 1 6' -3'' 11' -0'' 206.25 Sft
2 x 1 4' -0'' 5' -3'' 42.00 Sft
1 x 1 2' -6'' 5' -3'' 13.13 Sft
LB 3 x 1 4' -7'' 11' -0'' 151.25 Sft
Side Cover 3 x 2 14' -0'' 1' -6'' 126.00
6233.63 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 2nd Floor To 3rd Floor Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
6233 Sft
2 Labour Charges For Ready mixed G30 Concreting Work
For 2nd Floor Column
C1 16 × 1 1' -4'' 1' -6'' 10' -0'' 320.00 Cft
C2 8 × 1 1' -4'' 1' -6'' 10' -0'' 160.00 Cft
C3 31 × 1 1' -4'' 1' -10'' 10' -0'' 757.78 Cft
C4 20 × 1 1' -4'' 1' -10'' 10' -0'' 488.89 Cft
C5 6 × 1 3' -0'' 1' -0'' 10' -0'' 180.00 Cft
1906.67 Cft
3 Ready mixed G30 Concreting Work
For Stair (3 nos) 3 x 1 14' -0'' 5' -3'' 0' -9'' 165.38
step 36 x 0.5 5' -3'' 1' -0'' 0' -6'' 47.25
landing 3 x 1 5' -6'' 11' -0'' 0' -9'' 136.13
2 x 1 3' -6'' 5' -3'' 0' -9'' 27.56
1 x 1 2' -2'' 5' -3'' 0' -9'' 8.53
LB 3 x 1 11' -0'' 1' -0'' 2' -0'' 66.00
450.85 Cft
Total 2357.52 Cft
4 Curing Work For Column
C1 16 × 1 5' -8'' 10' -0'' 906.67 Sft
C2 8 × 1 5' -8'' 10' -0'' 453.33 Sft
C3 31 × 1 6' -0'' 10' -0'' 1860.00 Sft
C4 20 × 1 6' -0'' 10' -0'' 1200.00 Sft
C5 6 × 1 8' -0'' 10' -0'' 480.00 Sft
4900 Sft
5 Arm Frame Scaffolding Work For Column
81 × 2 5' -0'' 16' -0'' 12960.00 Sft
6 Hire Charges For
Ready Mixed (G30) Concreting
work for 1st floor Column &
Stair(2357.52 Cft)
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 2nd Floor To 3rd Floor Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Vibrator 6 Day
16' Ht Arm Frame 81 Day

Line F,GB5 1 × 1 8' -8'' 5' -8'' 49.11 Sft


GB3 4 × 1 18' -8'' 4' -10'' 360.89 Sft
GB3 1 × 1 6' -8'' 4' -10'' 32.22 Sft
GB3 1 × 1 8' -8'' 4' -10'' 41.89 Sft
GB3 1 × 1 4' -6'' 4' -10'' 21.75 Sft
Column C1,C2 20 × 1 6' -0'' 2' -0'' 240 Sft
C3,C4 29 × 1 6' -8'' 2' -0'' 386.67 Sft
C5 6 × 1 9' -0'' 2' -0'' 108 Sft
56429.1 Sft

Say 7341 Sft

3 (1:1½:3) RC Concreting
Work For Ground Beam
Line 1,3,4,5,6,8
GB2 6 × 2 6' -4'' 1' -0'' 1' -6'' 114 Cft
GB1 6 × 2 22' -8'' 1' -0'' 2' -0'' 544 Cft
GB2a 6 × 1 8' -2'' 1' -0'' 1' -6'' 73.5 Cft
Line7 ,GB2 1 × 2 6' -4'' 1' -0'' 1' -6'' 19 Cft
GB1 1 × 1 22' -8'' 1' -0'' 2' -0'' 45.33 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 2nd Floor To 3rd Floor Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
GB1 1 × 1 10' -2'' 1' -0'' 2' -0'' 20.33 Cft
GB2a 1 × 1 8' -2'' 1' -0'' 1' -6'' 12.25 Cft
Line2 ,GB2 1 × 1 6' -4'' 1' -0'' 1' -6'' 9.5 Cft
GB1 1 × 1 22' -8'' 1' -0'' 2' -0'' 45.33 Cft
SB1 2 × 1 23' -6'' 0' -9'' 1' -6'' 52.88 Cft
Lift Pit,GB1 2 × 1 9' -6'' 1' -0'' 2' -0'' 38 Cft
Portico,GB1 3 × 1 20' -6'' 1' -0'' 2' -0'' 123 Cft
Portico,GB1 3 × 1 10' -6'' 1' -0'' 2' -0'' 63 Cft
GB4 4 × 1 8' -8'' 1' -0'' 1' -8'' 57.78 Cft
GB4 2 × 1 18' -8'' 1' -0'' 1' -8'' 62.22 Cft
Line A,G GB4 2 × 5 18' -8'' 1' -0'' 1' -8'' 311.11 Cft
Line A,G GB4 2 × 1 8' -8'' 1' -0'' 1' -8'' 28.89 Cft
Line A,G GB4 2 × 1 4' -4'' 1' -0'' 1' -8'' 14.44 Cft
Line B,G GB3 2 × 5 18' -8'' 1' -0'' 1' -8'' 311.11 Cft
Line B,G GB3 2 × 1 8' -8'' 1' -0'' 1' -8'' 28.89 Cft
Line B,G GB3 2 × 1 4' -4'' 1' -0'' 1' -8'' 14.44 Cft
SB1 2 × 1 19' -0'' 0' -9'' 1' -6'' 42.75 Cft
SB1 1 × 1 10' -0'' 0' -9'' 1' -6'' 11.25 Cft
LineC ,GB1 1 × 1 8' -10'' 1' -0'' 2' -0'' 17.67 Cft
LineC ,GB1 2 × 1 6' -1'' 1' -0'' 2' -0'' 24.33 Cft
LineD ,GB3 5 × 1 18' -8'' 1' -0'' 1' -8'' 155.56 Cft
LineD ,GB3 1 × 1 4' -4'' 1' -0'' 1' -8'' 7.22 Cft
GB1 1 × 1 8' -8'' 1' -0'' 2' -0'' 17.33 Cft
LineF ,GB5 1 × 1 8' -8'' 1' -2'' 2' -0'' 20.22 Cft
GB3 4 × 1 18' -8'' 1' -0'' 1' -8'' 124.44 Cft
GB3 1 × 1 6' -8'' 1' -0'' 1' -8'' 11.11 Cft
GB3 1 × 1 8' -8'' 1' -0'' 1' -8'' 14.44 Cft
GB3 1 × 1 4' -4'' 1' -0'' 1' -8'' 7.22 Cft
Column C1,C2 20 × 1 1' -4'' 1' -6'' 2' -0'' 80 Cft
C3,C4 29 × 1 1' -4'' 1' -10'' 2' -0'' 141.78 Cft
C5 6 × 1 3' -0'' 1' -0'' 2' -0'' 36 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 2nd Floor To 3rd Floor Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
2700.32 Cft
Say 2700.00 Cft

4 Earth Filling & Sand Filling


Work For Ground Floor
9 × 1 19' -0'' 23' -6'' 2' 7½ 10548.6 Cft
Deduction, GB1 1 × 1 23' -6'' 1' -0'' 1' 7½ 38.18 Cft
SB1 2 × 1 23' -6'' 0' -9'' 1' 1½ 39.65 Cft
SB1 2 × 1 19' -0'' 0' -9'' 1' 1½ 32.06 Cft
SB1 1 × 1 9' -0'' 0' -9'' 1' 1½ 7.59 Cft
10 × 1 19' -0'' 7' -0'' 2' 7½ 3491.25 Cft
Deduction, GB2 1 × 1 7' -0'' 1' -0'' 1' 3½ 9.03 Cft
5 × 1 19' -0'' 9' -0'' 2' 7½ 2244.37 Cft
2 × 1 9' -0'' 9' -0'' 2' 7½ 425.25 Cft
2 × 2 9' -0'' 7' -0'' 2' 7½ 661.5 Cft
1 × 1 11' -0'' 11' -6'' 2' 7½ 332.06 Cft
1 × 1 9' -0'' 11' -0'' 2' 7½ 259.87 Cft
1 × 1 19' -0'' 11' -0'' 2' 7½ 548.62 Cft
3 × 1 9' -0'' 23' -6'' 2' 7½ 1665.56 Cft
Deduction, SB1 1 × 1 9' -0'' 0' -9'' 1' 7½ 7.59 Cft
Deduction, SB1 1 × 1 7' -0'' 0' -9'' 1' 7½ 5.9 Cft
Portico 1 × 1 19' -0'' 21' -0'' 0' 7½ 249.37 Cft
1 × 1 19' -0'' 11' -0'' 0' 7½ 130.62 Cft
1 × 1 9' -0'' 21' -0'' 0' 7½ 118.12 Cft
1 × 1 9' -0'' 11' -0'' 0' 7½ 61.87 Cft
140.00 20737.02 Cft

20597.02 Cft

Earth Filling Work 20597Cft x 2'-1½"/2'-7½" 16673.76 Cft


Sand Filling Work 20597Cft x 0'-6"/2'-7½" 3923.24 Cft
20597 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 2nd Floor To 3rd Floor Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 2nd Floor To 3rd Floor Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - 2nd Floor To 3rd Floor Column

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
c
2357.52
c
2357.52

-1577.00
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 2nd Floor Beam & Slab (Line 1 To 8 )

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

1 Labour Charges For 2nd Floor Beam& Slab


Formwork (12831 Sft)
Labour 12831 Sft 83200 %Sft 10675392
Analysis of Rate For Formwork For 100 Sft
From Yellow Book Pg (124 ) item (1 )
Carpenter 6 Nox8500/- 51000/-
Worker2 Nox6500/- 13000/-
64000/-
Dismentling Work (30%) 19200/-
Total 83200/- per % Sft
2 Labour Charges Rebar work for 2nd
Floor Beam & Slab (550.60 Cwt)
Labour (25mm) 5.45 Cwt 14580 Cwt 79461
Labour (20mm) 263.08 Cwt 14580 Cwt 3835706
Labour (16mm) 14.86 Cwt 14580 Cwt 216659
Labour (10mm) 267.21 Cwt 25830 Cwt 6902034
11033861
Analysis of Rate For 1Cwt For Beam&Slab
For16mm; 20mm Ø + 25mm Ø , YB Pg 133 Item (9)
Steel Fixer 0.75 Nox8500/- 6375/-
Worker 0.75 Nox6500/- 4875/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 ) x2 3330/-
Total 14580/- per Cwt
For 10mm Ø, From Yellow Book Pg (135 ) item ( 14 )
Steel Fixer 1.5 x 8500 /- 12750/-
worker 1.5 x 6500 /- 9750/-
2017-18 YGN Rate Book Pg (19 ) item ( 14-6 ) x2 3330/-
Total 25830/- per Cwt

Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)


4 STORYED R.C.C BUILDING
Name of work- 2nd Floor Beam & Slab (Line 1 To 8 )

ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

3 Labour charges (G-30) Concreting


Work For 2nd Floor Beam&Slab
(5616.00 Cft)
Labour For (G-30) Concreting 5616 Cft 625 Cft 3510000
Analysis of Rate
From Yellow Book Pg (33 ) item (6-2a )
Mason 2 Nox8500/- 17000/-
Worker7 Nox6500/- 45500/-
Total 62500/- per %Cft
4 Hire Charges For Concreting Wok

Vibrator 14 Day 15000 Day 210000

YGN Rate Book Pg (68 ) Item(4 )

5 Labour Charges For Curing Work


14 Day For Concreting 9360 Sft 65 Sft 608400
Analysis of Rate
From Yellow Book Pg (32 ) item (10 ) worker 1 x 6500 /- =6500 /-per %Sft
TOTAL Ks 26037653

Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)


4 STORYED R.C.C BUILDING

Name of work- 2nd Floor Beam & Slab (Line 1 To 8 )


ABSTRACT OF COST

Sr.
Particular Quantity Unit Rate Per Amount
No

MATERIAL ISSUE
10/2017 M.S ACCOUNT

J-Wood 17.11 Ton


5 Ply Wood (8'x4') 153 Sht
Wire Nail 385 Lb
10mmØ - M.S Rod 14.02 Ton
16mmØ - M.S Rod 0.78 Ton
20mmØ - M.S Rod 13.81 Ton
25mmØ - M.S Rod 0.29 Ton
Binding Wire 550 Lb
G-30 Ready Mixed Concrete 159 m3
H.S.D 28 Gal
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- 2nd Floor Beam & Slab

BILL OF QUANTITY
Sr.
Particular Quantity Unit Rate Per Amount
No

3b (1:1½:3) Concreting Work For Stair


(566.6 Cft)
Cement 7.05 Ton 116000 Ton 817800
R/ sand 3.51 Sud 21000 Sud 73710
R/ shingle 7.02 Sud 94000 Sud 659880
H.S.D 10 Gal 3000 Gal 30000
Mixer 2.5 Day 15000 Day 37500
Vibrator 2.5 Day 15000 Day 37500
Concrete admixture 70 Lit 1700 Lit 119000
Labour 566.6 Cft 1225 Cft 694085
Curing Work 2250 Sft 65 Sft 146250
2615725

5 Site Clearing Work For Between Construction


15000 Sft 16.2 Sft 243000

#REF!
Say 145273000

1 MATERIAL COST
J / wood (3 times) 33.82 Ton 680000 Ton 22997600
5 plywood 303 Shts 15800 Shts 4787400
Wire Nail 760 Lb 600 Lb 456000
25mm 0.39 Ton 719000 Ton 280410
20mm 23.82 Ton 719000 Ton 17126580
10mm 26.17 Ton 695000 Ton 18188150
16mm 4.12 Ton 695000 Ton 2863400
B/wire 1038 Lb 650 Lb 674700
G-30 Ready Mixed Concrete 293 m3 84900 m3 24875700
H.S.D 100 Gal 3000 Gal 300000
Cement 7.05 Ton 116000 Ton 817800
R/ sand 3.51 Sud 21000 Sud 73710
R/ shingle 7.02 Sud 94000 Sud 659880
H.S.D 10 Gal 3000 Gal 30000
Concrete admixture 70 Lit 1700 Lit 119000
94250330
2 LABOUR CHARGES
Labour 25366 Sft 83200 %Sft 21104512
Labour (25mm) 7.48 Cwt 14580 Cwt 109058
Labour (20mm) 453.75 Cwt 14580 Cwt 6615675
Labour (10mm) 498.54 Cwt 25830 Cwt 12877288
Labour (16mm) 78.51 Cwt 14580 Cwt 1144676
Labour 10061 Cft 625 Cft 6288125
Curing Work 15000 Sft 65 Sft 975000
Labour 566.6 Cft 1225 Cft 694085
Curing Work 2250 Sft 65 Sft 146250
site clearing 15000 Sft 16.2 Sft 243000
50197669
Mixer 2.5 Day 15000 Day 37500
Vibrator 52.5 Day 15000 Day 787500
825000

Total 145272999
Say 145273000/

Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)


4 STORYED R.C.C BUILDING
Name of work- ၉/သ
၂၀၁၇
$ ဖ စရနလထငင

BILL OF QUANTITY

Sr.
Particular Quantity Unit Rate Per Amount
No

1 MATERIAL COST
Jwood 50 ton 680000 ton 34000000
ms rod 115 ton 695000 ton 79925000
5ply wood 550 sht 15800 sht 8690000
ready mixed concrete 35 m3 84900 m3 2971500
H.S.D 116 Gal 3000 Gal 348000
Cement 7.05 Ton 116000 Ton 817800
R/ sand 3.51 Sud 21000 Sud 73710
R/ shingle 7.02 Sud 94000 Sud 659880
Concrete admixture 70 Lit 1700 Lit 119000
B/wire 684 Lb 650 Lb 444600
3/8"Ø Separater 2000 Rft 195 Rft 390000
Wire Nail 359 Lb 600 Lb 215400
128654890

2 LABOUR CHARGES
1st Floor column 11225389
2nd floor beam and slab 50197669
61423058

3 HIRE CHARGES
1st Floor column 859000
2nd floor beam and slab 825000
1684000

total 191761948
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 Re Bar Work For 1st 10mmØ 25mmØ 20mm
Floor Column
C1 (8)Nos Main(20mm) 8 × 8 13' -3'' 848.00
Stirrup (10mm) 8 × 32 5' -6'' 1408.00
8 × 32 1' -10'' 469.33
8 × 32 2' -0'' 512.00
C2 (6 Nos)
Main (20mm) 6 × 8 13' -3'' 636.00
6 × 4 7' -6'' 180.00
Stirrup (10mm) 6 × 32 5' -6'' 1056.00
6 × 32 4' -3'' 816.00
6 × 32 4' -0'' 768.00
C3 (17 Nos)
Main (25mm) 17 × 8 16' -0'' 2176.00
Stirrup (10mm) 17 × 62 5' -2'' 5445.67
17 × 96 1' -7'' 2584.00
C4 (12 Nos)
Main (25mm) 1 x 12 18' -10'' 226.00
11 × 12 16' -0'' 2112.00
Stirrup (10mm) 12 × 32 6' -2'' 2368.00
12 × 32 5' -2'' 1984.00
12 × 32 4' -2'' 1600.00
C5 (6 Nos)
Main (25mm) 6 × 12 18' -10'' 1356.00 1356.00
Stirrup (10mm) 6 × 64 6' -10'' 2624.00
6 × 64 1' -3'' 480.00
23471.00 5870 1664
25mm=5870 Rft x 2.587Lb/Ft 15144.6Lb 135.22 Cwt
20mm=1664Rft x 1.66Lb/Ft 2762Lb 24.66 Cwt
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
10mm=23471Rft x 0.415Lb/Ft 9740Lb 86.97 Cwt
246.85
1a Re Bar Work For Stair
16mmØ 10mmØ
Side Stair, First Floor 2 x 16 13' -3'' 424 Rft
Side Stair, First Floor 2 x 16 17' -0'' 544 Rft
Side Stair, First Floor 2 x 16 7' -0'' 224 Rft
Landing 2 x 16 13' -0'' 416 Rft
Landing 2 x 16 28' -0'' 896 Rft
Landing 4 x 16 7' -0'' 448 Rft
Landing 4 x 2 8' -0'' 64 Rft
Distribution Bar 4 × 52 6' -0'' 1248 Rft
Distribution Bar 2 x 20 12' -6'' 500 Rft
Main Stair
First Floor 1 x 16 13' -3'' 212 Rft
First Floor 1 x 16 17' -0'' 272 Rft
Landing 1 x 16 13' -0'' 208 Rft
Landing 1 x 16 28' -0'' 448 Rft
Landing 2 x 16 7' -0'' 224 Rft
Landing 2 x 2 8' -0'' 32 Rft
Distribution Bar 2 x 48 6' -0'' 576 Rft
Distribution Bar 2 x 11 12' -6'' 275 Rft
Landing Beam 20mm 25mm
10mmØ Stirrup 3 x 44 5' -9'' 759 Rft

Top 25mm 3 x 2 15' -6'' 93' Rft


3 x 10 7' -3'' 218' Rft
Spacer Bar 3 x 6 0' -9'' 14' Rft
Bottom Bar 20mm 3 x 7 15' -6'' 326' Rft
10mmØ Dowel 55 x 14 1' -6'' 1155 Rft
326' 324' 4412 4513 Rft

10mm Ø 4513 Rft×0.415 Lb 1782.9 16.72 Cwt


16mm Ø 4412 Rft×1.062 Lb 4685.54 41.84 Cwt
20mm Ø 326 Rft×1.66 Lb 541 4.83 Cwt
25mm Ø 324 Rft×2.587 Lb 838 7.48 Cwt
70.87 Cwt
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

2 Formwork For 1st Floor column


C1 8 × 1 6' -0'' 10' -0'' 480.00 Sft
C2 6 × 1 6' -0'' 10' -0'' 360.00 Sft
C3 17 × 1 6' -8'' 10' -0'' 1133.33 Sft
C4 8 × 1 6' -8'' 10' -0'' 533.33 Sft
4 x 1 6' -8'' 6' -0'' 160.00 Sft
6 x 1 6' -8'' 4' -0'' 160.00 Sft
C5 6 × 1 9' -0'' 10' -0'' 540.00 Sft
3366.66 Sft

Formwork For Stair


Flight 4 x 1 14' -0'' 5' -3'' 294.00 Sft
Step 41 x 1 5' -3'' 0' -6'' 107.63 Sft
landing 3 x 1 6' -3'' 11' -0'' 206.25 Sft
2 x 1 6' -0'' 5' -3'' 63.00 Sft
1 x 1 4' -0'' 5' -3'' 21.00 Sft
LB 3 x 1 4' -7'' 11' -0'' 151.25 Sft
Side Cover 3 x 2 14' -0'' 1' -6'' 126.00
969.13 Sft
Total 4336 Sft

3 Ready mixed G30 Concreting Work


For 1st Floor Column
C1 8 × 1 1' -4'' 1' -6'' 10' -0'' 160.00 Cft
C2 6 × 1 1' -4'' 1' -6'' 10' -0'' 120.00 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
C3 17 × 1 1' -4'' 1' -10'' 10' -0'' 415.56 Cft
C4 8 × 1 1' -4'' 1' -10'' 10' -0'' 195.56 Cft
2 x 1 1' -4'' 1' -10'' 4' -0'' 19.56
C5 6 × 1 3' -0'' 1' -0'' 10' -0'' 180.00 Cft
1090.68 Cft

4 Ready mixed G30 Concreting Work


For Stair (3 nos) 3 x 1 14' -0'' 5' -3'' 0' -9'' 165.38 Cft
1 x 1 5' -6'' 5' -3'' 0' -9'' 21.66 Cft
step 36 x 0.5 5' -3'' 1' -0'' 0' -6'' 47.25 Cft
5 x 0.5 5' -3'' 1' -0'' 0' -6'' 6.56 Cft
landing 3 x 1 5' -6'' 11' -0'' 0' -9'' 136.13 Cft
2 x 1 4' -6'' 5' -3'' 0' -9'' 35.44 Cft
1 x 1 2' -6'' 5' -3'' 0' -9'' 9.84 Cft
LB 3 x 1 11' -0'' 2' -0'' 1' -0'' 66.00 Cft
488.26 Cft

5 (1:1½: 3) Concreting Work


For 1st Floor Column
C4 4 x 1 1' -4'' 1' -10'' 6' -0'' 58.67 Cft
4 x 1 1' -4'' 1' -10'' 4' -0'' 39.11 Cft
97.78 Cft

6 Curing Work For Column


C1 8 × 1 5' -8'' 10' -0'' 453.33 Sft
C2 6 × 1 5' -8'' 10' -0'' 340.00 Sft
C3 17 × 1 6' -0'' 10' -0'' 1020.00 Sft
C4 8 × 1 6' -0'' 10' -0'' 480.00 Sft
4 x 1 6' -0'' 6' -0'' 144.00 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
6 x 1 6' -0'' 4' -0'' 144.00 sft
C5 6 × 1 8' -0'' 10' -0'' 480.00 Sft
3061.33 Sft

Curing Work For Stair


3 x 1 5' -3'' 17' -5'' 274.31 sft
1 x 1 5' -3'' 7' -0'' 36.75 sft
landing 3 x 1 5' -6'' 11' -0'' 181.50 sft
3 x 1 4' -6'' 5' -3'' 70.88 sft
LB 3 x 1 11' -0'' 4' -0'' 132.00 sft
695.44 sft
Total 3756.77 sft
say 3756 sft
7 Arm Frame Scaffolding Work For Column
49 × 2 5' -0'' 16' -0'' 7840.00 Sft
8 Hire Charges For
a Ready Mixed (G30) Concreting
work for 1st floor Column & Stair ( 1578.94cft )
Vibrator 8 Day

b. (1:1½ :3) Concreting Work For


1st Floor Column (97.78 Cft)
Mixer 0.5 Day
Vibrator 0.5 Day

c. 16' Ht Arm Frame Scaffolding Work For Column


(7840 Sft) 49 Day
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

×
×
×
× 0
× 0
× 0
× 0
× 0
× 0
× 0
× 0
× 0
× 0
× 0
× 0
× 0
× 0
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
× 0
× 0
450.67

60618.78 60686.56

10mmØ 23261.35 Rf x 0.415 Lb/Ft 9653.46Lb 86.19 Cwt


20mmØ 16954.5 Rf x 1.66 Lb/Ft 28144.47Lb 251.3 Cwt

2 Making & Fixing of Timber


Shuttering Formwork
Line 1 A To G,GB2 2 × 2 6' -4'' 1.0' -6'' 38 Sft
GB2a 1 × 2 8' -2'' 1.0' -6'' 24.5 Sft
GB1 2 × 2 22' -8'' 2.0' -0'' 181.33 Sft
Line 2 E To G,GB2 1 × 1 6' -4'' 4' -6'' 28.5 Sft
GB1 1 × 1 22' -8'' 5' -6'' 124.67 Sft
Line 3, A ,5,6,8
GB2 5 × 2 6' -4'' 4' -6'' 285 Sft
GB1 5 × 2 22' -8'' 5' -6'' 1246.67 Sft
GB2a 5 × 1 8' -2'' 4' -6'' 183.75 Sft
SB1 2 × 1 23' -6'' 4' -3'' 199.75 Sft
Line7 GB2 2 × 1 6' -4'' 4' -6'' 57 Sft
GB2a 1 × 1 8' -2'' 4' -6'' 36.75 Sft
Line7 GB1 1 × 1 22' -8'' 5' -6'' 124.67 Sft
Line7 GB1 1 × 1 10' -2'' 5' -6'' 55.92 Sft
Lift Pit GB1 2 × 1 9' -6'' 5' -6'' 104.5 Sft
Portico GB1 3 × 1 20' -6'' 5' -6'' 338.25 Sft
Portico GB1 3 × 1 10' -6'' 5' -6'' 173.25 Sft
GB4 4 × 1 8' -8'' 4' -10'' 167.56 Sft
GB4 2 × 1 18' -8'' 4' -10'' 180.44 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Line A,G 1 To 9,GB4 2 × 10 18' -8'' 1.0' -8'' 622.22 Sft
Line A,G 1 To 9,GB4 2 × 2 8' -8'' 1.0' -8'' 57.78 Sft
Line A,G 1 To 9,GB4 2 × 2 4' -6'' 1.0' -8'' 30 Sft
LineB, E 1 To 9 ,GB3 2 × 5 18' -8'' 4' -10'' 902.22 Sft
LineB, E 1 To 9 ,GB3 2 × 1 8' -8'' 4' -10'' 83.78 Sft
LineB, E 1 To 9 ,GB3 2 × 1 4' -6'' 4' -10'' 43.5 Sft
SB1 2 × 2 19' -0'' 1.0' -9'' 133 Sft
Line G ,SB1 1 × 1 10' -0'' 4' -3'' 42.5 Sft
GB1 1 × 1 8' -10'' 5' -6'' 48.58 Sft
GB1 2 × 1 6' -0'' 5' -6'' 66 Sft
Line D,GB3 5 × 1 18' -8'' 4' -10'' 451.11 Sft
GB3 1 × 1 4' -6'' 4' -10'' 21.75 Sft
GB1 1 × 1 8' -8'' 5' -6'' 47.67 Sft
Line F,GB5 1 × 1 8' -8'' 5' -8'' 49.11 Sft
GB3 4 × 1 18' -8'' 4' -10'' 360.89 Sft
GB3 1 × 1 6' -8'' 4' -10'' 32.22 Sft
GB3 1 × 1 8' -8'' 4' -10'' 41.89 Sft
GB3 1 × 1 4' -6'' 4' -10'' 21.75 Sft
Column C1,C2 20 × 1 6' -0'' 2' -0'' 240 Sft
C3,C4 29 × 1 6' -8'' 2' -0'' 386.67 Sft
C5 6 × 1 9' -0'' 2' -0'' 108 Sft
7341.15 Sft

Say 7341 Sft

3 (1:1½:3) RC Concreting
Work For Ground Beam
Line 1,3,4,5,6,8
GB2 6 × 2 6' -4'' 1' -0'' 1' -6'' 114 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
GB1 6 × 2 22' -8'' 1' -0'' 2' -0'' 544 Cft
GB2a 6 × 1 8' -2'' 1' -0'' 1' -6'' 73.5 Cft
Line7 ,GB2 1 × 2 6' -4'' 1' -0'' 1' -6'' 19 Cft
GB1 1 × 1 22' -8'' 1' -0'' 2' -0'' 45.33 Cft
GB1 1 × 1 10' -2'' 1' -0'' 2' -0'' 20.33 Cft
GB2a 1 × 1 8' -2'' 1' -0'' 1' -6'' 12.25 Cft
Line2 ,GB2 1 × 1 6' -4'' 1' -0'' 1' -6'' 9.5 Cft
GB1 1 × 1 22' -8'' 1' -0'' 2' -0'' 45.33 Cft
SB1 2 × 1 23' -6'' 0' -9'' 1' -6'' 52.88 Cft
Lift Pit,GB1 2 × 1 9' -6'' 1' -0'' 2' -0'' 38 Cft
Portico,GB1 3 × 1 20' -6'' 1' -0'' 2' -0'' 123 Cft
Portico,GB1 3 × 1 10' -6'' 1' -0'' 2' -0'' 63 Cft
GB4 4 × 1 8' -8'' 1' -0'' 1' -8'' 57.78 Cft
GB4 2 × 1 18' -8'' 1' -0'' 1' -8'' 62.22 Cft
Line A,G GB4 2 × 5 18' -8'' 1' -0'' 1' -8'' 311.11 Cft
Line A,G GB4 2 × 1 8' -8'' 1' -0'' 1' -8'' 28.89 Cft
Line A,G GB4 2 × 1 4' -4'' 1' -0'' 1' -8'' 14.44 Cft
Line B,G GB3 2 × 5 18' -8'' 1' -0'' 1' -8'' 311.11 Cft
Line B,G GB3 2 × 1 8' -8'' 1' -0'' 1' -8'' 28.89 Cft
Line B,G GB3 2 × 1 4' -4'' 1' -0'' 1' -8'' 14.44 Cft
SB1 2 × 1 19' -0'' 0' -9'' 1' -6'' 42.75 Cft
SB1 1 × 1 10' -0'' 0' -9'' 1' -6'' 11.25 Cft
LineC ,GB1 1 × 1 8' -10'' 1' -0'' 2' -0'' 17.67 Cft
LineC ,GB1 2 × 1 6' -1'' 1' -0'' 2' -0'' 24.33 Cft
LineD ,GB3 5 × 1 18' -8'' 1' -0'' 1' -8'' 155.56 Cft
LineD ,GB3 1 × 1 4' -4'' 1' -0'' 1' -8'' 7.22 Cft
GB1 1 × 1 8' -8'' 1' -0'' 2' -0'' 17.33 Cft
LineF ,GB5 1 × 1 8' -8'' 1' -2'' 2' -0'' 20.22 Cft
GB3 4 × 1 18' -8'' 1' -0'' 1' -8'' 124.44 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
GB3 1 × 1 6' -8'' 1' -0'' 1' -8'' 11.11 Cft
GB3 1 × 1 8' -8'' 1' -0'' 1' -8'' 14.44 Cft
GB3 1 × 1 4' -4'' 1' -0'' 1' -8'' 7.22 Cft
Column C1,C2 20 × 1 1' -4'' 1' -6'' 2' -0'' 80 Cft
C3,C4 29 × 1 1' -4'' 1' -10'' 2' -0'' 141.78 Cft
C5 6 × 1 3' -0'' 1' -0'' 2' -0'' 36 Cft
2700.32 Cft
Say 2700.00 Cft

4 Earth Filling & Sand Filling


Work For Ground Floor
9 × 1 19' -0'' 23' -6'' 2' 7½ 10548.56 Cft
Deduction, GB1 1 × 1 23' -6'' 1' -0'' 1' 7½ 38.18 Cft
SB1 2 × 1 23' -6'' 0' -9'' 1' 1½ 39.65 Cft
SB1 2 × 1 19' -0'' 0' -9'' 1' 1½ 32.06 Cft
SB1 1 × 1 9' -0'' 0' -9'' 1' 1½ 7.59 Cft
10 × 1 19' -0'' 7' -0'' 2' 7½ 3491.25 Cft
Deduction, GB2 1 × 1 7' -0'' 1' -0'' 1' 3½ 9.03 Cft
5 × 1 19' -0'' 9' -0'' 2' 7½ 2244.37 Cft
2 × 1 9' -0'' 9' -0'' 2' 7½ 425.25 Cft
2 × 2 9' -0'' 7' -0'' 2' 7½ 661.5 Cft
1 × 1 11' -0'' 11' -6'' 2' 7½ 332.06 Cft
1 × 1 9' -0'' 11' -0'' 2' 7½ 259.87 Cft
1 × 1 19' -0'' 11' -0'' 2' 7½ 548.62 Cft
3 × 1 9' -0'' 23' -6'' 2' 7½ 1665.56 Cft
Deduction, SB1 1 × 1 9' -0'' 0' -9'' 1' 7½ 7.59 Cft
Deduction, SB1 1 × 1 7' -0'' 0' -9'' 1' 7½ 5.9 Cft
Portico 1 × 1 19' -0'' 21' -0'' 0' 7½ 249.37 Cft
1 × 1 19' -0'' 11' -0'' 0' 7½ 130.62 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 × 1 9' -0'' 21' -0'' 0' 7½ 118.12 Cft
1 × 1 9' -0'' 11' -0'' 0' 7½ 61.87 Cft
140.00 20737.02 Cft
20597.02 Cft

Earth Filling Work 20597Cft x 2'-1½"/2'-7½" 16673.76 Cft


Sand Filling Work 20597Cft x 0'-6"/2'-7½" 3923.24 Cft
20597 Cft

×
×
×
×
×
×
×
×
×
×
×
×
×
×
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
×
×
×
×
×
×
×
×
×
×
×
×
c
1578.94

1.94
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 Re Bar Work For 1st 10mmØ 25mmØ 20mm
Floor Column
C1 (8 Nos)
Main (20mm) 8 × 8 13' -3'' 848.00
Stirrup (10mm) 8 × 32 5' -6'' 1408.00
8 × 32 1' -10'' 469.33
8 × 32 2' -0'' 512.00
C2 (6 Nos)
Main (20mm) 6 × 8 13' -3'' 636.00
6 × 4 7' -6'' 180.00
Stirrup (10mm) 6 × 32 5' -6'' 1056.00
6 × 32 4' -3'' 816.00
6 × 32 4' -0'' 768.00

C3 (17 Nos)
Main (25mm) 17 × 8 16' -0'' 2176.00
Stirrup (10mm) 17 × 62 5' -2'' 5445.67
17 × 96 1' -7'' 2584.00

C4 (12 Nos)
Main (25mm) 1 x 12 18' -10'' 226.00
11 × 12 16' -0'' 2112.00
Stirrup (10mm) 12 × 32 6' -2'' 2368.00
12 × 32 5' -2'' 1984.00
12 × 32 4' -2'' 1600.00
C5 (6 Nos)
Main (25mm) 6 × 12 18' -10'' 1356.00 1356.00
Stirrup (10mm) 6 × 64 6' -10'' 2624.00
6 × 64 1' -3'' 480.00
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

23471.00 5870 1664

25mm=5870 Rft x 2.587Lb/Ft 15144.6Lb 135.22 Cwt


20mm=1664Rft x 1.66Lb/Ft 2762Lb 24.66 Cwt
10mm=23471Rft x 0.415Lb/Ft 9740Lb 86.97 Cwt
246.85 Cwt
1a Re Bar Work For Stair
16mmØ 10mmØ
Side Stair, First Floor 2 x 16 13' -3'' 424 Rft
Side Stair, First Floor 2 x 16 17' -0'' 544 Rft
Side Stair, First Floor 2 x 16 7' -0'' 224 Rft
Landing 2 x 16 13' -0'' 416 Rft
Landing 2 x 16 28' -0'' 896 Rft
Landing 4 x 16 7' -0'' 448 Rft
Landing 4 x 2 8' -0'' 64 Rft
Distribution Bar 4 × 52 6' -0'' 1248 Rft
Distribution Bar 2 x 20 12' -6'' 500 Rft
Main Stair
First Floor 1 x 16 13' -3'' 212 Rft
First Floor 1 x 16 17' -0'' 272 Rft
Landing 1 x 16 13' -0'' 208 Rft
Landing 1 x 16 28' -0'' 448 Rft
Landing 2 x 16 7' -0'' 224 Rft
Landing 2 x 2 8' -0'' 32 Rft
Distribution Bar 2 x 48 6' -0'' 576 Rft
Distribution Bar 2 x 11 12' -6'' 275 Rft
Landing Beam 20mm 25mm
10mmØ Stirrup 3 x 44 5' -9'' 759 Rft

Top 25mm 3 x 2 15' -6'' 93' Rft


3 x 10 7' -3'' 218' Rft
Spacer Bar 3 x 6 0' -9'' 14' Rft
Bottom Bar 20mm 3 x 7 15' -6'' 326' Rft
10mmØ Dowel 55 x 14 1' -6'' 1155 Rft
326' 324' 4412 4513 Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
10mm Ø 4513 Rft×0.415 Lb 1782.9 16.72 Cwt
16mm Ø 4412 Rft×1.062 Lb 4685.54 41.84 Cwt
20mm Ø 326 Rft×1.66 Lb 541 4.83 Cwt
25mm Ø 324 Rft×2.587 Lb 838 7.48 Cwt
70.87 Cwt

2 Form Work For 1St Floor


Column
C1 8 x 1 6' -0'' 10' -0'' 480.00 Sft
C2 6 x 1 6' -0'' 10' -0'' 360.00 Sft
C3 17 x 1 6' -8'' 10' -0'' 1133.33 Sft
C4 8 x 1 6' -8'' 10' -0'' 533.33 Sft
C4 4 x 1 6' -8'' 6' -0'' 160.00 Sft
C4 6 x 1 6' -8'' 4' -0'' 160.00 Sft
C5 6 x 1 9' -0'' 10' -0'' 540.00 Sft
3366.66 Sft
Formwork For Stair
Flight 4 x 1 14' -0'' 5' -3'' 294.00 Sft
Step 41 x 1 5' -3'' 0' -6'' 107.63 Sft
landing 3 x 1 6' -3'' 11' -0'' 206.25 Sft
2 x 1 6' -0'' 5' -3'' 63.00 Sft
1 x 1 4' -0'' 5' -3'' 21.00 Sft
LB 3 x 1 4' -7'' 11' -0'' 151.25 Sft
Side Cover 3 x 2 14' -0'' 1' -6'' 126.00
969.13 Sft
Total 4336 Sft
3/8" Seperator For Formwork
C1 8 x 14 0' -20'' 187 Ft
8 x 14 0' -22'' 205 Ft
C2 6 x 14 0' -20'' 140 Ft
6 x 14 0' -22'' 154.00 ft
C3 17 x 14 0' -20'' 396.67 ft
17 x 14 0' -24'' 476.00 ft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
C4 8 x 14 0' -20'' 186.67 ft
8 x 14 0' -24'' 224.00 ft
C4 4 x 10 0' -20'' 66.67 ft
4 x 10 0' -24'' 80.00 ft
6 x 3 0' -20'' 30.00 ft
6 x 3 0' -24'' 36.00 ft
C5 6 x 14 0' -40'' 280.00 ft
6 x 14 0' -16'' 112.00 ft
2574.01 ft

3 Ready mixed G30 Concreting Work


For 1st Floor Column
C1 8 × 1 1' -4'' 1' -6'' 10' -0'' 160.00 Cft
C2 6 × 1 1' -4'' 1' -6'' 10' -0'' 120.00 Cft
C3 17 × 1 1' -4'' 1' -10'' 10' -0'' 415.56 Cft
C4 8 × 1 1' -4'' 1' -10'' 10' -0'' 195.56 Cft
2 x 1 1' -4'' 1' -10'' 4' -0'' 19.56
C5 6 × 1 3' -0'' 1' -0'' 10' -0'' 180.00 Cft
1090.68 Cft

Ready mixed G30 Concreting Work


For Stair (3 nos) 3 x 1 14' -0'' 5' -3'' 0' -9'' 165.38
1 x 1 5' -6'' 5' -3'' 0' -9'' 21.66
step 36 x 0.5 5' -3'' 1' -0'' 0' -6'' 47.25
5 x 0.5 5' -3'' 1' -0'' 0' -6'' 6.56
landing 3 x 1 5' -6'' 11' -0'' 0' -9'' 136.13
2 x 1 4' -6'' 5' -3'' 0' -9'' 35.44
1 x 1 2' -6'' 5' -3'' 0' -9'' 9.84
LB 3 x 1 11' -0'' 2' -0'' 1' -0'' 66.00
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
488.26 Cft

total 1578.94 Cft

4 (1:1½: 3) Concreting Work


For 1st Floor Column
C4 4 x 1 1' -4'' 1' -10'' 6' -0'' 58.67
4 x 1 1' -4'' 1' -10'' 4' -0'' 39.11
97.78 Cft

Curing Work For Column


C1 8 × 1 5' -8'' 10' -0'' 453.33 Sft
C2 6 × 1 5' -8'' 10' -0'' 340.00 Sft
C3 17 × 1 6' -0'' 10' -0'' 1020.00 Sft
C4 8 × 1 6' -0'' 10' -0'' 480.00 Sft
4 x 1 6' -0'' 6' -0'' 144.00 Sft
6 x 1 6' -0'' 4' -0'' 144.00
C5 6 × 1 8' -0'' 10' -0'' 480.00 Sft
3061.33 Sft

Curing Work For Stair


3 x 1 5' -3'' 17' -5'' 274.31
1 x 1 5' -3'' 7' -0'' 36.75
landing 3 x 1 5' -6'' 11' -0'' 181.50
3 x 1 4' -6'' 5' -3'' 70.88
LB 3 x 1 11' -0'' 4' -0'' 132.00
695.44 Cft
Total 3756.77 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

5 Arm Frame Scaffolding Work For Column


49 × 2 5' -0'' 16' -0'' 7840.00 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

×
×
×
× 0
× 0
× 0
× 0
× 0
× 0
× 0
× 0
× 0
× 0
× 0
× 0
× 0
× 0
× 0
× 0
450.67

60618.78 63599.73

10mmØ 23261.35 Rf x 0.415 Lb/Ft 9653.46Lb 86.19 Cwt


20mmØ 16954.5 Rf x 1.66 Lb/Ft 28144.47Lb 251.3 Cwt

2 Making & Fixing of Timber


Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Shuttering Formwork
Line 1 A To G,GB2 2 × 2 6' -4'' 1.0' -6'' 38 Sft
GB2a 1 × 2 8' -2'' 1.0' -6'' 24.5 Sft
GB1 2 × 2 22' -8'' 2.0' -0'' 181.33 Sft
Line 2 E To G,GB2 1 × 1 6' -4'' 4' -6'' 28.5 Sft
GB1 1 × 1 22' -8'' 5' -6'' 124.67 Sft
Line 3, A ,5,6,8
GB2 5 × 2 6' -4'' 4' -6'' 285 Sft
GB1 5 × 2 22' -8'' 5' -6'' 1246.67 Sft
GB2a 5 × 1 8' -2'' 4' -6'' 183.75 Sft
SB1 2 × 1 23' -6'' 4' -3'' 199.75 Sft
Line7 GB2 2 × 1 6' -4'' 4' -6'' 57 Sft
GB2a 1 × 1 8' -2'' 4' -6'' 36.75 Sft
Line7 GB1 1 × 1 22' -8'' 5' -6'' 124.67 Sft
Line7 GB1 1 × 1 10' -2'' 5' -6'' 55.92 Sft
Lift Pit GB1 2 × 1 9' -6'' 5' -6'' 104.5 Sft
Portico GB1 3 × 1 20' -6'' 5' -6'' 338.25 Sft
Portico GB1 3 × 1 10' -6'' 5' -6'' 173.25 Sft
GB4 4 × 1 8' -8'' 4' -10'' 167.56 Sft
GB4 2 × 1 18' -8'' 4' -10'' 180.44 Sft
Line A,G 1 To 9,GB4 2 × 10 18' -8'' 1.0' -8'' 622.22 Sft
Line A,G 1 To 9,GB4 2 × 2 8' -8'' 1.0' -8'' 57.78 Sft
Line A,G 1 To 9,GB4 2 × 2 4' -6'' 1.0' -8'' 30 Sft
LineB, E 1 To 9 ,GB3 2 × 5 18' -8'' 4' -10'' 902.22 Sft
LineB, E 1 To 9 ,GB3 2 × 1 8' -8'' 4' -10'' 83.78 Sft
LineB, E 1 To 9 ,GB3 2 × 1 4' -6'' 4' -10'' 43.5 Sft
SB1 2 × 2 19' -0'' 1.0' -9'' 133 Sft
Line G ,SB1 1 × 1 10' -0'' 4' -3'' 42.5 Sft
GB1 1 × 1 8' -10'' 5' -6'' 48.58 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
GB1 2 × 1 6' -0'' 5' -6'' 66 Sft
Line D,GB3 5 × 1 18' -8'' 4' -10'' 451.11 Sft
GB3 1 × 1 4' -6'' 4' -10'' 21.75 Sft
GB1 1 × 1 8' -8'' 5' -6'' 47.67 Sft
Line F,GB5 1 × 1 8' -8'' 5' -8'' 49.11 Sft
GB3 4 × 1 18' -8'' 4' -10'' 360.89 Sft
GB3 1 × 1 6' -8'' 4' -10'' 32.22 Sft
GB3 1 × 1 8' -8'' 4' -10'' 41.89 Sft
GB3 1 × 1 4' -6'' 4' -10'' 21.75 Sft
Column C1,C2 20 × 1 6' -0'' 2' -0'' 240 Sft
C3,C4 29 × 1 6' -8'' 2' -0'' 386.67 Sft
C5 6 × 1 9' -0'' 2' -0'' 108 Sft
7341.15 Sft

Say 7341 Sft

3 (1:1½:3) RC Concreting
Work For Ground Beam
Line 1,3,4,5,6,8
GB2 6 × 2 6' -4'' 1' -0'' 1' -6'' 114 Cft
GB1 6 × 2 22' -8'' 1' -0'' 2' -0'' 544 Cft
GB2a 6 × 1 8' -2'' 1' -0'' 1' -6'' 73.5 Cft
Line7 ,GB2 1 × 2 6' -4'' 1' -0'' 1' -6'' 19 Cft
GB1 1 × 1 22' -8'' 1' -0'' 2' -0'' 45.33 Cft
GB1 1 × 1 10' -2'' 1' -0'' 2' -0'' 20.33 Cft
GB2a 1 × 1 8' -2'' 1' -0'' 1' -6'' 12.25 Cft
Line2 ,GB2 1 × 1 6' -4'' 1' -0'' 1' -6'' 9.5 Cft
GB1 1 × 1 22' -8'' 1' -0'' 2' -0'' 45.33 Cft
SB1 2 × 1 23' -6'' 0' -9'' 1' -6'' 52.88 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Lift Pit,GB1 2 × 1 9' -6'' 1' -0'' 2' -0'' 38 Cft
Portico,GB1 3 × 1 20' -6'' 1' -0'' 2' -0'' 123 Cft
Portico,GB1 3 × 1 10' -6'' 1' -0'' 2' -0'' 63 Cft
GB4 4 × 1 8' -8'' 1' -0'' 1' -8'' 57.78 Cft
GB4 2 × 1 18' -8'' 1' -0'' 1' -8'' 62.22 Cft
Line A,G GB4 2 × 5 18' -8'' 1' -0'' 1' -8'' 311.11 Cft
Line A,G GB4 2 × 1 8' -8'' 1' -0'' 1' -8'' 28.89 Cft
Line A,G GB4 2 × 1 4' -4'' 1' -0'' 1' -8'' 14.44 Cft
Line B,G GB3 2 × 5 18' -8'' 1' -0'' 1' -8'' 311.11 Cft
Line B,G GB3 2 × 1 8' -8'' 1' -0'' 1' -8'' 28.89 Cft
Line B,G GB3 2 × 1 4' -4'' 1' -0'' 1' -8'' 14.44 Cft
SB1 2 × 1 19' -0'' 0' -9'' 1' -6'' 42.75 Cft
SB1 1 × 1 10' -0'' 0' -9'' 1' -6'' 11.25 Cft
LineC ,GB1 1 × 1 8' -10'' 1' -0'' 2' -0'' 17.67 Cft
LineC ,GB1 2 × 1 6' -1'' 1' -0'' 2' -0'' 24.33 Cft
LineD ,GB3 5 × 1 18' -8'' 1' -0'' 1' -8'' 155.56 Cft
LineD ,GB3 1 × 1 4' -4'' 1' -0'' 1' -8'' 7.22 Cft
GB1 1 × 1 8' -8'' 1' -0'' 2' -0'' 17.33 Cft
LineF ,GB5 1 × 1 8' -8'' 1' -2'' 2' -0'' 20.22 Cft
GB3 4 × 1 18' -8'' 1' -0'' 1' -8'' 124.44 Cft
GB3 1 × 1 6' -8'' 1' -0'' 1' -8'' 11.11 Cft
GB3 1 × 1 8' -8'' 1' -0'' 1' -8'' 14.44 Cft
GB3 1 × 1 4' -4'' 1' -0'' 1' -8'' 7.22 Cft
Column C1,C2 20 × 1 1' -4'' 1' -6'' 2' -0'' 80 Cft
C3,C4 29 × 1 1' -4'' 1' -10'' 2' -0'' 141.78 Cft
C5 6 × 1 3' -0'' 1' -0'' 2' -0'' 36 Cft
2700.32 Cft
Say 2700.00 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
4 Earth Filling & Sand Filling
Work For Ground Floor
9 × 1 19' -0'' 23' -6'' 2' 7½ 10548.56 Cft
Deduction, GB1 1 × 1 23' -6'' 1' -0'' 1' 7½ 38.18 Cft
SB1 2 × 1 23' -6'' 0' -9'' 1' 1½ 39.65 Cft
SB1 2 × 1 19' -0'' 0' -9'' 1' 1½ 32.06 Cft
SB1 1 × 1 9' -0'' 0' -9'' 1' 1½ 7.59 Cft
10 × 1 19' -0'' 7' -0'' 2' 7½ 3491.25 Cft
Deduction, GB2 1 × 1 7' -0'' 1' -0'' 1' 3½ 9.03 Cft
5 × 1 19' -0'' 9' -0'' 2' 7½ 2244.37 Cft
2 × 1 9' -0'' 9' -0'' 2' 7½ 425.25 Cft
2 × 2 9' -0'' 7' -0'' 2' 7½ 661.5 Cft
1 × 1 11' -0'' 11' -6'' 2' 7½ 332.06 Cft
1 × 1 9' -0'' 11' -0'' 2' 7½ 259.87 Cft
1 × 1 19' -0'' 11' -0'' 2' 7½ 548.62 Cft
3 × 1 9' -0'' 23' -6'' 2' 7½ 1665.56 Cft
Deduction, SB1 1 × 1 9' -0'' 0' -9'' 1' 7½ 7.59 Cft
Deduction, SB1 1 × 1 7' -0'' 0' -9'' 1' 7½ 5.9 Cft
Portico 1 × 1 19' -0'' 21' -0'' 0' 7½ 249.37 Cft
1 × 1 19' -0'' 11' -0'' 0' 7½ 130.62 Cft
1 × 1 9' -0'' 21' -0'' 0' 7½ 118.12 Cft
1 × 1 9' -0'' 11' -0'' 0' 7½ 61.87 Cft
140.00 20737.02 Cft
20597.02 Cft

Earth Filling Work 20597Cft x 2'-1½"/2'-7½" 16673.76 Cft


Sand Filling Work 20597Cft x 0'-6"/2'-7½" 3923.24 Cft
20597 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name of work - FIRST FLOOR COLUMN

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
×
×
×
c
1578.94
-1.94

1.94
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 Making & Fixing Of Timber Shuttering
Formwork for 2nd Floor Beam&Slab
Line - 14 FB1 1 × 1 22' -8'' 5' -4'' 120.89 Sft
Line - 13, 14 FB1 2 × 1 22' -8'' 4' -11'' 222.89 Sft
FB2 3 × 1 6' -4'' 4' -3'' 80.75 Sft
FB2a 1 × 1 8' -2'' 4' -3'' 34.71 Sft
SB2 1 × 1 22' -8'' 3' -3'' 73.67 Sft
Line 8.9.10.11.12FB1 9 × 1 22' -8'' 4' -6'' 918.00 Sft
Line 8 FB1 1 × 1 10' -6'' 4' -11'' 51.63 Sft
lift pit FB6 1 × 1 9' -6'' 4' -6'' 42.75 Sft
Between 9.10.11.12 SB2 3 × 1 73' -6'' 3' -3'' 716.63 Sft
Line-13 SB2 1 × 1 17' -3'' 3' -3'' 56.06 Sft
SB1 4 × 1 7' -0'' 3' -3'' 91.00 Sft
Line 8.9.10.11.12 FB2 10 × 1 6' -4'' 3' -10'' 242.78 Sft
FB 2a 4 × 1 8' -2'' 3' -10'' 125.22 Sft
FB 2a 1 × 1 8' -7'' 3' -10'' 32.90 Sft
A&G FB4 2 × 1 82' -6'' 4' -3'' 701.25 Sft
Line F,FB3 1 × 1 76' -6'' 4' -2'' 318.75 Sft
LineB,D, E,FB3 3 × 1 80' -10'' 4' -2'' 1010.42 Sft
FB5 1 × 1 10' -8'' 4' -8'' 49.78 Sft
SB2 1 × 1 89' -0'' 3' -3'' 289.25 Sft
SB2 1 × 1 45' -4'' 3' -3'' 147.33 Sft
SB2 1 × 1 19' -0'' 3' -3'' 61.75 Sft
SB1 3 × 1 9' -1'' 3' -3'' 88.55 Sft
Column; C1;C2 12 × 1 6' -0'' 2' -0'' 144.00 Sft
C3;C4 25 × 1 6' -8'' 2' -0'' 333.33 Sft
C5 2 × 1 9' -0'' 2' -0'' 36.00 Sft
Slab S2 2 × 1 9' -0'' 7' -0'' 126.00 Sft
Slab S2 12 × 1 9' -1'' 7' -0'' 763.00 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Slab S2 1 × 1 9' -0'' 7' -0'' 63.00 Sft
Slab S2 3 × 1 9' -1'' 7' -0'' 190.75 Sft
Slab S2` 1 × 1 15' -9'' 9' -0'' 141.75 Sft
Slab S2 2 × 1 7' -6'' 9' -1'' 136.25 Sft
Slab S2 1 × 1 9' -0'' 9' -0'' 81.00 Sft
Slab S2 6 × 1 9' -1'' 9' -0'' 490.50 Sft
Slab S2 2 × 1 11' -4'' 9' -0'' 204.00 Sft
Slab S2 8 × 1 11' -4'' 9' -1'' 823.56 Sft
Slab S2 3 × 1 7' -4'' 9' -1'' 199.83 Sft
Slab S3 1 × 1 23' -6'' 7' -0'' 164.50 Sft
Slab S1 5 × 1 15' -9'' 9' -1'' 715.31 Sft
Slab S3 1 × 1 19' -0'' 7' -0'' 133.00 Sft
Slab S1 1 × 1 19' -0'' 11' -1'' 210.58 Sft
Slab S2 1 × 1 7' -1'' 11' -1'' 78.51 Sft
Slab S2 1 × 1 11' -1'' 11' -1'' 122.84 Sft
Slab S2 1 × 1 7' -1'' 9' -0'' 63.75 Sft
Slab S2 1 × 1 11' -1'' 9' -0'' 99.75 Sft
Slab S2 1 × 1 7' -0'' 7' -0'' 49.00 Sft
Slab S2 1 × 1 11' -0'' 7' -0'' 77.00 Sft
Step 7 × 1 5' -3'' 0' -6'' 18.38 Sft
Landing 1 × 1 6' -2'' 11' -0'' 67.83 Sft
11010.38 Sft

2 Re-Bar Work for Second Floor Beam. & Slab & Stair
Line No 9.10.11.12.14 25mmØ 20mmØ 10mmØ
FB1,FB2,FB2a
20mmØ ,Top Bar 5 x 2 79' -0'' 790
FB2,25mmØ ,Extra Bar 5 x 2 8' -9'' 87.50
5 x 2 12' -10'' 128.33
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
20mmØ ,Extra Bar 5 x 4 10' -9'' 215
5 x 4 13' -8'' 273.33
5 x 2 10' -9'' 107.50
5 x 4 13' -8'' 273.33
5 x 2 10' -9'' 107.50
5 x 4 10' -9'' 215.00
FB2,25mmØ ,Extra Bar 5 x 2 12' -10'' 128.33
5 x 2 8' -9'' 87.50
Bottom Bar,FB2 5 x 6 9' -3'' 277.50
FB1,Extra Bar 5 x 8 28' -9'' 1150
5 x 6 14' -3'' 427.50
5 x 4 17' -10'' 356.67
Lapping 5 x 2 2' -7'' 25.83
Spacer Bar 5 x 96 0' -9'' 360
10mmØ Stirrups,FB1 5 x 128 5' -10'' 3733.33

FB2 5 x 38 5' -2'' 981.67

FB2a 5 x 27 5' -2'' 697.50

Line No 8
FB1,FB2,FB2a,FB6
20mmØ,Top Bar 1 x 2 78' -8'' 157.33
FB2,25mmØ ,Extra Bar 1 x 2 8' -9'' 17.50
1 x 2 12' -10'' 25.67
20mmØ ,Extra Bar 1 x 4 10' -9'' 43.00
1 x 4 13' -8'' 54.67
1 x 2 10' -9'' 21.50
1 x 4 10' -8'' 42.67
1 x 4 11' -4'' 45.33
1 x 2 7' -3'' 14.50
1 x 4 7' -3'' 29.00
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
FB2,25mmØ ,Extra Bar 1 x 2 9' -8'' 19.33
1 x 2 6' -0'' 12.00
Bottom Bar 1 x 3 12' -3'' 36.75
1 x 4 28' -9'' 115
1 x 4 14' -3'' 57
1 x 4 17' -0'' 68
1 x 4 16' -4'' 65.33
1 x 3 12' -3'' 36.75
1 x 2 19' -4'' 38.67
1 x 4 6' -9'' 27
1 x 2 7' -3'' 14.5
1 x 2 9' -8'' 19.33
1 x 2 9' -6'' 19
Lapping 1 x 2 2' -7'' 5.17
Spacer Bar 1 x 116 0' -9'' 87
10mmØ Stirrups,FB1 1 x 103 5' -10'' 600.83
FB2 1 x 38 5' -2'' 196.33
FB2a 1 x 27 5' -2'' 139.5
FB6 1 x 39 5' -10'' 227.5
Line No 13
FB1,FB2,SB2
20mmØ,Top Bar 1 x 2 59' -3'' 118.5
FB2,25mmØ ,Extra Bar 1 x 2 6' -0'' 12.00
1 x 2 12' -10'' 25.67
20mmØ ,Extra Bar 1 x 4 10' -9'' 43
1 x 2 13' -8'' 27.33
1 x 4 10' -9'' 43
1 x 2 10' -2'' 20.33
1 x 2 7' -4'' 14.67
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
FB2,25mmØ ,Extra Bar 1 x 1 10' -7'' 10.58
Bottom Bar,20mmØ 1 x 3 12' -3'' 36.75
1 x 4 28' -9'' 115
1 x 2 17' -10'' 35.67
1 x 2 79' -0'' 158
Lapping 1 x 4 2' -7'' 10.33
Spacer Bar 1 x 68 0' -9'' 51
10mmØ Stirrups,FB1 1 x 65 5' -10'' 379.17
FB2 1 x 19 5' -2'' 98.17
SB2 1 x 189 2' -8'' 504
Line Between 9&10,10&11,11&12
SB2
20mmØ,Top Bar 3 x 2 79' -3'' 475.5
Bottom Bar 3 x 2 78' -0'' 468
Lapping 3 x 1 2' -7'' 7.75
10mmØ Stirrups,SB2 3 x 188 2' -8'' 1504
SB2
20mmØ,Top Bar 4 x 2 12' -3'' 98
Extra Bar 4 x 1 6' -0'' 24
4 x 1 6' -0'' 24
Bottom Bar 4 x 2 10' -0'' 80
Extra Bar 4 x 1 6' -2'' 24.67
10mmØ Stirrups,SB2 4 x 35 2' -8'' 373.33
Line A & G
20mmØ,FB4,Top Bar 2 x 2 93' -8'' 374.67
Extra Bar 2 x 2 8' -9'' 35
2 x 2 15' -3'' 61
2 x 2 17' -3'' 69
2 x 2 17' -3'' 69
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
2 x 2 17' -3'' 69
2 x 2 10' -8'' 42.67
Bottom Bar 2 x 4 92' -8'' 741.33
Lapping 2 x 2 2' -7'' 10.33
10mmØ Stirrups,FB4 2 x 267 5' -1'' 2714.5
Line B,G & E
20mmØ,FB3,Top Bar 3 x 2 93' -6'' 561
Extra Bar 3 x 5 8' -9'' 131.25
3 x 5 15' -3'' 228.75
3 x 5 17' -3'' 258.75
3 x 5 17' -3'' 258.75
3 x 5 17' -3'' 258.75
3 x 5 10' -8'' 160
Bottom Bar 3 x 4 92' -3'' 1107
Extra Bar 3 x 2 6' -10'' 41
3 x 2 17' -3'' 103.5
3 x 2 17' -3'' 103.5
3 x 3 17' -3'' 155.25
3 x 3 17' -3'' 155.25
Lapping 3 x 2 2' -7'' 15.5
Spacer Bar 3 x 68 0' -9'' 153
10mmØ Stirrups,FB3 3 x 267 5' -5'' 4338.75

Line No F,FB3,FB5
20mmØ,Top Bar 1 x 2 93' -4'' 186.67
Extra Bar 1 x 5 8' -9'' 43.75
1 x 5 15' -3'' 76.25
1 x 5 17' -3'' 86.25
1 x 10 17' -3'' 172.5
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 5 9' -3'' 46.25
1 x 7 7' -3'' 50.75
Bottom Bar 1 x 4 92' -3'' 369
Extra Bar 1 x 2 7' -9'' 15.5
1 x 2 17' -3'' 34.5
1 x 2 17' -3'' 34.5
1 x 2 17' -3'' 34.5
1 x 2 8' -9'' 17.5
1 x 2 8' -9'' 17.5
Lapping 1 x 2 2' -7'' 5.17
Spacer Bar 1 x 68 0' -9'' 51
10mmØ Stirrups,FB3,FB5 1 x 257 5' -5'' 1392.08

Line No C
20mmØ,SB2,Top Bar 1 x 2 94' -3'' 188.5
Bottom Bar 1 x 2 93' -0'' 186
Lapping 1 x 2 2' -7'' 5.17
10mmØ Stirrups,SB2 1 x 247 2' -8'' 658.67
Line No Between E& F
20mmØ,SB2,Top Bar 1 x 2 74' -3'' 148.5
Bottom Bar 1 x 2 73' -0'' 146
Lapping 1 x 1 2' -7'' 2.58
10mmØ Stirrups,SB2 1 x 186 2' -8'' 496
554.41 14533.75 19035.33

Rebar Work For Stair 16mmØ 10mmØ


1st Floor to 2nd Floor Stair 2 x 16 7' -0'' 224 Rft
1 x 16 13' -0'' 208 Rft
2nd Floor Stair Dowel 1 x 16 13' -0'' 208 Rft
1 x 16 12' -0'' 192 Rft
Distribution Bar 1 x 14 6' -0'' 84 Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 20 12' -6'' 250 Rft
832 334 Rft

Rebar Work For Slab 10mmØ

S3,12-14 Bottom,Main Bar 1 x 25 9' -6'' 237.5 Rft


Distribution Bar 1 x 11 21' -6'' 236.5 Rft
Top Bar 1 x 50 11' -0'' 550 Rft
1 x 11 23' -0'' 253 Rft
S2,8-12,Main Bar 1 x 84 9' -6'' 798 Rft
Distribution Bar 1 x 11 72' -6'' 797.5 Rft
Lapping 1 x 11 1' -4'' 14.67 Rft
Top Bar 1 x 84 11' -6'' 966 Rft
1 x 10 74' -6'' 745 Rft
Lapping 1 x 10 1' -4'' 13.33 Rft
S1,Line 12-14
Bottom Bar 1 x 25 13' -6'' 337.5 Rft
1 x 15 21' -6'' 322.5 Rft
Top Bar 1 x 50 15' -6'' 775 Rft
1 x 15 23' -69'' 431.25 Rft
Between Line B &D
S2, Bottom,Main 1 x 9 31' -6'' 283.5 Rft
Dis; 1 x 25 8' -6'' 212.5 Rft
S2,Top,Main 1 x 9 33' -6'' 301.5 Rft
Dis; 1 x 25 10' -6'' 262.5 Rft
S2, Bottom,Main 1 x 16 21' -6'' 344 Rft
Dis; 1 x 25 14' -0'' 350 Rft
Top Bar 1 x 16 23' -6'' 376 Rft
1 x 25 16' -0'' 400 Rft
S1,S2 Bottom,Main 1 x 30 72' -6'' 2175 Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Dis; 1 x 84 26' -0'' 2184 Rft
Top Bar 1 x 30 74' -6'' 2235 Rft
1 x 84 28' -0'' 2352 Rft
S1 Top Bar 1 x 21 53' -6'' 1123.5 Rft
1 x 60 21' -0'' 1260 Rft
Lapping 1 x 81 1' -6'' 121.5 Rft
S2 Bottom Bar 1 x 13 92' -6'' 1202.5 Rft
1 x 108 11' -6'' 1242 Rft
Top Bar 1 x 13 94' -6'' 1228.5 Rft
1 x 108 13' -6'' 1458 Rft
Lapping 13 x 6 1' -6'' 117 Rft
Line E-F
S3 Bottom Bar 1 x 30 11' -6'' 345 Rft
1 x 10 26' -0'' 260 Rft
Top Bar 1 x 60 13' -6'' 810 Rft
1 x 10 28' -0'' 280 Rft
S3 Bottom Bar 1 x 30 9' -6'' 285 Rft
1 x 8 26' -0'' 208 Rft
Top Bar 1 x 60 11' -6'' 690 Rft
1 x 8 28' -0'' 224 Rft
S2 Bottom Bar 1 x 30 51' -6'' 1545 Rft
1 x 60 26' -0'' 1560 Rft
Top Bar 1 x 30 53' -6'' 1605 Rft
1 x 60 28' -0'' 1680 Rft
Lapping 30 x 2 1' -6'' 90 Rft
S2 Bottom Bar 1 x 30 11' -6'' 345 Rft
1 x 12 26' -0'' 312 Rft
Top Bar 1 x 30 13' -6'' 405 Rft
1 x 12 28' -0'' 336 Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Line F & G
S2 Bottom Bar 1 x 10 91' -6'' 915 Rft
1 x 109 9' -6'' 1035.5 Rft
Top Bar 1 x 10 92' -6'' 925 Rft
1 x 109 11' -6'' 1253.5 Rft
Lapping 10 x 3 1' -6'' 45 Rft
40860.75 Rft

10mmØ - 60230. Rf x0.415 Lb 24995.48 223.17 Cwt


16mmØ - 832 Rf x1.062 Lb 883.54 7.89 Cwt
20mmØ - 14533.75 Rf x1.66 Lb 24126.03 215.41 Cwt
25mmØ - 554.41 Rf x 2.587 Lb 1434.26 12.81 Cwt
459.28 Cwt
3 G-30 ready Mixed concreting
Work For 2nd Floor Beam &
Slab
Line - 14 FB1 1 × 1 22' -8'' 1' -0'' 2' -0'' 45.33 Cft
Line - 13, 14 FB1 2 × 1 22' -8'' 1' -0'' 2' -0'' 90.67 Cft
FB2 3 × 1 6' -4'' 1' -0'' 1' -8'' 31.67 Cft
FB2a 1 × 1 8' -2'' 1' -0'' 1' -8'' 13.61 Cft
SB2 1 × 1 22' -8'' 1' -0'' 1' -8'' 37.78 Cft

Line 9.10.11.12FB1 8 × 1 22' -8'' 1' -0'' 2' -0'' 362.67 Cft
Between 9.10.11.12 SB2 3 × 1 73' -6'' 0' -9'' 1' -6'' 248.06 Cft
Line-13 SB2 1 × 1 17' -3'' 0' -9'' 1' -6'' 19.41 Cft
SB1 3 × 1 7' -0'' 0' -9'' 1' -6'' 23.63 Cft
Line 9.10.11.12 FB2 8 × 1 6' -4'' 1' -0'' 1' -8'' 84.44 Cft
FB 2a 4 × 1 8' -2'' 1' -0'' 1' -8'' 54.44 Cft
A&G FB4 2 × 1 84' -3'' 1' -0'' 1' -8'' 280.83 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Line F,FB3 1 × 1 72' -3'' 1' -0'' 1' -10'' 132.46 Cft
LineB,D, E,FB3 3 × 1 84' -3'' 1' -0'' 1' -10'' 463.38 Cft
FB5 1 × 1 9' -2'' 1' -2'' 2' -0'' 21.39 Cft
SB2 1 × 1 84' -6'' 0' -9'' 1' -6'' 95.06 Cft
SB2 1 × 1 44' -6'' 0' -9'' 1' -6'' 50.06 Cft
SB2 3 × 1 74' -0'' 0' -9'' 1' -6'' 249.75 Cft
SB1 3 × 1 9' -1'' 0' -9'' 1' -6'' 30.66 Cft
Column; C1;C2 10 × 1 1' -4'' 1' -6'' 2' -0'' 40.00 Cft
C3;C4 22 × 1 1' -4'' 1' -10'' 2' -0'' 107.56 Cft
Slab S2 2 × 1 9' -0'' 7' -0'' 0' -5'' 52.50 Cft
Slab S2 12 × 1 9' -1'' 7' -0'' 0' -5'' 317.92 Cft
Slab S2 1 × 1 9' -0'' 7' -0'' 0' -5'' 26.25 Cft
Slab S2 3 × 1 9' -1'' 7' -0'' 0' -5'' 79.48 Cft
Slab S2` 1 × 1 15' -9'' 9' -0'' 0' -5'' 59.06 Cft
Slab S2 2 × 1 7' -6'' 9' -1'' 0' -5'' 56.77 Cft
Slab S2 1 × 1 9' -0'' 9' -0'' 0' -5'' 33.75 Cft
Slab S2 6 × 1 9' -1'' 9' -0'' 0' -5'' 204.38 Cft
Slab S2 2 × 1 11' -4'' 9' -0'' 0' -5'' 85.00 Cft
Slab S2 8 × 1 11' -4'' 9' -1'' 0' -5'' 343.15 Cft
Slab S2 3 × 1 7' -4'' 9' -1'' 0' -5'' 83.26 Cft
Slab S3 1 × 1 23' -6'' 7' -0'' 0' -5'' 68.54 Cft
Slab S1 5 × 1 15' -9'' 9' -1'' 0' -5'' 298.05 Cft
Slab S3 1 × 1 19' -0'' 7' -0'' 0' -5'' 55.42 Cft
Slab S1 1 × 1 19' -0'' 11' -1'' 0' -5'' 87.74 Cft
Slab S2 1 × 1 7' -1'' 11' -1'' 0' -5'' 32.71 Cft
Slab S2 1 × 1 11' -1'' 11' -1'' 0' -5'' 51.18 Cft
Slab S2 1 × 1 7' -1'' 9' -0'' 0' -5'' 26.56 Cft
Slab S2 1 × 1 11' -1'' 9' -0'' 0' -5'' 41.56 Cft
Slab S2 1 × 1 7' -0'' 7' -0'' 0' -5'' 20.42 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Slab S2 1 × 1 11' -0'' 7' -0'' 0' -5'' 32.08 Cft
Stair Step 7 × 1 5' -3'' 0' -6'' 0' -6'' 9.19 Cft
Flight 1 × 1 8' -0'' 5' -3'' 0' -9'' 31.50 Cft
Landing Floor 1 × 1 11' -0'' 6' -2'' 0' -9'' 50.88 Cft
4630.21 Cft
Deduction
FB3 1 × 1 16' -0'' 1' -0'' 1' -10'' 29.33 Cft
FB4 1 × 1 8' -0'' 1' -0'' 1' -8'' 13.33 Cft
Slab 1 × 1 68' -6'' 4' -0'' 0' -5'' 114.17 Cft
156.83 Cft
4473.38 Cft

4 Hire Charges For Concreting Work


4473.38 Cft
Vibrator 11 Day

5 Curing Work For Concreting


For14 Day
For 2nd Floor 1 × 1 87' -0'' 80' -0'' 6960 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

1 Making & Fixing Of Timber Shuttering


Formwork for 2nd Floor Beam,Slab & Stair
Line 1
FB1 1 x 1 22' -8'' 4' -11'' 111.44 Sft
FB2 2 x 1 6' -4'' 4' -3'' 53.83 Sft
FB2a 1 x 1 8' -2'' 4' -3'' 34.71 Sft
FB5 1 x 1 22' -8'' 5' -1'' 115.22 Sft
Line 2,3,4,5,6,7
FB1 9 x 1 22' -8'' 4' -6'' 918 Sft
FB1 1 x 1 10' -2'' 4' -6'' 45.75 Sft
FB5 1 x 1 22' -8'' 4' -8'' 105.78 Sft
FB6 2 x 1 9' -6'' 4' -6'' 85.5 Sft
FB2 11 x 1 6' -4'' 3' -10'' 267.06 Sft
FB2a 5 x 1 8' -3'' 3' -10'' 158.13 Sft
SB2 3 x 1 70' -0'' 3' -3'' 682.5 Sft
SB2 1 x 1 31' -6'' 3' -3'' 102.38 Sft
SB1 2 x 1 7' -0'' 3' -3'' 45.5 Sft
Line A & G
FB4 2 x 1 101' -0'' 4' -3'' 858.5 Sft
Line B & E
FB3 1 x 1 99' -0'' 4' -2'' 412.5 Sft
1 x 1 97' -3'' 4' -2'' 405.21 Sft
Line D
FB1 1 x 1 10' -8'' 4' -6'' 48 Sft
FB3 1 x 1 72' -8'' 4' -2'' 302.78 Sft
FB6 2 x 1 7' -0'' 4' -6'' 63 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Line F
FB3 1 x 1 87' -0'' 4' -2'' 362.5 Sft
FB5 1 x 1 10' -3'' 4' -8'' 47.83 Sft
Line C
FB1 1 x 1 9' -2'' 4' -6'' 41.25 Sft
FB6 2 x 1 7' -0'' 4' -6'' 63 Sft
Line Between 1 & 3
SB2 2 x 1 19' -0'' 3' -3'' 123.5 Sft
1 x 1 18' -3'' 3' -3'' 59.31 Sft
Column C1,C2 14 x 1 6' -0'' 2' -0'' 168 Sft
C3,C4 29 x 1 6' -8'' 2' -0'' 386.67 Sft
C5 6 x 1 9' -0'' 2' -0'' 108 Sft
Slab S3 2 x 1 19' -0'' 7' -0'' 266.00 Sft
Slab S3 1 x 1 19' -0'' 5' -6'' 104.50 Sft
Slab S3 4 x 1 23' -6'' 9' -2'' 861.67 Sft
Slab S3 2 x 1 19' -0'' 9' -0'' 342.00 Sft
Slab S3 1 x 1 23' -6'' 7' -0'' 164.50 Sft
Slab S3 6 x 1 23' -6'' 9' -2'' 1292.50 Sft
Slab S3 1 x 1 23' -6'' 9' -0'' 211.50 Sft
Slab S2 14 x 1 9' -2'' 7' -0'' 898.33 Sft
Slab S2 2 x 1 9' -0'' 7' -0'' 126.00 Sft
Slab S2 1 x 1 9' -0'' 11' -0'' 99.00 Sft
Slab S2 1 x 1 11' -0'' 11' -6'' 126.50 Sft
Slab S2 6 x 1 9' -2'' 9' -0'' 495.00 Sft
Slab S2 1 x 1 9' -0'' 9' -0'' 81.00 Sft
Slab S2 1 x 1 7' -0'' 7' -0'' 49.00 Sft
Slab S2 1 x 1 11' -0'' 7' -0'' 77.00 Sft
Slab S2 4 x 1 10' -4'' 9' -2'' 378.89 Sft
Slab S2 2 x 1 3' -9'' 7' -0'' 52.50 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Slab S2 2 x 1 5' -3'' 7' -0'' 73.50 Sft
Slab S1 1 x 1 15' -0'' 19' -0'' 285.00 Sft
Slab S1 2 x 1 9' -2'' 15' -9'' 288.75 Sft
Step 24 × 1 5' -3'' 0' -6'' 63.00 Sft
Landing 1 × 1 6' -2'' 11' -0'' 67.83 Sft
Landing 1 × 1 2' -2'' 11' -0'' 23.83 Sft
Flight 2 × 1 13' -8'' 5' -3'' 143.50 Sft
Side Cover 2 × 2 14' -0'' 1' -6'' 84.00 Sft
12831.15 Sft
2 Rebar Work for Second Floor
Beam , Slab & Stair
Line A & G,FB4 25mmØ 20mmØ 10mmØ
20mmØ,Top Bar 2 x 2 115' -0'' 460
Extra Bar 2 x 2 10' -0'' 40
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 14' -0'' 56
2 x 2 14' -0'' 56
2 x 2 10' -0'' 40
Bottom Bar 2 x 4 113' -6'' 908
Lapping 2 x 12 2' -7'' 62
10mmØ Stirrups,FB4 2 x 270 5' -1'' 2745
Line B & E,FB3
20mmØ,Top Bar 2 x 2 115' -0'' 460
Extra Bar 2 x 5 10' -0'' 100
2 x 5 18' -0'' 180
2 x 5 18' -0'' 180
2 x 5 18' -0'' 180
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
2 x 5 14' -0'' 140
2 x 5 14' -0'' 140
2 x 5 10' -0'' 100
Bottom Bar 2 x 4 113' -6'' 908
Extra Bar 2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 18' -0'' 72
2 x 2 10' -0'' 40
Lapping 2 x 12 2' -7'' 62
Spacer Bar 2 x 45 0' -9'' 68
10mmØ Stirrups,FB3 2 x 264 5' -5'' 2860
Line F
FB3,FB5
20mmØ,Top Bar 1 x 2 115' -0'' 230
Extra Bar 1 x 6 10' -0'' 60
1 x 5 10' -0'' 50
1 x 5 14' -0'' 70
1 x 5 18' -0'' 90
1 x 5 18' -0'' 90
1 x 5 14' -0'' 70
1 x 5 14' -0'' 70
1 x 5 10' -0'' 50
1 x 1 8' -0'' 8
Bottom Bar 1 x 4 101' -0'' 404
1 x 4 15' -0'' 60
Extra Bar 1 x 2 12' -0'' 24
1 x 2 8' -0'' 16
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 10' -0'' 20
Lapping 1 x 12 2' -7'' 31
Spacer Bar 1 x 47 0' -9'' 35
10mmØ Stirrups,FB3 1 x 242 5' -5'' 1311
FB5 1 x 40 5' -5'' 217
Line D
FB1,FB3,FB6
20mmØ,Top Bar 1 x 2 204' -0'' 408
Extra Bar 1 x 10 10' -0'' 100
1 x 10 18' -0'' 180
1 x 5 18' -0'' 90
1 x 5 18' -0'' 90
1 x 5 14' -0'' 70
1 x 4 10' -0'' 40
1 x 4 10' -0'' 40
25mmØ,FB2,Extra Bar 1 x 4 6' -6'' 26
1 x 3 8' -0'' 24
Bottom Bar 1 x 4 85' -0'' 340
1 x 4 14' -0'' 56
1 x 4 20' -0'' 80
1 x 4 95' -6'' 382
Extra Bar 1 x 12 18' -0'' 216
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
1 x 2 18' -0'' 36
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 2 10' -0'' 18
25mmØ,FB2,Extra Bar 1 x 4 8' -0'' 28
Lapping 1 x 10 2' -7'' 26
Spacer Bar 1 x 54 0' -9'' 41
10mmØ Stirrups,FB3 1 x 284 5' -5'' 1538
FB1 1 x 50 5' -10'' 292
FB6 1 x 68 5' -10'' 397
Line C
FB1,FB6
20mmØ,Top Bar,FB1 1 x 2 50' -0'' 100
Extra Bar,FB1 1 x 8 8' -0'' 56
1 x 4 10' -0'' 40
20mmØ,Extra Bar 1 x 4 10' -0'' 40
1 x 4 8' -0'' 32
Bottom Bar 1 x 4 14' -0'' 56
1 x 2 20' -0'' 40
Extra Bar,FB1 1 x 2 10' -0'' 20
20mmØ,Extra Bar 1 x 4 8' -0'' 32
Spacer Bar 1 x 45 0' -9'' 34
10mmØ Stirrups,FB1,FB6 1 x 68 5' -10'' 397
SB2
20mmØ,Top Bar 4 x 2 24' -0'' 192
Bottom Bar 4 x 2 23' -0'' 184
10mmØ Stirrups,SB2 4 x 54 2' -8'' 576
Line 1 & 3
FB1,FB2,FB2a,FB5
20mmØ,Top Bar 2 x 2 80' -0'' 320
25mmØ,FB2,Extra Bar 2 x 2 6' -0'' 24
Extra Bar,FB1 2 x 2 17' -0'' 56
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
2 x 4 17' -0'' 84
2 x 6 17' -0'' 112
20mmØ,Extra Bar 2 x 8 15' -0'' 240
2 x 6 12' -0'' 144
2 x 2 14' -0'' 53
25mmØ,FB2,Extra Bar 2 x 2 6' -0'' 24
20mmØ,Bottom Bar 2 x 3 12' -6'' 75
2 x 4 40' -0'' 320
2 x 4 15' -0'' 120
2 x 4 40' -0'' 320
2 x 3 12' -0'' 72
Extra Bar,FB1 2 x 2 20' -0'' 72
20mmØ,Extra Bar,FB5 2 x 2 20' -0'' 80
Lapping 2 x 1 2' -7'' 5
Spacer Bar 2 x 58 0' -9'' 87
10mmØ Stirrups,FB1 2 x 94 5' -10'' 1097
FB2 2 x 44 5' -2'' 455
FB2a 2 x 30 5' -2'' 310
FB5 2 x 60 5' -5'' 650
Line 4,5,6
FB1,FB2,FB2a
20mmØ,Top Bar 3 x 2 80' -0'' 480
25mmØ,FB2,Extra Bar 3 x 2 6' -0'' 36
3 x 4 15' -6'' 186
3 x 2 14' -0'' 84
3 x 8 12' -0'' 288
25mmØ,FB2,Extra Bar 3 x 2 6' -0'' 36
Extra Bar,FB1 3 x 2 14' -0'' 84
3 x 4 15' -6'' 186
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
3 x 4 12' -0'' 144
20mmØ,Bottom Bar 3 x 3 11' -0'' 99
3 x 4 28' -0'' 336
3 x 6 14' -0'' 252
3 x 4 28' -0'' 336
3 x 3 11' -0'' 99
Extra Bar,FB1 3 x 4 20' -0'' 240
Lapping 3 x 2 2' -7'' 16
Spacer Bar 3 x 68 0' -9'' 153
10mmØ Stirrups,FB1 2 x 128 5' -10'' 1493
FB2,FB2a 2 x 98 5' -2'' 1013
Line 7,FB1,FB2,FB2a
20mmØ,Top Bar 1 x 2 46' -6'' 93
1 x 2 14' -0'' 28
25mmØ,FB2,Extra Bar 1 x 2 6' -0'' 12
1 x 4 6' -6'' 26
1 x 2 6' -0'' 12
Extra Bar,FB1 1 x 4 15' -6'' 62
1 x 4 13' -9'' 55
1 x 16 12' -0'' 192
1 x 2 13' -3'' 27
20mmØ,Bottom Bar 1 x 3 11' -0'' 33
1 x 4 28' -0'' 112
1 x 6 14' -0'' 84
1 x 4 28' -0'' 112
1 x 3 11' -0'' 33
Extra Bar,FB1 1 x 4 20' -0'' 160
Lapping 1 x 2 2' -7'' 5
Spacer Bar 1 x 65 0' -9'' 49
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
10mmØ Stirrups,FB1 2 x 118 5' -10'' 1377
FB2,FB2a 2 x 78 5' -2'' 806
Line 2,FB1,FB2
20mmØ,Top Bar 1 x 2 40' -0'' 80
25mmØ,FB2,Extra Bar 1 x 2 6' -0'' 12
1 x 2 14' -0'' 28
1 x 10 12' -0'' 110
Bottom Bar 1 x 3 12' -0'' 36
1 x 4 28' -0'' 112
Extra Bar,FB1 1 x 2 20' -0'' 36
Spacer Bar 1 x 38 0' -9'' 29
10mmØ Stirrups,FB1 1 x 98 5' -10'' 572
FB2 1 x 45 5' -2'' 233
FB6,20mmØ,Top Bar 2 x 2 20' -0'' 80
Extra Bar 2 x 8 10' -0'' 160
Bottom Bar 2 x 4 15' -6'' 124
2 x 2 10' -6'' 42
Spacer Bar 2 x 28 0' -9'' 42
10mmØ Stirrups,FB6 2 x 54 5' -10'' 630
SB1,20mmØ,Top Bar 2 x 2 15' -0'' 60
Extra Bar 2 x 2 8' -0'' 32
Bottom Bar 2 x 2 14' -6'' 58
2 x 1 10' -0'' 20
10mmØ Stirrups,SB1 2 x 28 2' -8'' 149
Line Between 3&4,4&5,5&6
SB2,20mmØ,Top Bar 3 x 2 90' -0'' 540
Bottom Bar 3 x 2 88' -6'' 531
Lapping 3 x 4 2' -7'' 31
10mmØ Stirrups,SB2 3 x 98 2' -8'' 784
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
236 17750 19899

16mmØ 10mmØ
Rebar Work For Stair
2nd Floor to 3rd Floor Stair 2 x 16 7' -0'' 224 Rft
1 x 16 13' -0'' 208 Rft
3rd Floor Stair Dowel 1 x 16 13' -0'' 208 Rft
1 x 16 12' -0'' 192 Rft
Distribution Bar 1 x 14 6' -0'' 84 Rft
1 x 20 12' -6'' 250 Rft
2nd Floor to 3rd Floor Stair 2 x 16 7' -0'' 224 Rft
1 x 16 10' -0'' 160 Rft
3rd Floor Stair Dowel 1 x 16 10' -0'' 160 Rft
1 x 16 12' -0'' 192 Rft
Distribution Bar 1 x 14 6' -0'' 84 Rft
1 x 8 12' -0'' 100 Rft
2nd Floor to 3rd Floor Stair 2 x 16 7' -0'' 224 Rft
1 x 16 13' -0'' 208 Rft
3rd Floor Stair Dowel 1 x 16 13' -0'' 208 Rft
1 x 16 12' -0'' 192 Rft
Distribution Bar 1 x 14 6' -0'' 84 Rft
1 x 20 12' -6'' 250 Rft
2400 852 Rft
Rebar Work For Slab 10mmØ

S3,1-3, Bottom,Main Bar 1 x 25 9' -6'' 237.5 Rft


Distribution Bar 1 x 11 21' -6'' 236.5 Rft
Top Bar 1 x 50 11' -0'' 550 Rft
1 x 11 23' -0'' 253 Rft
S2,3-8,Bottom,Main Bar 1 x 111 9' -6'' 1054.5 Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Distribution Bar 1 x 12 91' -6'' 1098 Rft
Lapping 2 x 12 1' -4'' 32 Rft
Top Bar 1 x 88 11' -0'' 968 Rft
1 x 12 93' -0'' 1116 Rft
Lapping 2 x 12 1' -4'' 32 Rft
Line 1-3,S3
Bottom,Main Bar 1 x 26 8' -0'' 208 Rft
Distribution Bar 1 x 10 21' -6'' 215 Rft
Top,Main Bar 1 x 42 9' -6'' 399 Rft
Distribution Bar 1 x 17 23' -0'' 391 Rft
S1,Bottom,Main Bar 1 x 25 16' -0'' 400 Rft
Distribution Bar 1 x 20 21' -6'' 430 Rft
Top,Main Bar 1 x 44 17' -6'' 770 Rft
Distribution Bar 1 x 30 23' -0'' 690 Rft
Line 3-5,S3
Bottom,Main Bar 2 x 50 26' -0'' 2600 Rft
Distribution Bar 2 x 30 41' -6'' 2490 Rft
Top,Main Bar 2 x 83 27' -6'' 4565 Rft
Distribution Bar 2 x 60 43' -0'' 5160 Rft
Lapping 2 x 90 1' -4'' 240 Rft
Line 5-6,S2
Bottom,Main Bar 1 x 25 8' -6'' 212.5 Rft
Distribution Bar 1 x 10 21' -6'' 215 Rft
Top,Main Bar 1 x 21 10' -0'' 210 Rft
Distribution Bar 1 x 8 23' -0'' 184 Rft
Line 5-6,C-D,S1
Bottom,Main Bar 1 x 25 19' -0'' 475 Rft
Distribution Bar 1 x 21 21' -6'' 451.5 Rft
Top,Main Bar 1 x 45 20' -6'' 922.5 Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Distribution Bar 1 x 35 23' -0'' 805 Rft
Line 6-7,B-C,S2
Bottom,Main Bar 1 x 15 11' -6'' 172.5 Rft
Distribution Bar 1 x 12 13' -6'' 162 Rft
Top,Main Bar 1 x 13 13' -0'' 169 Rft
Distribution Bar 1 x 11 14' -0'' 154 Rft
Line C-D
Bottom,Main Bar 1 x 15 13' -0'' 195 Rft
Distribution Bar 1 x 14 14' -0'' 196 Rft
Top,Main Bar 1 x 13 14' -6'' 188.5 Rft
Distribution Bar 1 x 12 15' -6'' 186 Rft
Line D-E,1-3 & 7-8,S3
Bottom,Main Bar 2 x 25 11' -6'' 575 Rft
Distribution Bar 2 x 12 21' -6'' 516 Rft
Top,Main Bar 2 x 41 13' -0'' 1066 Rft
Distribution Bar 2 x 21 23' -0'' 966 Rft
Line 3-7,D-E,S2
Bottom,Main Bar 1 x 85 11' -6'' 977.5 Rft
Distribution Bar 1 x 12 71' -6'' 858 Rft
Top,Main Bar 1 x 73 13' -0'' 949 Rft
Distribution Bar 1 x 11 73' -0'' 803 Rft
Lapping 1 x 23 1' -4'' 30.67 Rft
Line 2-3,E-F,S2
Bottom,Main Bar 1 x 30 9' -6'' 285 Rft
Distribution Bar 1 x 10 26' -0'' 260 Rft
Top,Main Bar 1 x 50 11' -0'' 550 Rft
Distribution Bar 1 x 17 27' -6'' 467.5 Rft
Line 5-6,E-F,S2
Bottom,Main Bar 1 x 30 21' -6'' 645 Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Distribution Bar 1 x 25 26' -0'' 650 Rft
Top,Main Bar 1 x 50 23' -0'' 1150 Rft
Distribution Bar 1 x 12 27' -6'' 330 Rft
Line 6-8,E-F,S3
Bottom,Main Bar 1 x 37 26' -0'' 962 Rft
Distribution Bar 1 x 30 31' -6'' 945 Rft
Top,Main Bar 1 x 62 27' -6'' 1705 Rft
Distribution Bar 1 x 51 33' -0'' 1683 Rft
Line 1-8,F-G,S2
Bottom,Main Bar 1 x 133 9' -6'' 1263.5 Rft
Distribution Bar 1 x 10 111' -6'' 1115 Rft
Top,Main Bar 1 x 113 11' -0'' 1243 Rft
Distribution Bar 1 x 9 113' -0'' 1017 Rft
Lapping 2 x 19 1' -4'' 50.67 Rft
Chair 2 x 320 2' -6'' 1600 Rft
51696.84 Rft

10mmØ - 72113.84 Rf x0.415 Lb 29927.24 267.21 Cwt


16mmØ - 1568Rf x1.062 Lb 1665.22 14.86 Cwt
20mmØ - 17750 Rf x1.66 Lb 29465 263.08 Cwt
25mmØ - 236 Rf x 2.587 Lb 610.53 5.45 Cwt
550.6 Cwt
3 G-30 Ready Mixed Concreting Work
for 2nd Floor Beam & Slab
Line 1
FB1 1 x 1 22' -8'' 1' -0'' 2' -0'' 45.33 Cft
FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21.11 Cft
FB2a 1 x 1 8' -2'' 1' -0'' 1' -8'' 13.61 Cft
FB5 1 x 1 22' -8'' 1' -2'' 2' -0'' 52.89 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Line 2,3,4,5,6,7
FB1 9 x 1 22' -8'' 1' -0'' 2' -0'' 408.00 Cft
FB1 1 x 1 10' -2'' 1' -0'' 2' -0'' 20.33 Cft
FB5 1 x 1 22' -8'' 1' -2'' 2' -0'' 52.89 Cft
FB6 2 x 1 9' -6'' 1' -0'' 2' -0'' 38.00 Cft
FB2 11 x 1 6' -4'' 1' -0'' 1' -8'' 116.11 Cft
FB2a 5 x 1 8' -3'' 1' -0'' 1' -8'' 68.75 Cft
SB2 3 x 1 70' -0'' 0' -9'' 1' -6'' 236.25 Cft
SB2 1 x 1 31' -6'' 0' -9'' 1' -6'' 35.44 Cft
SB1 2 x 1 7' -0'' 0' -9'' 1' -6'' 15.75 Cft
Line A & G
FB4 2 x 1 101' -0'' 1' -0'' 1' -8'' 336.67 Cft
Line B & E
FB3 1 x 1 99' -0'' 1' -0'' 1' -10'' 181.50 Cft
1 x 1 97' -3'' 1' -0'' 1' -10'' 178.29 Cft
Line D
FB1 1 x 1 10' -8'' 1' -0'' 2' -0'' 21.33 Cft
FB3 1 x 1 72' -8'' 1' -0'' 1' -10'' 133.22 Cft
FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28.00 Cft
Line F
FB3 1 x 1 87' -0'' 1' -0'' 1' -10'' 159.50 Cft
FB5 1 x 1 10' -3'' 1' -2'' 2' -0'' 23.92 Cft
Line C
FB1 1 x 1 9' -2'' 1' -0'' 2' -0'' 18.33 Cft
FB6 2 x 1 7' -0'' 1' -0'' 2' -0'' 28.00 Cft
Line Between 1 & 3
SB2 2 x 1 19' -0'' 0' -9'' 1' -6'' 42.75 Cft
1 x 1 18' -3'' 0' -9'' 1' -6'' 20.53 Cft
2 x 1 4' -6'' 0' -9'' 1' -6'' 10.13 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Column C1,C2 14 x 1 1' -4'' 1' -6'' 2' -0'' 56.00 Cft
C3,C4 29 x 1 1' -4'' 1' -10'' 2' -0'' 141.78 Cft
C5 6 x 1 1' -0'' 2' -0'' 2' -0'' 24.00 Cft
Slab S3 2 x 1 19' -0'' 7' -0'' 0' -5'' 110.83 Cft
Slab S3 1 x 1 19' -0'' 5' -6'' 0' -5'' 43.54 Cft
Slab S3 4 x 1 23' -6'' 9' -2'' 0' -5'' 359.03 Cft
Slab S3 2 x 1 19' -0'' 9' -0'' 0' -5'' 142.50 Cft
Slab S3 1 x 1 23' -6'' 7' -0'' 0' -5'' 68.54 Cft
Slab S3 6 x 1 23' -6'' 9' -2'' 0' -5'' 538.54 Cft
Slab S3 1 x 1 23' -6'' 9' -0'' 0' -5'' 88.13 Cft
Slab S2 14 x 1 9' -3'' 7' -0'' 0' -5'' 377.71 Cft
Slab S2 2 x 1 9' -0'' 7' -0'' 0' -5'' 52.50 Cft
Slab S2 1 x 1 9' -0'' 11' -0'' 0' -5'' 41.25 Cft
Slab S2 1 x 1 11' -0'' 11' -6'' 0' -5'' 52.71 Cft
Slab S2 6 x 1 9' -2'' 9' -0'' 0' -5'' 206.25 Cft
Slab S2 1 x 1 9' -0'' 9' -0'' 0' -5'' 33.75 Cft
Slab S2 1 x 1 7' -0'' 7' -0'' 0' -5'' 20.42 Cft
Slab S2 1 x 1 11' -0'' 7' -0'' 0' -5'' 32.08 Cft
Slab S2 4 x 1 10' -4'' 9' -2'' 0' -5'' 157.87 Cft
Slab S2 2 x 1 3' -9'' 7' -0'' 0' -5'' 21.88 Cft
Slab S2 2 x 1 5' -3'' 7' -0'' 0' -5'' 30.63 Cft
Slab S1 1 x 1 15' -0'' 19' -0'' 0' -5'' 118.75 Cft
Slab S1 2 x 1 9' -3'' 15' -9'' 0' -5'' 121.41 Cft
Slab 1 × 1 68' -6'' 4' -0'' 0' -5'' 114.17 Cft
Stair Step 12 × 1 5' -3'' 0' -6'' 0' -6'' 15.8 Cft
Flight 1 × 2 13' -6'' 5' -3'' 0' -9'' 106.31 Cft
Landing Floor 1 × 1 11' -0'' 6' -2'' 0' -9'' 50.88 Cft
1 × 1 11' -0'' 2' -2'' 0' -9'' 17.88 Cft
FB1 1 x 1 22' -8'' 1' -0'' 2' -0'' 45.33 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
FB2 2 x 1 6' -4'' 1' -0'' 1' -8'' 21.11 Cft
FB2a 1 x 1 8' -2'' 1' -0'' 1' -8'' 13.61 Cft
FB6 1 x 1 9' -6'' 1' -0'' 2' -0'' 19.00 Cft
FB1 1 x 1 10' -2'' 1' -0'' 2' -0'' 20.33 Cft
FB3 1 × 1 16' -0'' 1' -0'' 1' -10'' 29.33 Cft
FB4 1 × 1 9' -6'' 1' -0'' 1' -8'' 15.83 Cft
5616.26 Cft
4 Hire Charges For Concreting Work
5616.00Cft
Vibrator 14 Day

5 Curing Work For Concreting for 14 Day


For 2nd Floor 1 × 1 117' -0'' 80' -0'' 9360 Sft

Machine Floor Beam & Slab


1 Making & Fixing Of Timber Shuttering
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Formwork for Floor Beam,Slab & Stair
Line 1,14
FB6 4 x 1 22' -9'' 4' -11'' 447.42 Sft
FB7 4 x 1 6' -4'' 3' -11'' 99.22 Sft
2 x 1 8' -2'' 3' -11'' 63.97 Sft
Line 3,4,5,6,7,8,9,10,11,12
FB6 10 x 2 22' -9'' 4' -6'' 2047.5 Sft
FB7 10 x 2 6' -4'' 3' -6'' 443.33 Sft
10 x 1 8' -2'' 3' -6'' 285.83 Sft
Line 2,13
FB6 2 x 1 22' -9'' 4' -6'' 204.75 Sft
FB7 2 x 1 6' -4'' 3' -6'' 44.33 Sft
Line Between 7 & 8
FB6 2 x 1 9' -6'' 4' -6'' 85.5 Sft
Line A & G
FB4 2 x 1 185' -4'' 4' -3'' 1575.33 Sft
Line B
FB4 1 x 1 185' -4'' 3' -10'' 710.44 Sft
Line D
FB4 1 x 1 158' -0'' 4' -3'' 671.5 Sft
FB6 1 x 1 22' -6'' 4' -6'' 101.25 Sft
Line E
FB1 1 x 2 6' -8'' 4' -6'' 60 Sft
FB4 1 x 1 169' -4'' 4' -3'' 719.67 Sft
Line F
FB4 1 x 1 161' -4'' 4' -3'' 685.67 Sft
FB5 1 x 2 10' -8'' 4' -8'' 99.56 Sft
Line C
FB6 1 x 1 22' -6'' 4' -6'' 101.25 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
SB2 1 x 1 161' -0'' 3' -3'' 523.25 Sft
Line Between E & F
SB2 1 x 1 151' -0'' 3' -3'' 490.75 Sft
Column C1,C2 24 x 1 6' -0'' 2' -0'' 288 Sft
C3,C4 51 x 1 6' -8'' 2' -0'' 680 Sft
C5 6 x 1 9' -0'' 2' -0'' 108 Sft
WT 2 x 1 19' -0'' 7' -0'' 266 Sft
WT 2 x 1 19' -0'' 11' -6'' 437 Sft
WT 2 x 1 19' -0'' 11' -0'' 418 Sft
S3 14 x 1 19' -0'' 7' -0'' 1862 Sft
S3 8 x 1 19' -0'' 9' -0'' 1368 Sft
S2 4 x 1 9' -0'' 7' 0' 252 Sft
S2 2 x 1 9' -0'' 9' -0'' 162 Sft
S2 4 x 1 9' -0'' 12' 0' 432 Sft
S2 4 x 1 9' -0'' 11' 6' 414 Sft
S2 2 x 1 11' -0'' 7' 0' 154 Sft
S2 2 x 1 7' -0'' 7' 0' 98 Sft
S3 2 x 1 7' -0'' 23' 6' 329 Sft
S1 14 x 1 19' -0'' 11' 0' 2926 Sft
S1 13 x 1 19' -0'' 11' 6' 2841 Sft
Step 36 × 1 5' -3'' 0' -6'' 94.50 Sft
Landing 1 × 2 6' -2'' 11' -0'' 135.67 Sft
Landing 1 × 1 2' -2'' 11' -0'' 23.83 Sft
Flight 3 × 1 13' -8'' 5' -3'' 215.25 Sft
Side Cover 3 × 2 14' -0'' 1' -6'' 126.00 Sft
23090.27 Sft
2 Rebar Work for Machine Floor
Beam , Slab & Stair
Line 1,3,4,5,6,7,8,9,10,11,12,14,FB6,FB7 20mmØ 10mmØ
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
20mmØ,Top Bar 12 x 2 80' -0'' 1920
Extra Bar 12 x 2 6' -0'' 144
12 x 2 14' -0'' 336
12 x 2 15' -0'' 360
12 x 12 12' -0'' 1728
Bottom Bar 12 x 6 10' -6'' 756
12 x 8 27' -0'' 2592
12 x 3 12' -6'' 450
12 x 4 18' -0'' 864
Spacer 12 x 75 0' -9'' 675
Lapping 12 x 2 2' -7'' 62
10mmØ Stirrups,FB6 1 x 140 5' -10'' 817
FB7 1 x 81 4' -10'' 392
Line 2 & 13,FB6,FB7
20mmØ,Top Bar 2 x 2 36' -3'' 145
Extra Bar 2 x 1 6' -0'' 12
2 x 1 14' -0'' 28
2 x 7 12' -0'' 168
Bottom Bar 2 x 3 10' -6'' 63
2 x 4 27' -0'' 216
Extra Bar 2 x 2 18' -0'' 72
Spacer 2 x 30 0' -9'' 45
10mmØ, Stirrups,FB6 1 x 75 5' -10'' 438
FB7 1 x 32 4' -10'' 155
FB6
20mmØ,Top Bar 2 x 2 16' -0'' 64
Extra Bar 2 x 8 4' -6'' 72
Bottom Bar 2 x 4 14' -6'' 116
Extra Bar 2 x 2 11' -0'' 44
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Spacer 2 x 14 0' -9'' 21
10mmØ Stirrups,FB6 2 x 51 5' -10'' 595
Line A,B,E,G,FB4
20mmØ,Top Bar 4 x 2 204' -0'' 1632
Extra Bar 4 x 2 11' -0'' 88
4 x 22 17' -6'' 1540
Bottom Bar 4 x 4 203' -0'' 3248
Lapping 4 x 30 2' -7'' 310
10mmØ Stirrups,FB4 4 x 554 5' -1'' 11265
Line F,FB4,FB5
20mmØ,Top Bar 1 x 2 204' -0'' 408
Extra Bar 1 x 16 7' -6'' 120
1 x 4 9' -6'' 38
1 x 4 12' -0'' 48
1 x 16 17' -6'' 280
Bottom Bar 1 x 4 179' -0'' 716
1 x 8 15' -0'' 120
Extra Bar 1 x 4 10' -6'' 42
Spacer 1 x 24 0' -9'' 18
Lapping 1 x 54 2' -7'' 140
10mmØ Stirrups,FB4 1 x 490 5' -1'' 2491
FB5 1 x 84 6' -2'' 518
Line D,FB4,FB5
20mmØ,Top Bar 1 x 2 204' -0'' 408
Extra Bar 1 x 4 11' -0'' 44
1 x 12 17' -6'' 210
1 x 2 14' -0'' 28
1 x 8 9' -6'' 76
1 x 6 9' -0'' 54
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 2 12' -0'' 24
1 x 2 7' -0'' 14
1 x 2 6' -6'' 13
Bottom Bar 1 x 4 83' -0'' 332
1 x 4 33' -0'' 132
1 x 4 93' -0'' 372
Extra Bar 1 x 2 10' -6'' 21
1 x 2 8' -6'' 17
1 x 2 8' -0'' 16
Spacer 1 x 47 0' -9'' 35
Lapping 1 x 54 2' -7'' 140
10mmØ Stirrups,FB4 1 x 474 5' -1'' 2410
FB6 1 x 90 5' -10'' 525
Line C,SB2,FB6
20mmØ,Top Bar 1 x 2 204' -0'' 408
Extra Bar 1 x 4 7' -0'' 28
1 x 4 9' -6'' 38
1 x 4 9' -0'' 36
1 x 4 7' -6'' 30
Bottom Bar 1 x 2 83' -0'' 166
1 x 4 33' -0'' 132
1 x 2 93' -0'' 186
Extra Bar 1 x 2 10' -6'' 21
1 x 2 8' -6'' 17
1 x 2 8' -6'' 17
Spacer 1 x 47 0' -9'' 35
Lapping 1 x 54 2' -7'' 140
10mmØ Stirrups,SB2 1 x 474 4' -4'' 2054
FB6 1 x 90 5' -10'' 525
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Line Between E & F,SB2
20mmØ,Top Bar 1 x 2 204' -0'' 408

Bottom Bar 1 x 2 203' -0'' 406

Lapping 1 x 20 2' -7'' 52

10mmØ Stirrups,SB2 1 x 554 4' -4'' 2401


23756 24583

Rebar Work For Slab

WT,Line1-3&12-14 Bottom,Main Bar 2 x 40 21' -6'' 1720 Rft

Distribution Bar 2 x 25 34' -0'' 1700 Rft

Top Bar 2 x 66 23' -0'' 3036 Rft

2 x 42 35' -6'' 2982 Rft

S3,3-6,9-12,Bottom,Main Bar 4 x 73 9' -6'' 2774 Rft

Distribution Bar 4 x 10 61' -6'' 2460 Rft

Lapping 4 x 1 1' -4'' 5.33 Rft

Top Bar,Main 4 x 123 11' -0'' 5412 Rft

Distribution Bar 4 x 17 63' -0'' 4284 Rft

Lapping 4 x 1 1' -4'' 5.33 Rft

S3,7-8,Bottom,Main Bar 2 x 25 9' -6'' 475 Rft

Distribution Bar 2 x 10 21' -6'' 430 Rft

Top Bar,Main 2 x 42 11' -0'' 924 Rft

Distribution Bar 2 x 17 23' -0'' 782 Rft

S3,Line1-6,9-14,Bottom,Main Ba 2 x 193 11' -6'' 4439 Rft

Distribution Bar 2 x 13 161' -6'' 4199 Rft

Lapping 2 x 1 1' -4'' 2.67 Rft

Top Bar,Main 2 x 328 13' -0'' 8528 Rft

Distribution Bar 2 x 21 163' -0'' 6846 Rft


Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Lapping 2 x 1 1' -4'' 2.67 Rft

S3,Line2-3,12-13,Bottom,Main Bar 2 x 30 9' -6'' 570 Rft

Distribution Bar 2 x 10 26' -0'' 520 Rft

Top Bar,Main 2 x 51 11' -0'' 1122 Rft

Distribution Bar 2 x 17 27' -6'' 935 Rft

S1,Line3-6,9-12,Bottom,Main Bar 4 x 73 14' -0'' 4088 Rft

Distribution Bar 4 x 15 61' -6'' 3690 Rft

Lapping 4 x 1 1' -4'' 5.33 Rft

Top Bar,Main 4 x 62 15' -6'' 3844 Rft

Distribution Bar 4 x 13 63' -0'' 3276 Rft

Lapping 4 x 1 1' -4'' 5.33 Rft

S1,Line3-6,9-12,Bottom,Main Bar 4 x 73 14' -0'' 4088 Rft

Distribution Bar 4 x 16 61' -6'' 3936 Rft

Lapping 4 x 1 1' -4'' 5.33 Rft

Top Bar,Main 4 x 63 15' -6'' 3906 Rft

Distribution Bar 4 x 14 63' -0'' 3528 Rft

Lapping 4 x 1 1' -4'' 5.33 Rft

S1,Line7-8,Bottom,Main Bar 2 x 25 13' -6'' 675 Rft

Distribution Bar 2 x 15 21' -6'' 645 Rft

Top Bar,Main 2 x 42 15' -0'' 1260 Rft

Distribution Bar 2 x 25 23' -0'' 1150 Rft

S1,Line7-8,Bottom,Main Bar 1 x 25 14' -0'' 350 Rft

Distribution Bar 1 x 16 21' -6'' 344 Rft

Top Bar,Main 1 x 42 15' -6'' 651 Rft

Distribution Bar 1 x 26 23' -0'' 598 Rft

S2,Line3-6,9-12,Bottom,Main Bar 2 x 25 9' -6'' 475 Rft


Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Distribution Bar 2 x 10 21' -6'' 430 Rft

Top Bar,Main 2 x 21 11' -0'' 462 Rft

Distribution Bar 2 x 5 23' -0'' 230 Rft

S2,Line6-7,8-9,A-F,Bottom,Main Bar 2 x 81 11' -6'' 1863 Rft


Distribution Bar 2 x 12 68' -6'' 1644 Rft
Lapping 2 x 1 1' -4'' 2.67 Rft
Top Bar,Main 2 x 11 13' -0'' 286 Rft
Distribution Bar 2 x 70 70' -0'' 9800 Rft
Lapping 2 x 1 1' -4'' 2.67 Rft

S2,Line6-7,8-9,Bottom,Main Bar 2 x 10 9' -6'' 190 Rft


Distribution Bar 2 x 12 11' -6'' 276 Rft
Top Bar,Main 2 x 11 11' -0'' 242 Rft
Distribution Bar 2 x 8 13' -0'' 208 Rft
Chair 320 x 1 2' -6'' 800 Rft
107115.66 Rft
10mmØ
Cantilever Slab 1 x 1312 10' -6'' 13776 Rft
2 x 11 207' -6'' 4565 Rft
2 x 11 76' -0'' 1672 Rft
Lapping 11 x 11 1' -4'' 161.33 Rft
4 x 11 2' -8'' 117.33 Rft
20291.66 Rft
16mmØ 10mmØ
Rebar Work For Stair
3rd Floor to Roof Floor Stair 2 x 16 7' -0'' 224 Rft
1 x 16 13' -0'' 208 Rft
Roof Floor Stair Dowel 1 x 16 13' -0'' 208 Rft
1 x 16 12' -0'' 192 Rft
Distribution Bar 1 x 14 6' -0'' 84 Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
1 x 20 12' -6'' 250 Rft
3rd Floor Stair 2 x 16 7' -0'' 224 Rft
1 x 16 10' -0'' 160 Rft
Distribution Bar 1 x 14 6' -0'' 84 Rft
1 x 8 12' -0'' 100 Rft
3rd Floor to Roof Floor Stair 2 x 16 7' -0'' 224 Rft
1 x 16 13' -0'' 208 Rft
Roof Floor Stair Dowel 1 x 16 13' -0'' 208 Rft
1 x 16 12' -0'' 192 Rft
Distribution Bar 1 x 14 6' -0'' 84 Rft
1 x 20 12' -6'' 250 Rft
2048 852 Rft
20mmØ - 23756 Rf x1.66 Lb 394353 352.1 Cwt
16mmØ - 2048 Rf x1.062 Lb 2175 19.42 Cwt
10mmØ - 152842 Rf x1.66 Lb 63429 566.33 Cwt
937.85 Cwt
3 G-30 Ready Mixed Concreting Work
For Machine Floor
Line 1,14
FB6 4 x 1 22' -9'' 1' -0'' 2' -0'' 182 Cft
FB7 4 x 1 6' -4'' 1' -0'' 1' -6'' 38 Cft
2 x 1 8' -2'' 1' -0'' 1' -6'' 24.5 Cft
Line 3,4,5,6,7,8,9,10,11,12
FB6 10 x 2 22' -9'' 1' -0'' 2' -0'' 910 Cft
FB7 10 x 2 6' -4'' 1' -0'' 1' -6'' 190 Cft
10 x 1 8' -2'' 1' -0'' 1' -6'' 123 Cft
Line 2,13
FB6 2 x 1 22' -9'' 1' -0'' 2' -0'' 91 Cft
FB7 2 x 1 6' -4'' 1' -0'' 1' -6'' 19 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Line Between 7 & 8
FB6 2 x 1 9' -6'' 1' -0'' 2' -0'' 38 Cft
Line A & G
FB4 2 x 1 185' -4'' 1' -0'' 1' -8'' 618 Cft
Line B
FB4 1 x 1 185' -4'' 1' -0'' 1' -8'' 309 Cft
Line D
FB4 1 x 1 158' -0'' 1' -0'' 1' -8'' 263 Cft
FB6 1 x 1 22' -6'' 1' -0'' 2' -0'' 45 Cft
Line E
FB1 1 x 2 6' -8'' 1' -0'' 2' -0'' 27 Cft
FB4 1 x 1 169' -4'' 1' -0'' 1' -8'' 282 Cft
Line F
FB4 1 x 1 161' -4'' 1' -0'' 1' -8'' 269 Cft
FB5 1 x 2 10' -8'' 1' -2'' 2' -0'' 50 Cft
Line C
FB6 1 x 1 22' -6'' 1' -0'' 2' -0'' 45 Cft
SB2 1 x 1 161' -0'' 0' -9'' 1' -6'' 181 Cft
Line Between E & F
SB2 1 x 1 151' -0'' 0' -9'' 1' -6'' 170 Cft
Column C1,C2 24 x 1 1' -4'' 1' -6'' 2' -0'' 96 Cft
C3,C4 51 x 1 1' -4'' 1' -10'' 2' -0'' 249 Cft
C5 6 x 1 3' -0'' 1' -0'' 2' -0'' 36 Cft
WT 2 x 1 19' -0'' 7' -0'' 0' -5'' 111 Cft
WT 2 x 1 19' -0'' 11' -6'' 0' -5'' 182 Cft
WT 2 x 1 19' -0'' 11' -0'' 0' -5'' 174 Cft
S3 14 x 1 19' -0'' 7' -0'' 0' -5'' 776 Cft
S3 8 x 1 19' -0'' 9' -0'' 0' -5'' 570 Cft
S2 4 x 1 9' -0'' 7' 0' 0' -5'' 105 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
S2 2 x 1 9' -0'' 9' -0'' 0' -5'' 68 Cft
S2 4 x 1 9' -0'' 12' 0' 0' -5'' 180 Cft
S2 4 x 1 9' -0'' 11' 6' 0' -5'' 173 Cft
S2 2 x 1 11' -0'' 7' 0' 0' -5'' 64 Cft
S2 2 x 1 7' -0'' 7' 0' 0' -5'' 41 Cft
S3 2 x 1 7' -0'' 23' 6' 0' -5'' 137 Cft
S1 14 x 1 19' -0'' 11' 0' 0' -5'' 1219 Cft
S1 13 x 1 19' -0'' 11' 6' 0' -5'' 1184 Cft

Stair Step 36 × 1 5' -3'' 0' -6'' 0' -6'' 47.3 Cft
Flight 1 × 3 13' -6'' 5' -3'' 0' -9'' 159.47 Cft
Landing Floor 1 × 2 11' -0'' 6' -2'' 0' -9'' 101.75 Cft
1 × 1 11' -0'' 2' -2'' 0' -9'' 17.88 Cft
9564 Cft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

4 Hire Charges For Concreting Work


9713 Cft
Vibrator 24 Day

5 Curing Work For Concreting


For14 Day
For Machine Floor 1 × 1 87' -0'' 80' -0'' 6960 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Third Floor
1 Making & Fixing Of Timber Shuttering
Formwork for 2nd Floor Beam,Slab & Stair
Line 1,14
FB1 2 x 1 22' -8'' 4' -11'' 222.89 Sft
FB2 2 x 2 6' -4'' 4' -3'' 107.67 Sft
FB2a 2 x 1 8' -2'' 4' -3'' 69.42 Sft
FB5 2 x 1 22' -8'' 5' -1'' 230.44 Sft
Line 2,3,4,5,6,7,8,9,10,11,12,13
FB1 18 x 1 22' -8'' 4' -6'' 1836 Sft
FB1 2 x 1 10' -2'' 4' -6'' 91.5 Sft
FB5 2 x 1 22' -8'' 4' -8'' 211.56 Sft
FB6 3 x 1 9' -6'' 4' -6'' 128.25 Sft
FB2 22 x 1 6' -4'' 3' -10'' 534.11 Sft
FB2a 10 x 1 8' -3'' 3' -10'' 316.25 Sft
SB2 6 x 1 70' -0'' 3' -3'' 1365 Sft
SB2 1 x 1 55' -0'' 3' -3'' 178.75 Sft
SB1 4 x 1 7' -0'' 3' -3'' 91 Sft
Line A & G
FB4 2 x 1 185' -4'' 4' -3'' 1575.33 Sft
Line B & E
FB3 2 x 1 185' -4'' 4' -2'' 1544.44 Sft
Line D
FB1 1 x 1 29' -6'' 4' -6'' 132.75 Sft
FB3 1 x 1 168' -6'' 4' -2'' 702.08 Sft
FB6 2 x 1 7' -0'' 4' -6'' 63 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Line F
FB3 1 x 1 142' -8'' 4' -2'' 594.44 Sft
FB5 1 x 1 21' -4'' 4' -8'' 99.56 Sft
FB1 1 x 1 18' -8'' 4' -6'' 84 Sft
Line C
FB1 1 x 1 9' -2'' 4' -6'' 41.25 Sft
FB6 2 x 1 7' -0'' 4' -6'' 63 Sft
Line Between 1 & 3
SB2 9 x 1 19' -0'' 3' -3'' 555.75 Sft
1 x 1 9' -0'' 3' -3'' 29.25 Sft
Column C1,C2 24 x 1 6' -0'' 2' -0'' 288 Sft
C3,C4 51 x 1 6' -8'' 2' -0'' 680 Sft
C5 6 x 1 9' -0'' 2' -0'' 108 Sft
Slab S3 3 x 1 19' -0'' 7' -0'' 399 Sft
Slab S3 1 x 1 19' -0'' 5' -6'' 104.5 Sft
Slab S3 10 x 1 23' -6'' 9' -2'' 2154.17 Sft
Slab S3 3 x 1 19' -0'' 9' -0'' 513 Sft
Slab S3 2 x 1 23' -6'' 7' -0'' 329 Sft
Slab S2 26 x 1 9' -2'' 7' -0'' 1668.33 Sft
Slab S2 4 x 1 9' -0'' 7' -0'' 252 Sft
Slab S2 2 x 1 9' -2'' 7' -0'' 128.33 Sft
Slab S2 4 x 1 7' -0'' 4' -3'' 119 Sft
Slab S2 4 x 1 7' -0'' 4' -2'' 116.67 Sft
Slab S2 1 x 1 11' -0'' 9' -0'' 99 Sft
Slab S2 1 x 1 11' -6'' 10' -6'' 120.75 Sft
Slab S2 12 x 1 9' -2'' 9' -0'' 990 Sft
Slab S2 2 x 1 9' -0'' 9' -0'' 162 Sft
Slab S2 7 x 1 11' -2'' 9' -2'' 716.53 Sft
Slab S2 7 x 1 11' -8'' 9' -2'' 748.61 Sft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Slab S2 2 x 1 7' -0'' 7' -0'' 98 Sft
Slab S2 2 x 1 11' -0'' 7' -0'' 154 Sft
Slab S1 1 x 1 19' -0'' 11' -6'' 218.5 Sft
Slab S1 6 x 1 16' -6'' 9' -2'' 907.5 Sft
Slab S1 2 x 1 11' -2'' 9' -2'' 204.7 Sft
Slab S1 2 x 1 11' -8'' 9' -2'' 213.9 Sft
OT 3 x 1 18' -3'' 23' -6'' 1286.6 Sft
23647.82 Sft

2 Re-Bar Work for Second Floor Beam. & Slab & Stair
Line - 1 & 3 , A to G
FB1 , FB2 , FB2a , FB5 10mmØ 20mmØ
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft

Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Rft
Rft
Rft
Rft

Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft

Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft

Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Rft
Rft
Rft
Rft

Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft

Rft
Rft
Rft
Rft
Rft
Rft

Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Rft
Rft
Rft
Rft
Rft
Rft

Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft

Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Rft
Rft
Rft

Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Rft
Rft
Rft
Rft

Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft

Rft
Rft
Rft
Rft

Rft
Rft
Rft
Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Rft
Rft
Rft
Rft
Rft

Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft

Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft

Rft
Rft
Rft
Rft

Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each

Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft

Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Rft
Rft
Rft

Rft
Rft
Rft
Rft
Rft
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OKALAPA TOWNSHIP)
4 STOREYED R.C.C BUILDING

Name Of Work Machine Floor Beam & Slab

DETAILS OF MEASUREMENT
Sr Measurement Ded- Total of
Particular No Content
No L B H uction Each
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- FIRST FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No
1 Rebar work for 1st Floor Column
(246.85 Cwt)
25mm Ø M.S Rod 7.09 Ton 797000 Ton 5650730
20mm Ø M.S Rod 1.3 Ton 797000 Ton 1036100
10mm Ø M.S Rod 4.56 Ton 695000 Ton 3169200
B/wire 246 Lb 650 Lb 159900
Labour (25mm) 135.22 Cwt 16665 Cwt 2253441
Labour (20mm) 24.66 Cwt 16665 Cwt 410959
Labour (10mm) 86.97 Cwt 24165 Cwt 2101630
14781960
1a Rebar work for 2nd Floor Stair
(70.87 Cwt)
25mm Ø M.S Rod 0.39 Ton 797000 Ton 310830
20mm Ø M.S Rod 0.25 Ton 797000 Ton 199250
16mm Ø M.S Rod 2.2 Ton 695000 Ton 1529000
10mm Ø M.S Rod 0.88 Ton 695000 Ton 611600
B/Wire 71 Lb 650 Lb 46150
Labour (25mm To 16mm) 54.15 Cwt 12915 Cwt 699347
Labour (10mm) 16.72 Cwt 24165 Cwt 404039
3800216
2 Formwork For 1st Floor Column & Stair
(4336 Sft)
J / wood (3 times) 5.8 Ton 680000 Ton 3944000
5 plywood 52 Shts 15800 Shts 821600
Wire Nail 130 Lb 600 Lb 78000
3/8"Ø Separater 2574 Rft 195 Rft 501930
Labour 4336 Sft 83200 %Sft 3607552
8953082

3 Ready Mixed G30 Concreting Work For


stair (1578.94 Cft)
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- FIRST FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No
Ready Mix Concrete G-30 46 m3 84900 m3 3905400
H.S.D 4 Gal 3000 Gal 12000
Vibrator 4 Day 15000 Day 60000
Labour (column) 1090.68 Cft 820 Cft 894357.6
labour ( stair) 488.26 Cft 625 cft 305162.5
Curing Work 3756.77 Sft 65 Sft 244190.05
5421110
4 (1:1½ :3) Concreting Work For
1st Floor Column (97.78 Cft)
Cement 24 bag 5700 bag 136800
R/Sand 0.45 sud 18000 Sud 8100
R/Shingle 0.9 sud 94000 Sud 84600
H.S.D 2 Gal 3000 Gal 6000
Mixer 0.5 Day 15000 Day 7500
Vibrator 0.5 Day 15000 Day 7500
Concrete Admixture 12 Lit 1700 Lit 20400
Labour 97.78 Cft 1425 Cft 139336.5
410237

5 Arm Frame Scaffolding Work for


Column (7840 Sft)
16'ht Arm Frame (င ရမခ) 49 Days 16000 Days 784000
Labour Charges 7840 Sft 21.1 Sft 165424
949424
Total 34316029
Say 34310000/-

MATERIAL COST
25mm Ø M.S Rod 7.49 Ton 797000 Ton 5969530
20mm Ø M.S Rod 1.55 Ton 797000 Ton 1235350
16mm Ø M.S Rod 2.2 Ton 695000 Ton 1529000
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- FIRST FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No
10mm Ø M.S Rod 5.44 Ton 695000 Ton 3780800
B/wire 317 Lb 650 Lb 206050
J / wood (3 times) 5.78 Ton 680000 Ton 3930400
5 plywood 52 Shts 15800 Shts 821600
Wire Nail 130 Lb 600 Lb 78000
3/8"Ø Separater 2574 Rft 195 Rft 501930
Ready Mix Concrete G-30 46 m3 84900 m3 3905400
Cement 24 bag 5700 bag 136800
R/Sand 0.45 sud 18000 Sud 8100
R/Shingle 0.9 sud 94000 Sud 84600
H.S.D 6 Gal 3000 Gal 18000
Concrete Admixture 12 Lit 1700 Lit 20400
22225960
HIRE CHARGES
Vibrator 4.5 Day 15000 Day 67500
Mixer 0.5 Day 15000 Day 7500
16'ht Arm Frame (င ရမခ) 49 Days 16000 Days 784000
859000
LABOUR CHARGES
Labour (25mm) 135.22 Cwt 16665 Cwt 2253441
Labour (20mm) 24.66 Cwt 16665 Cwt 410959
Labour (25-16mm) 54.15 Cwt 12915 Cwt 699347
Labour (10mm) 103.69 Cwt 24165 Cwt 2505669
Labour For Formwork 4336 Sft 83200 %Sft 3607552
Labour (column) 1090.68 Cft 820 Cft 894358
Labour (stair) 488.26 Cft 625 Cft 305163
Labour ( column) 97.78 Cft 1425 Cft 139337
Curing Work 3756 Sft 65 Sft 244140
Labour Charges For Scaffolding 7840 Sft 21.1 Sft 165424
11225389

TOTAL 34310349
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- FIRST FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No
Say 34310000/-
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- FIRST FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No
B/wire 246 Lb 650 Lb 159900
Wire Nail 99 Lb 600 Lb 59400
3/8"Ø Separater 2000 Rft 195 Rft 390000
H.S.D 6 Gal 3000 Gal 18000
627300
Location Head - WOMEN & CHILDREN HOSPITAL (SOUTH OAKALAPA TOWNSHIP)
4 STORYED R.C.C BUILDING

Name of work- FIRST FLOOR COLUMN

ABSTRACT OF COST

Sr. Particular Quantity Unit Rate Per Amount


No