Index for REC Drawings A: Construction Standards


S.No. Drawing No. Description

Series – A : 11 KV Lines Formations 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14.


15. 16. 17. 18. 19. A-1 A-2 A-3 A-4 A-5 A-6 A-7 A-8 A-9 A-10 A-11 A-12 A-13 A-14 A-
15 A-16 A-17 A-18 A-19 11 KV Lines – Protective Guarding 11 KV Lines – Conductor
Formation and Clearances without Earth Line 11 KV Lines – Conductor Formation with
Earth Wire 11 KV Lines – Supports with out Earth Wire 11 KV Lines – Lines Supports
with Earth Wire 11 KV Lines – ‘V’ Cross Arm (M.S. Channel) 11 KV Lines – Pole Top
Bracket 11 KV Lines – Permissible Spans (Tables) 11 KV Lines – A C S R Conductor
Voltage Regulation Table 11 KV Lines – Arrangement of Conductor at Angle LOC 11 KV
Lines – Tapping Arrangement – Single Pole Tapping 11 KV Lines – Tapping Arrangement
First Structure of Length Spur Line 11 KV Lines – ‘V’ Cross Arm (M.S. Angle) 11 KV
Lines – Automatic Voltage Booster Installation 11 KV Lines – Installation of
Autoreclosure on D.P. Structure 11 KV Lines – Conductor Formation and Clearance of
11 KV 3 φ Line 11 KV Lines – Configuration of Single Phase Line (8 M) 11 KV Lines –
Configuration of Single Phase Line (7 M) 11 KV Lines – Single Phase Tapping from 3
φ (Phase – Neutral)
2 of 178
S.No. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. Drawing
No. A-20 A-21 A-22 A-23 A-24 A-25 A-26 A-27 A-28 A-29 A-30 A-31 A-32 A-33 A-34 A-35
A-36 Description 11 KV Lines – Single Phase Tapping from Single Phase Line 11 KV
Lines – Arrangement at Tension Locations 11 KV Lines – Type of Poles for Angle and
Dead End Locations 11 KV Lines – Arrangement of Guys for 00 to 100 11 KV Lines –
Arrangement of Guys for 100 to 600 (Single Pole) 11 KV Lines – Arrangement of Guys
for 100 to 600 (D.P) 11 KV Lines – Arrangement of Guys for 600 to 900 (Four Pole)
11 KV Lines – Arrangement of Guys for Dead End Locations (D.P) (Double Pole
Support) 11 KV Lines – Configuration of S φ Line (7.5 M) Pole 11 KV Lines – Single
Phase Tapping Phase to Phase (R& B) 11 KV Lines – Single Phase Tapping Phase to
Phase (Y& R) 11 KV Lines – Single Phase Tapping from Single Phase Line 11 KV Lines
– Single Phase Line (ACSR) (Voltage Regulation Table) 11 KV Lines – Single Phase
(Phase – Neutral) Voltage Regulation Table 11 KV Lines – Permissible Spans for 11
KV Lines with A.A.A. Conductor 11 KV Lines – A.A.A. Conductor Voltage Regulation
Table 11 KV Lines – FRP Top Hamper for 11 KV O.H. Line with Polymeric Ferrule
3 of 178
4 of 178
5 of 178
6 of 178
7 of 178
8 of 178
9 of 178
10 of 178
11 of 178
12 of 178
13 of 178
14 of 178
15 of 178
16 of 178
17 of 178
18 of 178
19 of 178
20 of 178
21 of 178
22 of 178
23 of 178
24 of 178
25 of 178
26 of 178
27 of 178
28 of 178
29 of 178
30 of 178
31 of 178
32 of 178
33 of 178
34 of 178
35 of 178
36 of 178
37 of 178
38 of 178
39 of 178
Series – B : LT Lines 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.
18. 19. 20. 21. 22. 23. 24. B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-10 B-11 B-12 B-13
B-14 B-15 B-16 B-17 B-18 B-19 B-20 B-21 B-22 B-23 B-24 415 / 240 Volts Lines
Protective Guarding (Horizontal) 415 / 240 Volts Lines Protective Guarding
(Vertical) Across rod Vertical Formation 415 / 240 Line Horizontal Formation 415 /
240 Line conductor Formation and Clearances 415 / 240 Line Supports – Horizontal
Formation 415 / 240 Line Supports – Vertical Formation 415 / 240 Line – Pole Top
Bracket Max. Permissible Span for 3 φ L.T. Line (Table) 415 V. Line A.A.C. and ACSR
Conductor Voltage Regulation Table 415 V – Arrangement for Conductor at Angle Loc
Max. Permissible Span for L.T. Line 415 V – conductor Formation and Clearances 3 φ
4 to Line LT Line (Vertical) – Clearances 1 φ Line – Horizontal Formation 1 φ Line
– Vertical Formation LT Line – PVC Spacer Earth Knobs for LT Line Composite Spacer
for LT Line Type of Poles for Angle and Dead Loc LT Line Arrangement of Guys for 00
to 100 Angle Loc LT Line Arrangement of Guys for 100 to 600 Angle Loc LT Line
Arrangement of Guys for 100 to 600 Angle Loc LT Line Arrangement of Guys for 600 to
900 Angle Loc LT Line Arrangement of Guys for dead End Loc
40 of 178
25. 26. 27. 28. B-25 B-26 B-27 B-28 3 φ - 5 W Line – Arrangement of Guys for 00 to
100 3 φ - 5 W Line – Arrangement of Guys for 100 to 300 3 φ - 5 W Line –
Arrangement of Guys for 300 to 600 3 φ - 5 W Line – Arrangement of Guys for 600 to
900 Angle Loc 3 φ - 5 W Line – Arrangement of Guys for Dead End Loc 3 φ - 5 W Line
– Vertical Formation Guy Arrangement Dead Loc 3 φ - 4 W Line – Arrangement of Guys
for angle and Dead Loc LT Lines – Max. Permissible Span with A.A.A. Conductor
(Table) for 3 φ - Permissible Span with A.A.A Conductor (Table) for 1φ LT Lines –
A.A.A. Conductors – Voltage Regulation (Table)

29. 30.

B-29 B-30

31.

B-31

32.

B-36

33. 34.

B-37 B-38
41 of 178
42 of 178
43 of 178
44 of 178
45 of 178
46 of 178
47 of 178
48 of 178
49 of 178
50 of 178
51 of 178
52 of 178
53 of 178
54 of 178
55 of 178
56 of 178
57 of 178
58 of 178
59 of 178
60 of 178
61 of 178
62 of 178
63 of 178
64 of 178
65 of 178
66 of 178
67 of 178
68 of 178
69 of 178
70 of 178
71 of 178
72 of 178
73 of 178
74 of 178
75 of 178

Series – C : 11 KV Material 1. 2. 3. 4. 5. C-1 C-2 C-3 C-4 C-5 11 KV Insulators and


Fittings 11 KV Insulators – T & C Fittings Holding of Conductor on 11 KV Pin
Insulator (Straight Run) Holding of Conductor on 11 KV Pin Insulator Holding of
Conductor on 11 KV Pin Insulator (Angle Loc)
76 of 178
77 of 178
78 of 178
79 of 178
80 of 178
81 of 178

Series – D : LT Material 1. 2. 3. 4. 5. 6. D-1 D-2 D-3 D-4 D-5 D-6 415 / 240 V –
Pin Insulator 415 / 240 V – Pin Insulator and Fittings 415 / 240 V – Shackle
Insulator 415/240 V Insulators- Shackle type-2 Hardware Fitting Insulators –
Fitting for Shackle Insulator LT Conductor Straight – Run and Dead Arrangements
82 of 178
83 of 178
84 of 178
85 of 178
86 of 178
87 of 178
88 of 178

Series – E : Joints – 11 KV & LT 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. E-26 E-28


E-29 E-30 E-31 E-32 E-33 E-34 E-35 E-38 E-39 E-40 Crimped Tension Joints for A.A.C.
/ ACSR LT Service Connectors Application of Epoxy Compound on ‘T’ Joint HT
Bimetallic Connectors for DTR Helically Formed Fittings Helically Formed Fittings
T-Connectors Helically Formed Fittings – Splice for ACSR Joint Suspension Clamp and
Eye Hooks Dead End Clamp and Eye Hooks LT Connectors Non-Tension Clamped Joint for
LT Service Connection LT Aerial Bunched Cables Current Carrying Capacity (Table)
89 of 178
90 of 178
91 of 178
92 of 178
93 of 178
94 of 178
95 of 178
96 of 178
97 of 178
98 of 178
99 of 178
100 of 178

Series – F : DTR – Insulation 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15.


16. 17. 18. 19. F-1 F-2 F-3 F-4 F-5 F-6 F-7 F-8 F-9 F-10 F-11 F-13 F-14 F-15 F-16
F-17 F-18 F-19 F-20 11 KV / 433 V DTR with D.O. Fuse 11 KV / 433 DTR with AB Switch
and HG Fuses 11 KV / 433 DTR for on Line Locations along the line 11 KV / 433 DTR
for on Line Locations across the line 11 KV / 433 DTR Location of Earth Pots 11 KV
H.G. Fuse 11 KV HG Fuse – Mounting Details LT MultiCore Cables for DTRS 11 KV Air
Break Switches – Recommended Ratings Earthing Arrangement for DTR Installation of
Automatic Transformer Disconnection Switches with D.O. Fuse Single Phase
Transformer Arrangements Single Phase Transformer Mounting Details 3 Phase
Distribution – Using Two Single Phase Transformers 3 Phase Distribution Using Two
6.35 KV Single Phase Transformers Application of Automatic Transformer
Disconnection Switches Recommended Single Core Cables for DTR Table Single Phase
DTR Arrangement Mounting Arrangement of 25 KVA DTR
101 of 178
102 of 178
103 of 178
104 of 178
105 of 178
106 of 178
107 of 178
108 of 178
109 of 178
110 of 178
111 of 178
112 of 178
113 of 178
114 of 178
115 of 178
116 of 178
117 of 178
118 of 178
119 of 178
120 of 178
121 of 178

Series – G : Guy - Arrangement 1. 2. 3. 4. G-1 G-2 G-3 G-4 Guy Assembly Guy End
Assembly Guying Arrangements Single and Double Guy Guying Arrangements – Fly Guy,
Bow Guy
122 of 178
123 of 178
124 of 178
125 of 178
126 of 178

Series – H : Service Connection 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. H-1 H-2 H-4


H-5 H-6 H-7 H-8 H-9 H-10 H-11 H-12 H-13 Service Connection – Single Phase Line
Service Connection – S φ Service Connection Meter Board Service Connection – 3 φ
Industrial Bare-wire Service Connection – 3 φ Industrial Insulated Cable Service
Connection – 3 φ Agriculture Service Connection - 3 φ Meter Board - I Service
Connection - 3 φ Meter Board – II LT Capacitor – Ratings and Mode of Connections
Service Connection – 1 φ with MCB Control Service Connection - 3 φ Meter Board with
MCB Control Service Connection Single Phase Meter Board with Plug in Type MCB
Service Connection - 3 φ Meter Board with Plug in Type MCB
127 of 178
128 of 178
129 of 178
130 of 178
131 of 178
132 of 178
133 of 178
134 of 178
135 of 178
136 of 178
137 of 178
138 of 178
139 of 178

Series – J : Crossing of Lines & Earthing 1. 2. 3. 4. 5. J-1 J-2 J-3 J-4 J-5 Coil
Earthing Earthing Pipe Crossing of Power Lines with Railway Track Crossing of Power
Lines Telecommunication Lines Crossing of LT Power Lines
140 of 178
141 of 178
142 of 178
143 of 178
144 of 178
145 of 178

Series – K : Base Plate 1. K–4 R.C.C. Base / Ancher Plate


146 of 178
147 of 178

Series – L : 33 / 11 KV Sub-Station 1. 2. 3. 4. 5. 6. 7. L–1 L–2 L –3 L–4 L-5 L-7


L-8 33/11 KV Sub-Station – Standard Layout (Outdoor) 33/11 KV Sub-Station – Indoor
11 KV Switchgear 33/11 KV Sub-Station – Metering Arrangement 33/11 KV Sub-Station –
11 KV PILC Cables Recommended Sizes 33/11 KV Sub-Station – 11 KV XLPE Cables
Recommended Sizes Standard Layout for 33/11 KV Low Cost Sub-Station 33/11 KV Layout
of Unattended Sub-Station
148 of 178
149 of 178
150 of 178
151 of 178
152 of 178
153 of 178
154 of 178
155 of 178

Series – M : 33 KV Lines 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. M-1 M-2 M-3 M-4 M-5
M-6 M-7 M-8 M-9 M-10 M-11 M-12 33 KV Line – Pole Top Bracket 33 KV Line – Standard
Length/Working Load of Supports (Tables) 33 KV Line – Conductor formation and
Clearances 33 KV Line – Pole Top Bracket 33 KV Line – ACSR Conductor – Voltage
Regulation 33 KV Line – Protective Guard Table – Across Road with External Fuse
Protection 33 KV Lines – Arrangement of Conductors at Angle Location 00 – 100
deviation 33 KV Lines – Arrangement at 100 – 600 deviation 33 KV Lines –
Arrangement at 600 – 900 deviation 33 KV Lines – Tapping Arrangement on Single Pole
33 KV Lines – with A.A.A. Conductor Sizes Table 33 KV Lines – with A.A.A. Conductor
Voltage Regulation Table
156 of 178
157 of 178
158 of 178
159 of 178
160 of 178
161 of 178
162 of 178
163 of 178
164 of 178
165 of 178
166 of 178
167 of 178
168 of 178

Series – N : 66/11 KV Sub-Station 1. N-1 Layout-unattended Sub-Station


169 of 178
170 of 178

Series – P : 11 KV Switched Capacitors 1. 2. 3. 4. P-1 P-2 P-3 P-4 Installation of


11 KV Switched Capacitor Bank with Separately Mounted CT Installation of 11 KV
Switched Capacitor Bank with Built in CT Installation of 11 KV Switched Capacitor
Bank with Separately Mounted CT Installation of 11 KV Switched Capacitor Bank with
Built-in CT with internal Fuses.
171 of 178
172 of 178
173 of 178
174 of 178
175 of 178
176 of 178
177 of 178
178 of 178

S-ar putea să vă placă și