Sunteți pe pagina 1din 6

Company name: ASMA

Project: WATER SECURITY MEGA Date: 11/25/2017


RESERVOIR PACKAGE APRPS-
1 UMM BRIKA
Version: 2.3.5822.18147 Project number: GTC 626/2014 Page: 1/6

PROJECT DATA:

Company name: ASMA

Project name: WATER SECURITY MEGA RESERVOIR PACKAGE APRPS-1 UMM BRIKA

Name of the project engineer: SA

Subject/Topic:

Description:

Notes/Remarks:

Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines and must be checked for plausibility.
www.powers.com - Powers Fasteners (See website for regional contact info). anchorbolt design.pcp2
Company name: ASMA
Project: WATER SECURITY MEGA Date: 11/25/2017
RESERVOIR PACKAGE APRPS-
1 UMM BRIKA
Version: 2.3.5822.18147 Project number: GTC 626/2014 Page: 2/6

GEOMETRY:

LOAD ACTIONS: [kN], [kNm]

Design loads / actions


N 0.00
Vx 0.00
Vy -45.00
Mx 6.00
My 0.00
Mz 0.00

Eccentric profile
e x = 0 mm; e y = 75 mm

Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines and must be checked for plausibility.
www.powers.com - Powers Fasteners (See website for regional contact info). anchorbolt design.pcp2
Company name: ASMA
Project: WATER SECURITY MEGA Date: 11/25/2017
RESERVOIR PACKAGE APRPS-
1 UMM BRIKA
Version: 2.3.5822.18147 Project number: GTC 626/2014 Page: 3/6

SUMMARY:

Selected anchor: PTB-SS-ETA1-PRO - M16 max, A4-70


Effective embedment depth: h ef = 100 mm
Approval: ETA-10/0230
Issued: 2/1/2013 / 2/1/2018

Basic principles of Design: Design method: According to ETAG 001, Annex C,


Concrete: cracked concrete, f cc = 37.00 N/mm²
Loads: Design loads
Reinforcement: no reinforcement to limit splitting cracks available
no straight concrete edge reinforcement
normal reinforcement spacing (≥ 150 mm)
Stand-off: not existent
Resulting anchor forces / load distribution:
Anchor No. Tension load Shear load
#1 0.00 kN 7.50 kN
#2 3.41 kN 7.50 kN
#3 6.91 kN 7.50 kN
#4 6.91 kN 7.50 kN
#5 3.41 kN 7.50 kN
#6 0.00 kN 7.50 kN
Maximum 6.91 kN 7.50 kN
Max. concrete compression strain: 0.07 ‰
Max. concrete compression stress: 2.07 N/mm²
Resulting tension force: 20.63 kN
Resulting compression force: 20.63 kN

Calculations: Design proof Demand Capacity Status


Tension load 6.91 kN 13.52 kN 0.51 ≤ 1.0
Shear load 7.50 kN 30.63 kN 0.24 ≤ 1.0 OK
Interaction - - 0.49 ≤ 1.0

Anchor plate: Material: fyk = 355.00 N/mm²


Length x width: 425 mm x 300 mm
Actual plate thickness: 12 mm
Calculated plate thickness: 10 mm, OK
Profile: IPE 270

Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines and must be checked for plausibility.
www.powers.com - Powers Fasteners (See website for regional contact info). anchorbolt design.pcp2
Company name: ASMA
Project: WATER SECURITY MEGA Date: 11/25/2017
RESERVOIR PACKAGE APRPS-
1 UMM BRIKA
Version: 2.3.5822.18147 Project number: GTC 626/2014 Page: 4/6

DESIGN PROOF TENSION LOADING: Reference

Steel failure:

N Rk,s 75.00 kN 5.2.2.2

γ M,s 1.90
h 39.47 kN
N Rd,s
h 6.91 kN
N Sd
Design proof: h h
N Sd/N Rd,s= 0.18 ≤ 1.00

Concrete cone failure:

0
N Rk,c 43.80 kN 5.2.2.4

A c,N 225000 mm²


0 90000 mm²
A c,N
h ef 100 mm

ψ ec,N,x 1.000

ψ ec,N,y 0.855

ψ re,N 1.000

ψ s,N 1.000

ψ ucr,N 1.000

γ M,c 1.80

N Rd,c 52.00 kN

N Sd 20.63 kN
Design proof: N Sd/N Rd,c= 0.40 ≤ 1.00

Pullout failure:

N Rk,p 24.33 kN 5.2.2.3

γ M,p 1.8

N Rd,p 13.52 kN
h 6.91 kN
N Sd
Design proof: h
N Sd/N Rd,p= 0.51 ≤ 1.00

Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines and must be checked for plausibility.
www.powers.com - Powers Fasteners (See website for regional contact info). anchorbolt design.pcp2
Company name: ASMA
Project: WATER SECURITY MEGA Date: 11/25/2017
RESERVOIR PACKAGE APRPS-
1 UMM BRIKA
Version: 2.3.5822.18147 Project number: GTC 626/2014 Page: 5/6

DESIGN PROOF SHEAR LOADING: Reference

Steel failure (without lever arm):

V Rk,s 49.00 kN 5.2.3.2a

γ Ms 1.60
h 30.63 kN
V Rd,s
h 7.50 kN
V Sd
Design proof: h h
V Sd/V Rd,s= 0.24 ≤ 1.00

Concrete pryout failure:

h ef 100 mm 5.2.3.3
0 43.80 kN
N Rk,c
A c,N 300000 mm²
0 90000 mm²
A c,N
k 2.0

ψ ec,N,x 1.000

ψ ec,N,y 1.000

ψ s,N 1.000

ψ re,N 1.000

ψ ucr,N 1.000

V Rk,cp 291.97 kN

γ Mcp 1.50

V Rd,cp 194.65 kN
g 45.00 kN
V Sd
Design proof: g
V Sd/V Rd,cp= 0.23 ≤ 1.00

COMBINATION TENSION / SHEAR LOAD:


Interaction: 5.2.4
Design proof: β N1.5 + β V 1.5 = 0.51 1.5 + 0.24 1.5 = 0.49 ≤ 1.0

Displacements

The resulting displacements of the highest loaded anchor shall be calculated according to the requirements in the corresponding
approval.The characteristic loadings sum up to a total of:

h = 5.12 kN
N
Sk

Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines and must be checked for plausibility.
www.powers.com - Powers Fasteners (See website for regional contact info). anchorbolt design.pcp2
Company name: ASMA
Project: WATER SECURITY MEGA Date: 11/25/2017
RESERVOIR PACKAGE APRPS-
1 UMM BRIKA
Version: 2.3.5822.18147 Project number: GTC 626/2014 Page: 6/6

h = 5.56 kN
V
Sk

The allowable displacements depend on the construction fastened with the anchors. They shall be defined by the responsible engineer!

Proof of capacity of structural element

Load transfer of anchor forces in the structural element

The transfer of the anchor loads in the structural element must be shown according to the design guideline ETAG 001
or TR 029, Section 7.1!

Design proof for shear loads

The design proof for shear loads is necessary according to the approval and/or according to EC 2(or other national
regulations).

Fastening ok!

WARNINGS / REMARKS:

Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines and must be checked for plausibility.
www.powers.com - Powers Fasteners (See website for regional contact info). anchorbolt design.pcp2

S-ar putea să vă placă și