Documente Academic
Documente Profesional
Documente Cultură
SPECIFICATION NO.
GENERAL-PURPOSE GEAR UNIT REVISION NO. DATE
DATA SHEET (API 677-1ST) PAGE 1 OF 3 BY
U.S. CUSTOMARY UNITS
1 APPLICABLE TO: PROPOSAL PURCHASE AS BUILT
2 SITE
15 RATED INPUT SPD. (1.4) RPM SPEC'D NORM TOOTH PITTING INDEX, "K" (2.5.3)
22 H.S. SHAFT ROT FACING CPL'G (2.4.3) CW CCW MATERIAL INDEX NUMBER (FIG 3, TABLE 3)
23 L.S. SHAFT ROT FACING CPL'G (2.4.3) CW CCW ANTICIPATED SOUND PRESSURE LEVEL dBA @
29 INSTALLATION DATA
40 MAXIMUM °F °F PINION
41 MINIMUM °F °F HELIX ANGLE DEG NORMAL PRESS. ANGLE
42
42 UNUSUAL CONDITIONS: DUST FUMES NET FACE WIDTH, "F" IN. PINION L / D
50 REMARKS:
51
Amoco Corporation
JOB NO. ITEM NO.
GENERAL-PURPOSE GEAR UNIT REVISION NO. DATE
DATA SHEET (API 677-1ST) PAGE 2 OF 3 BY
U.S. CUSTOMARY UNITS
1 ADDITIONAL REQUIREMENTS (CONTINUED) THRUST BEARING(S):
21 INSTRUMENTS
29 LUBRICATION REQUIREMENTS
32 SYSTEM TYPE:
47 RESERVOIR LOCATION
49
50
Amoco Corporation
JOB NO. ITEM NO.
GENERAL-PURPOSE GEAR UNIT REVISION NO. DATE
DATA SHEET (API 677-1ST) PAGE 3 OF 3 BY
U.S. CUSTOMARY UNITS
1 INSPECTIONS & TEST (4.1.3)
7 DISMANTLE-REASSEMBLY
8 INSPECTION (4.3.1.2)
19
20
21
22
23
24
25
31 REMARKS
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
RPM
FPM
LB
GEAR
FT
LBS
LB FT²
FT LB @ LOW SPEED SHAFT
GEAR
IN
GEAR
GEAR
DEG
IN
PROCESS
PROCESS
IN²
PSI
PSI
LOW SPEED
PSIG
IN