Documente Academic
Documente Profesional
Documente Cultură
Templates
Step MAIC Focus Action Question
Does the selected CTQ offer high
1 Measure CTQ Select CTQ Characteristic
impact -- quality, cost or time ?
Project Name
Group Name Black Belt Name
Project Objective/Desired StateState the Project Objective/Desired State and make sure it links back to the Problem Statement
Clearly define and quantify State the Project Objective
70% Defect Reduction Sought
Include Entitlements - Best Performance
Include available benchmark data
Dependencies
Significant Systems Development Description:
Major Capital Investment
External Considerations
Potential to Leverage
Description:
Other Information Include any other information related to the Project as necessary
Project Action Plan
Project Black Belt
Process Owner Date
What How Who When Deliverables
(Action to Take) (Action Steps) (Accountable) Start Finish
Critical to Quality Characteristics
Project Name:
Project Description:
Project Managers:
Date:
Total
Who are the
What are the start and end customers for our
Who are the points of the process product or service?
SIPOC
suppliers for our associated with the problem What are their
product or What do the suppliers provide to my and the major steps in the What product or service does the requirements for
service? process? process. process deliver to the customer? performance
Step No. Activity ResponsibleVolume No. Total hrs NVA NVA hrs/
position per week individuals per week (Y/N?) week
(1) (2) (3) (4) (5) (6) (7) (8)
Sum=
Management Man Method
Cause Cause
Cause Cause
Cause
Cause
Cause
Cause
Rank Potential Root Cause Supporting Data & Analysis?* Source? Who? When?
b)
c)
2. Solution a)
b)
c)
3. Solution a)
b)
Due
Date
Solution Evaluation Form
List Root Cause(s) List Solutions % Effect Estimated Cost Complexity Estimated Benefit Risk* Priority
Root Cause 1 Solutions 1
% of cost time or savings High Order
effect of effort to due to Medium of potential
solution solution implement solution or solution
will have implementation short term? or Low implmentation
on the long term? improvement 1st, 2nd, 3rd
root cause in customer
satisfaction
Root Cause 2
Need
to
verify
effectiveness
of solution
Data Collection Plan
Define What to Measure Define How to Measure Who will Sample Plan
Do it?
Type of Operational Measurement Data Tags Needed Data Collection Person(s) What? Where? When?
Measure Measure Definition or Test Method to Stratify the Data Method Assigned
Name of X or Y Clear definition of Visual Data tags are Manual? State What Location How
parameter attribute orthe measurement inspection defined for the Spreadsheet? who has measure is for often
or condition discrete defined in such a or automated measure. Such Computer based? the being data the
to be data, way as to achieve test? as: time, date, etc. responsibility? collected collection data
measured product orrepeatable resultsTest instruments location, tester, is
process from multiple are defined. line, customer, collected
data observers buyer, operator,
Procedures for etc.
data collection
are defined.
ple Plan
How Many?
The number
of data
points
collected
per sample
collected
Measure Relationships
Responses or Outputs (Ys) Factors (Xs)
Dependent Variable USL LSL TargetIndependent Variable(s) USL LSL Target
Root Cause Analysis Timeline
Project Name: Start Date: 6/10/2002
Use lines and or color bars to indicate start and stop dates for each activity
Phase: Activity Start Date End DateAssigned to:6/10/2002 6/11/2002 6/12/2002 6/13/2002 6/14/2002 6/15/2002
1. Define and
Contain the
Problem
2. Measure the
Problem
3. Perform
Root Cause
Analysis
4. Plan and
Implement
Improvement
5. Assess
Effectiveness of
Improvement
6. Standardize
and Control
7. Realize and
Reflect
Root Cause Analysis Timeline
Project Name:
Use lines and or color bars to indicate start and stop dates for each activity
Phase: Activity Start Date End DateAssigned to: 6/16/2002 6/17/2002 6/18/2002 6/19/2002 6/20/2002 6/21/2002
1. Define and
Contain the
Problem
2. Measure the
Problem
3. Perform
Root Cause
Analysis
4. Plan and
Implement
Improvement
5. Assess
Effectiveness of
Improvement
6. Standardize
and Control
7. Realize and
Reflect
Root Cause Analysis Timeline
Project Name:
Phase: Activity Start Date End DateAssigned to: 6/22/2002 6/23/2002 6/24/2002 6/25/2002 6/26/2002 6/27/2002
1. Define and
Contain the
Problem
2. Measure the
Problem
3. Perform
Root Cause
Analysis
4. Plan and
Implement
Improvement
5. Assess
Effectiveness of
Improvement
6. Standardize
and Control
7. Realize and
Reflect
Root Cause Analysis Timeline
Project Name:
Phase: Activity Start Date End DateAssigned to:6/28/2002 6/29/2002 6/30/2002 7/1/2002 7/2/2002 7/3/2002
1. Define and
Contain the
Problem
2. Measure the
Problem
3. Perform
Root Cause
Analysis
4. Plan and
Implement
Improvement
5. Assess
Effectiveness of
Improvement
6. Standardize
and Control
7. Realize and
Reflect
Root Cause Analysis Timeline
Project Name:
Phase: Activity Start Date End DateAssigned to: 7/4/2002 7/5/2002 7/6/2002 7/7/2002 7/8/2002 7/9/2002
1. Define and
Contain the
Problem
2. Measure the
Problem
3. Perform
Root Cause
Analysis
4. Plan and
Implement
Improvement
5. Assess
Effectiveness of
Improvement
6. Standardize
and Control
7. Realize and
Reflect
Root Cause Analysis Timeline
Project Name:
2. Measure the
Problem
3. Perform
Root Cause
Analysis
4. Plan and
Implement
Improvement
5. Assess
Effectiveness of
Improvement
6. Standardize
and Control
7. Realize and
Reflect
22 Factorial Design (with up to 5 replicates)
Replications ----- ----
A B AB 1 2 3 4 5 Sum Average
-1 -1 1 28 25 27 80 26.67
1 -1 -1 36 32 32 100 33.33
-1 1 -1 18 19 23 60 20.00
1 1 1 31 30 29 90 30.00
ANOVA
REGRESSION MODEL
Intercept 27.50
A coefficient 4.17
B coefficient -2.5
AB coefficient 0
PREDICTION EQUATION
A 1
B 1
Y-hat 29.17
RESIDUALS
Actual Pred Residual rank Perc Z
1 -1 -1 28 ### 2.167 1 2.5 -1.96
2 -1 -1 25 ### -0.833 16 77.5 0.76
3 -1 -1 27 ### 1.167 5 22.5 -0.76
4 -1 -1 0 0 0.000 7 32.5 -0.45
12.000
5 -1 -1 0 0 0.000 7 32.5 -0.45
1 1 -1 36 ### 1.833 3 12.5 -1.15
10.000
2 1 -1 32 ### -2.167 18 87.5 1.15
3 1 -1 32 ### -2.167 18 87.5 1.15 8.000
4 1 -1 0 0 0.000 7 32.5 -0.45
5 1 -1 0 0 0.000 7 32.5 -0.45 6.000
1 -1 1 18 ### -2.833 20 97.5 1.96
2 -1 1 19 ### -1.833 17 82.5 0.93 4.000
3 -1 1 23 ### 2.167 1 2.5 -1.96
4 -1 1 0 0 0.000 7 32.5 -0.45 2.000
5 -1 1 0 0 0.000 7 32.5 -0.45
1 1 1 31 ### 1.833 3 12.5 -1.15 0.000
2 1 1 30 ### 0.833 6 27.5 -0.6 2 4 6 8 10 12
3 1 1 29 ### -0.167 15 72.5 0.6
4 1 1 0 0 0.000 7 32.5 -0.45
5 1 1 0 0 0.000 7 32.5 -0.45
EFFECTS PLOT
score rank (R-0.5)/nz score
8.3 #REF! #REF! #REF!
-5.0 #REF! #REF! #REF!
1.7 #REF! #REF! #REF!
1
1 Series1
1
B- C- C-
3.00 B+ 3.00 C+ 3.00 C+
2.00 2.00 2.00
1.00 1.00 1.00
0.00 0.00 0.00
A- A+ A- A+ B- B+
Sources SS df MS F F table Stat sig ? α
A 0.00 1 0.00 0.00 8.53 ns 0.01
B 0.00 1 0.00 0.00 8.53 ns
C 0.00 1 0.00 0.00 8.53 ns
AB 0.00 1 0.00 0.00 8.53 ns
AC 0.00 1 0.00 0.00 8.53 ns
BC 0.00 1 0.00 0.00 8.53 ns
ABC 0.00 1 0.00 0.00 8.53 ns
Error 16.00 16 1.00
Total 16.00 23
REGRESSION MODEL
Intercept 2.00
A coefficient 0
B coefficient 0
C coefficient 0
AB coefficient 0
AC coefficient 0
BC coefficient 0
ABC coefficient 0
PREDICTION EQUATION
A 1
B 1
C 1
Y-hat 2.00
ANOVA
B- B+
A- 2.00 2.00
A+ 2.00 2.00
C- C+
A- 2.00 2.00
A+ 2.00 2.00
C- C+
B- 2.00 2.00
B+ 2.00 2.00
Parts per Million Calculator
This is a simple sigma level calculator
RTY= 0.99
DPMO Calculator
This template calculates the DPMO using the number of defects.
DPMO = 80
Calibration GR&R
Date Resoluton Bias Linearity Stability Notes
Date By %R&R P/T Disc Index
Baseline
In-Service
In-Service
In-Service
In-Service
In-Service
In-Service
In-Service
In-Service
of of
Document No:
Revision Date:
Supercedes:
Frequencey:
Notes
External Client Management
Cost
Matrix
1=Weak
Call Work
9=Strong,
Call Backs
IVR Usage
Compliance
Relationship
3=Moderate,
Call Duration
Service Level
Risk Exposure
Call Transferred
POC Resolution
Quality of Service
Staffing Levels
Call Volume
Call Routing
Training
Systems Problems
Information Sources:
Speed/Availability
Call Blocking
Exception Processing
Rework Reduction
Delivery of Info
Technology Limitations
How Important
Baseline
Metric
Target
External Client Call Blocked
Time in Queue
How Important 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Metric
Target
Cause & Effect Matrix
Rating of
Importance
to Customer
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 0
2 0
3 0
4 0
5 0
6 0
7 0
8 0
9 0
10 0
11 0
12 0
13 0
14 0
15 0
16 0
17 0
18 0
19 0
20 0
0
0
Total
PFMEA Number:
Process Name:
Process Responsibility:
Prepared By:
Affected Product(s):
Process or
Product Name:
Responsible:
S O
Key Process
Process Step Potential Failure Mode Potential Failure Effects E Potential Causes C
Input
V C
cause or FM occur?
process step Key Process Key Input go wrong? Key Output Variables to go wrong?
Input? (Customer Requirements)
or internal requirements?
Product
Effects Analysis
A)
D R S O D R
Actions
Current Controls E P Resp. Actions Taken E C E P
Recommended
T N V C T N
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Effect Criteria: Severity of Effect Defined Ranking
Hazardous: May endanger operator. Failure mode affects safe vehicle operation
Without and / or involves noncompliance with government regulation. Failure will 10
Warning occur WITHOUT warning.
May endanger operator. Failure mode affects safe vehicle operation
Hazardous:
and / or involves noncompliance with government regulation. Failure will 9
With Warning
occur WITH warning.
Major disruption to production line. 100% of product may have to be
Very High scrapped. Vehicle / item inoperable, loss of primary function. Customer 8
very dissatisfied.
Minor disruption to production line. Product may have to be sorted and a
High portion (less than 100%) scrapped. Vehicle operable, but at a reduced 7
level of performance. Customer dissatisfied.
Minor disruption to production line. A portion (less than 100%) may have
Moderate to be scrapped (no sorting). Vehicle / item operable, but some comfort / 6
convenience item(s) inoperable. Customers experience discomfort.
Minor disruption to production line. 100% of product may have to be
reworked. Vehicle / item operable, but some comfort / convenience
Low 5
item(s) operable at reduced level of performance. Customer experiences
some dissatisfaction.
Minor disruption to production line. The product may have to be sorted
Very Low and a portion (less than 100%) reworked. Fit / finish / squeak / rattle item 4
does not conform. Defect noticed by most customers.
Minor disruption to production line. A portion (less than 100%) of the
product may have to be reworked on-line but out-of-station. Fit / finish /
Minor 3
squeak / rattle item does not conform. Defect noticed by average
customers.
Minor disruption to production line. A portion (less than 100%) of the
product may have to be reworked on-line but in-station. Fit / finish /
Very Minor 2
squeak / rattle item does not conform. Defect noticed by discriminating
customers.
None No effect. 1
Probability of Failure Possible Failure Rates Cpk Ranking
Very High: ≥ 1 in 2 < 0.33 10
Failure is almost inevitable 1 in 3 ≥ 0.33 9
High: Generally associated
with processes similar to 1 in 8 ≥ 0.51 8
previous
processes that have often
1 in 20 ≥ 0.67 7
failed
Moderate: Generally
associated with processes 1 in 80 ≥ 0.83 6
similar to
previous processes which have 1 in 400 ≥ 1.00 5
experienced occasional
failures, but not in major 1 in 2,000 ≥ 1.17 4
proportions
Low: Isolated failures
associated with similar 1 in 15,000 ≥ 1.33 3
processes
Very Low: Only isolated
failures associated with almost 1 in 150,000 ≥ 1.5 2
identical processes
Remote: Failure is unlikely. No
failures ever associated with ≤ 1 in 1,500,000 ≥ 1.67 1
almost identical processes
Detection Criteria: Liklihood the existence of a defect Ranking
will be detected by test content before
product advances to next or subsequent
process
Almost Test content detects < 80 % of failures 10
Impossible
Very Remote Test content must detect 80 % of failures 9
Remote Test content must detect 82.5 % of failures 8
Very Low Test content must detect 85 % of failures 7
Low Test content must detect 87.5 % of failures 6
Moderate Test content must detect 90 % of failures 5
Moderately High Test content must detect 92.5 % of failures 4
High Test content must detect 95 % of failures 3
Very High Test content must detect 97.5 % of failures 2
Almost Certain Test content must detect 99.5 % of failures 1
Control Plan
Date (Rev):
Specification/
Sub Process CTQ Specification Measurement Who Where Decision Rule/
Sub Process Requirement Sample Size Frequency
Step Characteristic Method Measures Recorded Corrective Action
KPOV KPIV USL LSL
of
Document No:
Revision Date:
Supercedes:
Decision Rule/
SOP Reference
Corrective Action
Six Sigma Preventative Maintenance Plan
Process Name: Prepared by: Page:
Customer Int/Ext Approved by: Document No:
Revision Date:
Supercedes:
Decision Rule/
SOP Reference
Corrective Action
Key Process Output Variable
Capability Status Sheet
O D
Item /
S Potential Cause(s)/ c Current Design e R. Responsibility &
Process Potential Failure Potential Effect(s) Current Design Recommended
e Mechanism(s) of c Controls t P. Target Completion
Mode of Failure Controls Detection Action(s)
v Failure u Prevention e N. Date
Function
r c
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Failure Mode and Effects Analysis
(Design FMEA) FMEA Number:
Page
System/Component: Design Responsibility: Prepared by:
FMEA Date (Orig.)
Core Team:
O D
Item /
S Potential Cause(s)/ c Current Design e R. Responsibility &
Process Potential Failure Potential Effect(s) Current Design Recommended
e Mechanism(s) of c Controls t P. Target Completion
Mode of Failure Controls Detection Action(s)
v Failure u Prevention e N. Date
Function
r c
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
of
(Rev.)
Action Results
O D
S c e R.
ActionsTaken e c t P.
v u e N.
r c
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
of
(Rev.)
Action Results
O D
S c e R.
ActionsTaken e c t P.
v u e N.
r c
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
The value in the table is the right tail probability.
Z-Value 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09
0.0 0.50000 0.49601 0.49202 0.48803 0.48405 0.48006 0.47608 0.47210 0.46812 0.46414
0.1 0.46017 0.45620 0.45224 0.44828 0.44433 0.44038 0.43644 0.43251 0.42858 0.42465
0.2 0.42074 0.41683 0.41294 0.40905 0.40517 0.40129 0.39743 0.39358 0.38974 0.38591
0.3 0.38209 0.37828 0.37448 0.37070 0.36693 0.36317 0.35942 0.35569 0.35197 0.34827
0.4 0.34458 0.34090 0.33724 0.33360 0.32997 0.32636 0.32276 0.31918 0.31561 0.31207
0.5 0.30854 0.30503 0.30153 0.29806 0.29460 0.29116 0.28774 0.28434 0.28096 0.27760
0.6 0.27425 0.27093 0.26763 0.26435 0.26109 0.25785 0.25463 0.25143 0.24825 0.24510
0.7 0.24196 0.23885 0.23576 0.23270 0.22965 0.22663 0.22363 0.22065 0.21770 0.21476
0.8 0.21186 0.20897 0.20611 0.20327 0.20045 0.19766 0.19489 0.19215 0.18943 0.18673
0.9 0.18406 0.18141 0.17879 0.17619 0.17361 0.17106 0.16853 0.16602 0.16354 0.16109
1.0 0.15866 0.15625 0.15386 0.15151 0.14917 0.14686 0.14457 0.14231 0.14007 0.13786
1.1 0.13567 0.13350 0.13136 0.12924 0.12714 0.12507 0.12302 0.12100 0.11900 0.11702
1.2 0.11507 0.11314 0.11123 0.10935 0.10749 0.10565 0.10383 0.10204 0.10027 0.09853
1.3 0.09680 0.09510 0.09342 0.09176 0.09012 0.08851 0.08691 0.08534 0.08379 0.08226
1.4 0.08076 0.07927 0.07780 0.07636 0.07493 0.07353 0.07215 0.07078 0.06944 0.06811
1.5 0.06681 0.06552 0.06426 0.06301 0.06178 0.06057 0.05938 0.05821 0.05705 0.05592
1.6 0.05480 0.05370 0.05262 0.05155 0.05050 0.04947 0.04846 0.04746 0.04648 0.04551
1.7 0.04457 0.04363 0.04272 0.04182 0.04093 0.04006 0.03920 0.03836 0.03754 0.03673
1.8 0.03593 0.03515 0.03438 0.03362 0.03288 0.03216 0.03144 0.03074 0.03005 0.02938
1.9 0.02872 0.02807 0.02743 0.02680 0.02619 0.02559 0.02500 0.02442 0.02385 0.02330
2.0 0.02275 0.02222 0.02169 0.02118 0.02068 0.02018 0.01970 0.01923 0.01876 0.01831
2.1 0.01786 0.01743 0.01700 0.01659 0.01618 0.01578 0.01539 0.01500 0.01463 0.01426
2.2 0.01390 0.01355 0.01321 0.01287 0.01255 0.01222 0.01191 0.01160 0.01130 0.01101
2.3 0.01072 0.01044 0.01017 0.00990 0.00964 0.00939 0.00914 0.00889 0.00866 0.00842
2.4 0.00820 0.00798 0.00776 0.00755 0.00734 0.00714 0.00695 0.00676 0.00657 0.00639
2.5 0.00621 0.00604 0.00587 0.00570 0.00554 0.00539 0.00523 0.00508 0.00494 0.00480
2.6 0.00466 0.00453 0.00440 0.00427 0.00415 0.00402 0.00391 0.00379 0.00368 0.00357
2.7 0.00347 0.00336 0.00326 0.00317 0.00307 0.00298 0.00289 0.00280 0.00272 0.00264
2.8 0.00256 0.00248 0.00240 0.00233 0.00226 0.00219 0.00212 0.00205 0.00199 0.00193
2.9 0.00187 0.00181 0.00175 0.00169 0.00164 0.00159 0.00154 0.00149 0.00144 0.00139
3.0 0.00135 0.00131 0.00126 0.00122 0.00118 0.00114 0.00111 0.00107 0.00104 0.00100
3.1 0.00097 0.00094 0.00090 0.00087 0.00084 0.00082 0.00079 0.00076 0.00074 0.00071
3.2 0.00069 0.00066 0.00064 0.00062 0.00060 0.00058 0.00056 0.00054 0.00052 0.00050
3.3 0.00048 0.00047 0.00045 0.00043 0.00042 0.00040 0.00039 0.00038 0.00036 0.00035
3.4 0.00034 0.00032 0.00031 0.00030 0.00029 0.00028 0.00027 0.00026 0.00025 0.00024
3.5 0.00023 0.00022 0.00022 0.00021 0.00020 0.00019 0.00019 0.00018 0.00017 0.00017
3.6 0.00016 0.00015 0.00015 0.00014 0.00014 0.00013 0.00013 0.00012 0.00012 0.00011
3.7 0.00011 0.00010 0.00010 0.00010 0.00009 0.00009 0.00008 0.00008 0.00008 0.00008
3.8 0.00007 0.00007 0.00007 0.00006 0.00006 0.00006 0.00006 0.00005 0.00005 0.00005
3.9 0.00005 0.00005 0.00004 0.00004 0.00004 0.00004 0.00004 0.00004 0.00003 0.00003
4.0 0.00003 0.00003 0.00003 0.00003 0.00003 0.00003 0.00002 0.00002 0.00002 0.00002