UMTS NEW SITE PAC DOCUMENT 1 (7)

Prepared No. Program Cluster Name


Rendhita/ Jhon P/Wick/Anang JPS batch-3-2017 2017B3_KAL_3G_A_004
Approved Checked Date Rev Reference
Waqas/ Kiki
Candra

PROVISIONAL ACCEPTANCE CERTIFICATE


(PAC)
3G JPS PROJECT

Area North Kalimantan

City Palangkaraya
Cluster Name 2017B3_KAL_3G_A_004

(Inner City)
Abstract
This document is to provide report for XL Axiata on Provisional Acceptance site based for commercial UMTS launch.

RND SOM PMO


PT.HUAWEI TECH PT.HUAWEI
PT. XL PT. XL PT. XL
INVESTEMEN SERVICE
AXIATA Tbk AXIATA Tbk AXIATA Tbk

Name : Name : Name : Name : Name :


Date : Date : Date : Date : Date :
UMTS NEW SITE PAC DOCUMENT 2 (7)

Prepared No. Program Cluster Name


Rendhita/ Jhon P/Wick/Anang JPS batch-3-2017 2017B3_KAL_3G_A_004
Approved Checked Date Rev Reference
Waqas/ Kiki
Candra
CONTENTS

1 INTRODUCTION .............................................................. Error! Bookmark not defined.


1.1. Introduction ................................................................... Error! Bookmark not defined.
1.2. General Cluster Information .......................................... Error! Bookmark not defined.
1.2.1. New Site ....................................................................... Error! Bookmark not defined.
1.2.2. First Tier Neighbor Sites ............................................... Error! Bookmark not defined.
1.2.3. Google Earth Snapshot ................................................ Error! Bookmark not defined.
1.3. Drive test route and cluster border at Google Map ........ Error! Bookmark not defined.
2 Performance Result ................................................................................................... 2
2.1. Drive Test ..................................................................... Error! Bookmark not defined.
2.1.1. Coverage Map Accuracy .............................................. Error! Bookmark not defined.
2.1.2. RSCP Plot .................................................................... Error! Bookmark not defined.
2.1.3. Ec/Io Drive test ............................................................. Error! Bookmark not defined.
2.1.4. DL Throughput Drive Test............................................. Error! Bookmark not defined.
2.1.5. Bad Spot Analysis ........................................................ Error! Bookmark not defined.
2.1.6. Physical Tuning Summary ............................................ Error! Bookmark not defined.
2.1.7. DT Optimization Result ................................................. Error! Bookmark not defined.
2.1.8. Overshooting Analysis from TP Status.......................... Error! Bookmark not defined.
2.1.9. MRR KPI ...................................................................... Error! Bookmark not defined.
2.2. NMS KPI UMTS ........................................................................................................... 3
2.2.1. Accessibility ................................................................................................................. 3
2.2.2. Retainability ................................................................................................................. 3
2.2.3. RTWP .......................................................................................................................... 3
2.2.4. NMS KPI Trend ........................................................................................................... 4
2.2.5. Traffic & UTILIZATION ................................................................................................ 5
3 KPI 2G.............................................................................. Error! Bookmark not defined.
3.1. List of 2G sites inside 3G Polygon ................................ Error! Bookmark not defined.
3.2. NMS 2G........................................................................ Error! Bookmark not defined.
4 KPI Justification ............................................................. Error! Bookmark not defined.
4.1. NMS KPI Trend ............................................................ Error! Bookmark not defined.
5 Recommendation............................................................ Error! Bookmark not defined.
6 Conclusion ...................................................................... Error! Bookmark not defined.

1 Performance Result
There are 2 Classification KPIs to be optimized, Drive Test result and NMS KPI result.
UMTS NEW SITE PAC DOCUMENT 3 (7)

Prepared No. Program Cluster Name


Rendhita/ Jhon P/Wick/Anang JPS batch-3-2017 2017B3_KAL_3G_A_004
Approved Checked Date Rev Reference
Waqas/ Kiki
Candra
1.1. NMS KPI UMTS

Cell KPI Aggregate for 7 days, taken at cell busy hour. Cell busy hour is defined as the hour when CS voice traffic
reach the peak value.

Date (Start - End) 2018/2/4 to 2018/2/10

1.1.1. Accessibility

No Name Target Measured On Cluster Level Status


1 Speech Access Rate >=98.50% Cell (Aggregated Cluster Level) 100.00% Pass

2 PS Access Rate >=98.00% Cell (Aggregated Cluster Level) 99.52% Pass

3 PS RAB Congestion Rate <=0% Cell (Aggregated Cluster Level) 0% Pass

1.1.2. Retainability

No Name Target Measured On Cluster Level Status


1 Speech Drop Rate <=0.8% Cell (Aggregated Cluster Level) 0% Pass

2 PS RAB Drop <=1.5% Cell (Aggregated Cluster Level) 0.12% Pass

1.1.3. RTWP

No Name Target Measured On Cluster Level Status


1 RTWP (Free hour) <= -100 dBm Only new site -105.9dBm Pass
UMTS NEW SITE PAC DOCUMENT 4 (7)

Prepared No. Program Cluster Name


Rendhita/ Jhon P/Wick/Anang JPS batch-3-2017 2017B3_KAL_3G_A_004
Approved Checked Date Rev Reference
Waqas/ Kiki
Candra
1.1.4. NMS KPI Trend

Speech Access Rate (%) PS Access Rate (%)

CS Access Rate already achieved KPI Target PS Access Rate already achieved KPI Target

PS RAB Congestion (%) Speech Drop Rate (%)

PS RAB Drop already achieved KPI target Speech Drop Rate already achieved KPI target.
UMTS NEW SITE PAC DOCUMENT 5 (7)

Prepared No. Program Cluster Name


Rendhita/ Jhon P/Wick/Anang JPS batch-3-2017 2017B3_KAL_3G_A_004
Approved Checked Date Rev Reference
Waqas/ Kiki
Candra

PS Drop Rate (%) RTWP (%)

PS RAB Drop already achieved KPI target RTWP already achieved KPI target

1.1.5. Traffic & UTILIZATION

Total Voice Traffic (KErl) Total Payload Data (GB)

2G+3G Voice Traffic stable after new site on air. (Only for 2G+3G Payload Data increase after new site on air. (Only for
information) information)
UMTS NEW SITE PAC DOCUMENT 6 (7)

Prepared No. Program Cluster Name


Rendhita/ Jhon P/Wick/Anang JPS batch-3-2017 2017B3_KAL_3G_A_004
Approved Checked Date Rev Reference
Waqas/ Kiki
Candra

Utilization Code Utilization CE

Code Utilization keep stable after new site on air. (Only for CE Utilization keep stable after new site on air. (Only for
information) information)

Utilization Power Utilization CNBAP

Power Utilization keep stable after new site on air. (Only for CNBAP Utilization keep stable after new site on air. (Only
information) for information)
UMTS NEW SITE PAC DOCUMENT 7 (7)

Prepared No. Program Cluster Name


Rendhita/ Jhon P/Wick/Anang JPS batch-3-2017 2017B3_KAL_3G_A_004
Approved Checked Date Rev Reference
Waqas/ Kiki
Candra