Documente Academic
Documente Profesional
Documente Cultură
City Palangkaraya
Cluster Name 2017B3_KAL_3G_A_004
(Inner City)
Abstract
This document is to provide report for XL Axiata on Provisional Acceptance site based for commercial UMTS launch.
1 Performance Result
There are 2 Classification KPIs to be optimized, Drive Test result and NMS KPI result.
UMTS NEW SITE PAC DOCUMENT 3 (7)
Cell KPI Aggregate for 7 days, taken at cell busy hour. Cell busy hour is defined as the hour when CS voice traffic
reach the peak value.
1.1.1. Accessibility
1.1.2. Retainability
1.1.3. RTWP
CS Access Rate already achieved KPI Target PS Access Rate already achieved KPI Target
PS RAB Drop already achieved KPI target Speech Drop Rate already achieved KPI target.
UMTS NEW SITE PAC DOCUMENT 5 (7)
PS RAB Drop already achieved KPI target RTWP already achieved KPI target
2G+3G Voice Traffic stable after new site on air. (Only for 2G+3G Payload Data increase after new site on air. (Only for
information) information)
UMTS NEW SITE PAC DOCUMENT 6 (7)
Code Utilization keep stable after new site on air. (Only for CE Utilization keep stable after new site on air. (Only for
information) information)
Power Utilization keep stable after new site on air. (Only for CNBAP Utilization keep stable after new site on air. (Only
information) for information)
UMTS NEW SITE PAC DOCUMENT 7 (7)