Documente Academic
Documente Profesional
Documente Cultură
Dated, March 16, 2016
Technology Agreement for GNG Pressure Reducing Unit(PRD)
Model: ERJ‐1000
一、设备技术参数
One. Equipment technical parameters
序号 项 目 参 数 备 注
No. item parameters remarks
1 设备名称 燃气调压装置
Equipment name Gas pressure regulation device
2 规格型号 ERJ‐1000 电加热型
Specfication&model Electric heating
type
3 结构形式 一级一开一备,二级一开一备
Construction&form One open and one spare for 1st stage,
One open and one spare for 2nd stage
4 额定流量 1000Nm3/h(进口压力>3MPa) 单路
3
Rated flow 1000Nm /h(inlet pressure>3MPa) Single route
5 换热级数 1
Heat exchange stage
6 减压级数 2
Decompression stage
7 过滤器精度 20μm
Filter precision
8 调压精度 ≤±5%
Pressure regulation precision
9 关闭精度 ≤±3%
Closedown precision
10 计量精度 ≤±1.5%
Computation precision
11 一级前设计压力 27.5 Mpa
Design pressure before 1st
stage
12 二级前设计压力 2.5Mpa
nd
Design pressure before 2
stage
13 二级后设计压力 1.0Mpa
Design pressure after 2nd
stage
14 最高水温度 85℃
Incoming water temperature
15 最低水温度 75℃
Backwater temperature
16 出口气体温度 10~20℃
Outlet gas temperature
17 一级出口压力范围 1.3~1.6MPa(可调)
st
1 stage outlet pressure range 1.3~1.6MPa(adjustable)
18 二级出口压力范围 0.3Mpa(可调 0.2‐0.4Mpa)
2nd stage outlet pressure 0.3Mpa(adjustable0.2‐0.4Mpa)
range
19 仪表风压力 0.4‐0.6MPa
Instrument air pressure
20 一级后放散压力 1.3P2(可调)
Relief pressure after 1st stage 1.3P2(adjustable)
21 二级后放散压力 1.3P3(可调)
nd
Relief pressure after 2 stage 1.3P3(adjustable)
22 设备重量 约 1300KG
Equipment weight About 1300KG
23 设备进出口 DN25 PN27.5 / DN80 PN1.6
Inlet&outlet of equipment
24 加臭机(选配) HJC‐C‐20(手动加臭)
Odor add machine(option) HJC‐C‐20
(single pump and single tank)
25 电加热器热负荷 50kw
Heat load of electric heater
2
26 辅助卸车电磁阀开启压力 0.6MPa
Startup pressure of auxiliary
unload solenoid valve
27 外形尺寸 长*宽*高=7000*2100*2200
Outside dimension length*width*height=5000*2100*2
200
技术说明
Technical specifications
一、设备性能描述
One. Equipment performance description
(一)、基础参数
(one.) basic parameters
1.用户类型:工业用户
2. 进口压力:25Mpa
2.燃气输送压力:0.2‐0.4Mpa
3.CNG 减压撬流量:1000m3/h
4. 配置:一级换热、二级调压、切断、放散、计量、卸气柱、供热系统。
5. 结构:一开一备,
6. 工作介质
压缩天然气(CNG)
7. 现场安装条件
户外(箱体)
1. User Type: Industrial users
2. Inlet pressure: 25Mpa
2. Gas transmission pressure: 0.2‐0.4Mpa
3. CNG decompression pry flow:500m3 / h
4. Configuration: the 1st stage heat exchanging, the 2nd stage pressure regulating, cutting, emission,
measurement, unloading gas column and heat supply system
5. Structure: one opening ,one for spare,
6. Working media
Compressed natural gas (CNG)
7. On‐site installation conditions
Outdoor( for box body)
3
(二)、CNG 减压撬制造原则及依据标准
(Two)CNG Pressure Reducing Unit (PRD)manufacturing principle&standards
1.设计原则
1. design principle
(1)符合国家相关设计规范,确保设备安全稳定运行。
(2)结构合理、运行经济,确保设备输出天然气压力在控制范围内。
(3)尽可能运用新产品、新技术。
(1) complied with relevant state design standards, ensuring that the equipment safe and
stable operation.
(2) reasonable structure, economical running, ensuring that natural gas output pressure of
equipment in the control range.
(3) making use of new products and new technologies as far as possible.
2.设计制造依据
2. Design And Manufacturing
GB150 《钢制压力容器》
GB150 Steel Pressure Vessel
GB50028 《城镇燃气设计规范》
GB50028 Specification For Town Gas Design
GB50251 《输气管道工程设计规范》
GB50251 Specification For Design Of Gas Transmission Pipeline Project
JB4730 《承压设备无损检测》
JB4730 Nondestructive Testing Of Pressure Equipment
GB50160 《石油化工企业设计防火规范》
GB50160 Code For Fire Protection Design Of Petrochemical Engineering Enterprises
GB50264 《工业设备及管道绝热工程设计规范》
GB50264 Design Code For Industrial Equipment And Pipeline Insulation Engineering
GB50235 《工业金属管道工程施工及验收规范》
GB50235 Specification Of Industrial Metal Pipeline Engineering Construction And Acceptance
GB50316 《工业金属管道设计规范》
GB50316 Design Specification For Industrial Metal Pipeline
GB3836 《爆炸性气体环境用电气设备》
4
GB3836 Electrical Apparatus For Explosive Gas Atmospheres
GB50016 《建筑设计防火规范》
GB50016 Specification For Fire Prevention Design Of Building
GB50184 《工业金属管道工程施工质量验收规范》
GB50184 Code For Industrial Metal Pipeline Engineering Construction Quality Acceptance
GB50540 《石油天然气站内工艺管道工程施工规范》
GB50540 Standards Of Petroleum And Natural Gas Pipeline Engineering Construction
GB50683 《现场设备、工业管道焊接工程施工质量验收》
GB50683 Acceptance Of Field Equipment And Industrial Pipeline Welding Construction Quality
TSG D0001 《压力管道安全技术监察规程‐工业管道》
TSG D0001 Supervision Regulation For Pressure Pipe Safety Technology ‐Industrial Pipeline
GB50236 《现场设备、工业管道焊接工程施工及验收规范》
GB50236 Code Of Field Equipment And Industrial Pipeline Welding Construction And Acceptance
GB5310 《高压锅炉用无缝钢管》
GB5310 Seamless Steel Pipe For High Pressure Boiler
GB8063 《输送流体用无缝钢管》
GB8063 Seamless Steel Pipe For Fluid Transport
HG20592 《钢制管法兰》
HG20592 Steel Pipe Flanges
(三)、CNG 减压站功能及设计技术参数
(three) CNG Pressure Reducing Unit (PRD) station function&design technical parameters
1.主要功能 Main function
1) 天然气减压功能
2) 天然气加热功能
3) 天然气紧急切断
4) 天然气泄漏报警
5) 燃气超压放散
6) 超压切断
7) 天然气计量功能
8) 天然气
9) 加臭功能
10) 各段压力、温度、流量、报警的远传及连锁功能
1) Natural gas decompression function
5
2) Natural gas heating function
3) natural gas emergency cut‐off
4) Gas leakage alarm
5) Relief for gas with overpressure
6) Cut off for super‐pressure
7) Natural gas measurement functions
8) Natural Gas
9) odor adding function(Option)
10) Each stage pressure, temperature, flow, alarm remote transmitting and linkage
function
(四)、设计计算条件即运行参数
(four) design technical condition i.e. running parameters
1. 换热器的换热面积的计算条件
1. heat exchanging area calculation condition for heat exchanger
一级换热器:介质压力:25Mpa
介质进口温度:‐10℃(或当地历年最低温度)
介质出口温度:30℃
二级换热器:介质压力:4.0Mpa
介质进口温度:5℃
介质出口温度:15℃
1st stage heat exchanger: medium pressure: 25Mpa
Medium inlet temperature: ‐10℃ (or local historical low
temperature)
Medium outlet temperature: 30℃
2nd stage heat exchangers: medium pressure: 4.0Mpa
Medium inlet temperature: 5℃
Medium outlet temperature: 15℃
2.一、二级调压装置流量的确定条件
2. flow determination condition for 1st & 2nd stage pressure regulation device
一级调压装置:进口压力范围:1.6~25MPa,出口压力:1.6MPa,进口压力为 3.0MPa
出口压力为 1.6MPa 时的流量为一级调压装置的额定流量。
6
二级调压装置:进口压力范围:0.6~1.6MPa,出口压力:0.4MPa,进口压力为 0.6MPa
出口压力为 0.4MPa 时的流量为二级调压装置的额定流量。
1st stage pressure regulation device: inlet pressure range: 1.6 ~ 25MPa, outlet pressure:
1.6MPa,flow at inlet pressure of 3.0MPa and outlet pressure with 1.6MPa is the nominal flow.
2nd stage pressure regulation devices: inlet pressure range: 0.6 ~ 1.6MPa, outlet pressure:
0.4MPa, flow at inlet pressure of 0.6 ~ 1.6MPa and outlet pressure with0.4MPa is the nominal
flow.
3.设计参数
3. design parameters
一级调压装置前的设计压力:27.5MPa
二级调压装置前的设计压力:2.5MPa
二级调压装置后的设计压力:1.6MPa
热水系统设计压力:常压
Design pressure before1st stage pressure regulation device: 27.5MPa
Design pressure before 2nd stage pressure regulation device: 2.5MPa
Design pressure after 2nd stage pressure regulation device: 1.6MPa
Design pressure of hot‐water system: atmospheric pressure
4.运行参数
4. running parameters:
一级调压装置出口压力:1.5Mpa(可调)
二级调压装置出口压力:0.3MPa(可调)
天然气出口温度:≥10℃
Outlet pressure of 1st stage pressure regulation device : 1.5Mpa (adjustable)
Outlet pressure of 2nd stage pressure regulation device: 0.3MPa (adjustable)
Gas outlet temperature: ≥ 10 ℃
5.箱体技术条件
5. technical condition for box body
(1) 彩钢箱体,顶部为户外防雨型。
(2) 箱体上半部分冲有通风孔,通风孔总面积
满足 30cm2/m2 的要求。
7
(1) Color steel with top for outdoor water‐resistant type.
(2) The upper part of the box has ventilation holes, the total area of ventilation holes can meet
requirements. of 30cm2/m2
(五)、CNG 调压站的基本组成
(five)basic constitution for CNG gas regulator station
CNG 减压撬由卸车系统、调压换热计量系统、控制系统、加臭系统、供热系统五
部分组成。
CNG decompression PRU which is composed of five parts: the unloading system,
pressure regulation& heat exchange metering systems, control systems, odor add system
and heat supply system,.
A. 卸车系统由快装接头、高压胶管、主阀、放空阀、支架、切断阀与质量流量计(可
选)组成(此部分设备由甲方采购制作,我司负责控制)。
A. Unloading system consists of quick connectors, high pressure hose, the main valve,
venting valve, bracket, shut‐off valve and mass flow meter (optional) component (in this part,
the equipment is purchased and manufactured by the Party A and our company is responsible
for control).
B. 调压换热计量系统由进气管路、进口球阀、高压过滤器、紧急切断阀、一级换热
器、一级调压器、二级调压器、流量计、安全放散阀、压力表、温度计、控制阀
门、压力及温度传感器等组成。
B. Pressure adjusting measurement system consists of inlet gas pipeline, inlet ball
valve, high pressure filters, emergency cut‐off valve, the 1st stage heat exchanger, the
1st stage pressure regulator, the 2nd stage pressure regulator, flow meter, safety relief
valve, pressure gauge, thermometer, control valve, pressure and temperature sensor so
on.
控制系统由压力及温度传感器、防爆接线盒、温度仪表、压力仪表、流量仪表、报
警控制仪表、PLC 控制器及各种开关组成。
C. Control system consists of pressure and temperature sensors, explosion‐proof junction
box, temperature meters, pressure meters, flow meters, alarm control devices, PLC
controller and various switches.
C. 供热系统由:不锈钢电加热器和换热盘管组成。
E. Heating system consists of: Stainless steel electric heater and heat exchange coil
8
(六)、工艺流程说明(参见工艺流程图)
(six) technological process instruction(refer to technological process drawing)
压缩天然气减压装置工艺流程图
压缩天然气储存及运输的撬装车将压缩天然气运到供气站内,经过卸车系统进入
CNG 调压设备,通过减压撬内的装置将高压天然气减至用户所需的压力进入输送管网。
减压撬内的减压装置一般设两路,一开一备,每路采用两级调压; CNG 进口采用双路
进口,可同时供应,也可单独供应,便于用户使用。
Prying vehicle for compressed natural gas storage and transport carries compressed natural
gas to the gas supply station, then the gas enters CNG pressure adjusting equipment by way
of unloading system, afterwards high pressure gas can be depressurized to user’s requirement
by way of depression prying device and goes into transport pipe network. Generally
depression prying device can offer 2 routes, one open and one for storage, each route adopts
2 stages pressure adjusting; double route inlet for CNG, which can be supplied at 2 routes or 1
route according to user’s requirements.
(1) 天然气经入口球阀、高压过滤器(除掉燃气中的杂质)和紧急切断阀后进入
到换热器中,经换热器将天然气温度升至 65°C左右,预热后的天然气进入到一级
调压器中。
(1). Natural gas enters heat exchanger through the entrance ball valve and high‐pressure filter
9
(to get rid of gas impurities) and emergency shut‐off valve, by way of heat exchanger, the
natural gas temperature will be raised to 65 °Cor so, After preheating, the natural gas will
enter pressure regulator.
(2) 一级调压器将压缩天然气压力降到 1.5MPa 左右,天然气进入到二级调压器。
(2) The 1st stage pressure adjustor can reduce natural gas pressure to around 1.5MPa or so,
then
The natural gas enters into the 2nd stage pressure regulator.
(3) 二级调压器将压缩天然气压力降到 0.2~0.4MPa。
(3). The 2nd stage pressure regulator can reduce compressed natural gas to 0.2 ~ 0.4MPa.
(4) 减压后的天然气经再次过滤后进入到流量计,经计量加臭后进入燃气外管网。
(4) After decompression, natural gas enters flow meter through re‐filtering, then goes to
outside pipeline network after gas odorization.
(七)、安全装置
(seven) safety device
1. 设备自动连锁控制
1. Equipment auto linkage control
ERJ 系列 CNG 减压撬配有中央控制柜,可以实现整个气站的远程监控,并对设备的
安全进行连锁控制。
控制台的采集点如下:
ERJ series of CNG decompression pry with a central cabinet that enables remote monitoring
and control the entire gas station, and safety equipment, chain of control.
Console collection points are as follows:
天然气 A、B 路总进口压力
A、B 路一级调压后压力
A、B 路换热器水温度
A、B 路换热器水位
天然气的出口压力
天然气的流量
箱内燃气泄漏浓度
天然气的出气温度
A、B 路电加热器工作状态
① Natural gas general inlet pressure route A, B,
10
② Pressure after 1st stage pressure adjusting on A&B route.
③ Water temperature of heat exchanger at route A&B.
④ Water level of heat exchanger at route A&B..
⑤ outlet pressure of natural gas
⑥ flow of natural gas
⑦ gas leakage density inside box
⑨ outlet temperature of natural gas
⑩ working status of electric heater at route A&B.
以上信号远传到中央控制柜,当某一点出现异常时,通过中央控制柜自动切断天然气入
口的紧急切断阀。
The above signal is transmitted furtherly to the central control cabinet, when an abnormality
occurs at a certain point, through a central cabinet, emergency shut‐off valve at gas inlet can be
automatically cut off by the central control console.
超压放散
2. Relief for overpressure
当一、二级调压器后的压力超安全过放散阀设定的压力时,放散阀会自动开启。两
级放散阀根据不同的压力汇合,汇合管引出箱体,并高出箱体顶部 2 米及高出地面 4 以
上。
When pressure of 1st&2nd stage pressure adjustor is over than the set pressure of safety
relief valve, the relief valve can open automatically. Convergence with different pressure occurs at 2
stages relief valve, and convergence tube is led out of box body to be 2 meters higher than box top
and over 4 meters higher than ground.
二、设备控制逻辑
Two. Control logic of equipment
(一)、控制安全措施
(one) control safety measures
由于压缩天然气调压装置工作压力高,且压力变化范围宽,因此不仅要求调压
装置结构的合理性、选材和配套产品选型严格性,而且要充分考虑调压装置的安全性。天津安
耐吉燃气技术有限公司设计和生产的CNG减压装置在安全运行上采取冗余设计,测点信号采
取两种手段获取以保证信号的实时和可靠性,且有自动切断功能和报警功能;工艺上入口带紧
急切断阀、每路两级调压阀带两级超压放散,电气上采用双路冗余报警连锁;因此可确保任何
时候该装置安全运行;安全性措施完备,充分。
Because high working pressure and wide change range of CNG pressure adjustor, full
11
consideration to the safety of pressure adjustor should be given especially besides structure
rationality, strict selection of material and accessory products. Tianjin Energy Gas Technology Co.,
Ltd. ,adopts redundancy design at safety running for CNG depression device design and production,
moreover Signal for survey obtained by 2 methods to ensure real‐time and reliable, additionally
self‐cutoff and alarm function are added; emergency shut‐off valve with 2 stages overpressure relief
for per route, double‐line redundancy alarm linkage is applied on electricity route; therefore this
device can be ensured for safety running at any time;
security measures is comprehensive and sufficient.
为每路安全运行,安全连锁奠定了基础,同时某路安全连锁相互独立,互不影响,安全
连锁信号取自如下几点:
For safety running on each route, safety chain offers this foundation, meantime safety chain
on a certain route is independent of each other, cannot be affected each other, safety chain signal
can be ensured with the following points:
(1)第一级出口压力,由第一级出口压力变送器PT测量。
(1) For the first stage outlet pressure, which can be measured by the 1st stage outlet pressure
transmitter PT.
(2)第二级出口压力 由第二级出口压力变送器PT测量。
(2) For the second stage outlet pressure, which can be measured by the 2nd stage outlet
pressure transmitter PT.
上述PT信号进入操作台上的PLC软连锁;连锁 A、B 路进口的气动紧急切
断阀,确保系统供气安全。满足下述条件之一,紧急切断阀关闭:
The above PT signal goes into PLC soft‐chain of working platform; link pneumatic emergency
shut‐off valve at route A&B to ensure the gas supply security of the system. Meeting the following
conditions, emergency shut‐off valve will be closed:
A.在调压装置出口压力超过设定压力 1.3 倍时(可自由设定);
B.A、B 路一级调压后压力超过设定压力 1.3 倍时(可自由设定);
C.箱体内出现燃气泄漏时;
D.伴热系统出现温度低限故障时;
E.装置本身故障时;
F.控制系统出故障时;
G.需要停机时
A. When outlet pressure of regulator device exceeds the set pressure with 1.3 times (adjustable
freely);
B. When pressure after 1st stage pressure adjusting exceeds the set pressure with 1.3 times
12
(adjustable freely);
C. When the gas leakage occurs in the box body.;
D. When temperature lower limit failure occurs in Heat tracing system;
E. Failure of the device itself;
F. failure of control system;
G. Need to machine stop
(二)、自动控制
(two) auto‐control
本中央控制系统由本公司设计制造并生产,专用于压缩天然气调压站检测和控
制.整个系统由常规仪表显示系统和可编程序控制器(PLC采集控制)组成;系统采用西门
子PLC对CNG调压装置和其他辅助系统进行控制、显示;该装置可全自动、半自动和手动
控制;两路可根据入口、出口压力设定范围能分别自动启停、根据具体情况能自动同时启停两
路运行。
This central control system is designed and manufactured by our company, which is
especially for detection and control of compressed natural gas regulator station. The whole system
is composed by general instrument display system and programmable logic controller(PLC
Acquisition and Control); Siemens PLC controls and displays for CNG pressure adjustor and other
auxiliary system; this device can be fully automatic, semi‐automatic and manual control; 2 routes
can be automatically start or stop based on inlet&outlet set pressure range, also automatically and
simultaneously start or stop these 2 routes can occur according to specific circumstances.
1.操作功能
(1)具有现场手动启动、停机功能;
(2)具有现场运行、停机指示功能;
(3)具有远端停机功能;
(4)具有远端故障报告功能;
(5)具有紧急情况下(控制台失灵)手动启动功能;
1. Operating functions
(1) On‐site manually start&stop function;
(2) On‐site operation&stop instructions function;
(3) A remote stop function;
(4) A remote fault reporting functions;
(5) Manual start function for an emergency situation (working console failure);
2.中央控制台上显示和控制如下内容:
第一路入口压力、第一级调压后的压力;
13
第二路入口压力、第二级调压后的压力;
出口压力和换热器水温,水位;
每套卸气柱的撬车压力;
减压撬流量;
入口紧急切断阀和每路等开停状况;
显示报警状态;
控制每路的启停;
站区内所有模拟量及数字量参数进入PLC。PLC的输出用于控制站内
设备的启、停、指示灯的显示、报警以及连锁功能。本装置和整个站的显示和控制由进口西门
子PLC完成。
2. The central console can display and control the following:
1) The first route inlet pressure, the pressure after the first stage pressure regulating;
2) The second route inlet pressure, the pressure after the second stage pressure regulating;
3) Outlet pressure and incoming&backwater temperature;
4) Each of the skid truck unloading gas column pressure;
5) The flow of decanting panel and decompression pry;
6) The comprehensive working condition display of odor adding machine;
7) emergency shut‐off valve at entrance and start or stop status of each route;
8) The alarm state display;
9) Start or stop control of each route;
All analog and digital parameters within station area enter into the PLC. PLC's output is for start and
stop of the control station equipment, display of indicating light, alarm and chain function. The
device and display and control of the entire station are fulfilled by imported Siemens PLC.
3 .设备优点:
(1)结构紧凑,扩展方便。
(2)具有极高的可靠性。
(3)可同时完成采集和控制。
(4)可编程并且编程灵活。
(5)具有电气隔离功能。
(6)可与计算机系统通讯,便于系统扩展。
(选装)
3. Equipment advantages:
(1), compact structure and easy expansion.
(2) extremely high reliability.
(3) acquisition and control. can be completed at the same time
14
(4) programmable, and flexible programming.
(5) function of electrical isolation.
(6) communication with the computer system for easy system expansion. (Optional)
三、设备配置表 Five. Equipment Configuration Table
编号 单位 数量 制造商
名称 name 规格 specification
No. unit Qty. Manufacturer
一、减压撬本体部件 parts for Pressure relief skid
一级调压器
个 美国 America
1 The 1st stage pressure E1HPPR‐1/2EP‐30 2
pcs KIMRAY
regulator
二级调压器 PN25 DN25 EZR
台 美国 America
2 The 2nd stage pressure P1=1.5MPa P2=0.2‐0.4MPa 2
set FISHER
regulator Q=1000NM3/h
一级安全放散阀
个
3 The 1st stage Safety relief WON 1/2″NPT 1 韩国 Korea WON
pcs
valve
二级安全放散阀
个 美国 America
4 The 2nd stage Safety relief 289HH 1″NPT 1
pcs FISHER
valve
高压球阀 个 德国 Germany
5 Q21N‐320C‐DN25 4
High pressure ball valve pcs MHA
双作用式紧急切断阀
个 德国 Germany
6 Double action type 320C‐DN25 2
pcs MHA
emergency cut‐off valve
二位五通
电磁阀 个
7 Fivepositiontwowaysolenoid 2 亚德客 Yadeke
solenoid valve pcs
valve
上海双高
手动球阀 个
8 Q11F‐16C‐DN25 2 Shanghai
Manual ball valve pcs
Shuanggao
上海双高
手动球阀 个
9 Q11F‐25C‐DN15 2 Shanghai
Manual ball valve pcs
Shuanggao
15
上海双高
手动球阀 个
10 Q41F‐25C‐DN25 4 Shanghai
Manual ball valve pcs
Shuanggao
蝶阀 个 日本 Japanese
11 D71X‐16C‐DN80 2
Butterfly valve pcs KITZ
针型阀(带泄压孔)
个 天津海花 Tianjin
12 Needle type valve JJ.M1H‐320C Rc1/2‐M20×1.5 4
pcs Haihua
(with pressure relief hole)
针型阀(带泄压孔)
个 天津海花 Tianjin
13 Needle type valve JJ.M1H‐160C Rc1/2‐M20×1.5 4
pcs Haihua
(with pressure relief hole)
高压过滤器 个
14 OGL‐DN25‐PN32MPa 2 安耐吉 Energy
High Pressure filter pcs
电热增热器(两极)
个
15 Electric heat exchanger EVE‐CNG‐1000 2 安耐吉 Energy
pcs
(bipolar)
电加热器
16 25KW 台 set 4 金隆基 Jin Longji
Electric heater
压力变送器 个 天津永康 Tianjin
17 0~25.0MPa 2
pressure transmitter pcs Yongkang
压力变送器 个 天津永康 Tianjin
18 0~2.5MPa 1
pressure transmitter pcs Yongkang
压力变送器 个 天津永康 Tianjin
19 0~0.6MPa 1
pressure transmitter pcs Yongkang
压力表 个
20 0~40MPa 2 捷达 JETTA
Pressure gauge pcs
压力表 个
21 0~2.5MPa 1 捷达 JETTA
Pressure gauge pcs
压力表 个
22 0~1.0MPa 1 捷达 JETTA
Pressure gauge pcs
温度计 个
23 ‐40~80℃ 1 捷达 JETTA
thermometer pcs
温度计 个
24 0~100℃ 2 捷达 JETTA
thermometer pcs
16
温度变送器 个 索思仪表
25 R1/2″ 3
temperature transmitter pcs Source meter
水位开关 个
26 / 2 国产 domestic
Water Level Switch pcs
水位计 个
27 / 2 国产 domestic
water level gauge pcs
燃气报警仪 个
28 / 1 安可信 ACTION
Gas alarm instrument pcs
防爆接线箱
个
29 Explosion proof junction / 1 南午 Nan Wu
pcs
box
防爆开关 个
30 / 1 中兴 Zhongxing
Explosion proof switch pcs
防爆灯 个
31 AC220V‐100W 1 中兴 Zhongxing
Explosion proof lamp pcs
双层彩钢板内夹保温层
箱体 thermal insulation inner 个
32 1 安耐吉 Energy
Box body layer of Double layer color pcs
steel plate
管件 法兰 螺栓 易耗件及
相关组件
设备配套
33 pipe fittings, Flange, bolt, 套 set 1 安耐吉 Energy
Equipment accessories
Consumable parts and
related components
二、计量装置部件 Two. Parts Of Metering Unit
涡轮流量计 个
34 PN16 DN80 1 苍南 Cangnan
turbine flowmeter pcs
Y 型过滤器 个
35 PN16 DN80 1 双高 Shuanggao
Y type filter pcs
蝶阀 个 日本 Japanese
36 D71X‐16C‐DN80 3
Butterfly valve pcs KITZ
三、加臭装置部件 Three. Device for adding odor
17
Manual feed machine pcs
个
38 卡套阀 Card sleeve valve Φ10 1 国产 domestic
pcs
四、仪表风部件 Four. Instrument wind component
空气调压过滤装置
个
39 Air pressure regulating and BRF‐3000‐3/8″ 1 天津 Tianjin
pcs
filtering device
上海双高
个
40 手动球阀 manual ball valve Q11F‐16P‐DN15 1 Shanghai
pcs
Shuanggao
针型阀 个
41 J13‐16T‐DN8 4 国产 domestic
Needle valve pcs
五、中央控制系统部件 Five. Parts for Central control system unit
PLC+触摸屏
43 控制系统 control system 套 set 1 安耐吉 Energy
PLC+ touch screen
电器辅件
44 电缆等 cable etc. 套 set 1 安耐吉 Energy
Electrical accessories
六、卸车柱 unloading pole
18