Sunteți pe pagina 1din 1

THE VILLA @ DUBAILAND

THE MAIN PACKAGE (PHASE 2)


PROJECT No. 2005-11-P2
NON-CON FORMANCE REPORT
IDENTIFICATION OF NON-CONFORMANCE REPORT
Details: Report No.:
Attachment
Issued By: Project Manager
Signature:
Date:
ACTION TO BE TAKEN BY CONTRACTOR
Recommended by Project Manager / Lead Consultant:  USE AS IS REWORK  REPAIR  REJECT
 ADMINISTRATIVE ACTION
DISMANTLE AND REDO
Corrective Action Details Action By:
Completion Date:
Issued By:
Signature:
Date:
Prevention Action Details Action By:
Completion Date:
Issued By:
Signature:
Date:
REVIEW OF ACTION
Corrective Action  ACCEPTED  REJ ECTED Preventive Action  ACCEPTED
 REJECTED
SHADID ENGINEERING CONSULTANTS:

Signature: Date:
FOLLOW UP BY CONTRACTOR
All action required has been completed in the prescribed manner
Details:
By: Signature: Date:
CLOSE OUT BY THE ENGINEER

By: Signature: Date:

Areas to be filled by SEC


Other fields to be filled by ASGC
Cc: Mr. Tim Heywood – M/s. Mace

Page 1 of 1

S-ar putea să vă placă și