CIVILWORK WHICH COULD BE AFFECTED BY MISSING ELECTROMECHANICAL CONTRAC
KF1

pump foundations, the EM contractor could possibly propose modifications based on the seat size of the submersible pumps it
pipe outlet openings position from the wetwell due to above reason.
lps valve chamber, the arrangement of the valves & fittings and outlet position of the discharge pipes to the ptu. Work on the v
proceed pending the review of the eventual em contractor

the inletpipe incoming direction and ending position depends on the outlet arrangement from the lps valve chamber and the s
supplied. Thererfore the floorwork in the ptu should pend.

the seats for the blowers and the seat for the pretreatment control panel (LCP-1) would require contractor review. Therefore th

Contractor would need to review the aeration piping arrangement/seizing and this could affect the upper structures of the BT (
mlss recirculation pump foundations and piping arrangements, the EM contractor could possibly propose modifications based
submersible pumps it will supply
proposed arrangement & locations of drain valve chambers require contractor review

secondary sludge return & rejection pump foundations and piping arrangements, the EM contractor could possibly propose mo
size of the submersible pumps it will supply
proposed arrangement & locations of drain valve chambers require contractor review

Location & arrangemnt & outlet location on the FCT wall of the scum equipment & piping

the seats for the chemical tanks and the seat for the teritary treatment control panel (LCP-3) would require contractor review. T
pend.

the seats for the blowers and the seats for the low voltage (GLV) & the biological treatment control panel (LCP-2) would require
floorwork should pend.
Contractor would need to review the aeration piping arrangement/seizing for the stabilization & mixing tanks and this could aff
structures
proposed arrangement & locations of drain valve chambers require contractor review

the seats for the blowers, sludge feeding pumps, PPU, belt press and the seats for the sludge treatment control panel (LCP-4) &
the building would require contractor review. Therefore all civilwork outside the structural (the columns) should pend.
Contractor would need to review the aeration piping arrangement/seizing for the stabilization & mixing tanks and this could aff
structures
proposed arrangement & locations of drain valve chambers require contractor review

completion of (walls, roofs) the ptu blower building, chemical building, energy building, control room, sludge dewatering build
installation drawings will result in a lot of civil work modidifications later during the actual electrical installation.

no compound work could be done at all without the contractor's review and submission of compound electrical & control layo

completion of (walls, roofs) the ptu blower building, chemical building, energy building, control room, sludge dewatering build
installation drawings will result in a lot of civil work modidifications later during the actual air control equipment installation.

no compound work could be done at all without the contractor's review and submission of compound wash, drainage, bypass
drawings.
LPS
1
2

3
PTU

1
BLOWER ROOM FOR
PTU

1
DISTRIBUTION TANK
TO PST
1

2
3
PST
1
BT

2
3
SLUDGE RETURN &
REJECTION WELLS

1
2
FCT
1

CHEMICAL BUILDING
1
ENERGY BUILDING

THICKENING,
STABILIZATION &
MIXING TANKS

1
2

SLUDGE
DEWATERING
BUILDING

2
3
ELECTRICAL

2
Air conditioning

COMPOUND PIPING

1
CIVILWORK WHICH COULD BE AFFECTED BY MISSING ELECTROMECHANICAL CONTRAC
KF2

pump foundations, the EM contractor could possibly propose modifications based on the seat size of the submersible pumps it
pipe outlet openings position from the wetwell due to above reason.
lps valve chamber, the arrangement of the valves & fittings and outlet position of the discharge pipes to the ptu. Work on the v
proceed pending the review of the eventual em contractor

the inletpipe incoming direction and ending position depends on the outlet arrangement from the lps valve chamber and the s
supplied. Thererfore the floorwork in the ptu should pend.

the seats for the blowers and the seat for the pretreatment control panel (LCP-1) would require contractor review. Therefore th

The direction and position of the inlet pipe to the distribution chamber depends on the ptu to be supplied.
primary sludge rejection pump foundations and piping arrangements, the EM contractor could possibly propose modifications
submersible pumps it will supply
proposed arrangement & locations of drain, bypass & return valve chambers require contractor review

Location & arrangemnt & outlet location on the PST wall of the scum equipment & piping

Contractor would need to review the aeration piping arrangement/seizing and this could affect the upper structures of the BT (
mlss recirculation pump foundations and piping arrangements, the EM contractor could possibly propose modifications based
submersible pumps it will supply
proposed arrangement & locations of drain valve chambers require contractor review

secondary sludge return & rejection pump foundations and piping arrangements, the EM contractor could possibly propose mo
size of the submersible pumps it will supply
proposed arrangement & locations of drain valve chambers require contractor review

Location & arrangemnt & outlet location on the FCT wall of the scum equipment & piping
the seats for the chemical tanks and the seat for the teritary treatment control panel (LCP-3) would require contractor review. T
pend.

the seats for the blowers and the seats for the low voltage (GLV) & the biological treatment control panel (LCP-2) would require
floorwork should pend.

Contractor would need to review the aeration piping arrangement/seizing for the stabilization & mixing tanks and this could aff
structures
proposed arrangement & locations of drain valve chambers require contractor review

the seats for the blowers, sludge feeding pumps, PPU, belt press and the seats for the sludge treatment control panel (LCP-4) &
the building would require contractor review. Therefore all civilwork outside the structural (the columns) should pend.
Contractor would need to review the aeration piping arrangement/seizing for the stabilization & mixing tanks and this could aff
structures
proposed arrangement & locations of drain valve chambers require contractor review

completion of (walls, roofs) the ptu blower building, chemical building, energy building, control room, sludge dewatering build
installation drawings will result in a lot of civil work modidifications later during the actual electrical installation.

no compound work could be done at all without the contractor's review and submission of compound electrical & control layo

completion of (walls, roofs) the ptu blower building, chemical building, energy building, control room, sludge dewatering build
installation drawings will result in a lot of civil work modidifications later during the actual air control equipment installation.

no compound work could be done at all without the contractor's review and submission of compound wash, drainage, bypass
drawings.