Project Title: Petron Mabini Depot Repair of Pier Important Note: Please fill up all items which

are applicable for the project, otherwise,


kindly put N/A.
Location: Petron Mainaga, Mabini, Batangas

Contractor's Name:

Qty Unit Amount (Base Bid)

1.0 General Preliminaries 1 lot -


2.0 Detailed Engineering 1 lot -
3.0 Engineering Services 1 lot -
4.0 Labor 1 lot -
5.0 Equipment Rental 1 lot -
6.0 Mechanical 1 lot -
7.0 Piping 1 lot -
8.0 Fire Fighting and HSSE 1 lot -
9.0 Electrical 1 lot -
10.0 Instrument and Control 1 lot -
11.0 Building and Architecture 1 lot -
12.0 Civil, Structural, Foundation 1 lot -
Others (Bidders to specify)

SUBTOTAL : -

OVERHEAD : -

PROFIT : -

CONTINGENCY : -

GRAND TOTAL VAT EX (PHP) : -

Submitted by:
FIRM :
TIN # :
ADDRESS :
NAME/TITLE :

SIGNATURE :
DATE :
DURATION : Ninety (90) Calendar Days
Project Title: Petron Mabini Depot: Repair of Pier

Location: Petron Mainaga, Mabini, Batangas

Contractor's Name:

Commercia
Work Package Clarification of Petron Item Description
Item
Manpower Mobilization/ Demobilization
Mobilization/ Demobilization
Equipment Mobilization/ Demobilization
Container van bunkhouse
Contractor shall indicate Container van subcontractor office
the necessary
Temporary Facility temporary facilities Temporary fence for lay down area
necessary for the Electrical Supply
project.
Water Supply

Proponent may
determine the
acceptability of piles
Quality Assurance and Control and may reject the piles Materials Testing and Commissioning
if it does not meet the
requirement.

Drawing Submittals
Contract Documentation As-Built Plans
Progress Report
Performance Bond
EAR equivalent to 125% of project amount
Contractor shall provide
Permits and Insurances the necessary permits CGLI - By Owner
for the project Warranty Bond
Construction Permit
PPE
Safety Officer
Safety Requirements Fire Extinguisher
Barriers
Online gas detector
Others (Bidders to specify)
Important Note: Kindly breakdown / specify inclusions in all items with "lot' unit. For
your strict compliance. Thank you.

Commercial

Total Amount Amount Base Bid


Qty UM UC
1 lot - - -
1 lot - - -
1 lot - - -
1 lot - - -
1 lot - - -
1 lot - - -
1 lot - - -
1 lot - - -

1 lot - - -
1 lot - - -
1 lot - - -
1 lot - - -
1 lot - - -
1 lot - - -
1 lot - - -
1 lot - - -
1 lot - - -
1 lot - - -
1 lot - - -
1 lot - - -
1 lot - - -

TOTAL COST, P (VAT EX) : -


Important Note: Kindly breakdown / specify inclusions in all ite
Project Title: Petron Mabini Depot: Repair of Pier "lot' unit. For your strict compliance. Thank you.

Location: Petron Mainaga, Mabini, Batangas

Contractor's Name:

Commercial
Work Package Description
Contractor Proposal Qty Unit

1.0 Detailed Engineering


Mechanical - 1 lot
Piping - 1 lot
Fire Fighting and HSSE - 1 lot
Electrical - 1 lot
Instrument and Control - 1 lot
Building and Architecture - 1 lot
Civil, Structural, Foundation - 1 lot
Others (Bidders to specify)

TOTAL COST, P (VAT EX) :

***Note: Design & Engineering Services includes;


- Engineering Team
- Tool & Equipment
- Documentation (Report, Pictures & Videos)
- Rebound Hammer Test
- Drawings, Structural Analysis & Calculations signed by Structural Engineer.
/ specify inclusions in all items with
t compliance. Thank you.

mercial

Amount Base Bid

-
-
-
-
-
-
-

-
Important Note: Please fill up all items which are applicable for the project,
Engineering Services otherwise, kindly put N/A.

Personnel No. Rate Per Day No of Days Reqd Total


Project Manager
Cost Engineer - PHP 0.00 - PHP 0.00
Secretary/Clerk - PHP 0.00 - PHP 0.00
Sub-Contract Engineer - PHP 0.00 - PHP 0.00
Process Engineer - PHP 0.00 - PHP 0.00
Civil Engineer - PHP 0.00 - PHP 0.00
Piping Engineer - PHP 0.00 - PHP 0.00
Instrument Engineer - PHP 0.00 - PHP 0.00
Electrical Engineer - PHP 0.00 - PHP 0.00
Procurement Manager - PHP 0.00 - PHP 0.00
Buyer/Shpping Coordinator - PHP 0.00 - PHP 0.00
Others (Bidders to specify) PHP 0.00

TOTAL COST, P (VAT EX) : -

Field Supervision

Personnel No. Rate Per Day No of Days Reqd Total


Construction Manager - PHP 0.00 - PHP 0.00
Safety Officer - PHP 0.00 - PHP 0.00
QC Engineer/Inspector - PHP 0.00 - PHP 0.00
Civil Supervisor - PHP 0.00 - PHP 0.00
E/I Supervisor - PHP 0.00 - PHP 0.00
Pre-commissioning Engineer - PHP 0.00 - PHP 0.00
Others (Bidders to specify)

TOTAL COST, P (VAT EX) : -

***Note: Design & Engineering Services includes;


- Engineering Team
- Tool & Equipment
- Documentation (Report, Pictures & Videos)
- Rebound Hammer Test
- Drawings, Structural Analysis & Calculations signed by Structural Engineer.
Important Note: Please fill up all items which are applicable for the project, otherwise,
Labor kindly put N/A.

Personnel No. Rate Per Day No. of Days Required


Heavy Equipment Operator - - -
Light Equipment Operator - - -
Mason - - -
Helper - - -
Scaffolder - - -
Rigger - - -
Welder/Cutter - - -
Fitter - - -
Painter - - -
Service Driver - - -
Draftsman - - -
NDT Technician - - -
NDT Assistant - - -
Others (Bidders to specify)

TOTAL COST, P (VAT EX) :


plicable for the project, otherwise,

Total
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00
PHP 0.00

-
Important Note: Please fill up all items which are applicable for the project, otherwise, kindly
EQUIPMENT RENTAL COST put N/A.

Equipment Specification No. Of Units No. Of Hours Rate per Hour Total
Passenger Service truck
Welding Machine (Gas/Diesel Driven), 300A
Drill Rig, Hyrdaulic Crawler Type - - PHP 0.00 PHP 0.00
Backhoe - - PHP 0.00 PHP 0.00
Concrete Mixer - - PHP 0.00 PHP 0.00
Crane, Hydraulic Telescopic Boom, 50-tonner - - PHP 0.00 PHP 0.00
Dump Truck - - PHP 0.00 PHP 0.00
Cable Puller - - PHP 0.00 PHP 0.00
Cable Tensioner - - PHP 0.00 PHP 0.00
Cable Reeler - - PHP 0.00 PHP 0.00
Crimping Tool - - PHP 0.00 PHP 0.00
Boom Truck, 26 to 30-Tonner - - PHP 0.00 PHP 0.00
Pavement Breaker - - PHP 0.00 PHP 0.00
Power Tools - - PHP 0.00 PHP 0.00
Bar Cutter / Bar Bender - - PHP 0.00 PHP 0.00
Sand Blasting Equipment - - PHP 0.00 PHP 0.00
Concrete Cutter - - PHP 0.00 PHP 0.00
Pumpcrete - - PHP 0.00 PHP 0.00
Jackhammer - - PHP 0.00 PHP 0.00
Service Boat (Motorized) - - PHP 0.00 PHP 0.00
Dinghy Boat - - PHP 0.00 PHP 0.00
Pontoon - - PHP 0.00 PHP 0.00
Power Generator - - PHP 0.00 PHP 0.00
Aircompressor ( 90 CFM ) - - PHP 0.00 PHP 0.00
Aircompressor ( 1 HP ) - - PHP 0.00 PHP 0.00
Water Truck - - PHP 0.00 PHP 0.00
OTHERS (Bidders to specify)

TOTAL COST, P (VAT EX) : -


PBR or Dept/Terminal Petron Mabini
Important Note: Kindly breakdown / specify inclusions in all ite
Proponent Mr. Jonathan Del Rosario your strict compliance. Thank you.
Project Location Petron Mainaga, Mabini, Batangas

Contract No. Date:


Project Title: Petron Mabini Depot Repair of Pier For the Year:
Petron Mainaga, Mabini, Batangas
Work Description: CIVIL, STRUCTURAL AND FOUNDATION WORKS

Contractor's Name:

ITEM QTY UNIT DESCRIPTION BIDDERS REMARKS MATERIAL COST

A. Breasting Dolphin No. 01


1 Repair of Top, Side & Under Slab
- m3 Demolition of concrete section for -
retrofit; including hauling of debris
- m3 Provide and place reinforced concrete, -
min Fc' ( 28 days ) 30Mpa
- kg Supply and fix deformed high yield -
reinforcement steel bars, Grade 60
- m2 Formworks -
- m2 Epoxy bonding at construction joint -
- m2 Roughen surface of existing concrete -
section for proper adhesion to new
reinforced concrete
- m2 Protective treatment on finished -
concrete surfaces
2 Repair of Catwalk
kg Replacement severely corroded -
Structural Steel Members (same specs &
dimension)
pcs Replacement severely corroded bolts & -
nuts (same specs & dimension)
m2 Remove and application of marine paint -
of corroded structural steel members

3 Repair of Light Post


- m2 Remove and application of marine paint -
of corroded structural steel members

- m3 Demolition of concrete section for -


retrofit; including hauling of debris
- m3 Provide and place reinforced concrete, -
min Fc' ( 28 days ) 30Mpa
- kg Supply and fix deformed high yield -
reinforcement steel bars, Grade 60
- m2 Formworks -
- m2 Epoxy bonding at construction joint -
- m2 Roughen surface of existing concrete -
section for propoer adhesion to new
reinforced concrete

Page 10 of 53
- m2 Protective treatment on finished -
concrete surfaces
4 Repair of Bollard
- m3 Demolition of concrete section for -
retrofit; including hauling of debris
- m3 Provide and place reinforced concrete, -
min Fc' ( 28 days ) 30Mpa
- kg Supply and fix deformed high yield -
reinforcement steel bars, Grade 60
- m2 Formworks -
- m2 Epoxy bonding at construction joint -
- m2 Roughen surface of existing concrete -
section for propoer adhesion to new
reinforced concrete
- m2 Protective treatment on finished -
concrete surfaces
- m2 Remove and application of marine paint -
of corroded structural steel members

- unit Supply & Installation of New Bollard -


(Optional, Unit Cost Only)
5 Repair of Fender
- unit Supply and installation of Fender -
6 Repair of Pile
- m3 Roughen surface of existing concrete -
section for proper adhesion to new
reinforced concrete
- m3 Provide and place reinforced concrete, -
min Fc' ( 28 days ) 30Mpa
- kg Supply and fix deformed high yield -
reinforcement steel bars, Grade 60
- m2 Fabric / steel forms for new pile jacket -

- m2 Protective treatment on finished -


concrete surfaces
7 Others
- kg Supply of steel railing on the 3 sides of -
breasting dolphin
- m2 Application of marine paint of structural -
steel members
OTHERS (Bidders to specify)

SUBTOTAL - A :

B. Breasting Dolphin No. 02


1 Repair of Top, Side & Under Slab
- m3 Demolition of concrete section for -
retrofit; including hauling of debris
- m3 Provide and place reinforced concrete, -
min Fc' ( 28 days ) 30Mpa
- kg Supply and fix deformed high yield -
reinforcement steel bars, Grade 60
- m2 Formworks -
- m2 Epoxy bonding at construction joint -

Page 11 of 53
- m2 Roughen surface of existing concrete -
section for propoer adhesion to new
reinforced concrete
- m2 Protective treatment on finished -
concrete surfaces
2 Repair of Catwalk
kg Replacement severely corroded -
Structural Steel Members (same specs &
dimension)
pcs Replacement severely corroded bolts & -
nuts (same specs & dimension)
m2 Remove and application of marine paint -
of corroded structural steel members

3 Repair of Light Post


m2 Remove and application of marine paint -
of corroded structural steel members

Demolition of concrete section for -


m3 retrofit; including hauling of debris
Provide and place reinforced concrete, -
m3 min Fc' ( 28 days ) 30Mpa
kg Supply and fix deformed high yield -
reinforcement steel bars, Grade 60
m2 Formworks -
m2 Epoxy bonding at construction joint -
m2 Roughen surface of existing concrete -
section for propoer adhesion to new
reinforced concrete
Protective treatment on finished -
m2 concrete surfaces
4 Repair of Bollard
m3 Demolition of concrete section for -
retrofit; including hauling of debris
m3 Provide and place reinforced concrete, -
min Fc' ( 28 days ) 30Mpa
Supply and fix deformed high yield -
kg reinforcement steel bars, Grade 60
m2 Formworks -
m2 Epoxy bonding at construction joint -
m2 Roughen surface of existing concrete -
section for propoer adhesion to new
reinforced concrete
Protective treatment on finished -
m2 concrete surfaces
m2 Remove and application of marine paint -
of corroded structural steel members

unit Supply & Installation of New Bollard -


(Optional, Unit Cost Only)
5 Supply of Fender
unit Supply and installation of Fender -
6 Repair of Pile
- m3 Roughen surface of existing concrete -
section for proper adhesion to new
reinforced concrete

Page 12 of 53
- m3 Provide and place reinforced concrete, -
min Fc' ( 28 days ) 30Mpa
- kg Supply and fix deformed high yield -
reinforcement steel bars, Grade 60
- m2 Fabric / steel forms for new pile jacket -

- m2 Protective treatment on finished -


concrete surfaces
7 Others
- kg Supply of steel railing on the 3 sides of -
breasting dolphin
- m2 Application of marine paint of structural -
steel members
OTHERS (Bidders to specify)

SUBTOTAL - B :

C. Receiving Platform
1 Valves, Insulating Flanges and Drip Pans

- m2 Remove and application of marine paint -


of corroded valves, insulating flanges
and drip pans
2 Repair of Top, Side & Under Slab
- m3 Demolition of concrete section for -
retrofit; including hauling of debris
- m3 Provide and place reinforced concrete, -
min Fc' ( 28 days ) 30Mpa
- kg Supply and fix deformed high yield -
reinforcement steel bars, Grade 60
- m2 Formworks -
- m2 Epoxy bonding at construction joint -
- m2 Roughen surface of existing concrete -
section for propoer adhesion to new
reinforced concrete
- m2 Protective treatment on finished -
concrete surfaces
3 Supply of Fender
- unit Supply and installation of Fender -
4 Repair of Pile
- m3 Roughen surface of existing concrete -
section for proper adhesion to new
reinforced concrete
- m3 Provide and place reinforced concrete, -
min Fc' ( 28 days ) 30Mpa
- kg Supply and fix deformed high yield -
reinforcement steel bars, Grade 60
- m2 Fabric / steel forms for new pile jacket -

- m2 Protective treatment on finished -


concrete surfaces
OTHERS (Bidders to specify)

SUBTOTAL - C :

Page 13 of 53
D. Main Catwalk
1 Repair of Beams
- Demolition of concrete section for -
m3 retrofit; including hauling of debris
- Provide and place reinforced concrete, -
m3 min Fc' ( 28 days ) 30Mpa
- Supply and fix deformed high yield -
kg reinforcement steel bars, Grade 60
- m2 Formworks -
- m2 Epoxy bonding at construction joint -
- m2 Roughen surface of existing concrete -
section for propoer adhesion to new
reinforced concrete
- Protective treatment on finished -
m2 concrete surfaces
2 Repair of Pile
- Roughen surface of existing concrete -
m3 section for proper adhesion to new
reinforced concrete
- Provide and place reinforced concrete, -
m3 min Fc' ( 28 days ) 30Mpa
- Supply and fix deformed high yield -
kg reinforcement steel bars, Grade 60
- -
m2 Fabric / steel forms for new pile jacket
- Protective treatment on finished -
m2 concrete surfaces
3 Repair of Railings
- m2 Repair, remove/apply marine paint -
including protective treatment on
railings
OTHERS (Bidders to specify)

SUBTOTAL - D :

TOTAL COST, P (VAT EX) :

Page 14 of 53
Important Note: Kindly breakdown / specify inclusions in all items with "lot' unit. For
your strict compliance. Thank you.

February 21, 2018


2018

TOTAL COST
(P)

-
-
-

-
-
-

Page 15 of 53
-

-
-
-

-
-

Page 16 of 53
-

-
-
-

-
-
-

Page 17 of 53
-

-
-
-

Page 18 of 53
-

-
-
-

Page 19 of 53
PBR or Dept/Terminal Petron Mabini
Important Note: Kindly breakdown / specify inclusions in all ite
Proponent Mr. Jonathan Del Rosario your strict compliance. Thank you.
Project Location Petron Mainaga, Mabini, Batangas

Contract No. Date:


Project Title: Petron Mabini Depot Repair of Pier For the Year:
Petron Mainaga, Mabini, Batangas
Work Description: MECHANICAL WORKS

Contractor's Name:

ITEM QTY UNIT DESCRIPTION BIDDERS REMARKS MATERIAL COST

1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -

Page 20 of 53
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48 -
49 -
50 -
OTHERS (Bidders to specify)

TOTAL COST, P (VAT EX) :

Page 21 of 53
Important Note: Kindly breakdown / specify inclusions in all items with "lot' unit. For
your strict compliance. Thank you.

February 21, 2018


2018

TOTAL COST
(P)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

Page 22 of 53
-
-
-
-
-
-
-
-
-
-
-
-

Page 23 of 53
PBR or Dept/Terminal Petron Mabini
Important Note: Kindly breakdown / specify inclusions in all ite
Proponent Mr. Jonathan Del Rosario your strict compliance. Thank you.
Project Location Petron Mainaga, Mabini, Batangas

Contract No. Date:


Project Title: Petron Mabini Depot Repair of Pier For the Year:
Petron Mainaga, Mabini, Batangas
Work Description: PIPING WORKS

Contractor's Name:

ITEM QTY UNIT DESCRIPTION BIDDERS REMARKS MATERIAL COST

1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -

Page 24 of 53
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48 -
49 -
50 -
OTHERS (Bidders to specify)

TOTAL COST, P (VAT EX) :

Page 25 of 53
Important Note: Kindly breakdown / specify inclusions in all items with "lot' unit. For
your strict compliance. Thank you.

February 21, 2018


2018

TOTAL COST
(P)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

Page 26 of 53
-
-
-
-
-
-
-
-
-
-
-

Page 27 of 53
PBR or Dept/Terminal Petron Mabini
Important Note: Kindly breakdown / specify inclusions in all ite
Proponent Mr. Jonathan Del Rosario your strict compliance. Thank you.
Project Location Petron Mainaga, Mabini, Batangas

Contract No. Date:


Project Title: Petron Mabini Depot Repair of Pier For the Year:
Petron Mainaga, Mabini, Batangas
Work Description: FF AND HSE

Contractor's Name:

ITEM QTY UNIT DESCRIPTION BIDDERS REMARKS MATERIAL COST

1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -

Page 28 of 53
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48 -
49 -
50 -
THERS (Bidders to specify)

TOTAL COST, P (VAT EX) :

Page 29 of 53
Important Note: Kindly breakdown / specify inclusions in all items with "lot' unit. For
your strict compliance. Thank you.

February 21, 2018


2018

TOTAL COST
(P)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

Page 30 of 53
-
-
-
-
-
-
-
-
-
-
-
-
-
-

Page 31 of 53
PBR or Dept/Terminal Petron Mabini
Important Note: Kindly breakdown / specify inclusions in all ite
Proponent Mr. Jonathan Del Rosario your strict compliance. Thank you.
Project Location Petron Mainaga, Mabini, Batangas

Contract No. Date:


Project Title: Petron Mabini Depot Repair of Pier For the Year:
Petron Mainaga, Mabini, Batangas
Work Description: ELECTRICAL WORKS

Contractor's Name:

ITEM QTY UNIT DESCRIPTION BIDDERS REMARKS MATERIAL COST

1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -

Page 32 of 53
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48 -
49 -
50 -
OTHERS (Bidders to specify)

TOTAL COST, P (VAT EX) :

Page 33 of 53
Important Note: Kindly breakdown / specify inclusions in all items with "lot' unit. For
your strict compliance. Thank you.

February 21, 2018


2018

TOTAL COST
(P)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

Page 34 of 53
-
-
-
-
-
-
-
-
-
-
-

Page 35 of 53
PBR or Dept/Terminal Petron Mabini
Important Note: Kindly breakdown / specify inclusions in all ite
Proponent Mr. Jonathan Del Rosario your strict compliance. Thank you.
Project Location Petron Mainaga, Mabini, Batangas

Contract No. Date:


Project Title: Petron Mabini Depot Repair of Pier For the Year:
Petron Mainaga, Mabini, Batangas
Work Description: INSTRUMENTS AND CONTROL

Contractor's Name:

ITEM QTY UNIT DESCRIPTION BIDDERS REMARKS MATERIAL COST

1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -

Page 36 of 53
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48 -
49 -
50 -
OTHERS (Bidders to specify)

TOTAL COST, P (VAT EX) :

Page 37 of 53
Important Note: Kindly breakdown / specify inclusions in all items with "lot' unit. For
your strict compliance. Thank you.

February 21, 2018


2018

TOTAL COST
(P)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

Page 38 of 53
-
-
-
-
-
-
-
-
-
-
-

Page 39 of 53
Project Name: Petron Mabini Depot Repair of Pier
Work Description: Civil
GUARANTEED MAXIMUM QUANTITIES FOR ______________________

ITEM NO. DESCRIPTION GMQ FL UNIT RATE AMOUNT

1 - - -
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
35 - - -
36 - - -
37 - - -
38 - - -
39 - - -
40 - - -

Page 40 of 53
TOTAL COST, P (VAT EX) : -

"WE HEREBY CONFIRM AND GUARANTEE THAT SHOULD PETRON CORPORATION OPTED TO SUPPLY _____________________________
THE ABOVE QUANTITIES ARE MAXIMUM BASED ON THE BID PLANS AND SPECIFICATIONS DATED FEBRUARY 2018.

"WE CONFIRM FURTHER THAT THE COST OF SAID __________________________ AS INDICATED ABOVE SHALL BE THE
ABSOLUTE AMOUNT TO BE DEDUCTED FROM OUR BID COST"

SIGNED:

Contractor's Authorized Representative

Page 41 of 53
Project Name: Petron Mabini Depot Repair of Pier
Work Description: Mechanical
GUARANTEED MAXIMUM QUANTITIES FOR ______________________

ITEM NO. DESCRIPTION GMQ FL UNIT RATE AMOUNT

1 - - -
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
35 - - -
36 - - -
37 - - -
38 - - -
39 - - -
40 - - -

Page 42 of 53
TOTAL COST, P (VAT EX) : -

"WE HEREBY CONFIRM AND GUARANTEE THAT SHOULD PETRON CORPORATION OPTED TO SUPPLY _____________________________
THE ABOVE QUANTITIES ARE MAXIMUM BASED ON THE BID PLANS AND SPECIFICATIONS DATED FEBRUARY 2018.

"WE CONFIRM FURTHER THAT THE COST OF SAID __________________________ AS INDICATED ABOVE SHALL BE THE
ABSOLUTE AMOUNT TO BE DEDUCTED FROM OUR BID COST"

SIGNED:

Contractor's Authorized Representative

Page 43 of 53
Project Name: Petron Mabini Depot Repair of Pier
Work Description: Electrical
GUARANTEED MAXIMUM QUANTITIES FOR ______________________

ITEM NO. DESCRIPTION GMQ FL UNIT RATE AMOUNT

1 - - -
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
35 - - -
36 - - -
37 - - -
38 - - -
39 - - -
40 - - -

Page 44 of 53
TOTAL COST, P (VAT EX) : -

"WE HEREBY CONFIRM AND GUARANTEE THAT SHOULD PETRON CORPORATION OPTED TO SUPPLY _____________________________
THE ABOVE QUANTITIES ARE MAXIMUM BASED ON THE BID PLANS AND SPECIFICATIONS DATED FEBRUARY 2018.

"WE CONFIRM FURTHER THAT THE COST OF SAID __________________________ AS INDICATED ABOVE SHALL BE THE
ABSOLUTE AMOUNT TO BE DEDUCTED FROM OUR BID COST"

SIGNED:

Contractor's Authorized Representative

Page 45 of 53
Project Name: Petron Mabini Depot Repair of Pier
Work Description: Piping
GUARANTEED MAXIMUM QUANTITIES FOR ______________________

ITEM NO. DESCRIPTION GMQ FL UNIT RATE AMOUNT

1 - - -
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
35 - - -
36 - - -
37 - - -
38 - - -
39 - - -
40 - - -

Page 46 of 53
TOTAL COST, P (VAT EX) : -

"WE HEREBY CONFIRM AND GUARANTEE THAT SHOULD PETRON CORPORATION OPTED TO SUPPLY _____________________________
THE ABOVE QUANTITIES ARE MAXIMUM BASED ON THE BID PLANS AND SPECIFICATIONS DATED FEBRUARY 2018.

"WE CONFIRM FURTHER THAT THE COST OF SAID __________________________ AS INDICATED ABOVE SHALL BE THE
ABSOLUTE AMOUNT TO BE DEDUCTED FROM OUR BID COST"

SIGNED:

Contractor's Authorized Representative

Page 47 of 53
Project Name: Petron Mabini Depot Repair of Pier
Work Description: FF & HSE
GUARANTEED MAXIMUM QUANTITIES FOR ______________________

ITEM NO. DESCRIPTION GMQ FL UNIT RATE AMOUNT

1 - - -
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
35 - - -
36 - - -
37 - - -
38 - - -
39 - - -
40 - - -

Page 48 of 53
TOTAL COST, P (VAT EX) : -

"WE HEREBY CONFIRM AND GUARANTEE THAT SHOULD PETRON CORPORATION OPTED TO SUPPLY _____________________________
THE ABOVE QUANTITIES ARE MAXIMUM BASED ON THE BID PLANS AND SPECIFICATIONS DATED FEBRUARY 2018.

"WE CONFIRM FURTHER THAT THE COST OF SAID __________________________ AS INDICATED ABOVE SHALL BE THE
ABSOLUTE AMOUNT TO BE DEDUCTED FROM OUR BID COST"

SIGNED:

Contractor's Authorized Representative

Page 49 of 53
Project Name: Petron Mabini Depot Repair of Pier
Work Description: Instrumentation
GUARANTEED MAXIMUM QUANTITIES FOR ______________________

ITEM NO. DESCRIPTION GMQ FL UNIT RATE AMOUNT

1 - - -
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
35 - - -
36 - - -
37 - - -
38 - - -
39 - - -
40 - - -

Page 50 of 53
TOTAL COST, P (VAT EX) : -

"WE HEREBY CONFIRM AND GUARANTEE THAT SHOULD PETRON CORPORATION OPTED TO SUPPLY _____________________________
THE ABOVE QUANTITIES ARE MAXIMUM BASED ON THE BID PLANS AND SPECIFICATIONS DATED FEBRUARY 2018.

"WE CONFIRM FURTHER THAT THE COST OF SAID __________________________ AS INDICATED ABOVE SHALL BE THE
ABSOLUTE AMOUNT TO BE DEDUCTED FROM OUR BID COST"

SIGNED:

Contractor's Authorized Representative

Page 51 of 53
PROJECT: Petron Mabini Depot Repair of Pier
LOCATION: Petron Mainaga, Mabini, Batangas

ELECTRICAL/MECHANICAL/INSTRUMENTS &CONTROL/PIPING/CIVIL/FF&HSE

MATERIAL COMPLIANCE FORM


SPECIFIED BRAND /
ITEM NO. DESCRIPTION OFFERED BRAND
MANUFACTURER
Electrical
1
2
3
4
5
6
7
8
Mechanical
1
2
3
4
5
6
7
8
Instrumentation & Control
1
2
3
4
5
6
7
8
Piping
1
2
3
4
5
6
7
8
Civil
1 Cement Type V Northern Cement
2 Fender Trelleborg
3 Bollard
4 Paint Hempel
5 Epoxy Sikadura
6 Sand Washed Sand - S1

Page 52 of 53
7 Deformed Bar Grade 60, Japan Brand
8 Structural Members Japan Brand
FF & HSE
1
2
3
4
5
6
7
8

Page 53 of 53