SITE ACCEPTANCE TEST REPORT
66/11 kV AL MASHAAF
SUBSTATION
40MVA POWER TRANSFORMER
VOLUME NO: 1
FILE NO: 1.5
AC/DC CHECK TEST REPORT
(RTCC - 1)
1.SITE ACCEPTANCE TEST REPORT FOR 40MVA TRANSFORMER RTCC ACDC CHECKS (RTCC-1)
wang Ura 2 1 |
SESS cuntoniihacy sian | Mott MacDonald
QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No.
PHASE-11 (STAGE?) SUBSTATIONS - PACKAGE 84 Date
Name of Substation = O6/11KV AL-MASHAAF SiS Bay Number
Name of Equipment + AOMIVA TRANSFORMER RTGG PANEL Manufacturer: SIEMENS
LIST OF CONTENT
S.No DESCRIPTION PAGE NO
1. Purpose of Test 2
2, Reference Drawing and Documents 2
3. Initial Checks. 2
4 st of Schematic Drawings. 2
5 $.1, AC Cireult Check 3
5.1. 1, Heater & Ilumination crcutt. 3
5.1.2. Heater Circuits 3
5.1.3 Power Socket Circuits. 3
6 DC Circuit Check 5
7 Instruments Used 7
8 Remarks. 7
Tested By a Witnessed & Verified By :
ETA/ SIEMENS Mott Mac Donald / KAHRAMAA
Sionature . Signature eee |
ere. M: RoRNEHSTHAM, Name _| |: Dues Bago
Date | 20-02-2016 Dato Bp6a 2016 |
DocNo_| PH11-8A-10-36-P083 Rev 0 _[Annex- 1 Page No.1 OF7SITE ACCEPTANCE TEST REPORT FOR 40MVA TRANSFORMER RTCC ACDC CHECKS (RTCC-1)
Cn ory {|e eer
win Fon 4 pian “aT ETA STAR INTERNATIONAL
|_ rae cwiendioimaniccnan | Mott MacDonald | STEMIENS|
QATAR POWER TRANSMISSION SYSTEM EXPANSION ContractNo, _: GTC/e0A/2012
PHASE-11 (STAGE1) SUBSTATIONS ~ PACKAGE S4 Date — Ps
Name of Substation 2 BB/1IKV ALMASHAAF SIS [Bay Number |
Name of Equipment :_40NIVA TRANSFORMER RTOC PANEL Manufacturer: SIEMENS I
4, PURPOSE OF TEST:
‘These tests are intended to check the equipments AC/DC Circuits Voltage through, Equipment
Healthy & Earth fault Check.
REFERENCE DRAWING AND DOCUMENTS :
4OMVA Tx RIC Electrical drawing
SAINITIAL CHECKS:
40M Tx RTC Internal and External wiring Tightness Checked
40MVA Tx RTC Internal and External Wiring Ferrules Checked
4.LIST OF SCHEMATIC DRAWINGS:
40MVA Tx RTCC-1 Drawings
PHI1-8A-48-23-2002
Checked ([5))
Drawing No. Category
Tested By Witnessed & Verified By
_ETA / SIEMENS Mott Mac Donald / KAHRAMAA
senate | QY Signature ie
Name _| M-PS9usHsi em Nas \c-DidesM BAG.
Ld 30 -03-201h Date 3-02 20\6
Doc.No. PH11-8A-10-36-P083 Rev. 0 Annex- 1 Page No. 2 of 7.SITE ACCEPTANCE TEST REPORT FOR 40MVA TRANSFORMER RTGC ACDC CHECKS (RTCC-1)
roe te Pintle | Mott MacDonald TARTAR TERNATIONN._
GATAR POWER TRANSMISSION SYSTEM EXPANSION Contrast No. = GTeusaw02
PHASE-11 (STAGE1) SUBSTATIONS - PACKAGE S4 Date 130032016
‘Name of Substation 66/11KV_AL-MASHAAF S/S Bay Number RTCC-1
ane of Equipment + 40}IVA TRANSFORMER RTC PANEL Nanactrer 7 SEWERS
cir
5.1. Heater
Sine tem Visual & Operation Checks
1 AC MCB-F101-168 Ok
2. Hygrotherm-H101-240V AC ol,
3 Heater-R101- 240V AC - 100W Ok
Heasured voltage in volts
eB Status
X100:9 - X100:8 X100:10 ~ x100:7
F101-0N 236-4 2364
FLO1-OFF oo od |
5.2. lllumination circuit :
Sine Item visual & Operation Checks
1 AC MCB-F101, Be,
2 Door Limit switch-S101 ok,
L 3. Lamp-£101-260v ae
Measured Voltage in volts
eae X100:11 -X100: 6
Fi01-ON 236-4
/__FIO1-OFF a
7 Tested By Witnessed & Verified By _d
_ETA/ SIEMENS Mott Mac Donald / KAHRAMAA
Name Name
Date | apod-201k Date :
Doc.No. PH11-8A-10-36-P083 Rev. 0 Annex- 1 Page No. 3 of 7SITE ACCEPTANCE TEST REPORT FOR 40MVA TRANSFORMER RTGC ACDC CHECKS (RTCC-1)
a a RReC
| te ee mona nat yeeeran
QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. 3 GTCH486A/2012
5.3, Power Socket Circuit:
Sino Item ‘Visual & Operation Checks
di, AC MCB-F101 ow
2 Socket switch-S100 oe,
3 ‘Socket-X101- 5A/13A AC ok :
Measured voltage in volts
eee %100:12- x100:5
F101-0N ES
FLOL-OFF : oO
Sino Socket terminal (X101) Measured voltage in volts
L 1 LN - 226-5
- — oe DB
N-E i Od
Heater Earth point connection checked with Earth OK
Lamp Earth point connection checked with Earth ok
‘Socket Earth point connection checked with Earth ok
eck:
MCB Status Line Side Load side ]
ACMCB-ON | L-N Dabs LN! 36h
ACMCB-OFF | L-E: ‘22k Loe: ou
Tested By Witnessed & Verified By
Cc ETA/ SIEMENS Mott Mac Donald / KAHRAMAA
sonawe | WY Signature ba
Nene [M. Ronusheniam Name | \sDySesH BARS a
Date | apng-2016 Date 30-02-2014
[BocNo. | PH11-8A-10-36-PO83. Rev. 0 [Annex- 1] Page No. 4 of 7= SITE ACCEPTANCE TEST REPORT FOR 40MVA TRANSFORMER RTCC ACDC CHECKS (RTCC-1)
| Zens
ula oi eafisto—d [TT
De intesterserigaa |ntott Macbonate
QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No.
P OTCMBBA2012
PHASE-11 (STAGE1) SUBSTATIONS ~ PACKAGE S4 Date 30.03.2016
Name of Substation = O6/11KV AL-MASHAAF SIS) Bay Number RTCo-
[Name of Equipment + 40MVA TRANSFORMER RTCC PANEL Manufacturer
6. DC CIRCUIT CHECKS:
Note: F110 (108): Main MCB
F111 (2A): Tapcon 260 Communication Circuit
F112 (2A): Tapcon 260
F121 (4A): Tapcon 260 BI Circuit
F122 (4A): Indication / Auxiliary Circurt
During the Test Particular Source MCB ON Remaining MCB Should be OFF.
Measured voltage with respect to ground (volts)
ocmes status |riio:1] ito:3 | risa:2 | rint:4 | ivz:2 | rtizi4 | rraii2 | pita
F110-ON FSi) -O 3 | 45h | - Ol Aw [4S 6] ~ hs | 4154S bls
F110-OFF 20 oo oo od of oo oo a0
Measured voltage with respect to ‘aroun (volts) _
DC MCB Status -
F122:2 F122: 4 x210:1 x210:2
F110-ON aS? bes ASI b Abb
FLL0-OFF BO oo oo | a
Measured voltage with respect ta ground (vals) oe
DC MCB Status pitta | raiu:3 | xia | xaaa2 | at meat AL: MCL-2
Lieeeattans AS | HOS | 45h | ~olb AS 3 OF
| FLLL-OFF oo | oo | oo | oo oo oo
ae Measured voltage with respect to ground (volls) :
DC MCB Stotus Fuzit F123 xis xan2:2 | atrsua | at: su-2
FL12-0N £ ~Ol's, AShh -F _ | Aes — oF
FL12-OFF oo oo oo oo od 0-0
Tested By Witnessed & Verified By
ETA/ SIEMENS Mott Mac Donald / KAHRAMAA
— 1
Signature Qu. Signature | bar
Name__| Ms PagssheTam Name i: Disesn Bap
Date 8-03-2016 Date oa 2010
Doc.No. PH11-8A-10-36-P083 Rev. 0 Annex- 1 Page No. 5 of 7‘SITE ACCEPTANCE TEST REPORT FOR 40MVA TRANSFORMER RTCC ACDC CHECKS (RTCC-1)
so Bion Besson. at | BD | EE ay seam eRnaTIONNL
| R= cwwcrcaicnnsiawcomain | Mott MacDonald STEMENS|
‘QATAR POWER TRANSMISSION SYSTEM EXPANSION [Contract No. rromasazo2 |
PHASE-11 (STAGE1) SUBSTATIONS ~ PACKAGE S4 Date 03.2016
Name of Substation BS/TTRV ALMASHAAF S'S Bay Number: RTOCA
Name of Equipment _ + AOMVA TRANSFORMER RTGG PANEL Manufacturer: SIEMENS
Measured voltage with respect t ground (volts)
Dc MCB Status riaist | riai3 | aaa | xiai:2 | anuce-xt.33 | anuce-x134
FI21:0N xseb | 3 | +k 6 ~bh2 Sb ~ 642.
F121:0FF oOo oo eo oo oO oo
A ‘Measured voltage with respect to ground (volts)
DC MCB Status FL22:1 F122:3 X122:1, X122:2, X8T:13, K71:A2,
_F122:0N 4Sk6 | —ots [ssh ~ora | aSee | eh
-_FiRa:oFF on 00 oo od 0:0 od
: 1 Teasured voltage with respect to ground (volt)
DC MCB Status xat:19 | Kesiaz | xer:19 | Kas:az | «77:53 | Koa:a2 | xer:23 | Ka:a2
FI2z/0N Lasiee | -bbo | 45) °6 [Lob | 486] Ob 3 | 4SiF | bbs
_Fuz2:0FF | ew | eo] oo | oo | oe} oo] oo | oO
Wieasured voltage with respect to ground (volks)
pemcestatus | xsr:38 | K205:a2 | «207:13 | K2ozA:az | K203:61 | K2038:A2 | K2T!25 | K2TL:AZ
FARBON, AS | O'3 [457 |-o2 | +o | ob2 [+ Sed | Oly,
F122:0FF Oo oo oO oo oo o-0 i
Measured voltage with respect to ground (volts)
oc mcs status — | xer:165| Keo1:e2 | Ke0:13 | Ha6:x2 | 74:13 | H2ix2 | KSOL:AL | K501:A2
F122:0N asheb | oi [aster | bb [4 yb] 83 [4s | oS”
F122:0FF co | oo | od oo] oo | oof oo | ov
Tested By Witnessed & Verified By
Soe ETA/ SIEMENS Mott Mac Donald / KAHRAMAA
soratwe | Quy Signature we
Name | MA: Rogosnatiaet sate M-DyiscH GAB —
Date 2p-o2-20ih Date BDOR-201h
Doc.No. PH11-8A-10-36-P083 Rev. oO Annex- 1 Page No.6 of 7SITE ACCEPTANCE TEST REPORT FOR 40MVA TRANSFORMER RTCC ACDC CHECKS (RTCC-1)
air eonSUTANT CENTRAETOR
sw Fon Yo Gyjsocl—a |B | EN eran rennanoua
| ere cascewaitannsiins cman | Mott MacDonald | SIEMENS|
‘QATAR POWER TRANSMISSION SYSTEM EXPANSION. [Contract No GroMesA/2012
PHASE-1* (STAGE1) SUBSTATIONS ~ PACKAGE S¢ Date 30.032016
Name of Substation = GS/TTKV ALMASHAAF SS Bay Number: RTOC-1 7]
Namo of Equipment + AOMVA TRANSFORMER RTC PANEL Manufacturer: SIEMENS
DC Line/Load Voltage Checks:
MCB Status Line Side Load side
DCMCBF110-ON | +vetoE: She svetoE: orb #vetoE: She |-vetoe: Clue
DCMCBFII0-OFF |+vetoE: Shy |-vetoe: 6hb |+vetoE: OD |-vetoE OO
MCB Status Line Side oad side
DCMCBFII-ON | +vetoE: Syee [-vetoe: Gh [+vetol: Ope [-vetoe Ohe
DCMCBFILI-OFF [+vetoE: Ste |-vetoe: og |+tveto& op |-vetoe: OO
MCB Status Line Side : Load side
DCMCBFIIZ-ON |+vetoE: Sa |-vetoe Gls |+vetoe Ge2 |-vetoe: Ole |
DC MCB FII2-0FF [+vetoE: Sha |-vetoE: Oy [+veWE OO |-vetoe oD
MCB Status Line Side Load side
DCMCBFI2I-ON |+vetoE: Seb |-vetoE: G2 |+veWE ya |-vetoe: Oe
DCMCBFI2i-OFF [+vetoE: Sb |-vetoE: gna |+vetoe: op |-vetoE: oo
MCB Status | Line Side Load side d
DCMCBFI22-ON | +vetoE: Bab |-vetoe: G2 |+vetoe: Shep |-vetoe: 6l2
DCMCBFIZ-0FF [+vetoe: chy [vetoe Ory [+vewe oo |-veE ow
7. INSTRUMENT USED:
sno | — Description Make Equipment S.No | Calibration Date | Calibration Due Date
1 Multimeter Fluke / 87V 30770138 11-Jun-2015 44-Jun-2016
ve
8. REMARKS: AC/DC Circuits found healthy: YES / NO
Ez Tested By Witnessed & Verified By
STA/ SIEMENS Mott Mac Donald / KAHRAMAA
sone | MA. Signature we
Name [Ms Qagughiem4an Nene KDpiesh Bago
| Date Bo. 02-201h a Bo-0g.-2016
DoeNo_| PH11-BA-10-36-P083 Row. o_[Annex- 1 Page No.7 of 7