Sunteți pe pagina 1din 8
SITE ACCEPTANCE TEST REPORT 66/11 kV AL MASHAAF SUBSTATION 40MVA POWER TRANSFORMER VOLUME NO: 1 FILE NO: 1.5 AC/DC CHECK TEST REPORT (RTCC - 1) 1. SITE ACCEPTANCE TEST REPORT FOR 40MVA TRANSFORMER RTCC ACDC CHECKS (RTCC-1) wang Ura 2 1 | SESS cuntoniihacy sian | Mott MacDonald QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. PHASE-11 (STAGE?) SUBSTATIONS - PACKAGE 84 Date Name of Substation = O6/11KV AL-MASHAAF SiS Bay Number Name of Equipment + AOMIVA TRANSFORMER RTGG PANEL Manufacturer: SIEMENS LIST OF CONTENT S.No DESCRIPTION PAGE NO 1. Purpose of Test 2 2, Reference Drawing and Documents 2 3. Initial Checks. 2 4 st of Schematic Drawings. 2 5 $.1, AC Cireult Check 3 5.1. 1, Heater & Ilumination crcutt. 3 5.1.2. Heater Circuits 3 5.1.3 Power Socket Circuits. 3 6 DC Circuit Check 5 7 Instruments Used 7 8 Remarks. 7 Tested By a Witnessed & Verified By : ETA/ SIEMENS Mott Mac Donald / KAHRAMAA Sionature . Signature eee | ere. M: RoRNEHSTHAM, Name _| |: Dues Bago Date | 20-02-2016 Dato Bp6a 2016 | DocNo_| PH11-8A-10-36-P083 Rev 0 _[Annex- 1 Page No.1 OF7 SITE ACCEPTANCE TEST REPORT FOR 40MVA TRANSFORMER RTCC ACDC CHECKS (RTCC-1) Cn ory {|e eer win Fon 4 pian “aT ETA STAR INTERNATIONAL |_ rae cwiendioimaniccnan | Mott MacDonald | STEMIENS| QATAR POWER TRANSMISSION SYSTEM EXPANSION ContractNo, _: GTC/e0A/2012 PHASE-11 (STAGE1) SUBSTATIONS ~ PACKAGE S4 Date — Ps Name of Substation 2 BB/1IKV ALMASHAAF SIS [Bay Number | Name of Equipment :_40NIVA TRANSFORMER RTOC PANEL Manufacturer: SIEMENS I 4, PURPOSE OF TEST: ‘These tests are intended to check the equipments AC/DC Circuits Voltage through, Equipment Healthy & Earth fault Check. REFERENCE DRAWING AND DOCUMENTS : 4OMVA Tx RIC Electrical drawing SAINITIAL CHECKS: 40M Tx RTC Internal and External wiring Tightness Checked 40MVA Tx RTC Internal and External Wiring Ferrules Checked 4.LIST OF SCHEMATIC DRAWINGS: 40MVA Tx RTCC-1 Drawings PHI1-8A-48-23-2002 Checked ([5)) Drawing No. Category Tested By Witnessed & Verified By _ETA / SIEMENS Mott Mac Donald / KAHRAMAA senate | QY Signature ie Name _| M-PS9usHsi em Nas \c-DidesM BAG. Ld 30 -03-201h Date 3-02 20\6 Doc.No. PH11-8A-10-36-P083 Rev. 0 Annex- 1 Page No. 2 of 7. SITE ACCEPTANCE TEST REPORT FOR 40MVA TRANSFORMER RTGC ACDC CHECKS (RTCC-1) roe te Pintle | Mott MacDonald TARTAR TERNATIONN._ GATAR POWER TRANSMISSION SYSTEM EXPANSION Contrast No. = GTeusaw02 PHASE-11 (STAGE1) SUBSTATIONS - PACKAGE S4 Date 130032016 ‘Name of Substation 66/11KV_AL-MASHAAF S/S Bay Number RTCC-1 ane of Equipment + 40}IVA TRANSFORMER RTC PANEL Nanactrer 7 SEWERS cir 5.1. Heater Sine tem Visual & Operation Checks 1 AC MCB-F101-168 Ok 2. Hygrotherm-H101-240V AC ol, 3 Heater-R101- 240V AC - 100W Ok Heasured voltage in volts eB Status X100:9 - X100:8 X100:10 ~ x100:7 F101-0N 236-4 2364 FLO1-OFF oo od | 5.2. lllumination circuit : Sine Item visual & Operation Checks 1 AC MCB-F101, Be, 2 Door Limit switch-S101 ok, L 3. Lamp-£101-260v ae Measured Voltage in volts eae X100:11 -X100: 6 Fi01-ON 236-4 /__FIO1-OFF a 7 Tested By Witnessed & Verified By _d _ETA/ SIEMENS Mott Mac Donald / KAHRAMAA Name Name Date | apod-201k Date : Doc.No. PH11-8A-10-36-P083 Rev. 0 Annex- 1 Page No. 3 of 7 SITE ACCEPTANCE TEST REPORT FOR 40MVA TRANSFORMER RTGC ACDC CHECKS (RTCC-1) a a RReC | te ee mona nat yeeeran QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. 3 GTCH486A/2012 5.3, Power Socket Circuit: Sino Item ‘Visual & Operation Checks di, AC MCB-F101 ow 2 Socket switch-S100 oe, 3 ‘Socket-X101- 5A/13A AC ok : Measured voltage in volts eee %100:12- x100:5 F101-0N ES FLOL-OFF : oO Sino Socket terminal (X101) Measured voltage in volts L 1 LN - 226-5 - — oe DB N-E i Od Heater Earth point connection checked with Earth OK Lamp Earth point connection checked with Earth ok ‘Socket Earth point connection checked with Earth ok eck: MCB Status Line Side Load side ] ACMCB-ON | L-N Dabs LN! 36h ACMCB-OFF | L-E: ‘22k Loe: ou Tested By Witnessed & Verified By Cc ETA/ SIEMENS Mott Mac Donald / KAHRAMAA sonawe | WY Signature ba Nene [M. Ronusheniam Name | \sDySesH BARS a Date | apng-2016 Date 30-02-2014 [BocNo. | PH11-8A-10-36-PO83. Rev. 0 [Annex- 1] Page No. 4 of 7 = SITE ACCEPTANCE TEST REPORT FOR 40MVA TRANSFORMER RTCC ACDC CHECKS (RTCC-1) | Zens ula oi eafisto—d [TT De intesterserigaa |ntott Macbonate QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. P OTCMBBA2012 PHASE-11 (STAGE1) SUBSTATIONS ~ PACKAGE S4 Date 30.03.2016 Name of Substation = O6/11KV AL-MASHAAF SIS) Bay Number RTCo- [Name of Equipment + 40MVA TRANSFORMER RTCC PANEL Manufacturer 6. DC CIRCUIT CHECKS: Note: F110 (108): Main MCB F111 (2A): Tapcon 260 Communication Circuit F112 (2A): Tapcon 260 F121 (4A): Tapcon 260 BI Circuit F122 (4A): Indication / Auxiliary Circurt During the Test Particular Source MCB ON Remaining MCB Should be OFF. Measured voltage with respect to ground (volts) ocmes status |riio:1] ito:3 | risa:2 | rint:4 | ivz:2 | rtizi4 | rraii2 | pita F110-ON FSi) -O 3 | 45h | - Ol Aw [4S 6] ~ hs | 4154S bls F110-OFF 20 oo oo od of oo oo a0 Measured voltage with respect to ‘aroun (volts) _ DC MCB Status - F122:2 F122: 4 x210:1 x210:2 F110-ON aS? bes ASI b Abb FLL0-OFF BO oo oo | a Measured voltage with respect ta ground (vals) oe DC MCB Status pitta | raiu:3 | xia | xaaa2 | at meat AL: MCL-2 Lieeeattans AS | HOS | 45h | ~olb AS 3 OF | FLLL-OFF oo | oo | oo | oo oo oo ae Measured voltage with respect to ground (volls) : DC MCB Stotus Fuzit F123 xis xan2:2 | atrsua | at: su-2 FL12-0N £ ~Ol's, AShh -F _ | Aes — oF FL12-OFF oo oo oo oo od 0-0 Tested By Witnessed & Verified By ETA/ SIEMENS Mott Mac Donald / KAHRAMAA — 1 Signature Qu. Signature | bar Name__| Ms PagssheTam Name i: Disesn Bap Date 8-03-2016 Date oa 2010 Doc.No. PH11-8A-10-36-P083 Rev. 0 Annex- 1 Page No. 5 of 7 ‘SITE ACCEPTANCE TEST REPORT FOR 40MVA TRANSFORMER RTCC ACDC CHECKS (RTCC-1) so Bion Besson. at | BD | EE ay seam eRnaTIONNL | R= cwwcrcaicnnsiawcomain | Mott MacDonald STEMENS| ‘QATAR POWER TRANSMISSION SYSTEM EXPANSION [Contract No. rromasazo2 | PHASE-11 (STAGE1) SUBSTATIONS ~ PACKAGE S4 Date 03.2016 Name of Substation BS/TTRV ALMASHAAF S'S Bay Number: RTOCA Name of Equipment _ + AOMVA TRANSFORMER RTGG PANEL Manufacturer: SIEMENS Measured voltage with respect t ground (volts) Dc MCB Status riaist | riai3 | aaa | xiai:2 | anuce-xt.33 | anuce-x134 FI21:0N xseb | 3 | +k 6 ~bh2 Sb ~ 642. F121:0FF oOo oo eo oo oO oo A ‘Measured voltage with respect to ground (volts) DC MCB Status FL22:1 F122:3 X122:1, X122:2, X8T:13, K71:A2, _F122:0N 4Sk6 | —ots [ssh ~ora | aSee | eh -_FiRa:oFF on 00 oo od 0:0 od : 1 Teasured voltage with respect to ground (volt) DC MCB Status xat:19 | Kesiaz | xer:19 | Kas:az | «77:53 | Koa:a2 | xer:23 | Ka:a2 FI2z/0N Lasiee | -bbo | 45) °6 [Lob | 486] Ob 3 | 4SiF | bbs _Fuz2:0FF | ew | eo] oo | oo | oe} oo] oo | oO Wieasured voltage with respect to ground (volks) pemcestatus | xsr:38 | K205:a2 | «207:13 | K2ozA:az | K203:61 | K2038:A2 | K2T!25 | K2TL:AZ FARBON, AS | O'3 [457 |-o2 | +o | ob2 [+ Sed | Oly, F122:0FF Oo oo oO oo oo o-0 i Measured voltage with respect to ground (volts) oc mcs status — | xer:165| Keo1:e2 | Ke0:13 | Ha6:x2 | 74:13 | H2ix2 | KSOL:AL | K501:A2 F122:0N asheb | oi [aster | bb [4 yb] 83 [4s | oS” F122:0FF co | oo | od oo] oo | oof oo | ov Tested By Witnessed & Verified By Soe ETA/ SIEMENS Mott Mac Donald / KAHRAMAA soratwe | Quy Signature we Name | MA: Rogosnatiaet sate M-DyiscH GAB — Date 2p-o2-20ih Date BDOR-201h Doc.No. PH11-8A-10-36-P083 Rev. oO Annex- 1 Page No.6 of 7 SITE ACCEPTANCE TEST REPORT FOR 40MVA TRANSFORMER RTCC ACDC CHECKS (RTCC-1) air eonSUTANT CENTRAETOR sw Fon Yo Gyjsocl—a |B | EN eran rennanoua | ere cascewaitannsiins cman | Mott MacDonald | SIEMENS| ‘QATAR POWER TRANSMISSION SYSTEM EXPANSION. [Contract No GroMesA/2012 PHASE-1* (STAGE1) SUBSTATIONS ~ PACKAGE S¢ Date 30.032016 Name of Substation = GS/TTKV ALMASHAAF SS Bay Number: RTOC-1 7] Namo of Equipment + AOMVA TRANSFORMER RTC PANEL Manufacturer: SIEMENS DC Line/Load Voltage Checks: MCB Status Line Side Load side DCMCBF110-ON | +vetoE: She svetoE: orb #vetoE: She |-vetoe: Clue DCMCBFII0-OFF |+vetoE: Shy |-vetoe: 6hb |+vetoE: OD |-vetoE OO MCB Status Line Side oad side DCMCBFII-ON | +vetoE: Syee [-vetoe: Gh [+vetol: Ope [-vetoe Ohe DCMCBFILI-OFF [+vetoE: Ste |-vetoe: og |+tveto& op |-vetoe: OO MCB Status Line Side : Load side DCMCBFIIZ-ON |+vetoE: Sa |-vetoe Gls |+vetoe Ge2 |-vetoe: Ole | DC MCB FII2-0FF [+vetoE: Sha |-vetoE: Oy [+veWE OO |-vetoe oD MCB Status Line Side Load side DCMCBFI2I-ON |+vetoE: Seb |-vetoE: G2 |+veWE ya |-vetoe: Oe DCMCBFI2i-OFF [+vetoE: Sb |-vetoE: gna |+vetoe: op |-vetoE: oo MCB Status | Line Side Load side d DCMCBFI22-ON | +vetoE: Bab |-vetoe: G2 |+vetoe: Shep |-vetoe: 6l2 DCMCBFIZ-0FF [+vetoe: chy [vetoe Ory [+vewe oo |-veE ow 7. INSTRUMENT USED: sno | — Description Make Equipment S.No | Calibration Date | Calibration Due Date 1 Multimeter Fluke / 87V 30770138 11-Jun-2015 44-Jun-2016 ve 8. REMARKS: AC/DC Circuits found healthy: YES / NO Ez Tested By Witnessed & Verified By STA/ SIEMENS Mott Mac Donald / KAHRAMAA sone | MA. Signature we Name [Ms Qagughiem4an Nene KDpiesh Bago | Date Bo. 02-201h a Bo-0g.-2016 DoeNo_| PH11-BA-10-36-P083 Row. o_[Annex- 1 Page No.7 of 7

S-ar putea să vă placă și