6 Producing Wells
TO IGAT 7
24” (4 Km.) KGTP in Aftab 1000
mmscfd
Slug Catcher
Inlet Separation 56”
HC & Water (92 Km.)
Manifold Cluster 2 UG LINE SEA LINE
D.P. Control Unit
(10 Km.) 32” (18 Km.) 32”(1.3 Km.) 11.3
For Export
AGR Unit Mbpd
6 Producing Wells HC Liquid Stab. Unit (5 Km.)
Hot Oil Package
1 Appraisal Well
Kish gas field, in Kish island, is located about 30 Km. east of Lavan island.13
wells were drilled in the field up to now, but they have not been completed due
to the lack of equipment, hence no production.
Disc. Prod. init. Dim. Seismic No. Wells Formation CGR H2S Field OGIP Cumulative Production Current Production Planned Production
Data (Up to now)
109 SCF 109 SCF
6 6
year year kmxkm STB/MMSCF ppm 10 SCF/d 10 SCF/d
2003 N/A 32x25 2D 13 Kangan/ Dalan 4.2-11.3 70-200 Kish 55000 0 0 3000
118 119