0 PROCEDURES
There are 1 case that needs to be completed. Please follow all procedures and relevant
regulations / guidelines.
Guidelines proposed for this cases referring to Panduan Teknik, Cawangan Kejuruteraan
Elektrik, Jabatan Kerja Raya Malaysia :-
A. Guidelines for Schematic Design
B. Switchboards and Distribution System
C. Reticulation Cable Size and Voltage Drop Calculation
D. Power Factor Correction
4.1 Case :
4.1.1 An existing masjid Seremban Jaya requires new air conditioner 3HP -20 unit & 5HP – 4
unit. Existing SSB masjid load without new air conditioner is TCL = 59.19kW, MD =
43.61kW which is supply from the electrical utility company (TNB) with MSB allocate
at Substation TNB with 400 V, 50 Hz supply at 0.85 power factor. The existing MSB at
substation TNB is shown as below:
Page 9 of 15
4.1.2 To Calculate Capacitor bank size requirement. 20 marks
(Mech. Load) 59.68 1.0 11 24 264 0.5 0.9 60º 26º 1.7 0.5 72
Aircond load
Air Cond
3hp 2.238 44.76
5hp 3.730 14.92
a. Total (kVAR) 72
b. Proposed size (kVAR) 80
c. Proposed no. of steps 4
d. Steps' No. 1 2 3 4
e. Bank size (kVAR) 10 10 20 40 80
f. In (A 3ph.) 7.0 13.9 27.8 55.6 111.30
g. Cable size(A) 21.0 28.0 28 28 144.69
4x 1C pvc(mm2) 2.5 4.0 4.0 4.0
h. Contactor 10.4 20.9 41.7 83.5 166.95
Size (A)TPN 20.0 30.0 30.0 30.0
i. MCCB TPN 11.8 23.7 47.3 94.6 189.21
Size (A)TPN 20 30 50 100
j. Incoming A 127.13
k. Proposed size of MCCB
(A) TPN 150
l. Proposed busbar size
[mm](1.5A max per
mm2) 4x6
4.1.3 To Calculate Total Connected Load, Maximum demand and determine diversity factor
20 marks
Map B : Load Details Table
(TCL) Diversity
No. Description Unit Qty (TCL) kW (MD) kW TCL (kW) MD (kW)
kW/unit Factor
MSB Summary of Load Details.
b) DB AC
Air Cond 3 HP Nos. 20 2.238 44.76 1.0 44.76
Air Cond 5 HP Nos. 4 3.730 14.92 1.0 14.92 TCL (Amp) MD (Amp)
Page 10 of 15
4.1.4 From Load Detail Table, Propose upgrading cable, device MCCB and related device for
MSB. Show calculation of voltage drop for each cable. Distance from MSB at Substation
to SSB Masjid is 300 meter. While Distance from SSB to DB masjid & DB AC is 20 meter.
(You may use new sheet for calculation) 20 marks
Page 11 of 15
4.1.5 Design DB AC complete with MCCB incoming/ RCCB/ Busbar/ Load/ Ways/ Cable/ TCL/
MD label.
20 marks
Page 12 of 15
Page 13 of 15
4.2 Discussion:
4.2.1 Base on question 4.1.4 regarding size cable calculation, what is the criteria
for selection cable size?
Voltage Drop and type of cable (single core or multi core and installation type) 5 marks
Page 14 of 15