BAR BENDING SCHEDULE & QUANTITY

Project Tujuh Bukit Copper and Gold Project


Sub Project Secondary OPP
Location project Secondary OPP Title
: Secondary Ore Preparation Plant Generator 2 x 250 kVA
Drawing Reference DWG-SOPP-DWG-CS-113
Shelter Foundation Plan

dia A B C D E
No Member Name Bar Mark Ea Bar Qty Shape
(mm)
mm mm mm mm mm
Rebar Schedule for 2@ Generator 250 kVA
B
Section 2
Genset DWG-
1 Pad Arah SOPP- 1800 4400 600 Stirrups 150 D13 13 2 52 A 434 200
X DWG-CS-
113
B
B
Section 2
Genset DWG-
2 Pad Arah SOPP- 1800 4400 600 Stirrups 150 D13 13 2 124 A 434 200
Y DWG-CS-
113
B
Section 2
DWG-
3 Chair Bar SOPP- 1800 4400 600 Stirrups 150 D13 13 16 16 200 408 200.00
DWG-CS-
113

Section 2
DWG- Top &
4 #M8-150 SOPP- 1800 4400 600 Bottom M8 8 4 4 1,800 4,400
DWG-CS- Bar
113

Rebar Schedule for 2@ Generator 250 kVA PAD & Bund Wall

Section 6 A
Genset DWG-
5 Pad Arah SOPP- 9100 7100 150 Stirrups 150 D13 13 220 220 B E 263 200 79 212 258
X DWG-CS- D
113 C

Section 6
DWG-
4 #M8-150 SOPP- 9100 7100 150 Top rebar 150 M8 8 8 8 9,100 7,100
DWG-CS-
113

Rebar Schedule for 2@ plin


BAR BENDING SCHEDULE & QUANTITY
Project Tujuh Bukit Copper and Gold Project
Sub Project Secondary OPP
Location project Secondary OPP Title
: Secondary Ore Preparation Plant Generator 2 x 250 kVA
Drawing Reference DWG-SOPP-DWG-CS-113
Shelter Foundation Plan

dia A B C D E
No Member Name Bar Mark Ea Bar Qty Shape
(mm)
mm mm mm mm mm

Section 4, C
8 DWG-
Plin 300 B B
5 SOPP- 1650 400 300 Top rebar 150 D13 13 2 21 200 317 274
mm
DWG-CS- A A
113

Section 4, A
8 DWG- C
Plin 300 B B
6 SOPP- 1650 400 300 Stirrups 150 D13 13 2 6 1,550 300 78.00
mm
DWG-CS- A
113

Section 7
Left Bund
DWG-
Bottom
A B B A
7 SOPP- 4000 500 250 D10 10 17 17 258 212 259.00
Wall Rebar
DWG-CS-
113 C

Section 7
DWG-
Left Bund A
8 SOPP- 4000 500 Long Bar 250 D10 10 17 17 457 110
Wall
DWG-CS-
113

Section 7
DWG-
9 #M8-150 SOPP- 4000 500 Top rebar 150 M8 8 2 2 4,000 500
DWG-CS-
113

Section 7
DWG-
10
Left Bund
SOPP- 4000 500
Bottom
250 D10 10 4 4
B B 3,900 250
Wall Bar
DWG-CS-
113 A
BAR BENDING SCHEDULE & QUANTITY
Project Tujuh Bukit Copper and Gold Project
Sub Project Secondary OPP
Location project Secondary OPP Title
: Secondary Ore Preparation Plant Generator 2 x 250 kVA
Drawing Reference DWG-SOPP-DWG-CS-113
Shelter Foundation Plan

dia A B C D E
No Member Name Bar Mark Ea Bar Qty Shape
(mm)
mm mm mm mm mm

Section 7
DWG-
11 #M8-150 SOPP- 4000 3950 Top rebar 150 M8 8 2 2 4,000 3,950
DWG-CS-
113

Section 7
DWG-
Left Bund Bottom
10 SOPP- 4000 3950 250 D10 10 34 34 D 258 212 79.00 476.00
Wall Bar A
DWG-CS-
113
B
C
Rebar Schedule Oil Separator 2200 x 900

Section 9
bottom DWG-
5 Rebar arah SOPP- 2200 900 900
Bottom
Bar
150 D10 10 4 28 A 200 200
y DWG-CS-
113 B
Section 9
bottom DWG-
5 Rebar arah SOPP- 2200 900 900
Bottom
Bar
150 D10 10 2 32 A 200 200
x DWG-CS-
113 B
Section 7
DWG- Wall &
11 #M8-150 SOPP- 5400 2100 Bottom 150 M8 8 2 2 5,400 2,100
DWG-CS- Rebar
113

Sub To
Page
Prepared RF
Checked
: Secondary Ore Preparation Plant Generator 2 x 250 kVA
Rev. Internal Rev.
Shelter Foundation Plan
Rev. Internal Rev.
Rev. 0 Internal Rev.
Date Prepared 2016-10-13
Length of Total
Total Length UoM / Weight
Each Bar Weight
(mm) 12 m Kg/m
(mm) (Kg)

834 43,368 3.61 1.04 45.18

834 103,416 8.62 1.04 107.75

1,416 22,656 1.89 1.04 23.60

3.07 97.11

1,012 222,640 18.55 1.04 231.97

3.07 1524.47
Page
Prepared RF
Checked
: Secondary Ore Preparation Plant Generator 2 x 250 kVA
Rev. Internal Rev.
Shelter Foundation Plan
Rev. Internal Rev.
Rev. 0 Internal Rev.
Date Prepared 2016-10-13
Length of Total
Total Length UoM / Weight
Each Bar Weight
(mm) 12 m Kg/m
(mm) (Kg)

1,308 27,468 2.29 1.04 28.62

3,856 23,136 1.93 1.04 24.11

1,199 20,383 1.70 0.62 12.57

567 9,639 0.80 0.62 5.94

3.07 12.26

4,400 17,600 1.47 0.62 10.85


Page
Prepared RF
Checked
: Secondary Ore Preparation Plant Generator 2 x 250 kVA
Rev. Internal Rev.
Shelter Foundation Plan
Rev. Internal Rev.
Rev. 0 Internal Rev.
Date Prepared 2016-10-13
Length of Total
Total Length UoM / Weight
Each Bar Weight
(mm) 12 m Kg/m
(mm) (Kg)

3.07 96.86

1,025 34,850 2.90 0.62 21.49

400 11,200 0.93 0.62 6.90

400 12,800 1.07 0.62 7.89

3.07 69.52

Sub Total : Lgh@12m Kg


Page
Prepared RF
Checked
: Secondary Ore Preparation Plant Generator 2 x 250 kVA
Rev. Internal Rev.
Shelter Foundation Plan
Rev. Internal Rev.
Rev. 0 Internal Rev.
Date Prepared 2016-10-13
Length of Total
Total Length UoM / Weight
Each Bar Weight
(mm) 12 m Kg/m
(mm) (Kg)
D10 9 66
D13 37 461
D19 0 0
D25 0 0
#M12-150 5400x2100mm 0 Sheets 0
#M8-150 5400x2100mm 29 Sheets 1800
PURCHASE REQUEST FORM
Requested By: Roni Fauzi PRF No: PR.1609250001 Received PR date:

Department: Engineering Date Raised: 24-Sep-16 Entry Pronto date:

Proposed Supplier: Date Required: 8-Oct-16 PIC

Estimate/Quote
No. Part # Item Description Qty UOM Currency Price (per/unit)
(by S/C)
Add Silo 3 x 200 T
1 Deformed Bar D10, 12m per Length 24 Lgh
2 Deformed Bar D19, 12m per Length 40 Lgh
3 Deformed Bar D32, 12m per Length 100 Lgh
4 Wiremesh #M8 - 150 Size 5,4m x 2,4 m 20 Sheets
5 HD-M24-B1-600-120 Anchor Bolt 48 Units
Note:
Anchor bolt material shall be Hot deep Galvanized
C/W with 2 nut + 1 washer + 1 lock washer
Holding downbolt material shall be grade 4.6
Material Certificate Required

Wire mesh Material shall be comply to SNI-07-0663-1989 (Yield Strength of 500 MPa)
Material Certificate Required
Rebar Material shall be comply to SNI-07-2052-2002 '(Round Bar, Yield Strength of 240 MPa)
(Deformed Bar, Yield Strength of 400 MPa)
Rebar shall be delivered to Site in Straight Condition
Material Certificate Required
TOTAL
Approved by, Important Instructions:-
Requested by, Acknowledged by, Checked by cost control Project / Plant Manager All requests must be sent to the Supply Ch
typed and emailed to all.supplychain@bs
End user should endeavour to check to en
Requests for spare parts must include Mo
Any quotation information, & photograph
All requests must include the allocation o
All requests must include an X in a “Reque
Roni Fauzi Arya Perdana
Received PR date: Budgeted :

Entry Pronto date: Yes, No_____________


Un-budgeted

Total Price General Ledger Code/Project #


(by S/C)

-
Important Instructions:-
All requests must be sent to the Supply Chain department. Forms may be either handwritten or
typed and emailed to all.supplychain@bsibatu.com
End user should endeavour to check to ensure sufficient budget exists for a request
Requests for spare parts must include Model/Type, and OEM Part #
Any quotation information, & photographs of samples should be included with form.
All requests must include the allocation of a cost code or Project #
All requests must include an X in a “Requesting Department” box

S-ar putea să vă placă și