Sunteți pe pagina 1din 2

Success Story www.adexa.

com

Samsung Electronics
NETWORKING DIVISION
Adexa Provides Foundation For Unified Planning Environment

"From a strategic With more than 66,000 employees and Just as important, higher inventory levels
perspective, the sales of US$27.2 billion, Samsung (including obsolete materials), some supply
Electronics operates 25 separate shortages, delays in identifying bottlenecks,
company needed
production bases and 59 sales subsidiaries lengthy forecasting cycles, and too many
to increase asset
in 46 countries. Around the world, rush orders were also combining to prevent
utilization, Samsung Electronics is renowned and Samsung from achieving even greater levels
decrease COGS, acclaimed for its broad lines of innovative of efficiency, customer service, and
and increase products that range from semiconductor business success.
market share" components, hard-disk drives, notebook
computers, consumer electronics, and SEEKING MANUFACTURING
"Samsung chose mobile phones, to televisions and home INTELLIGENCE
and implemented appliances such as microwave ovens, In 2000, recognizing that it faced multiple
vacuum cleaners, and refrigerators. opportunities for improvement, Samsung
Adexa’s Supply
initiated a strategic campaign to revamp its
Chain Planning, Samsung Electronics’ Network Division supply chain management efforts.
Factory Planning provides a variety of high-quality Company managers undertook a thorough
and Scheduling, infrastructure solutions for ATM, IP, DSL, 3G and careful analysis of Samsung’s needs
Order Fulfillment, mobile telecommunications networks. This and thoroughly evaluated commercial SCM
and Collaborative division employs more than 2,300 people software offerings. After considering and
Demand Planning and generated revenues of US$1.3 billion rejecting tools from i2 (which was
modules over the and a profit of US$122 million. implemented in other Samsung divisions)
Samsung’s Network Division selected
course of 11
Despite its success and profitability, Adexa’s Enterprise Global Planning System
months"
Samsung’s Network Division -- operating in (eGPS) platform for supply chain planning,
a rapidly changing, highly volatile sector of enterprise performance management, and
the technology industry -- nonetheless intelligent collaboration.
faced a continuous series of internal
manufacturing challenges. From a strategic eGPS helps companies maximize asset
perspective, the company needed to utilization within and beyond the walls of
increase asset utilization, decrease COGS, their factories by providing a local and
and increase market share. global view of supply and demand
requirements and constraints and the
Tactically, customers for its sophisticated insight needed to optimize them for greater
components and solutions were seeking speed and profitability. With the help of
real-time responses to their purchase Adexa consultants, Samsung chose and
requests and order inquiries. Late changes implemented Adexa’s Supply Chain
to orders were creating unacceptable Planning, Factory Planning and Scheduling,
production delays and hampered visibility Order Fulfillment, and Collaborative
into orders and statuses. Demand Planning solutions over the course
of 11 months, creating a unified planning
environment.
Success Story Samsung Electronics www.adexa.com

"From a benefits • Supply Chain Planning – This solution With Adexa eGPS, the Samsung Electronic
standpoint, provides a unified planning environment Network Division has already begun to see
that considers capacity and materials, and measurable improvements in many areas.
Samsung has
provides realistic planning solutions. This Adexa helps Samsung:
enjoyed higher
system represents the entire Samsung
customer Electronics Networking Division supply • Increase forecasting accuracy through
satisfaction and chain and enables planners to quickly consensus-based forecasting, greater plan
lower costs " respond to various planning requests. visibility, and flexible views of products
organizations, and time
• Factory Planning and Scheduling – There • Increase the quality of plans generated through
are separate installations of Adexa’s FPS constrained and unconstrained scenarios,
solution at Samsung Electronics Networking establishing a structure that responds quickly to
plants. Each product division (Mobile, changes, and using rule-based problem solving
Inter/Intra, Data, and Access) has a and optimization
separate Plant Planner module to enable • Shorten the order to delivery time by
each to separately develop de tailed responding quickly to demand changes,
schedules and respond to “within-week” minimizing stock-out by properly allocating
planning events. materials, and focusing on key customers through
strategic buffering
Adexa, Inc. • Collaborative Demand Planning –
5933 West Century Blvd.
Los Angeles, CA 90045 USA
Adexa’s CDP solution provides planning and From a benefits standpoint, Samsung has
sales with new forecasting tools that utilize enjoyed higher customer satisfaction and lower
Tel: 310.338.8444
historical and statistical analysis on costs in the following ways:
Fax: 310.338.9878
forecasts and sales in order to develop a
www.adexa.com collaborative forecast. This solution, • Increasing on-time deliveries
combined with revised business practices • Providing accurate and “best-available” ATP
Adexa's Worldwide Locations helps reduce excess inventory by providing dates to sales reps in real time
North America decision makers with more reliable data. • Providing customers with fast and accurate
CDP also includes a Collaborative Planning order status information
Atlanta, GA
Los Angeles, CA solution with an alert system that monitors • Faster communication of forecasted delays
Norwalk, CT the results of an SCP plan and provides • Reducing planning and production lead times
Toronto, ON
exception-based, online reporting to enable • Responding faster to order modification
Europe planners to quickly respond to late demands requests
Germany and scheduling issues. It also provides • Prioritizing orders based on future sales
United Kingdom Available to Promise dates for all demands potential.
Asia
and forecasts through a regularly scheduled • Reducing on-hand inventory
planning cycle. • Generating capacity-constrained and accurate
Japan
South Korea plans that reduce costly rush orders, expedited
Singapore • Order Fulfillment – Adexa’s Order material purchases, and overtime
Taiwan
Fulfillment solution provides real-time • Optimizing use of sub-contract capacity
available to promise and capable to promise • Accelerating sales forecasts that proactively
information for all FERT and previously reflect changing market conditions.
forecasted products. ATP utilizes SCP to
perform these functions. ATP will also
enable KMAT inquiries utilizing a standard
BOM.

S-ar putea să vă placă și