2.4.11 Filling arrangement including valves, fittings etc.

in industrial water pipe


work for filling of U-seals, drain pots etc.
2.4.12 One no. of Underground Facility Locator including control unit, antennas &
interpretation software for surveying the area before the start of excavation
work so that existing underground facility can be located to avoid fouling with
trestle foundation.
Further expert support towards the data collection in site with Underground
Facility Locator and data analysis during the execution of project shall also be
in the scope of contractor.
2.4.13 Replacement of 30 nos. 3000 mm dia. compensators in existing BF gas network
and 30 nos. 2000 mm dia. compensators in existing CO gas network with SS
bellow type compensators. 5 m length of $2000 mm pipeline in both upstream
& downstream of 30 nos. compensators shall also be changed in the existing
COG header along with the compensators. Further 4 nos. of U-sedvalve each
shall also be installed at suitable locations in existing BF & CO gas network.
The existing network shall be made available for revamping within a period of
30 days (max) after stabilization & performance guarantee of the Alternate
Gas Network.
2.4.14 Flexibility Analysis of pipelines shall be carried out by the Contractor.
2.5 ELECTRICAL
The scope of work of contractor will cover design, engineering, submission of
drawings for approval, manufacture, factory testing, inspection by client /
consultant, packing, loading, forwarding, delivery at Plant site, loading/unloading,
storage, handling of material 1 equipment to erection site, erection, no-load and load
testing, com.uiissioning, PG test, PAT / FAT and liquidating the defects and
handing over all electrics related to shop electrics, drives & control, illumination,
earthing etc. for complete & satisfactory operation of Interplant alternate Gas
network for all units on turnkey basis.
2.5.1 The scope of work will include but not limited to the following:
a) Power Distribution Boards (PDBs)/Sub Distribution Boards (SDBs) for electric
actuators, illumination etc. Quantity of SDBs shall be generally in line with
SLD given in the TS. However the actual will be provided as per
requirement.
b) Rerouting of approx. 500 m HT cable in the COBPP area in fiont of refractory
stores and associated civiVstructural work. Supply and laying of HT cable
including outdoor type termination kit (approx. 500 m cable) (HT cable
specification shall be 11 kV UE 3 x 185 sq mm XPLE) shall be in scope of
contractor. Dismantling of existing overhead conductor system (approx. 500
m) and handover of the same is also included in scope of contractor.
c) Power cable with intermittent ICTPN g the gas line for making provision of
power s~pplyto welding machine foi purposes. ICTPN (CI type)

&'@KC
XGE
2.8
V
CONTRACT DOCUMENT