Powering Bangladesh’s Future
Investment Requirements
Generation & Transmission
TOTAL VALUE (billion in USD)
TRANSMISSION
RENEWABLE ENERGY
HYDRO & RE
DIESEL
FURNACE OIL
NATURAL GAS

$13.92
IMPORTED COAL

$12.47
DOMESTIC COAL

$7.63
$7.53

$5.89
$4.50

$0.50

$0.56

PARTICULARS TOTAL VALUE (billion in USD)


TRANSMISSION $ 7.53
RENEWABLE ENERGY $ 4.5
HYDRO & RE $ 0.5
DIESEL $ 0.56
FURNACE OIL $ 5.89
NATURAL GAS $ 7.63
Key Points
The government of Bangladesh has set a
target to bring the whole country under
electricity coverage by 2021.

Bangladesh requires multibillion dollar


investments in the power sector.

Bangladesh government is increasingly


diversifying the sources of investment.

Innovative funds- Export Credit Agency (ECA)


financing is one of the big innovative ways.

Power Infrastructure is the backbone of


development for a country.
Powering Bangladesh’s Future

12, 071
MW
CURRENT INSTALLED CAPACITY

6, 431
MW
Current Average Demand

34,000
62% MW
Of the Population Projected Energy Demand (2030)
Have access to Electricity

63%
Of Electricity Fuel
Is supplied by Natural Gas

42%
Of Electricity
Is supplied by the Private Sector
Present Installed Generation Capacity
(MW) as on 01 January, 2017.
Public Sector Installed Generation Capacity (MW)
BPDB 4650
APSCL 1200
EGCB 622
NWPGCL 440
RPCL 77
BPDB-RPCL JV 149

Subtotal 7138 (54%)


Private Sector
IPPs 3025
SIPPs (BPDB) 99
SIPPs (REB) 251
15 YR. Rental 169
3/5 YR. Rental 1869
Power Import 600
Subtotal 6,013 (46%)
TOTAL 13,151 *
Present Installed Generation Capacity
(MW) as on 01 January, 2017.

MAXIMUM DEMAND SERVED FAR 9,036 MW 30-06-2016

TRANSMISSION LINES (400 kV) 221 Ckt. K.M FY-2016

TRANSMISSION LINES (230 kV) 3185 Ckt. K.M FY-2016

TRANSMISSION LINES (132 kV) 6487 Ckt. K.M FY-2016


GRID SUB-STATION CAPACITY (400/230/132 kV) 520 MVA FY-2016

GRID SUB-STATION CAPACITY (230/132 kV) 9625 MVA FY- 2016

GRID SUB-STATION CAPACITY (132/33 kV) 15,133 MVA FY- 2016


DISTRIBUTION LINES (33 KV & BELOW) (only BPDB)
41,919 K.M FY-2016
CONSUMER NUMBER 34,57,178 FY-2016
CURRENT FUEL MIX & COST OF GENERATION (TK/UNIT)
CURRENT FUEL MIX

FURNACE OIL
21.11 DIESEL
COAL
8.05
POWER IMPORT
62.59 2.10
4.21 HYDRO
1.94 NATURAL GAS

COST OF GENERATION (TK/UNIT)


25.90

17.95

12.20

8.10

6.20

2.57
DIESEL FURNACE OIL LNG IMPORTED IMPORTED DOMESTIC
COAL POWER GAS
PRIMARY GRID SYSTEM OF BANGLAESH
TO SEE THE
THANKS TO ALL
PRESENTATION

You can find: Email: Skype: Linkedin:


Mukhlasur Rahman mukhlasur26@gmail.com mukhlasur.rahman47 mukhlasurrahman

S-ar putea să vă placă și