SUMMARY OF BILL OF QUANTITIES

PROJECT : ENVIRONMENTAL BUILDING, RIYADH.

FACILITY : SCECO / ELECTRICAL ROOM

S.No. Description Total Amount

1. STRUCTURAL WORK
Page 2.

2. ARCHITECTURAL WORK
Page 3 to 5.

3. PLUMBING WORK
Page 6.

4. HVAC WORK
Page 7.

5. ELECTRICAL WORK
Page 8 to 10.

TOTAL AMOUNT
In Words :

Environmental Bldg.
Page 1
BILL OF QUANTITIES

PROJECT : ENVIRONMENTAL BUILDING, RIYADH.

FACILITY : SCECO / ELECTRICAL ROOM

SECTION : STRUCTURAL WORK

S.No. Description Unit Qty Unit Rate Total Amount

1.0 EARTH WORK :


The size of excavation trench is assumed as
the size of the footing/raft foundation with an
allowance of 1000mm around the raft
foundation.

1.1 Filling and compaction below slab on grade in M3 13


layers up to required level as per drawing.

2.0 ANTI-TERMITE TREATMENT :

2.1 Anti - termite treatment below grade slab. M2 20

3.0 CONCRETE :
Including form work, reinforcement, sundries,
embedded items not included elsewhere,
waterstopper, other concreting materials and
accessories.

3.1 Reinforced concrete for slab on grade. M3 3

3.2 Reinforced concrete for columns above M3 4


grade slab.

3.3 Reinforced concrete for drop beams, solid M3 6


slabs and parapet coping etc.

3.4 Reinforced concrete for trench walls. M3 4

3.5 Reinforced concrete for 400mm thick Hordi M2 20


slab including ribs, cross ribs, hordi blocks,
etc. as per drawing.

4.0 Bituminous paint, 2coats for concrete below M2 52


fill, trench walls/beams, etc.

Page Sub-total

Environmental Bldg.
Page 2
TOTAL STRUCTURAL WORK - SCECO / Electrical Room

Environmental Bldg.
Page 3
PROJECT : ENVIRONMENTAL BUILDING, RIYADH.

FACILITY : SCECO / ELECTRICAL ROOM

SECTION : ARCHITECTURAL WORK

S.No. Description Unit Qty Unit Rate Total Amount

1.0 BLOCK WORK :


Including joint reinforcement, lintels,
miscellaneous concrete wall elements,
other masonry materials and accessories.

1.1 200mm thick CMU. M2 85

2.0 METAL WORKS:


Including jointing materials paint, hardware &
accessories.

2.1 Supply and install Chequered steel plate trench M2 8


cover as per drawing including frames, fixing
accessories and other required materials to
complete the work.

3.0 THERMAL AND MOISTURE


PROTECTION :

3.1 ROOF FINISHES AND PROTECTION

3.1.1 400 x 400 x 20mm concrete paver on cement M2 30


mortar for roof.

3.1.2 4mm thick waterproofing membrane with primer M2 37


including aluminum flashing and sealant.

3.1.3 50mm thick (min.) light weight concrete to slope M2 30

3.1.4 Felt layer protection (2mm thick non-woven M2 37


polyprorylene protective fabric).

4.0 INSULATION :

4.1 50mm thick extruded Polystyrene insulation M2 37


for roof.

Environmental Bldg.
Page 4
Page Sub-total
FACILITY : SCECO / ELECTRICAL ROOM

SECTION : ARCHITECTURAL WORK (Contd . . . )

S.No. Description Unit Qty Unit Rate Total Amount

5.0 DOORS AND FRAMES :


Including glazing, painting, hardware, louver,
attachment materials and accessories
complete as per drawing and schedule.
Actuall clear dimension should be checked
on site prior to final fabrication and
installation.

5.1 Door type D-1, double leaves, swing type, Ea 1


steel door with steel louvers at bottom portion
with metal primer prior to final painting.
( 1.80 x 2.50m )

5.1 Door type D-2, single leaf, swing type, steel Ea 1


door on metal frame with metal primer prior to
final painting. ( 1.00 x 2.20m )

6.0 WINDOWS :
Including glazing, painting, hardware,
attachment materials and accessories
complete as per the drawing and schedule,
checked actual clear dimension on the site
prior to final fabrication and installation.

6.1 Window type W-1, 1.5mm thick fresh air intake Ea 1


steel louver with metal paint finish.
(1.60 x 2.00m ).

7.0 PLASTERING:

7.1 WALL PLASTERING: Including expanded


metal lath and plastering accessories.

7.1.1 Cement plaster for internal walls including M2 92


columns.

7.1.2 Cement plaster for external walls including M2 126


inner face of parapet wall.

7.2 CEILING PLASTERING: Including expanded


metal lath if required and plastering accessories.

7.2.1 Cement plaster for internal ceiling. M2 30

Environmental Bldg.
Page 5
Page Sub-total
FACILITY : SCECO / ELECTRICAL ROOM

SECTION : ARCHITECTURAL WORK (Contd . . . )

S.No. Description Unit Qty Unit Rate Total Amount

8.0 FINISHES :

8.1 FLOOR FINISHES : Including mortar,


grout, sand bed, paint and finishing
treatment.

8.1.1 Concrete screed with floor hardener and epoxy M2 20


coatings.

8.2 BASE:

8.2.1 100mm high Epoxy paint skirting Lm 27

9.0 PAINTING :

9.1 WALL PAINTING:

9.1.1 Emulsion paint finish for internal cement M2 92


plastered walls.

9.1.2 Epoxy coatings for cable trench inner face. M2 30

9.1.3 Textured paint finish on external cement plaster M2 126


wall including parapet inner face.

9.2 CEILING PAINTING :

9.2.1 Textured paint finish on cement plaster slab M2 30


soffit with complete surface preparation.

Page Sub-total

Environmental Bldg.
Page 6
TOTAL ARCHITECTURAL WORK - SCECO / Electrical Room

Environmental Bldg.
Page 7
PROJECT : ENVIRONMENTAL BUILDING, RIYADH.

FACILITY : SCECO / ELECTRICAL ROOM

SECTION : PLUMBING WORK

S.No. Description Unit Qty Unit Rate Total Amount

1.0 FIRE FIGHTING SYSTEM :

1.1 Portable hand held fire extinguisher dry Ea 2


chemical powder, 6Kg capacity complete with
mounting bracket etc (PFE) as per drawing.

2.0 RAIN WATER SYSTEM :

2.1 PIPES AND FITTINGS : Including


jointings, fittings, supports, materials
and all accessories complete in all
aspects.

2.1.1 110mm dia. UPVC pipe, class 4. Lm 5

2.2 Roof drains, 110mm diameter connection Ea 1


with cast iron body and strainer.

Page Sub-total

Environmental Bldg.
Page 8
TOTAL PLUMBING WORK - SCECO / Electrical Room

Environmental Bldg.
Page 9
PROJECT : ENVIRONMENTAL BUILDING, RIYADH.

FACILITY : SCECO / ELECTRICAL ROOM

SECTION : HVAC WORK

S.No. Description Unit Qty Unit Rate Total Amount

1.0 VENTILATION AND EXHAUST


SYSTEM :
Including mounting, control, testing and
commissioning other accessories for complete
installation.

1.1 Wall mounted with gravity shutter.

1.1.1 Type EF-G2, Wall mounted with gravity shutter. Ea 1


Exhaust air - 700 L/S
ESP - 200 Pa.
Motor rating - 0.75kW
Power supply - 230/1/60

1.1.2 Type EF-G3, Wall mounted with gravity shutter.


Exhaust air - 340 L/S Ea 1
ESP - 180 Pa.
Motor rating - 0.25kW
Power supply - 230/1/60

Page Sub-total

Environmental Bldg.
Page 10
TOTAL HVAC WORK - SCECO / Electrical Room

Environmental Bldg.
Page 11
PROJECT : ENVIRONMENTAL BUILDING, RIYADH.

FACILITY : SCECO / ELECTRICAL ROOM

SECTION : ELECTRICAL WORK

S.No. Description Unit Qty Unit Rate Total Amount

1.0 DISTRIBUTION PANELBOARDS:


Supply, installation, testing and
commissioning with main and branch circuit
breakers, including bus bars, supports,
grounding, internal wirings and other
accessories required to complete the work as
per drawings and specifications.

1.1 2000A, 3P, ACB in IP 31 Enclosure, Free Ea 1


Standing.

1.2 2000A, 3P, 3phase, KWHR meter complete Ea 1


with current transformer (CT).

1.3 Enclosed circuit breaker, 30A, 2P, (ECB) Ea 1

2.0 CABLING :
Supply, installation, testing and
commissioning of cables on wall, roof or
ground with suitable G.S clamps, cable racks,
spacers, supports, conduits, cable trays,
grounding, trenching, end connections,
concreting etc. from their corresponding
panelboards/ distribution boards and
transformer. All in accordance with the
drawing and specifications.

2.1 3sets - 4 x 1Cx630 sq.mm + 1Cx300 sq.mm (E) Lm 30


XLPE/PVC copper cable.

3.0 SOCKET OUTLETS / SWITCHES :


Supply, installation, testing and
commissioning of wall mounted type socket
outlets, switches including wirings, trays,
conduiting, supports, grounding, metal boxes
and other required accessories in accordance
with the drawings and specifications

3.1 16A, 250V, 2P + E single earthed socket outlet. Ea 5

3.2 20A, 250V, 1 way, 1 gang switch. Ea 3

Environmental Bldg.
Page 12
Page Sub-total
FACILITY : SCECO / ELECTRICAL BUILDING

SECTION : ELECTRICAL WORK (Contd . . . )

S.No. Description Unit Qty Unit Rate Total Amount

4.0 LIGHTING SYSTEM:


Supply, installation, testing and commissioning
of the following lighting fixtures including wiring,
conduiting grounding, metal boxes, supports,
hangers, controls, concreting, civil works and
other accessories required to complete the
work as per specification. Electronic ballast for
all fluorescent.

4.1 Type F1, lighting fixture 2 x 28W, T5, G5 linear Ea 4


fluorescent surface mounted luminaire with
clear prismatic acrylic diffuser moisture proof
housing of injection moulded in grey vandal
resistant polycarbonate coil-rolled steel sheet
reflector painted with oven-dried white
epoxy-polyster and with electronic control gear.

4.2 Type F1E lighting fixture, same as type F1 Ea 2


except with emergency battery back-up of 3
hours duration for 1 lamp, maintained.

5.0 FIRE ALARM SYSTEM :


Supply and installation of conduits and boxes
for fire alarm system including wiring,
supports, cable trays and fixing accessories
etc. as per drawings and specifications.

5.1 Addressable smoke detector. Ea 2

5.2 Addressable manual call station, weatherproof Ea 1


type.

5.3 Addressable electronic sounder. Ea 1

5.4 Interface unit (IFU). Ea 1

6.0 GROUNDING SYSTEM:


Supply, installation, testing and commissioning
of grounding and lightning protection system
including copper rod, rebar jumper connections,
all accessories with the following materials as
per drawings and specification.

Environmental Bldg.
Page 13
6.1 Ground bar, 6 way with disconnect link Ea 2

Page Sub-total
FACILITY : SCECO / ELECTRICAL BUILDING

SECTION : ELECTRICAL WORK (Contd . . . )

S.No. Description Unit Qty Unit Rate Total Amount

6.2 95mm2 soft drawn bare copper wire bonding Lm 6


conductor.

6.3 70mm2 soft drawn bare copper wire bonding Lm 6


conductor.

7.0 Supply materials for metered circuit breaker Job 1


RMU with load break switches, withdrawable
1-630A, CB and extensible RMU, 3P, 13.8kV
cubicles including 1-1000kVA transformer,
13.8kV-400/230V, 3PH. These cubicles shall
be in accordance to SCECO/SEC standard
requirements. Installation shall be executed or
subcontractor. This scope of work also include
HV cable from SCECO/SEC available 13.8kV
tapping point, miscellaneous fees and other
requirements for medium voltage power
connection and energizing the system as per
SEC standard. (Contractor to verify the site for
the actual existing incoming voltages).

Page Sub-total

Environmental Bldg.
Page 14
TOTAL ELECTRICAL WORK - SCECO / Electrical Room