CALCULATION FOR PIPE SPLICING D3 = HOLE FOR GALVANIZING = 1/2D1

a
b M20 HSB
c T1

D1 a2
D2

T2
RIB PLATE

e r

2r

Dimension:

D1 = 101.6 x 4.5 mm (Hollow Pipe, mm)


D2 = 291.6 mm (Diameter end Plate)
D3 = 50.8 mm (Hole Diameter end Plate)
D4 = 190 mm (Bolt Circle Diameter)

a = 15 mm (End Plate, mm)


b = 65 mm (Rib Plate, mm)
c = 15 mm (Rib Plate, mm)
a1 = 90.8 mm
a2 = 90.8 mm
a3 = 0 mm
n1 = 1 pcs
n2 = 2 pcs
n3 = 1 pcs
M1 = 102640 kg cm
M2 = 102640 kg cm
M3 = 0 kg cm

1. Moment & Shear Capacity Check

P actual = 2624 kg Beam Force form staad output


M actual = 34763 kg cm Moment Force from staad output
D bolt M20 = 2.0 cm
Ab = 3.14 cm2 Cross section area of bolts
T = Φ tension * Fy * A = 5652.00 kg (Tension Capacity M20)
V = Φ shear * Fy * A = 3014.40 kg (Shear Capacity M20)

M design=M1 + M2 + M3
M design=(T1 x a1) + (T2 x a2) + (T3 x a3) = 205281 kg cm

V design = (V1 x n1)+(V2 x n2)+(v3 x n3) = 12058 kg

Moment ChecK:
M actual < M design = Design OK

Shear ChecK:
V actual < V design = Design OK
2. Thickness of End Plate Check

a1

T = P actual

a2

t plate

P actual = 2624 kg Beam Force form staad output


M actual = 17381.5 kg cm Moment Force from staad output
t plate = 2.4 cm

M design = 1/4 P (a1 + a2) = 54742 kg cm

Fb = 0.6 x Fy = 1440 kg/cm2


Section Modulus
(Sx design = 1/6 (a1+a2) (t 2) = 17.43 cm3 (Design)
(Sx actual = M actual / 0.75 Fy) = 9.66 cm3 (Actual)