TOOL BOX TALK

8TH September 2010


SITE TRAFFIC REGULATIONS, MODIFIED DRUMS & PTW SYSTEM
PTW SYSTEM INSIDE BARRICADED AREA
Obtain necessary work permit issued by Q-chem
Operation (Q-Chem PTW System) and received
20 by Contractor/ subcontractor Lead Workers; All
supporting documents shall be available at site
prior to issue the permit, according to the
typology of the work to be done;
Always maintain 20Km/h Speed while on site The Safety Plan for the Start Up operation shall
be followed; All personnel entering into the
SITE TRAFFIC REGULATIONS: barricaded areas shall wear the Nomex Coverall
The site is a work area and as such, speed must (FRC); All personnel shall have a valid Hazcom
be controlled for all Equipment/Vehicles at all Card in order to be allowed to enter the
times. The speed limit on site roads is 20Km/Hr. barricaded areas P-Pass card shall be attached at
PARKING: gate’s P-Pass Board before entering the
There are dedicated Parking lots on site. Vehicles barricaded area and shall be collected when
must never be parked elsewhere, where they exiting from that area. All Managers and
block access / Fire hydrants. Where there are no Supervisor entering the barricaded areas need to
parking lots and a vehicle is parked, keys must attend the Module # 44 Training and shows the
be left on the ignition so that they could be proper sticker in the helmet.
removed during emergency. No vehicle must be
parked in a RESTRICTED AREA on site. In an
emergency, drivers must park on road shoulders
and move to the nearest muster point.

MODIFIED DRUMS OBJECTS:


Modified thinners drum used to collect garbage,
the modification i.e. particularly opened top All sources of ignition are strictly forbidden inside
cover has created a serious laceration type the barricaded area (i.e. mobile phones, lighters,
hazard. etc); only Intrinsically Safe radios are allowed
inside;
PTW SYSTEM OUTSIDE BARRICADED AREA
Until further notice, all work to be executed
outside of barricaded areas shall be done by
issuing a Contractor PTW, which shall be co-
signed by Q-Chem Operation Personnel. The
Permit Issuer & receiver must ensure full controls
are in place at the work site and communicate
clearly with the Co-signator, and any anomalies
found by either party, must be rectified prior to
the Permit being issued.
Contractor Area Safety Officer shall be contacted
DO NOT CUT DRUMS IN by the Permit receiver or Issuer in order to track
THIS FASHION all PTW issued in that area.
TOOL BOX TALK RECORD

LOCATION…………………… DATE………………

SECTION:.……………………………………
SUBJECT:………………………………………………………………………….
S/ I.D.
N NAME NO. SIGN. S/N NAME I.D. NO. SIGN.
1 31
2 32
3 33
4 34
5 35
6 36
7 37
8 38
9 39
10 40
11 41
12 42
13 43
14 44
15 45
16 46
17 47
18 48
19 49
20 50
21 51
22 52
23 53
24 54
25 55
26 56
27 57
28 58
29 59
30 60
CONDUCTED BY: SUPERVISOR’S SIGNATURE
------------------------------------------------ -------------------------------------

S-ar putea să vă placă și