Sunteți pe pagina 1din 13

Market Sounding for Coal Power Plant

Jakarta, Februari 2018

Proper Emas 2017


PLTU Paiton 1 & 2
1 The Purpose

Upcoming Coal Power Plant


2
Projects

3 Question & Answer


The Purpose

1. To gather information about Product information and specification


(via questionnaire)
2. To gather information about Manufacturing capacity & capability
and publishing price (via questionnaire)
3. To know about manufacturer’s interest to participate in PLN
upcoming coal power plant project.

www.pln.co.id | 3
1 The Purpose

Upcoming Coal Power Plant


2
Projects

3 Question & Answer


Upcoming Coal Power Plant Projects
No Project Location Capacity Boiler’s type Construction
period
2x 50 MW
(month)
1 PLTU Timor-1 NTT CFB
Tipe Boiler 2x 50 MW CFB 36/39
2 PLTU Palu-3 Sulawesi Tengah 2x 50 MW CFB 36/39
3 PLTU Sulut-1 Sulawesi Utara 2x 50 MW CFB 36/39
2x 50 MW Tipe Boiler PC
4 PLTU Bangka Bangka belitung 2x 50 MW CFB 36/39
5 PLTU Sumbawa NTB 2x 50 MW CFB 36/39
6 PLTU Toli-toli Sulawesi Tengah 2x 25 MW CFB 33/36

Source of fund : APLN

www.pln.co.id | 5
Location

Group 2
6. TOLI - TOLI (CFB) : 2x25 MW

6 2
1

Group 1
1. PALU-3 (CFB) : 2x50 MW
5 2. SULUT-1 (CFB) : 2x50 MW
3. TIMOR-1 (CFB) : 2x50 MW
4. BANGKA (CFB) : 2x50 MW
3 5. SUMBAWA (CFB) : 2x50 MW

www.pln.co.id | 6
Qualification Criteria (1)
1. Bidder Qualification
• The Bidder shall be registered under the laws of his country.
• The Bidder shall be Joint Venture/ Joint Operation/ Consortium shall consist of :
• The Leader of Joint Venture/Joint Operation/Consortium shall be a Local Company
listed in the Pre-Approved EPC Contractor List (DPT), and
• Manufacturer of Boiler listed in the PLN’s Pre-Approved Major Equipment Vendor of
Boiler List (DPT – Daftar Penyedia Terseleksi) , and
• O&M company shall be local company or Foreign Company which has diplomatic
relation with Indonesia,
If the Joint Venture/ Joint Operation/ Consortium consist of 4 members, the other member
shall be listed in the Pre-Approved Contractor List (DPT) or State Owned Company.

www.pln.co.id | 7
Qualification Criteria (2)
2. Financial Capability
• D&B Rating
• Cashflow
• Credit Rating
3. Technical Capability
4. Experience

www.pln.co.id | 8
PLN’s Pre-Approved CFB BOILER & EPC Contractor List
DPT EPC ≥ 50 MW DPT EPC ≥ 50 MW
LOKAL OECD
• PT. Poeser Indonesia • Doosan Heavy Industries and Construction Co., Ltd.
• PT. Rekayasa Industri • POSCO E & C Co., Ltd
• PT. Rekadaya Elektrika • Mitsubishi Corporation
• PT. Inti Karya Persada Teknik • Marubeni Corporation
• PT. Bagus Karya • Sumitomo Corporation
• PT. Wijaya Karya • ITOCHU Corporation
• PT. Truba Jaya Engineering • TECNIMONT Sp.A

DPT BOILER
CFB
• Doosan Heavy Industries & Construction (DHIC)
• PT Thyssenkrupp Industrial Solutions Indonesia
• PT Valmet
• Rafako SA
• Sumitomo Heavy Industries, Ltd.
• The Babcock & Wilcox Company

www.pln.co.id | 9
Procurement Implementation
• The Bidder is allowed to bid for more than 1 (one) location.
• If bidder participate in more than 1 (one) location then Joint Venture/ Joint
Operation/ Consortium shall consist of the same member for every location.
• Each location has its own contract.
• PLN will consider regarding the capability of the manufacturer to execute the
project at the same time. Evaluate based on SKP (Sisa Kemampuan Paket).

www.pln.co.id | 10
1 The Purpose

Upcoming Coal Power Plant


2
Projects

3 Question & Answer


Question & Answer
THANK YOU

S-ar putea să vă placă și