Sunteți pe pagina 1din 8

CONSRUCTION OF METRO TRAIN DEPOT CUM WORKSHOP AT APPARAL PARK ON EAST WEST CORRIDOR OF

AHMEDABAT METRO RAIL PROJECT PHASE – 1


Inspection & Test Plan for : Brick Masonry Work
Inspection & Test Plan No : URC/MEGA/BW/ITP/001/REV00
INSPECTION & TEST PLAN
Sl. Activity / Method of Reference Format of
Charecterstics to be checked Friquency Acceptable tolerance
No. Process Check Document Record
1 a. Bricks Source to be tested for following for approval
1.1 -Dimentional tolerance IS 3495/1597
Lab. Test
1.2 - Water absorption for Brick Lab. Test IS 3495/1597
IS 3459/ IS 1077/IS Third party
Once Per Source
1597 Lab. Report
1.3 IS 3495/1597
- Compressive strength only for Brick Lab. Test
1.4 IS 3495/1597
- Effluorescence only for Brick Lab. Test

b. Incoming Material Inspection


IS 3495/1597 URC/MEGA/Q
Dimentional tolerance Field lab. AQC/F-033
IS 3495/1597
Water absorption Field lab. 20 nos for every 100000 nos of IS 3459/ IS 1077/IS
Brick Work bricks/each source 1597 URC/MEGA/Q
IS 3495/1597
compressive strength Field lab. AQC/F-034
IS 3495/1597
Effluorescence Field lab.
2 C. Ensure Masonry work is done as per Tech.Specification
2.1 Cement mortar proportioning Visual Random

2.2 Check for bond / closures thickness


of joints and Masonry. Visual Random

Lines, levels, and plumb in brickwork IS 2212 / IS 2250 / URC/MEGA/Q


2.3 IS 2645 / IS1597 / As Per Procedure AQC/F-035,
raking of joints , keys in brickwork Measurement Random
IS 1124 Rev 01
2.4 Curing Visual Random

2.5 Check for Reinforcement, if


applicable Visual Random
P - Performer,RM - 10% Random Checking on site for Ins.offered qty., W - 100% Notification of operation in advance to disignated responsible
CONSRUCTION OF METRO TRAIN DEPOT CUM WORKSHOP AT APPARAL PARK ON EAST WEST CORRIDOR OF
AHMEDABAT METRO RAIL PROJECT PHASE – 1
Inspection & Test Plan for : Brick Masonry Work
Inspection & Test Plan No : URC/MEGA/BW/ITP/001/REV00
INSPECTION & TEST PLAN
Sl. Activity / Method of Reference Format of
Charecterstics to be checked Friquency Acceptable tolerance
No. Process Check Document Record
1 a. Bricks Source to be tested for following for approval
1.1 -Dimentional tolerance IS 3495/1597
Lab. Test
1.2 - Water absorption for Brick Lab. Test IS 3495/1597
IS 3459/ IS 1077/IS Third party
Once Per Source
1597 Lab. Report
1.3 IS 3495/1597
- Compressive strength only for Brick Lab. Test
1.4 IS 3495/1597
- Effluorescence only for Brick Lab. Test

b. Incoming Material Inspection


IS 3495/1597 URC/MEGA/Q
Dimentional tolerance Field lab. AQC/F-033
IS 3495/1597
Water absorption Field lab. 20 nos for every 100000 nos of IS 3459/ IS 1077/IS
Brick Work bricks/each source 1597 URC/MEGA/Q
IS 3495/1597
compressive strength Field lab. AQC/F-034
IS 3495/1597
Effluorescence Field lab.
2 C. Ensure Masonry work is done as per Tech.Specification
2.1 Cement mortar proportioning Visual Random

2.2 Check for bond / closures thickness


of joints and Masonry. Visual Random

Lines, levels, and plumb in brickwork IS 2212 / IS 2250 / URC/MEGA/Q


2.3 IS 2645 / IS1597 / As Per Procedure AQC/F-035,
raking of joints , keys in brickwork Measurement Random
IS 1124 Rev 01
2.4 Curing Visual Random

2.5 Check for Reinforcement, if


applicable Visual Random
R -100% Review & Signed of Report , M - Monitor
CONSRUCTION OF METRO TRAIN DEPOT CUM WORKSHOP AT APPARAL PARK ON EAST WEST CORRIDOR OF
AHMEDABAT METRO RAIL PROJECT PHASE – 1
Inspection & Test Plan for : Brick Masonry Work
Inspection & Test Plan No : URC/MEGA/BW/ITP/001/REV00
INSPECTION & TEST PLAN
Sl. Activity / Method of Reference Format of
Charecterstics to be checked Friquency Acceptable tolerance
No. Process Check Document Record
1 a. Bricks Source to be tested for following for approval
1.1 -Dimentional tolerance IS 3495/1597
Lab. Test
1.2 - Water absorption for Brick Lab. Test IS 3495/1597
IS 3459/ IS 1077/IS Third party
Once Per Source
1597 Lab. Report
1.3 IS 3495/1597
- Compressive strength only for Brick Lab. Test
1.4 IS 3495/1597
- Effluorescence only for Brick Lab. Test

b. Incoming Material Inspection


IS 3495/1597 URC/MEGA/Q
Dimentional tolerance Field lab. AQC/F-033
IS 3495/1597
Water absorption Field lab. 20 nos for every 100000 nos of IS 3459/ IS 1077/IS
Brick Work bricks/each source 1597 URC/MEGA/Q
IS 3495/1597
compressive strength Field lab. AQC/F-034
IS 3495/1597
Effluorescence Field lab.
2 C. Ensure Masonry work is done as per Tech.Specification
2.1 Cement mortar proportioning Visual Random

2.2 Check for bond / closures thickness


of joints and Masonry. Visual Random

Lines, levels, and plumb in brickwork IS 2212 / IS 2250 / URC/MEGA/Q


2.3 IS 2645 / IS1597 / As Per Procedure AQC/F-035,
raking of joints , keys in brickwork Measurement Random
IS 1124 Rev 01
2.4 Curing Visual Random

2.5 Check for Reinforcement, if


applicable Visual Random

0 11/22/2016 For Review & Approval


CONSRUCTION OF METRO TRAIN DEPOT CUM WORKSHOP AT APPARAL PARK ON EAST WEST CORRIDOR OF
AHMEDABAT METRO RAIL PROJECT PHASE – 1
Inspection & Test Plan for : Brick Masonry Work
Inspection & Test Plan No : URC/MEGA/BW/ITP/001/REV00
INSPECTION & TEST PLAN
Sl. Activity / Method of Reference Format of
Charecterstics to be checked Friquency Acceptable tolerance
No. Process Check Document Record
1 a. Bricks Source to be tested for following for approval
1.1 -Dimentional tolerance IS 3495/1597
Lab. Test
1.2 - Water absorption for Brick Lab. Test IS 3495/1597
IS 3459/ IS 1077/IS Third party
Once Per Source
1597 Lab. Report
1.3 IS 3495/1597
- Compressive strength only for Brick Lab. Test
1.4 IS 3495/1597
- Effluorescence only for Brick Lab. Test

b. Incoming Material Inspection


IS 3495/1597 URC/MEGA/Q
Dimentional tolerance Field lab. AQC/F-033
IS 3495/1597
Water absorption Field lab. 20 nos for every 100000 nos of IS 3459/ IS 1077/IS
Brick Work bricks/each source 1597 URC/MEGA/Q
IS 3495/1597
compressive strength Field lab. AQC/F-034
IS 3495/1597
Effluorescence Field lab.
2 C. Ensure Masonry work is done as per Tech.Specification
2.1 Cement mortar proportioning Visual Random

2.2 Check for bond / closures thickness


of joints and Masonry. Visual Random

Lines, levels, and plumb in brickwork IS 2212 / IS 2250 / URC/MEGA/Q


2.3 IS 2645 / IS1597 / As Per Procedure AQC/F-035,
raking of joints , keys in brickwork Measurement Random
IS 1124 Rev 01
2.4 Curing Visual Random

2.5 Check for Reinforcement, if


applicable Visual Random

Rev Date Revisions Prepared by Reviewed By


Responsibility
URC GEC MEGA

R R R

R R R

R R R

R R R

P RM M

P RM M

P RM M

P RM M

P W M

P W M

P W M

P W M

P W M
Responsibility
URC GEC MEGA

R R R

R R R

R R R

R R R

P RM M

P RM M

P RM M

P RM M

P W M

P W M

P W M

P W M

P W M
Responsibility
URC GEC MEGA

R R R

R R R

R R R

R R R

P RM M

P RM M

P RM M

P RM M

P W M

P W M

P W M

P W M

P W M
Responsibility
URC GEC MEGA

R R R

R R R

R R R

R R R

P RM M

P RM M

P RM M

P RM M

P W M

P W M

P W M

P W M

P W M

Recommended and
Approved By

S-ar putea să vă placă și