Form completion guidance: ได้มาจากแบบฟอร์ม Original Form completion guidance: ต ัวแก้ไขให้ตรงก ับ Daily Report

This form is used to Assignment in each unit or all RCI


Block 1. Enter the name of project Block 1. Enter the name of project
Block 2. Enter location of work , E.g. : CT2 Nakhon sawan Block 2. Enter location of work ,CT4 TAK
Block 3. Enter the report date (dd / mm / yyyy), E.g. : 23 / 11 /2017 Block 3. Enter the report date
Block 4. Enter time in Block 4. Enter Manpower
Block 5. Enter Period RT time -Item
Block 6. Enter Period film processing time -Position
Block 7. Enter time out -Name
Block 8. Enter Note -Time In
Block 9. Enter the request date (dd / mm / yyyy), E.g. : 23 / 11 / 2017 -Working time
Block 10. Enter test method -Processing time
- X-ray -Time Out
- Gamma-ray Block 5. Enter Request No.
- Ect. Block 6. Enter Inspection Method
Block 11. Enter type product Block 7. Request
- Mainline -New
- WQT -Backlog
- Tie-in -Repair
- Ect. -R/S
Block 12. Enter RT request -Total joints
- New Block 8. Enter for work
- Backlog - Period working
- Repair - RT done
- Reshoot Block 9. Enter Inspection Result
Block 13. Enter for work - Accept
- Period working - Reject
- RT done - Reshoot
Block 12. Enter RT result Block 10. Enter RT backlog
- Accept Block 11. Enter Remark
- Reject - Request No.
- Reshoot - Joint No.
Block 15. Enter RT backlog - New
Block 16. Enter Summary film reject and reshoot -Backlog
Block 17. Enter Manpower, Name, Position and Work time of each person -Repair
-Cause of Backlog
-Total
Block 12. Enter Prepared By
Block 13. Reviewed / Apporved By