Job Number Sheet

101 F1
Job Title
BULDING 1
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com HORIZONTAL LINE
E-Mail : mail@prokon.com Calcs by Checked by Date

Column Base Design : Default single column example: ULS stability checks
C15
Input Data

Base length A (m) 3.7


Base width B (m) 3
Column(s) Col 1 Col 2
C (m) 0.70
D (m) 0.20
E (m)
F (m)
Stub column height X (m) 0.001
Base depth Y (m) 0.60
Soil cover Z (m) 1.2
Concrete density (kN/m3) 25
Soil density (kN/m3) 18
Soil friction angle (°) 22
Base friction constant 0.5
Rebar depth top X (mm) 50
Rebar depth top Y (mm) 60
Rebar depth bottom X (mm) 50
Rebar depth bottom Y (mm) 60
ULS ovt. LF: Self weight 0.9
ULS LF: Self weight 1.4
Max. SLS bearing pr. (kN/m²) 150
S.F. Overturning (ULS) 1
S.F. Slip (ULS) 1
fcu base (MPa) 28
fcu columns (MPa) 28
fy (MPa) 400
Job Number Sheet
101 F2
Job Title
BULDING 1
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com HORIZONTAL LINE
E-Mail : mail@prokon.com Calcs by Checked by Date

Loading Data

Unfactored Loads

Load Col LF LF P Hx Hy Mx My
Case no. ULS ULS (kN) (kN) (kN) (kNm) (kNm)
ovt

1 1 1.5 1.5 1250

Sketch of Base

BS8110 - 1997 Y

C1 X
D1
B

A
Y

Mx
P
Z

Hx X
Y
Job Number Sheet
101 F3
Job Title
BULDING 1
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com HORIZONTAL LINE
E-Mail : mail@prokon.com Calcs by Checked by Date

Output for Load Case 1


Note: The calculated flexural reinforcement was used in the calculations.

Output for Load Case 1


Soil pressure (ULS) (kN/m²) 220.16
Soil pressure (SLS) (kN/m²) 149.21
SF overturning (SLS) >100
SF overturning (ULS) >100
Safety Factor slip (ULS) >100
Safety Factor uplift (ULS) >100
Bottom
Design moment X (kNm/m) 190.00
Reinforcement X (mm²/m) 1045
Design moment Y (kNm/m) 165.51
Reinforcement Y (mm²/m) 928
Top
Design moment X (kNm/m) 0.00
Reinforcement X (mm²/m) 0
Design moment Y (kNm/m) 0.00
Reinforcement Y (mm²/m) 0
Linear Shear X (MPa) 0.295
vc (MPa) 0.377
Linear Shear Y (MPa) 0.263
vc (MPa) 0.365
Linear Shear Other (MPa) 0.000
Punching Shear (MPa) 0.233
vc (MPa) 0.372
Cost 3351.67

Load Case:1 Legend


Max M (+)
BS8110 - 1997Y Y Max M (-)
Max Shear

0.70 X 0.70 X
3.00

3.00

0.20 0.20

3.70 3.70
Y Y

Mx Mx
P P
1.20

1.20

Hx 0.00 Hx 0.00
0.60 0.60

149.21 kN/m² 220.16 kN/m²


Soil Pressures at SLS Soil Pressures at ULS
Job Number Sheet
101 F4
Job Title
BULDING 1
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com HORIZONTAL LINE
E-Mail : mail@prokon.com Calcs by Checked by Date

Reinforcement Calculation for X-direction:Positive Moments

Load Case 1

Design moment:190.00 kNm/m

Calculation of the maximum steel strain:

f st
est =
Es
347.83
=
200000
= 0.0017

Balanced neutral axis

d
xb =
est
1+
ec
550
=
.00174
1+
.0035
= 367.366 mm

%redis
bb = 1 -
100
0
=1 -
100
= 1.0000

Maximum allowed neutral axis depth: 3.2.2.1

x = min(d/(1+est/ec) , (bb-0.4)*d) = 367.427 mm

Depth of rectangular stress block:

a = b. x
= .9 ×275
= 247.500 mm

Concrete moment capacity: 3.4.4.4


Job Number Sheet
101 F5
Job Title
BULDING 1
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com HORIZONTAL LINE
E-Mail : mail@prokon.com Calcs by Checked by Date

a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
247.5
= 247.5 × 550 - ×1000 ×.66667 ×.66667 ×28 ×1×10-6
2
= 1 312.863 kNm

Lever arm 3.4.4.4

M
z = d . 0.5 + 0.25 -
2 a f b . d 2 . f cu
. . .

1900×105
= 550 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×550 2 ×28
= 535.751 mm

Lever arm limitation 3.4.4.4

z = min(535.751 , 0.95*550.000) = 522.500 mm

Tension steel 3.4.4.4

M
Ast =
f st . z
1900×105
=
347.83 ×522.5
= 1 045.443 mm²

Neutral axis depth 3.4.4.4

2 . (d - z )
Neutralaxis=
b
2 ×(550 - 522.5 )
=
.9
= 61.111 mm

Reinforcement Calculation for Y-direction:Positive Moments

Load Case 1

Design moment:165.51 kNm/m

Calculation of the maximum steel strain:


Job Number Sheet
101 F6
Job Title
BULDING 1
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com HORIZONTAL LINE
E-Mail : mail@prokon.com Calcs by Checked by Date

f st
est =
Es
347.83
=
200000
= 0.0017

Balanced neutral axis

d
xb =
est
1+
ec
540
=
.00174
1+
.0035
= 360.687 mm

%redis
bb = 1 -
100
0
=1 -
100
= 1.0000

Maximum allowed neutral axis depth: 3.2.2.1

x = min(d/(1+est/ec) , (bb-0.4)*d) = 360.747 mm

Depth of rectangular stress block:

a = b. x
= .9 ×270
= 243.000 mm

Concrete moment capacity: 3.4.4.4

a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
243
= 243 × 540 - ×1000 ×.66667 ×.66667 ×28 ×1×10-6
2
= 1 265.557 kNm
Job Number Sheet
101 F7
Job Title
BULDING 1
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com HORIZONTAL LINE
E-Mail : mail@prokon.com Calcs by Checked by Date

Lever arm 3.4.4.4

M
z = d . 0.5 + 0.25 -
2 . a . f . b . d 2 . f cu
1655×105
= 540 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×540 2 ×28
= 527.392 mm

Lever arm limitation 3.4.4.4

z = min(527.391 , 0.95*540.000) = 513.000 mm

Tension steel 3.4.4.4

M
Ast =
f st . z
1655×105
=
347.83 ×513
= 927.499 mm²

Neutral axis depth 3.4.4.4

2 . (d - z )
Neutralaxis=
b
2 ×(540 - 513 )
=
.9
= 60.000 mm

Punching Shear Stress/Reinforcement Calculation

Load Case 1

Column number:1

The shear force outside the critical perimeter amounts to:1059.00 kN

Calculation of required punching shear reinforcement:

Area used for shear


Job Number Sheet
101 F8
Job Title
BULDING 1
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com HORIZONTAL LINE
E-Mail : mail@prokon.com Calcs by Checked by Date

Ash = ucrit . d
= 8340 ×545
6
= 4.545×10 mm²

% Rebar in X - direction tab 3.11

100 . Asx
F1x =
xb. d
100 ×2 441.1
=
2335 ×545
= 0.1918

% Rebar in Y - direction tab 3.11

100 . Asy
F1y =
yb. d
100 ×1 702.1
=
1835 ×545
= 0.1702

tab 3.11

F2 = 1

tab 3.11

0.79 .
v cx = F1x0.33333 . F20.25
1.25
0.79
= ×.19183 0.33333 ×1 0.25
1.25
= 0.3645 MPa

tab 3.11

0.79 .
v cy = F1y0.33333 . F20.25
1.25
0.79
= ×.17019 0.33333 ×1 0.25
1.25
= 0.3502 MPa

Weighted average of vc
Job Number Sheet
101 F9
Job Title
BULDING 1
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com HORIZONTAL LINE
E-Mail : mail@prokon.com Calcs by Checked by Date

v cx. nx. xb + v cy. ny. yb


vc =
nx. xb + ny. yb
.36449 ×2 ×2335 + .35024 ×2 ×1835
=
2 ×2335 + 2 ×1835
= 0.3582 MPa

Actual shear stress

Veff
vv =
Ash
1059×103
=
4545×103
= 0.2330 MPa

tab 3.11

f cu 0.33333
F3 =
25
28 0.33333
=
25
= 1.038

tab 3.11

v c = v c_. F3
= .35822 ×1.0385
= 0.3720 MPa

Shear capacity without reinforcement

vc. Ash
Vcap =
1000
.37201 ×4545×103
=
1000
= 1 690.785 kN

The concrete shear capacity for this perimeter is sufficient: no shear reinforcement required

Shear Stress/Reinforcement Calculation for Y-direction


Job Number Sheet
101 F10
Job Title
BULDING 1
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com HORIZONTAL LINE
E-Mail : mail@prokon.com Calcs by Checked by Date

Load Case 1

Design shear force:141.89 kN


Based on flexural reinforcement of:928 mm²/m

Shear Calculations:
Area used for shear calculations:

Ash = bw. de - (bw - bf ). bf


= 1000 ×540 - (1000 - 0 )×0
= 540.0×103 mm²

Reinforcement ratio 3.4.5.4-6

Ast
F1 =
Ash
927.55
=
540000
= 0.0017

f 1 = f 1i . 100
= .00172 ×100
= 0.1720

F1 = min(3 , F1) = 0.172

F1 = max(0.15 , F1) = 0.172 3.4.5.4-6

f2 = 1

0.79 . 0.33333 . 0.25


vc = F1 F2
1.25
0.79
= ×.17177 0.33333 ×1 0.25
1.25
= 0.3513 MPa

f cu 0.33333
F3 =
25
28 0.33333
=
25
= 1.038
Job Number Sheet
101 F11
Job Title
BULDING 1
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com HORIZONTAL LINE
E-Mail : mail@prokon.com Calcs by Checked by Date

v c = v c1. F3
= .35132 ×1.0385
= 0.3648 MPa

Maximum allowable shear stress

v cu = 0.8 . f cu
= 0.8 × 28
= 4.233 MPa

vcu = min(5 , vcu) = 4.233

Actual Shear stress:

V . 1×103
v=
Ash
141.89 ×1×103
=
540000
= 0.2628 MPa

Shear force capacity

Vco = v c. Ash. 1×10-3


-3
= .36484 ×540000 ×1×10
= 197.014 kN

Shear reinforcement Table 3.16

(v - v c). b
Asv/sv =
0.95 . f yv
(.26276 - .36484 )×1000
=
0.95 ×400
= -0.2686

Minimum links Table 3.16

0.40 . b
Asv/svn =
0.95 . f yv
0.40 ×1000
=
0.95 ×400
= 1.053
Job Number Sheet
101 F12
Job Title
BULDING 1
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com HORIZONTAL LINE
E-Mail : mail@prokon.com Calcs by Checked by Date

Schematic reinforcement of Base

R10-SA
20Y14-A-150 (B1) E F E

E F E
SECTION: col1
col1

25Y14-B-150 (B2)

4Y20-E +
PLAN 2Y16-F
3R10-SA

A
BBBBBBBBBBBBBBBBBBBBBBBBB

SECTION