Documente Academic
Documente Profesional
Documente Cultură
2010
General Information
DustChek
Description and Ingredients:
DustChek is a powdered concentrate of acrylamide, surfactants and binders
which when mixed with water forms a liquid co-polymer. (liquid soil stabiliser)
The principal function of this product is to impart improved strength to the host
material in both dry and wet conditions. In conjunction with sound maintenance
techniques the inclusion of DustChek enables higher densities to be achieved in
•Road surface stabilisation a wide variety of materials with the added benefit of delivering a very high
degree of water resistance and increased flexibility to the treated layer. This
•Remediation of Dispersive 'hydrophobic action' assists in maintaining the improved dry pavement strength
Soils during wet cycles.
•Wear Course Improvement
Improved pavement strength (improved CBR) is achieved through efficient
•Sediment and Erosion particle lubrication and increased water/DustChek viscosity which in turn
Control creates a higher degree of densification and therefore internal friction within
•Improvements to Clays, the treated host material. This in turn results in increased modulus (stiffness)
Silts, Sands, Gravels and in the stabilised layer upon drying back.
Crushed Rock What DustChek delivers:
•Dust Control to surface and
DustChek will deliver increased wear course strength, increased flexibility, and
underground soil surfaces a very high degree of water resistance delivering large reductions in dust
emissions from the treated layer. The treated area resists block cracking,
fatigue and shrinkage cracking.
Uses:
Wear course improvement - natural ground and unsealed gravel roads
Stabilisation of sub-grades to increase strength and prevent water softening
Capping of sub-grade layers during construction to prevent traffic damage,
water softening and excess dust emission
Remediation of sodic soils to prevent piping (tunneling)
Haul road and hardstand dust control
For detailed information
contact: Weather proofing and dust control of road materials and stockpiles
Dust and sediment control for open areas, batters and drains
SEALS Group Installation:
143-157 Harrison Road
Cedar Vale DustChek installation can be achieved using stabilising machines, grader
mixing or by a correctly designed watering program
Qld, 4285
Australia Installation can be quoted the same as for neat water. (i.e. scarify, wet mix
and re-compact or programmed watering)
Ph. 61 7 5543 1053 Stabilising machine installation can also be quoted as for neat water.
Ops manager - 0414 185 493 There is no extra time taken to use DustChek and no extra equipment or
info@seals-group.com machinery is required for competent installation.
www.seals-group.com Stabilisation depth requirements:
Job by job as requirements will vary.
copyright © 2010
SEALS Group - Specialist sub-contractor
GENERAL SPECIFICATIONS
2010
DustChek
Technical Specifications
Technical classification Typical Water Savings
DustChek delivers high levels of soil stability and DustChek delivers increased strength (higher CBR),
hence, competent dust control and water savings. increased flexibility and a very high degree of water
Stabilised areas are always re-workable and treated resistance to the host material. These introduced soil
material can be stockpiled for extended periods. properties also deliver remediation of dispersive soils
and reactive clays.
DustChek is approved for use in water catchment
areas. DustCheck is environmentally inert and is Testing
listed with Eco-Buy Victorian Centre for Environ-
National testing protocol available upon request
mental Purchasing, and NSW Local Government
Sustainable Choice.
Carbon Footprint comparison
Plant requirements
Traditional stabilisation product - 1,500 Kg of CO2 is
Installation of the product can be competently stabilise 100 ton of pavement material at a standard
2% rate.
achieved by standard grader crews, stabilisation
machines or programmed watering.
DustChek product - 5 Kg of CO2 is produced to
Packaging
Global supply, technical assistance and major client
arrangements contact -
Two Kilogram recyclable plastic bottles
admin@dmgcivil.com
Suggested Dosage rates - wet or dry
Haul road improvement - improving wear courses on mining roads can be effected using on-site equipment
and is easily managed to reduce dust, water use and maintenance requirements - Tertiary clay at Jellinbah coal
Hardstand stabilisation and dust control - wear course stabilisation and dust control of hard stands can be
completed with standard equipment saving costs - Lay down area, BMA Crinum mine
High level of water resistance - This re-sheet was stabilised with DustChek, the shoulders were not - 2009
flooding, Emerald, Qld
copyright © 2010
SEALS Group - Specialist sub-contractor
SUMMARY OF BENEFITS AND ADVANTAGES
2010
DustChek
Flexible layer
Non-leeching
Non corrosive
Environmentally sound
OH&S compliant
Cost negative
No shrinkage cracking
No fatigue cracking
No transport costs
‘It’s
all
about
improving
and
preserving
the
dry
strength
of
the
available
material’
copyright © 2010
SEALS Group - Specialist sub-contractor
RECENT PROJECTS AND MAJOR CLIENTS